Limitation on Claims Against Proposed Public Transportation Projects, 38200-38201 [2018-16682]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
38200
Federal Register / Vol. 83, No. 150 / Friday, August 3, 2018 / Notices
to 5:00 p.m., Monday through Friday,
except Federal holidays.
SUPPLEMENTARY INFORMATION: Notice is
hereby given that FTA has taken final
agency action by issuing a certain
approval for the public transportation
project listed below. The actions on the
project, as well as the laws under which
such actions were taken, are described
in the documentation issued in
connection with the project to comply
with the National Environmental Policy
Act (NEPA) and in other documents in
the FTA administrative record for the
project. Interested parties may contact
either the project sponsor or the FTA
Regional Office for more information.
Contact information for FTA’s Regional
Offices may be found at https://
www.fta.dot.gov.
This notice applies to all FTA
decisions on the listed project as of the
issuance date of this notice and all laws
under which such actions were taken,
including NEPA [42 U.S.C. 4321–4375],
Section 4(f) requirements [23 U.S.C.
138, 49 U.S.C. 303], Section 106 of the
National Historic Preservation Act [16
U.S.C. 470f], and the Clean Air Act [42
U.S.C. 7401–7671q]. This notice does
not, however, alter or extend the
limitation period for challenges of
project decisions subject to previous
notices published in the Federal
Register. The project and action that is
the subject of this notice follow:
Project name and location: The Geary
Corridor Bus Rapid Transit (BRT)
Project in San Francisco, California.
Project Sponsor: The San Francisco
Municipal Transportation Authority
(SFMTA), in coordination with San
Francisco County Transportation
Authority (SFCTA). Project description:
The purpose of the Geary Corridor BRT
Project is to enhance the performance,
viability, and comfort level of transit
and pedestrian travel along a 6.5-mile
BRT corridor that connects to the
Transbay Transit Center in northern San
Francisco, California. The Geary
corridor is a major thoroughfare,
accommodating more than 50,000 daily
person trips via public transit; auto
volumes up to 44,000 vehicles per day;
and tens of thousands of daily
pedestrian trips. The project will
implement BRT service with a
combination of side-running and centerrunning bus-only lanes as well as within
mixed-flow travel lanes along different
segments of the 6.5-mile corridor. The
project will implement higher-frequency
bus service, new BRT stations,
improvements to pedestrian features,
and upgrades to traffic signals,
including fiber-based transit signal
priority to optimize bus service.
VerDate Sep<11>2014
18:26 Aug 02, 2018
Jkt 244001
Physical roadway and lane changes
would occur between Market Street and
34th Avenue while bus service
amenities and improvements would be
provided along the Geary corridor from
the Transbay Transit Center to 48th
Avenue. The proposed project was the
subject of the Geary Corridor Bus Rapid
Transit Project Final Environmental
Impact Statement (Final EIS)/Record of
Decision (ROD), dated June 1, 2018. The
project’s notice of availability for the
Final EIS was published in the Federal
Register on June 15, 2018.
Final agency actions: Section 4(f)
determination, dated June 1, 2018;
Section 106 finding of no adverse effect
on historic properties dated October 17,
2017; project-level air quality
conformity; and ROD, dated June 1,
2018. Supporting documentation: The
Geary Corridor Bus Rapid Transit
Project Final Environmental Impact
Statement (Final EIS) with Record of
Decision, dated June 1, 2018.
Elizabeth S. Riklin,
Deputy Associate Administrator for Planning
and Environment.
[FR Doc. 2018–16684 Filed 8–2–18; 8:45 am]
BILLING CODE P
DEPARTMENT OF TRANSPORTATION
Federal Transit Administration
Limitation on Claims Against Proposed
Public Transportation Projects
Federal Transit Administration
(FTA), DOT.
ACTION: Notice.
AGENCY:
This notice announces final
environmental actions taken by the
Federal Transit Administration (FTA)
for the Regional Transportation
Commission of Washoe County’s
(RTC’s) Virginia Street Bus RAPID
Transit Extension project in Washoe
County, Nevada. The project includes
construction of a 1.8-mile extension to
its existing bus rapid transit service (the
RAPID) operating in the Virginia Street
corridor from its existing northern
terminus at the 4th Street Station
transfer terminal in Downtown Reno to
the University of Nevada, Reno campus.
The purpose of the project is to increase
transit ridership and connectivity,
enhance pedestrian safety, and improve
accessibility to transit in the Virginia
Street corridor. The purpose of this
notice is to announce publicly the
environmental decisions by FTA on the
subject project and to activate the
limitation on any claims that may
challenge this final environmental
action.
