Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Units 2 and 3, 37529 [2018-16402]

Download as PDF Federal Register / Vol. 83, No. 148 / Wednesday, August 1, 2018 / Notices 9. The estimated number of hours needed annually to comply with the information collection requirement or request: 75 hours. 10. Abstract: The Debt Collection Improvement Act of 1996 requires that agencies collect TINs from individuals who do business with the Government, including contractors and recipients of credit, licenses, permits, and benefits. The TIN will be used to process all electronic payments (refunds) made to licensees by electronic funds transfer by the Department of the Treasury. The Department of the Treasury will use the TIN to determine whether the refund can be used to administratively offset any delinquent debts reported to the Treasury by other government agencies. In addition, the TIN will be used to collect and report to the Department of the Treasury any delinquent indebtedness arising out of the licensee’s or applicant’s relationship with the NRC. III. Specific Requests for Comments The NRC is seeking comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the estimate of the burden of the information collection accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology? Dated at Rockville, Maryland, this 26th day of July 2018. For the Nuclear Regulatory Commission. David Cullison, NRC Clearance Officer, Office of the Chief Information Officer. [FR Doc. 2018–16401 Filed 7–31–18; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION sradovich on DSK3GMQ082PROD with NOTICES [Docket Nos. 50–277 and 50–278; NRC– 2018–0130] Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Units 2 and 3 Nuclear Regulatory Commission. ACTION: License renewal application; receipt. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) has received an SUMMARY: VerDate Sep<11>2014 20:07 Jul 31, 2018 Jkt 244001 application for the subsequent license renewal of Renewed Facility Operating License Nos. DPR–44 and DPR–56, which authorize Exelon Generation Company, LLC (the applicant) to operate Peach Bottom Atomic Power Station Units 2 and 3 (Peach Bottom). The renewed licenses would authorize the applicant to operate Peach Bottom for an additional 20 years beyond the period specified in each of the current renewed licenses. The current renewed operating licenses for Peach Bottom expire as follows: Unit 2 on August 8, 2033, and Unit 3 on July 2, 2034. DATES: The license renewal application referenced in this document was submitted on July 10, 2018. ADDRESSES: Please refer to Docket ID NRC–2018–0130 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0130. Address questions about NRC dockets to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Bennett M. Brady, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 2941, email: Bennett.Brady@nrc.gov. SUPPLEMENTARY INFORMATION: The NRC has received an application (ADAMS Package Accession No. ML18193A689) from Exelon Generation Company, LLC PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 37529 (Exelon or the applicant), dated July 10, 2018, filed pursuant to Section 103 of the Atomic Energy Act of 1954, as amended, and part 54 of title 10 of the Code of Federal Regulations, to renew the operating licenses for Peach Bottom. Renewal of the licenses would authorize the applicant to operate the facility for an additional 20-year period beyond the period specified in the respective current renewed operating licenses. The current renewed operating licenses for Peach Bottom expire as follows: Unit 2 on August 8, 2033, and Unit 3 on July 2, 2034. The Peach Bottom units are boiling water reactors located in Delta, PA, about 17.9 miles south of Lancaster, PA. The acceptability of the tendered application for docketing, and other matters, including an opportunity to request a hearing, will be the subject of subsequent Federal Register notices. A copy of the subsequent license renewal application for Peach Bottom is also available for inspection near the site at the Harford County Public Library: Whiteford Branch, 2407 Whiteford Rd, Whiteford, MD 21160. Dated at Rockville, Maryland, this 26th day of July 2018. For the Nuclear Regulatory Commission. Emmanuel C. Sayoc, Acting Chief, License Renewal Projects Branch, Division of Materials and License Renewal, Office of Nuclear Reactor Regulation. [FR Doc. 2018–16402 Filed 7–31–18; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2018–0159] Interim Staff Guidance for Decommissioning Funding Plans for Materials Licensees Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on its draft Interim Staff Guidance (ISG) on Decommissioning Funding Plans (DFP) for materials licensees. The purpose of this ISG is to provide the NRC staff and the industry with guidance based on recent developments and lessons learned in financial assurance since the last update to NUREG–1757, Vol. 3, Rev. 1, ‘‘Consolidated Decommissioning Guidance Financial Assurance, Recordkeeping, and Timeliness’’ (NUREG–1757, Vol. 3). SUMMARY: E:\FR\FM\01AUN1.SGM 01AUN1

Agencies

[Federal Register Volume 83, Number 148 (Wednesday, August 1, 2018)]
[Notices]
[Page 37529]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-16402]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-277 and 50-278; NRC-2018-0130]


Exelon Generation Company, LLC; Peach Bottom Atomic Power Station 
Units 2 and 3

AGENCY: Nuclear Regulatory Commission.

ACTION: License renewal application; receipt.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has received an 
application for the subsequent license renewal of Renewed Facility 
Operating License Nos. DPR-44 and DPR-56, which authorize Exelon 
Generation Company, LLC (the applicant) to operate Peach Bottom Atomic 
Power Station Units 2 and 3 (Peach Bottom). The renewed licenses would 
authorize the applicant to operate Peach Bottom for an additional 20 
years beyond the period specified in each of the current renewed 
licenses. The current renewed operating licenses for Peach Bottom 
expire as follows: Unit 2 on August 8, 2033, and Unit 3 on July 2, 
2034.

DATES: The license renewal application referenced in this document was 
submitted on July 10, 2018.

ADDRESSES: Please refer to Docket ID NRC-2018-0130 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0130. Address 
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Bennett M. Brady, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2941, email: [email protected].

SUPPLEMENTARY INFORMATION: The NRC has received an application (ADAMS 
Package Accession No. ML18193A689) from Exelon Generation Company, LLC 
(Exelon or the applicant), dated July 10, 2018, filed pursuant to 
Section 103 of the Atomic Energy Act of 1954, as amended, and part 54 
of title 10 of the Code of Federal Regulations, to renew the operating 
licenses for Peach Bottom. Renewal of the licenses would authorize the 
applicant to operate the facility for an additional 20-year period 
beyond the period specified in the respective current renewed operating 
licenses. The current renewed operating licenses for Peach Bottom 
expire as follows: Unit 2 on August 8, 2033, and Unit 3 on July 2, 
2034. The Peach Bottom units are boiling water reactors located in 
Delta, PA, about 17.9 miles south of Lancaster, PA. The acceptability 
of the tendered application for docketing, and other matters, including 
an opportunity to request a hearing, will be the subject of subsequent 
Federal Register notices.
    A copy of the subsequent license renewal application for Peach 
Bottom is also available for inspection near the site at the Harford 
County Public Library: Whiteford Branch, 2407 Whiteford Rd, Whiteford, 
MD 21160.

    Dated at Rockville, Maryland, this 26th day of July 2018.

    For the Nuclear Regulatory Commission.

Emmanuel C. Sayoc,
Acting Chief, License Renewal Projects Branch, Division of Materials 
and License Renewal, Office of Nuclear Reactor Regulation.
[FR Doc. 2018-16402 Filed 7-31-18; 8:45 am]
 BILLING CODE 7590-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.