Combined Notice of Filings #1, 36585-36586 [2018-16218]
Download as PDF
Federal Register / Vol. 83, No. 146 / Monday, July 30, 2018 / Notices
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: July 24, 2018.
Kimberly D. Bose
Secretary.
[FR Doc. 2018–16233 Filed 7–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–124–000.
Applicants: Atlantic City Electric
Company, Public Service Electric and
Gas Company, Delmarva Power & Light
Company, Potomac Electric Power
Company, PECO Energy Company, PPL
Electric Utilities Corporation, UGI
Utilities Inc., Baltimore Gas and Electric
Company.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Atlantic City
Electric Company, et al.
Filed Date: 7/23/2018.
Accession Number: 20180723–5216.
Comment Date: 5 p.m. ET 8/13/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–343–008;
ER13–342–012; ER16–700–001; ER16–
701–001.
Applicants: CPV Maryland, LLC, CPV
Shore, LLC, CPV Towantic, LLC, CPV
Valley, LLC.
Description: Amendment to June 30,
2017 Market Power Update of CPV
Maryland, LLC, et. al.
Filed Date: 7/23/18.
Accession Number: 20180723–5233.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER17–706–004.
Applicants: GridLiance West LLC.
Description: Compliance filing:
GridLiance West 7–23–18 Compliance
Filing to be effective 9/14/2017.
Filed Date: 7/23/18.
Accession Number: 20180723–5172.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18–1169–001.
VerDate Sep<11>2014
20:33 Jul 27, 2018
Jkt 244001
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2018–
07–23 Commitment Cost Enhancements
Phase 3 Compliance to be effective 11/
1/2018.
Filed Date: 7/23/18.
Accession Number: 20180723–5194.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18–1778–000.
Applicants: CFE International LLC.
Description: Supplement to June 13,
2018 CFE International LLC tariff filing
(certified translations for documents
cited in the affidavit of Dr. Agustin J.
Ros and Ms. Judy W. Chang).
Filed Date: 7/20/2018.
Accession Number: 20180720–5210.
Comment Date: 5 p.m. ET 8/10/2018.
Docket Numbers: ER18–1952–001.
Applicants: Gulf Power Company.
Description: Tariff Amendment: Gulf
Power Amendment to Market-Based
Rate Filing to be effective 12/30/2018.
Filed Date: 7/24/18.
Accession Number: 20180724–5118.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18–1953–001.
Applicants: Gulf Power Company.
Description: Tariff Amendment:
Amendment to July 3, 2018 OATT
Filing to be effective 12/30/2018.
Filed Date: 7/24/18.
Accession Number: 20180724–5115.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18–1954–001.
Applicants: Gulf Power Company.
Description: Tariff Amendment:
Amendment to July 3, 2018 NITSA
Filing to be effective 12/30/2018.
Filed Date: 7/24/18.
Accession Number: 20180724–5117.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18–2052–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
WAPA Work Performance Agreement
for Pleasant Valley Pumping Plant (SA
59) to be effective 7/24/2018.
Filed Date: 7/23/18.
Accession Number: 20180723–5212.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18–2053–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Second Revised ISA No. 3917, Queue
No. Y1—047/Y2–060/Z2–103/AD1–110
to be effective 6/22/2018.
Filed Date: 7/23/18.
Accession Number: 20180723–5186.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18–2054–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2018–
07–23_Attachment X GIP and GIA
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
36585
revisions relative to EL18–17–000 to be
effective 7/24/2018.
Filed Date: 7/23/18.
Accession Number: 20180723–5209.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18–2055–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits tariff filing per
35.13(a)(2)(iii: 1154R14 Associated
Electric Cooperative NITSA and NOA to
be effective 7/1/2018.
Filed Date: 7/24/2018.
Accession Number: 20180724–5016.
Comment Date: 5 p.m. ET 8/14/2018.
Docket Numbers: ER18–2056–000.
Applicants: CenterPoint Energy
Houston Electric, LLC.
Description: § 205(d) Rate Filing: TFO
Tariff Interim Rate Revision to Conform
with PUCT-Approved Rate—April 2018
to be effective 4/27/2018.
Filed Date: 7/24/18.
Accession Number: 20180724–5061.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18–2057–000.
Applicants: CenterPoint Energy
Houston Electric, LLC.
Description: § 205(d) Rate Filing: TFO
Tariff Interim Rate Revision to Conform
with PUCT-Approved Rate—July 2018
to be effective 7/11/2018.
Filed Date: 7/24/18.
Accession Number: 20180724–5063.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18–2058–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits tariff filing per
35.13(a)(2)(iii: Revisions to Attachment
AE to Change Market Settlement
Timelines to be effective 5/1/2019.
Filed Date: 7/24/2018.
Accession Number: 20180724–5073.
Comment Date: 5:00 p.m. ET 8/14/18.
Docket Numbers: ER18–2059–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
2018–07–24_SA 3138 Pioneer-DEI
Interconnection Agreement to be
effective 6/20/2018.
