Notice of Availability of the Environmental Assessment for the Proposed Texas Eastern Transmission, LP, Lambertville East Expansion Project, 36584-36585 [2018-16233]
Download as PDF
36584
Federal Register / Vol. 83, No. 146 / Monday, July 30, 2018 / Notices
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on August 22, 2018.
Dated: July 24, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–16234 Filed 7–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–26–000]
daltland on DSKBBV9HB2PROD with NOTICES
Notice of Availability of the
Environmental Assessment for the
Proposed Texas Eastern
Transmission, LP, Lambertville East
Expansion Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Lambertville East Expansion Project,
proposed by Texas Eastern
Transmission, LP (Texas Eastern) in the
above-referenced docket. Texas Eastern
requests authorization to replace two
existing natural gas-fired turbine
compressor engines and appurtenant
facilities at their existing Lambertville
Compressor Station in Hunterdon
County, New Jersey.
The EA assesses the potential
environmental effects of the
construction and operation of the
Lambertville East Expansion Project in
accordance with the requirements of the
National Environmental Policy Act. The
FERC staff concludes that approval of
the proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The proposed Lambertville East
Expansion Project includes
abandonment by removal of the
following facilities at Texas Eastern’s
existing Lambertville Compressor
Station:
• Two 5,100 horsepower Clark DC–
990 natural gas-fired turbine compressor
VerDate Sep<11>2014
20:33 Jul 27, 2018
Jkt 244001
units and associated building, coolers,
and auxiliary piping and equipment;
• four retired reciprocating
compressor units 1 and associated
building, coolers, and auxiliary piping
and equipment;
• an existing warehouse; and
• auxiliary and control buildings.
Additionally, the proposed project
includes construction and operation of
the following new facilities at the
Lambertville Compressor Station:
• A new compressor building to
house two new Solar Taurus 70 natural
gas-fired turbine compressor units rated
at 8,600 horsepower each and associated
piping and equipment;
• electrical control and auxiliary
buildings, replacement warehouse
buildings, and an electrical generator
building;
• appurtenant facilities;
• yard piping modifications; and
• new plant roads and
reconfiguration of existing plant roads.
The FERC staff mailed copies of the
EA to federal, state, and local
government representatives and
agencies; elected officials; Native
American tribes; potentially affected
landowners; and other interested
individuals, groups, and commenters. In
addition, the EA is available for public
viewing on the FERC’s website
(www.ferc.gov) using the eLibrary link.
A limited number of copies of the EA
are available for distribution and public
inspection at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE, Room 2A,
Washington, DC 20426, (202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the EA’s disclosure and
discussion of potential environmental
effects, reasonable alternatives, and
measures to avoid or lessen
environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before 5:00 p.m. Eastern Time on
August 23, 2018.
For your convenience, there are three
methods you can use to file your
comments with the Commission. In all
instances please reference the project
docket number (CP18–26–000) with
your submission. The Commission
encourages electronic filing of
1 The four existing reciprocating compressor units
were retired in 2011 as part of Texas Eastern’s
Advanced Notification filing in Docket No. CP11–
143–000.
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature located on the Commission’s
website (www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214). Only
intervenors have the right to seek
rehearing or judicial review of the
Commission’s decision. The
Commission may grant affected
landowners and others with
environmental concerns intervenor
status upon showing good cause by
stating that they have a clear and direct
interest in this proceeding which no
other party can adequately represent.
Simply filing environmental comments
will not give you intervenor status, but
you do not need intervenor status to
have your comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search,’’ and enter the
docket number in the ‘‘Docket Number’’
field, excluding the last three digits (i.e.,
CP18–26). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
E:\FR\FM\30JYN1.SGM
30JYN1
Federal Register / Vol. 83, No. 146 / Monday, July 30, 2018 / Notices
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: July 24, 2018.
Kimberly D. Bose
Secretary.
[FR Doc. 2018–16233 Filed 7–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–124–000.
Applicants: Atlantic City Electric
Company, Public Service Electric and
Gas Company, Delmarva Power & Light
Company, Potomac Electric Power
Company, PECO Energy Company, PPL
Electric Utilities Corporation, UGI
Utilities Inc., Baltimore Gas and Electric
Company.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Atlantic City
Electric Company, et al.
Filed Date: 7/23/2018.
Accession Number: 20180723–5216.
