Environmental Impact Statements; Notice of Availability, 35637 [2018-16094]

Download as PDF amozie on DSK3GDR082PROD with NOTICES1 Federal Register / Vol. 83, No. 145 / Friday, July 27, 2018 / Notices information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564– 2970; fax number: (202) 564–0050; email address: yellin.patrick@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents, which explain in detail the information that the EPA will be collecting, are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov, or in person at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit: https:// www.epa.gov/dockets. Abstract: Owners and operators of affected facilities are required to comply with reporting and record keeping requirements for the General Provisions (40 CFR part 60, subpart A), as well as the specific requirements at 40 CFR part 60, subpart F. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with the standards. Form numbers: None. Respondents/affected entities: Portland cement plants. Respondent’s obligation to respond: Mandatory (40 CFR part 60, subpart F). Estimated number of respondents: 95 (total). Frequency of response: Initially and semiannually. Total estimated burden: 14,500 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $2,290,000 (per year), which includes $767,000 in annualized capital startup and/or operation and maintenance costs. Changes in the estimates: There is a small adjustment decrease in the respondent labor hours and the total capital and O&M costs from the mostrecently approved ICR due to a decrease in the number of respondents. Consistent with past ICRs, this ICR uses the most recent data from EPA’s VerDate Sep<11>2014 17:38 Jul 26, 2018 Jkt 244001 35637 Greenhouse Gas Reporting Program to estimate the respondent universe, which shows a decrease of 1 respondent as compared to the previous ICR. Dated: July 24, 2018. Kelly Knight, Acting Director, Office of Federal Activities. Courtney Kerwin, Director, Regulatory Support Division. BILLING CODE 6560–50–P [FR Doc. 2018–16070 Filed 7–26–18; 8:45 am] BILLING CODE 6560–50–P [FR Doc. 2018–16094 Filed 7–26–18; 8:45 am] ENVIRONMENTAL PROTECTION AGENCY [FRL–9980–97–OEI] ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9040–5] Responsible Agency: Office of Federal Activities, General Information (202) 564–7156 or https://www2.epa.gov/ nepa/. Weekly receipt of Environmental Impact Statements Filed 07/16/2018 Through 07/20/2018 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20180165, Draft, USFS, CA, Williamson Rock and Pacific Crest Trail, Comment Period Ends: 09/14/ 2018, Contact: Chinling Chen 626– 574–5255 EIS No. 20180166, Final Supplement, FHWA, AK, Juneau Access Improvements Project, Under 23 U.S.C. 139(n)(2), FTA has issued a single document that consists of a final environmental impact statement and record of decision. Therefore, the 30-day wait/review period under NEPA does not apply to this action. Contact: Tim Haugh 907–586–7418 EIS No. 20180167, Draft, NMFS, DC, Draft Amendment 11 to the 2006 Consolidated Atlantic Highly Migratory Species Fishery Management Plan, Comment Period Ends: 10/01/2018, Contact: Guy DuBeck 301–427–8503 EIS No. 20180168, Draft, USACE, AL, Mobile Harbor, Mobile, Alabama Draft Integrated General Reevaluation Report with Supplemental, Comment Period Ends: 09/10/2018, Contact: Jennifer L. Jacobson 251–690–2724 EIS No. 20180169, Final, BLM, NV, Gold Rock Mine Project, Comment Period Ends: 08/29/2018, Contact: Maria Ryan 775–289–1888 Frm 00034 Fmt 4703 Office of Environmental Information, Environmental Protection Agency (EPA). ACTION: Notice of a new system of records. AGENCY: Environmental Impact Statements; Notice of Availability PO 00000 Privacy Act of 1974; System of Records Sfmt 4703 The Environmental Protection Agency’s (EPA) Office of Environmental Information (OEI), Office of Enterprise Information Programs (OEIP), eDiscovery Division, is giving notice that it proposes to establish a new system of records pursuant to the provisions of the Privacy Act of 1974 (5 U.S.C. 552a). The new system of records will contain information collected using the Agency’s suite of tools that search and preserve electronically stored information (ESI) in support of eDiscovery requests, Freedom of Information Act (FOIA) requests or other formal information requests. Exemptions for this system of records will be included in the Agency’s update of its Privacy Act regulations at 40 CFR part 16. DATES: Persons wishing to comment on this system of records notice must do so by. If no comments are received, the systems of records notice will become effective by August 27, 2018. ADDRESSES: Submit your comments, identified by Docket ID No. EPA–HQ– OEI–2012–0882, to the Federal eRulemaking Portal: https:// www.regulations.gov. Follow the online instructions for submitting comments. Once submitted, comments cannot be edited or withdrawn. The EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information for which disclosure is restricted by statute. Multimedia submissions (audio, video, etc.) must be accompanied by a written comment. The written comment is considered the official comment and should include discussion of all points you wish to make. The EPA will generally not consider comments or comment contents located outside of the primary submission (i.e., on the web, SUMMARY: E:\FR\FM\27JYN1.SGM 27JYN1

Agencies

[Federal Register Volume 83, Number 145 (Friday, July 27, 2018)]
[Notices]
[Page 35637]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-16094]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9040-5]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7156 or https://www2.epa.gov/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 07/16/2018 Through 07/20/2018
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.

EIS No. 20180165, Draft, USFS, CA, Williamson Rock and Pacific Crest 
Trail, Comment Period Ends: 09/14/2018, Contact: Chinling Chen 626-574-
5255
EIS No. 20180166, Final Supplement, FHWA, AK, Juneau Access 
Improvements Project, Under 23 U.S.C. 139(n)(2), FTA has issued a 
single document that consists of a final environmental impact statement 
and record of decision. Therefore, the 30-day wait/review period under 
NEPA does not apply to this action. Contact: Tim Haugh 907-586-7418
EIS No. 20180167, Draft, NMFS, DC, Draft Amendment 11 to the 2006 
Consolidated Atlantic Highly Migratory Species Fishery Management Plan, 
Comment Period Ends: 10/01/2018, Contact: Guy DuBeck 301-427-8503
EIS No. 20180168, Draft, USACE, AL, Mobile Harbor, Mobile, Alabama 
Draft Integrated General Reevaluation Report with Supplemental, Comment 
Period Ends: 09/10/2018, Contact: Jennifer L. Jacobson 251-690-2724
EIS No. 20180169, Final, BLM, NV, Gold Rock Mine Project, Comment 
Period Ends: 08/29/2018, Contact: Maria Ryan 775-289-1888

    Dated: July 24, 2018.
Kelly Knight,
Acting Director, Office of Federal Activities.
[FR Doc. 2018-16094 Filed 7-26-18; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.