Filed Date: 7/24/2018.
Accession Number: 20180724–5096.
Comment Date: 5:00 p.m. ET 8/14/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
E:\FR\FM\30JYN1.SGM
30JYN1
36586
Federal Register / Vol. 83, No. 146 / Monday, July 30, 2018 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 24, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–16218 Filed 7–27–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14879–000]
daltland on DSKBBV9HB2PROD with NOTICES
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications: Go With the Flow Hydro
Power, LLC
On June 8, 2018, Go With the Flow
Hydro Power, LLC (Go With the Flow)
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Go With the Flow
Hydroelectric Project (project) to be
located on the Umatilla River about 8.7
river miles upstream from the
confluence with the Columbia River,
and 2.1 miles west southwest of
Hermiston in Umatilla county, Oregon.
On July 11, 2018, the applicant filed an
amended permit application for the
project. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project will be at the
site of the existing, abandoned Jim Boyd
Hydroelectric Project (P–7269). The
license for the Jim Boyd Project was
terminated in 2011, and Go With the
Flow has purchased these facilities. The
proposed run-of-river project will
involve rehabilitation and upgrade of
the following existing facilities: A 3.5foot-high concrete diversion weir; a
VerDate Sep<11>2014
20:33 Jul 27, 2018
Jkt 244001
canal intake with trashracks and fish
screens; A 5,350-foot-long power canal;
four 5-foot-diameter, 280-foot-long steel
penstocks; a powerhouse with 4
turbine/generators with rated capacity
of 300 kilowatts (kW) each for a total
capacity of 1,200 kW; a 60-foot-wide, 20
foot-long concrete-lined tailrace; a 0.25mile-long, 12.47 kilovolt transmission
line; and access roads.
The estimated averaged annual
generation of the project would be 3
gigawatt-hours and would be conveyed
from the powerhouse to the existing
Pacific Power and Light Company
substation.
Applicant Contact: Mark Sigl, Go
With the Flow Hydro Power, LLC, 8021
Firestone Way, Antelope, CA 95843,
phone (916) 812–5051.
FERC Contact: Kim Nguyen, (202)
502–6105.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14879–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibary.asp.
Enter the docket number (P–14879) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: July 24, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–16232 Filed 7–27–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Western Area Power Administration
Boulder Canyon Project
Western Area Power
Administration, DOE.
ACTION: Notice of proposed fiscal year
2019 base charge and rates for electric
service.
AGENCY:
Western Area Power
Administration (WAPA) is proposing to
calculate formula rates for fiscal year
(FY) 2019 Boulder Canyon Project (BCP)
electric service. The expiration of the
FY 2018 base charge and rates on
September 30, 2018, requires this
action. The proposed base charge will
provide sufficient revenue to recover all
annual costs and repay investment
obligations within the allowable period.
The proposed base charge and rates are
scheduled to become effective on
October 1, 2018, and will remain in
effect through September 30, 2019.
Publication of this Federal Register
notice will initiate the public process.
DATES: The consultation and comment
period begins today and will end
October 29, 2018. WAPA will present a
detailed explanation of the proposed FY
2019 base charge and rates at a public
information forum that will be held on
August 29, 2018, from 10:00 a.m. to
12:00 p.m. Mountain Standard Time
(MST) in Phoenix, Arizona. WAPA will
also host a public comment forum that
will be held on September 28, 2018,
from 10:00 a.m. to 12:00 p.m. MST in
Phoenix, Arizona. Written comments
will be accepted any time during the
consultation and comment period.
ADDRESSES: The public information
forum and public comment forum will
be held at WAPA’s Desert Southwest
Customer Service Regional Office
located at 615 South 43rd Avenue,
Phoenix, Arizona 85009. Send written
comments to Mr. Ronald E. Moulton,
Regional Manager and Senior Vice
President, Desert Southwest Customer
Service Region, Western Area Power
Administration, P.O. Box 6457,
Phoenix, Arizona 85005–6457, or email
dswpwrmrk@wapa.gov. WAPA will post
information about the rate process and
written comments received on its
website at: https://www.wapa.gov/
regions/DSW/Rates/Pages/bouldercanyon-rates.aspx. Written comments
must be received by the end of the
consultation and comment period to be
considered by WAPA in its decision
process.
As access to federal facilities is
controlled, any U.S. citizen wishing to
attend a public forum at WAPA must
SUMMARY:
E:\FR\FM\30JYN1.SGM
30JYN1
Agencies
[Federal Register Volume 83, Number 146 (Monday, July 30, 2018)]
[Notices]
[Pages 36585-36586]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-16218]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-124-000.
Applicants: Atlantic City Electric Company, Public Service Electric
and Gas Company, Delmarva Power & Light Company, Potomac Electric Power
Company, PECO Energy Company, PPL Electric Utilities Corporation, UGI
Utilities Inc., Baltimore Gas and Electric Company.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act, et al. of Atlantic City Electric Company, et
al.