Comment Date: 5 p.m. ET 8/13/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–343–008;
ER13–342–012; ER16–700–001; ER16–
701–001.
Applicants: CPV Maryland, LLC, CPV
Shore, LLC, CPV Towantic, LLC, CPV
Valley, LLC.
Description: Amendment to June 30,
2017 Market Power Update of CPV
Maryland, LLC, et. al.
Filed Date: 7/23/18.
Accession Number: 20180723–5233.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER17–706–004.
Applicants: GridLiance West LLC.
Description: Compliance filing:
GridLiance West 7–23–18 Compliance
Filing to be effective 9/14/2017.
Filed Date: 7/23/18.
Accession Number: 20180723–5172.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18–1169–001.
VerDate Sep<11>2014
20:33 Jul 27, 2018
Jkt 244001
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2018–
07–23 Commitment Cost Enhancements
Phase 3 Compliance to be effective 11/
1/2018.
Filed Date: 7/23/18.
Accession Number: 20180723–5194.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18–1778–000.
Applicants: CFE International LLC.
Description: Supplement to June 13,
2018 CFE International LLC tariff filing
(certified translations for documents
cited in the affidavit of Dr. Agustin J.
Ros and Ms. Judy W. Chang).
Filed Date: 7/20/2018.
Accession Number: 20180720–5210.
Comment Date: 5 p.m. ET 8/10/2018.
Docket Numbers: ER18–1952–001.
Applicants: Gulf Power Company.
Description: Tariff Amendment: Gulf
Power Amendment to Market-Based
Rate Filing to be effective 12/30/2018.
Filed Date: 7/24/18.
Accession Number: 20180724–5118.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18–1953–001.
Applicants: Gulf Power Company.
Description: Tariff Amendment:
Amendment to July 3, 2018 OATT
Filing to be effective 12/30/2018.
Filed Date: 7/24/18.
Accession Number: 20180724–5115.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18–1954–001.
Applicants: Gulf Power Company.
Description: Tariff Amendment:
Amendment to July 3, 2018 NITSA
Filing to be effective 12/30/2018.
Filed Date: 7/24/18.
Accession Number: 20180724–5117.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18–2052–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
WAPA Work Performance Agreement
for Pleasant Valley Pumping Plant (SA
59) to be effective 7/24/2018.
Filed Date: 7/23/18.
Accession Number: 20180723–5212.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18–2053–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Second Revised ISA No. 3917, Queue
No. Y1—047/Y2–060/Z2–103/AD1–110
to be effective 6/22/2018.
Filed Date: 7/23/18.
Accession Number: 20180723–5186.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18–2054–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2018–
07–23_Attachment X GIP and GIA
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
36585
revisions relative to EL18–17–000 to be
effective 7/24/2018.
Filed Date: 7/23/18.
Accession Number: 20180723–5209.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18–2055–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits tariff filing per
35.13(a)(2)(iii: 1154R14 Associated
Electric Cooperative NITSA and NOA to
be effective 7/1/2018.
Filed Date: 7/24/2018.
Accession Number: 20180724–5016.
Comment Date: 5 p.m. ET 8/14/2018.
Docket Numbers: ER18–2056–000.
Applicants: CenterPoint Energy
Houston Electric, LLC.
Description: § 205(d) Rate Filing: TFO
Tariff Interim Rate Revision to Conform
with PUCT-Approved Rate—April 2018
to be effective 4/27/2018.
Filed Date: 7/24/18.
Accession Number: 20180724–5061.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18–2057–000.
Applicants: CenterPoint Energy
Houston Electric, LLC.
Description: § 205(d) Rate Filing: TFO
Tariff Interim Rate Revision to Conform
with PUCT-Approved Rate—July 2018
to be effective 7/11/2018.
Filed Date: 7/24/18.
Accession Number: 20180724–5063.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18–2058–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits tariff filing per
35.13(a)(2)(iii: Revisions to Attachment
AE to Change Market Settlement
Timelines to be effective 5/1/2019.
Filed Date: 7/24/2018.
Accession Number: 20180724–5073.
Comment Date: 5:00 p.m. ET 8/14/18.
Docket Numbers: ER18–2059–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
2018–07–24_SA 3138 Pioneer-DEI
Interconnection Agreement to be
effective 6/20/2018.
Filed Date: 7/24/2018.
Accession Number: 20180724–5096.