SUMMARY:
PO 00000
Frm 00085
Fmt 4703
Sfmt 4703
By this notice, FTA is advising
the public of final agency actions
subject to 23 U.S.C. 139(l). A claim
seeking judicial review of FTA actions
announced herein for the listed public
transportation project will be barred
unless the claim is filed on or before
December 31, 2018.
FOR FURTHER INFORMATION CONTACT:
Nancy-Ellen Zusman, Assistant Chief
Counsel, Office of Chief Counsel, (312)
353–2577, or Alan Tabachnick,
Environmental Protection Specialist,
Office of Environmental Programs, (202)
366–8541. FTA is located at 1200 New
Jersey Avenue SE, Washington, DC
20590. Office hours are from 9:00 a.m.
to 5:00 p.m., Monday through Friday,
except Federal holidays.
SUPPLEMENTARY INFORMATION: Notice is
hereby given that FTA has taken final
agency action by issuing a certain
approval for the public transportation
project listed below. The actions on the
project, as well as the laws under which
such actions were taken, are described
in the documentation issued in
connection with the project to comply
with the National Environmental Policy
Act (NEPA) and in other documents in
the FTA administrative record for the
project. Interested parties may contact
either the project sponsor or the FTA
Regional Office for more information.
Contact information for FTA’s Regional
Offices may be found at https://
www.fta.dot.gov.
This notice applies to all FTA
decisions on the listed project as of the
issuance date of this notice and all laws
under which such actions were taken,
including NEPA [42 U.S.C. 4321–4375],
Section 4(f) requirements [23 U.S.C.
138, 49 U.S.C. 303], Section 106 of the
National Historic Preservation Act [16
U.S.C. 470f], and the Clean Air Act [42
U.S.C. 7401–7671q]. This notice does
not, however, alter or extend the
limitation period for challenges of
project decisions subject to previous
notices published in the Federal
Register. The project and action that is
the subject of this notice follow:
Project name and location: The
Regional Transportation Commission of
Washoe County’s (RTC’s) Virginia Street
Bus RAPID Transit Extension project in
Washoe County, Nevada.
Project Sponsor: The Regional
Transportation Commission of Washoe
County’s (RTC’s). Project description:
The project includes construction of a
1.8-mile extension to its existing bus
rapid transit service (the RAPID)
operating in the Virginia Street corridor
from its existing northern terminus at
the 4th Street Station transfer terminal
in Downtown Reno to the University of
DATES:
E:\FR\FM\03AUN1.SGM
03AUN1
Federal Register / Vol. 83, No. 150 / Friday, August 3, 2018 / Notices
Nevada, Reno campus. The purpose of
the project is to increase transit
ridership and connectivity, enhance
pedestrian safety, and improve
accessibility to transit in the Virginia
Street corridor. The project includes
building five new RAPID stations and
replacing three bus shelters with full
RAPID stations; acquiring right-of-way;
and creating exclusive bus lanes, traffic
signal priority at five intersections, offboard fare collection, level boarding,
and real-time bus arrival information at
stations. The project also includes
purchasing two electric buses,
constructing two roundabouts at
intersections to improve bus turning
movements and enhance traffic
operations and safety, and improving
sidewalk and cross walk infrastructure
to enhance the pedestrian and bicycle
network and visibility in the corridor.
Finally, the project includes parking
and access management, utility
relocations and drainage improvements.
The project was the subject of the
Virginia Street Bus RAPID Transit
Extension Project Environmental
Assessment, dated June 2018.
Final agency actions: Section 4(f)
determination, dated June 12, 2018;
Section 106 of the NHPA finding of No
Adverse Effect, dated March 17, 2017;
project-level air quality conformity; and
Finding of No Significant Impact
(FONSI), dated June 15, 2018.
Supporting documentation: The
Virginia Street Bus RAPID Transit
Extension Project Environmental
Assessment in Washoe County, Nevada,
dated June 2018.
Elizabeth S. Riklin,
Deputy Associate Administrator for Planning
and Environment.
[FR Doc. 2018–16682 Filed 8–2–18; 8:45 am]
BILLING CODE P
DEPARTMENT OF TRANSPORTATION
National Highway Traffic Safety
Administration
[Docket No. NHTSA–2018–0055]
New Car Assessment Program
National Highway Traffic
Safety Administration (NHTSA),
Department of Transportation (DOT).
ACTION: Notice of public meeting;
request for comments.
amozie on DSK3GDR082PROD with NOTICES1
AGENCY:
NHTSA’s New Car
Assessment Program (NCAP) provides
comparative information on the safety of
new vehicles to assist consumers with
vehicle purchasing decisions.
Significant changes to NCAP have been
SUMMARY:
VerDate Sep<11>2014
18:26 Aug 02, 2018
Jkt 244001
either suggested by NHTSA or
mandated by Congress in recent years.