Filed Date: 7/23/2018.
Accession Number: 20180723-5216.
Comment Date: 5 p.m. ET 8/13/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-343-008; ER13-342-012; ER16-700-001; ER16-701-
001.
Applicants: CPV Maryland, LLC, CPV Shore, LLC, CPV Towantic, LLC,
CPV Valley, LLC.
Description: Amendment to June 30, 2017 Market Power Update of CPV
Maryland, LLC, et. al.
Filed Date: 7/23/18.
Accession Number: 20180723-5233.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER17-706-004.
Applicants: GridLiance West LLC.
Description: Compliance filing: GridLiance West 7-23-18 Compliance
Filing to be effective 9/14/2017.
Filed Date: 7/23/18.
Accession Number: 20180723-5172.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18-1169-001.
Applicants: California Independent System Operator Corporation.
Description: Compliance filing: 2018-07-23 Commitment Cost
Enhancements Phase 3 Compliance to be effective 11/1/2018.
Filed Date: 7/23/18.
Accession Number: 20180723-5194.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18-1778-000.
Applicants: CFE International LLC.
Description: Supplement to June 13, 2018 CFE International LLC
tariff filing (certified translations for documents cited in the
affidavit of Dr. Agustin J. Ros and Ms. Judy W. Chang).
Filed Date: 7/20/2018.
Accession Number: 20180720-5210.
Comment Date: 5 p.m. ET 8/10/2018.
Docket Numbers: ER18-1952-001.
Applicants: Gulf Power Company.
Description: Tariff Amendment: Gulf Power Amendment to Market-Based
Rate Filing to be effective 12/30/2018.
Filed Date: 7/24/18.
Accession Number: 20180724-5118.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18-1953-001.
Applicants: Gulf Power Company.
Description: Tariff Amendment: Amendment to July 3, 2018 OATT
Filing to be effective 12/30/2018.
Filed Date: 7/24/18.
Accession Number: 20180724-5115.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18-1954-001.
Applicants: Gulf Power Company.
Description: Tariff Amendment: Amendment to July 3, 2018 NITSA
Filing to be effective 12/30/2018.
Filed Date: 7/24/18.
Accession Number: 20180724-5117.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18-2052-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: WAPA Work Performance
Agreement for Pleasant Valley Pumping Plant (SA 59) to be effective 7/
24/2018.
Filed Date: 7/23/18.
Accession Number: 20180723-5212.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18-2053-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Second Revised ISA No. 3917,
Queue No. Y1--047/Y2-060/Z2-103/AD1-110 to be effective 6/22/2018.
Filed Date: 7/23/18.
Accession Number: 20180723-5186.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18-2054-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2018-07-23_Attachment X GIP and GIA
revisions relative to EL18-17-000 to be effective 7/24/2018.
Filed Date: 7/23/18.
Accession Number: 20180723-5209.
Comments Due: 5 p.m. ET 8/13/18.
Docket Numbers: ER18-2055-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits tariff filing per
35.13(a)(2)(iii: 1154R14 Associated Electric Cooperative NITSA and NOA
to be effective 7/1/2018.
Filed Date: 7/24/2018.
Accession Number: 20180724-5016.
Comment Date: 5 p.m. ET 8/14/2018.
Docket Numbers: ER18-2056-000.
Applicants: CenterPoint Energy Houston Electric, LLC.
Description: Sec. 205(d) Rate Filing: TFO Tariff Interim Rate
Revision to Conform with PUCT-Approved Rate--April 2018 to be effective
4/27/2018.
Filed Date: 7/24/18.
Accession Number: 20180724-5061.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18-2057-000.
Applicants: CenterPoint Energy Houston Electric, LLC.
Description: Sec. 205(d) Rate Filing: TFO Tariff Interim Rate
Revision to Conform with PUCT-Approved Rate--July 2018 to be effective
7/11/2018.
Filed Date: 7/24/18.
Accession Number: 20180724-5063.
Comments Due: 5 p.m. ET 8/14/18.
Docket Numbers: ER18-2058-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits tariff filing per
35.13(a)(2)(iii: Revisions to Attachment AE to Change Market Settlement
Timelines to be effective 5/1/2019.
Filed Date: 7/24/2018.
Accession Number: 20180724-5073.
Comment Date: 5:00 p.m. ET 8/14/18.
Docket Numbers: ER18-2059-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Midcontinent Independent System Operator, Inc. submits
tariff filing per 35.13(a)(2)(iii: 2018-07-24_SA 3138 Pioneer-DEI
Interconnection Agreement to be effective 6/20/2018.
Filed Date: 7/24/2018.
Accession Number: 20180724-5096.
Comment Date: 5:00 p.m. ET 8/14/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's
[[Page 36586]]
Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date. Protests may be considered, but
intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 24, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-16218 Filed 7-27-18; 8:45 am]
BILLING CODE 6717-01-P