Comment Date: 5:00 p.m. ET 8/14/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
E:\FR\FM\30JYN1.SGM
30JYN1
Agencies
[Federal Register Volume 83, Number 146 (Monday, July 30, 2018)]
[Notices]
[Pages 36584-36585]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-16233]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-26-000]
Notice of Availability of the Environmental Assessment for the
Proposed Texas Eastern Transmission, LP, Lambertville East Expansion
Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the
Lambertville East Expansion Project, proposed by Texas Eastern
Transmission, LP (Texas Eastern) in the above-referenced docket. Texas
Eastern requests authorization to replace two existing natural gas-
fired turbine compressor engines and appurtenant facilities at their
existing Lambertville Compressor Station in Hunterdon County, New
Jersey.
The EA assesses the potential environmental effects of the
construction and operation of the Lambertville East Expansion Project
in accordance with the requirements of the National Environmental
Policy Act. The FERC staff concludes that approval of the proposed
project, with appropriate mitigating measures, would not constitute a
major federal action significantly affecting the quality of the human
environment.
The proposed Lambertville East Expansion Project includes
abandonment by removal of the following facilities at Texas Eastern's
existing Lambertville Compressor Station:
Two 5,100 horsepower Clark DC-990 natural gas-fired
turbine compressor units and associated building, coolers, and
auxiliary piping and equipment;
four retired reciprocating compressor units \1\ and
associated building, coolers, and auxiliary piping and equipment;
---------------------------------------------------------------------------
\1\ The four existing reciprocating compressor units were
retired in 2011 as part of Texas Eastern's Advanced Notification
filing in Docket No. CP11-143-000.
---------------------------------------------------------------------------
an existing warehouse; and
auxiliary and control buildings.
Additionally, the proposed project includes construction and
operation of the following new facilities at the Lambertville
Compressor Station:
A new compressor building to house two new Solar Taurus 70
natural gas-fired turbine compressor units rated at 8,600 horsepower
each and associated piping and equipment;
electrical control and auxiliary buildings, replacement
warehouse buildings, and an electrical generator building;
appurtenant facilities;
yard piping modifications; and
new plant roads and reconfiguration of existing plant
roads.
The FERC staff mailed copies of the EA to federal, state, and local
government representatives and agencies; elected officials; Native
American tribes; potentially affected landowners; and other interested
individuals, groups, and commenters. In addition, the EA is available
for public viewing on the FERC's website (www.ferc.gov) using the
eLibrary link. A limited number of copies of the EA are available for
distribution and public inspection at: Federal Energy Regulatory
Commission, Public Reference Room, 888 First Street NE, Room 2A,
Washington, DC 20426, (202) 502-8371.
Any person wishing to comment on the EA may do so. Your comments
should focus on the EA's disclosure and discussion of potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. The more specific your comments, the
more useful they will be. To ensure that the Commission has the
opportunity to consider your comments prior to making its decision on
this project, it is important that we receive your comments in
Washington, DC on or before 5:00 p.m. Eastern Time on August 23, 2018.
For your convenience, there are three methods you can use to file
your comments with the Commission. In all instances please reference
the project docket number (CP18-26-000) with your submission. The
Commission encourages electronic filing of comments and has staff
available to assist you at (866) 208-3676 or
[email protected].
(1) You can file your comments electronically using the eComment
feature located on the Commission's website (www.ferc.gov) under the
link to Documents and Filings. This is an easy method for submitting
brief, text-only comments on a project;
(2) You can also file your comments electronically using the
eFiling feature on the Commission's website (www.ferc.gov) under the
link to Documents and Filings. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426.
Any person seeking to become a party to the proceeding must file a
motion to intervene pursuant to Rule 214 of the Commission's Rules of
Practice and Procedures (18 CFR 385.214). Only intervenors have the
right to seek rehearing or judicial review of the Commission's
decision. The Commission may grant affected landowners and others with
environmental concerns intervenor status upon showing good cause by
stating that they have a clear and direct interest in this proceeding
which no other party can adequately represent. Simply filing
environmental comments will not give you intervenor status, but you do
not need intervenor status to have your comments considered.
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search,'' and enter the docket number
in the ``Docket Number'' field, excluding the last three digits (i.e.,
CP18-26). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
[[Page 36585]]
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Dated: July 24, 2018.
Kimberly D. Bose
Secretary.
[FR Doc. 2018-16233 Filed 7-27-18; 8:45 am]
BILLING CODE 6717-01-P