In December 2015, Congress mandated
that NHTSA conduct a rulemaking
requiring that crash avoidance
information be placed on the Monroney
label of new vehicles. Later that same
month, NHTSA published a ‘‘request for
comments’’ (RFC) in which it sought
public comments on planned changes to
NCAP. This notice announces a public
meeting to obtain up-to-date stakeholder
input on the way forward for NCAP.
DATES: NHTSA will hold the public
meeting on September 14, 2018, from 9
a.m. to 5 p.m., Eastern Daylight Time.
Check-in will begin at 8 a.m. Attendees
should arrive by 8 a.m. to allow
sufficient time for security clearance. In
addition to this meeting, the public will
have the opportunity to submit written
comments to the docket for this notice
concerning matters addressed in this
notice.
The public meeting will be
held at DOT Headquarters, located at
1200 New Jersey Avenue SE,
Washington, DC 20590–0001 (Green
Line Metro station at Navy Yard) in the
Oklahoma City Conference Room. This
facility is accessible to individuals with
disabilities.
FOR FURTHER INFORMATION CONTACT: You
may contact Ms. Jennifer N. Dang,
Division Chief, New Car Assessment
Program, Office of Crashworthiness
Standards (Telephone: 202–366–1810).
SUPPLEMENTARY INFORMATION:
ADDRESSES:
I. Background
This notice announces the holding of
a public meeting on September 14,
2018, to obtain up-to-date stakeholder
input for use in planning the future of
NCAP. The impetus for this meeting
comes from developments relating to
two events in December 2015. On
December 4, 2015, the Fixing America’s
Surface Transportation (FAST) 1 Act
was signed into law, which includes a
mandate that NHTSA conduct a
rulemaking to require the incorporation
of crash avoidance information on the
vehicle price stickers (also known as the
Monroney labels) placed on the
windows of new vehicles. On December
16, 2015, NHTSA announced in a
Federal Register ‘‘request for
comments’’ (RFC) 2 its plan to add new
tools and techniques to NCAP.
NHTSA received nearly 300 sets of
written comments on its December 2015
RFC.3 The commenters included vehicle
1 §§ 24321–22,
Public Law 114–94.
FR 78521, December 16, 2015.
3 The comments are available in Docket No.
NHTSA–2015–0119 at www.regulations.gov.
38201
manufacturers, automotive suppliers,
associations of vehicle manufacturers
and suppliers, consumer advocacy
groups, universities, and other
individuals and organizations interested
in vehicle safety. NHTSA also received
oral comments at two public hearings,
the first in Detroit, Michigan on January
14, 2016, and the second at DOT
Headquarters in Washington, DC on
January 29, 2016.4
Commenters across the spectrum
raised a number of issues involving both
data and procedures. Commenters stated
the public comment period was
inadequate for purposes of responding
because of the complexity of the
program upgrade, and that the technical
information supporting the RFC was not
sufficient to allow a full understanding
of the contemplated changes. According
to the commenters, this hindered their
ability to prepare substantive public
comments.
In addition, most vehicle
manufacturers stated that the significant
cost burden due to fitment of the
contemplated new technologies and the
inclusion of a new crash test and new
test devices would increase the price of
new vehicles. Manufacturers, along with
safety advocates, also expressed the
need for data demonstrating that each
proposed program change would
provide enough safety benefits to
warrant its inclusion in NCAP. Safety
and consumer advocates recommended
that NCAP award credit only if the
technologies meet certain human
machine interface requirements. In
addition, several commenters suggested
that NHTSA develop near-term and
long-term roadmaps for NCAP and
revise NCAP in a more gradual,
‘‘phased’’ approach.
Furthermore, commenters suggested
that most of the planned NCAP
upgrades, including the new rating
system, should only be adopted through
a process similar in rigor to that of a
notice and comment rulemaking
conducted under the Administrative
Procedure Act. Lastly, certain vehicle
manufacturers were concerned that
changing future vehicle designs in order
to respond to a NCAP upgrade would
have an adverse effect on compliance
with fuel economy and greenhouse gas
emissions requirements.
In light of the public comments and
NHTSA’s FAST Act mandate, NHTSA is
requesting oral and written comments
from the public to help guide the
Agency in planning its next steps for
NCAP. The Agency continues to believe
that NCAP needs to be modernized to
2 80
PO 00000
Frm 00086
Fmt 4703
Sfmt 4703
4 The transcripts are available in Docket No.
NHTSA–2015–0119 at www.regulations.gov.
E:\FR\FM\03AUN1.SGM
03AUN1
Agencies
[Federal Register Volume 83, Number 150 (Friday, August 3, 2018)]
[Notices]
[Pages 38200-38201]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-16682]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Transit Administration
Limitation on Claims Against Proposed Public Transportation
Projects
AGENCY: Federal Transit Administration (FTA), DOT.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice announces final environmental actions taken by the
Federal Transit Administration (FTA) for the Regional Transportation
Commission of Washoe County's (RTC's) Virginia Street Bus RAPID Transit
Extension project in Washoe County, Nevada. The project includes
construction of a 1.8-mile extension to its existing bus rapid transit
service (the RAPID) operating in the Virginia Street corridor from its
existing northern terminus at the 4th Street Station transfer terminal
in Downtown Reno to the University of Nevada, Reno campus. The purpose
of the project is to increase transit ridership and connectivity,
enhance pedestrian safety, and improve accessibility to transit in the
Virginia Street corridor. The purpose of this notice is to announce
publicly the environmental decisions by FTA on the subject project and
to activate the limitation on any claims that may challenge this final
environmental action.
DATES: By this notice, FTA is advising the public of final agency
actions subject to 23 U.S.C. 139(l). A claim seeking judicial review of
FTA actions announced herein for the listed public transportation
project will be barred unless the claim is filed on or before December
31, 2018.
FOR FURTHER INFORMATION CONTACT: Nancy-Ellen Zusman, Assistant Chief
Counsel, Office of Chief Counsel, (312) 353-2577, or Alan Tabachnick,
Environmental Protection Specialist, Office of Environmental Programs,
(202) 366-8541. FTA is located at 1200 New Jersey Avenue SE,
Washington, DC 20590. Office hours are from 9:00 a.m. to 5:00 p.m.,
Monday through Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION: Notice is hereby given that FTA has taken
final agency action by issuing a certain approval for the public
transportation project listed below. The actions on the project, as
well as the laws under which such actions were taken, are described in
the documentation issued in connection with the project to comply with
the National Environmental Policy Act (NEPA) and in other documents in
the FTA administrative record for the project. Interested parties may
contact either the project sponsor or the FTA Regional Office for more
information. Contact information for FTA's Regional Offices may be
found at https://www.fta.dot.gov.
This notice applies to all FTA decisions on the listed project as
of the issuance date of this notice and all laws under which such
actions were taken, including NEPA [42 U.S.C. 4321-4375], Section 4(f)
requirements [23 U.S.C. 138, 49 U.S.C. 303], Section 106 of the
National Historic Preservation Act [16 U.S.C. 470f], and the Clean Air
Act [42 U.S.C. 7401-7671q]. This notice does not, however, alter or
extend the limitation period for challenges of project decisions
subject to previous notices published in the Federal Register. The
project and action that is the subject of this notice follow:
Project name and location: The Regional Transportation Commission
of Washoe County's (RTC's) Virginia Street Bus RAPID Transit Extension
project in Washoe County, Nevada.
Project Sponsor: The Regional Transportation Commission of Washoe
County's (RTC's). Project description: The project includes
construction of a 1.8-mile extension to its existing bus rapid transit
service (the RAPID) operating in the Virginia Street corridor from its
existing northern terminus at the 4th Street Station transfer terminal
in Downtown Reno to the University of
[[Page 38201]]
Nevada, Reno campus. The purpose of the project is to increase transit
ridership and connectivity, enhance pedestrian safety, and improve
accessibility to transit in the Virginia Street corridor. The project
includes building five new RAPID stations and replacing three bus
shelters with full RAPID stations; acquiring right-of-way; and creating
exclusive bus lanes, traffic signal priority at five intersections,
off-board fare collection, level boarding, and real-time bus arrival
information at stations. The project also includes purchasing two
electric buses, constructing two roundabouts at intersections to
improve bus turning movements and enhance traffic operations and
safety, and improving sidewalk and cross walk infrastructure to enhance
the pedestrian and bicycle network and visibility in the corridor.
Finally, the project includes parking and access management, utility
relocations and drainage improvements. The project was the subject of
the Virginia Street Bus RAPID Transit Extension Project Environmental
Assessment, dated June 2018.
Final agency actions: Section 4(f) determination, dated June 12,
2018; Section 106 of the NHPA finding of No Adverse Effect, dated March
17, 2017; project-level air quality conformity; and Finding of No
Significant Impact (FONSI), dated June 15, 2018. Supporting
documentation: The Virginia Street Bus RAPID Transit Extension Project
Environmental Assessment in Washoe County, Nevada, dated June 2018.
Elizabeth S. Riklin,
Deputy Associate Administrator for Planning and Environment.
[FR Doc. 2018-16682 Filed 8-2-18; 8:45 am]