Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria, 34890-34891 [2018-15683]
Download as PDF
amozie on DSK3GDR082PROD with NOTICES1
34890
Federal Register / Vol. 83, No. 141 / Monday, July 23, 2018 / Notices
(6) Experience in transition
assistance;
(7) Experience in the protection of
employment and reemployment rights;
(8) Experience in education, skills
training, integration into the workforce
and outreach;
(9) Understanding of licensing and
credentialing issues; and/or
(10) Experience in military/veteran
apprenticeship programs.
The ACVETEO’s responsibilities are
to: (a) Assess employment and training
needs of veterans and their integration
into the workforce; (b) determine the
extent to which the programs and
activities of the Department are meeting
such needs; (c) assist the Assistant
Secretary for Veterans’ Employment and
Training (ASVET) in conducting
outreach to employers with respect to
the training and skills of veterans and
the advantages afforded employers by
hiring veterans; (d) make
recommendations to the Secretary of
Labor, through the ASVET, with respect
to outreach activities and the
employment and training needs of
veterans; and (e) carry out such other
activities deemed necessary to making
required reports and recommendations
under section 4110(f) of Title 38, U.S.
Code. Per section 4110(c)(1) of Title 38,
U.S. Code, the Secretary shall appoint at
least twelve, but no more than sixteen,
individuals to serve as Special
Government Employees of the
ACVETEO as follows: Seven
individuals, one each from the
following organizations: (i) The Society
for Human Resource Management; (ii)
the Business Roundtable; (iii) the
National Association of State Workforce
Agencies; (iv) the United States
Chamber of Commerce; (v) the National
Federation of Independent Business; (vi)
a nationally recognized labor union or
organization; and (vii) the National
Governors Association. The Secretary
shall appoint not more than five
individuals nominated by veterans’
service organizations that have a
national employment program and not
more than five individuals who are
recognized authorities in the fields of
business, employment, training,
rehabilitation, or labor and who are not
employees of DOL.
Requirements for Nomination
Submission: Nominations should be
typewritten (one nomination per
nominator). The nomination package
should include:
(1) Letter of nomination that clearly
states the name and affiliation of the
nominee, the basis for the nomination
(i.e., specific attributes, including
military service, if applicable, that
VerDate Sep<11>2014
17:59 Jul 20, 2018
Jkt 244001
qualifies the nominee for service in this
capacity);
(2) Statement from the nominee
indicating willingness to regularly
attend and participate in Committee
meetings;
(3) Nominee’s contact information,
including name, mailing address,
telephone number(s), and email address;
(4) Nominee’s curriculum vitae or
resume;
(5) Summary of the nominee’s
experience and qualifications relative to
the experience listed above;
(6) Nominee biography; and
(7) Statement that the nominee has no
apparent conflicts of interest that would
preclude membership.
Individuals selected for appointment
to the Committee will be reimbursed for
per diem and travel for attending
Committee meetings. The Department
makes every effort to ensure that the
membership of its Federal advisory
committees is fairly balanced in terms of
points of view represented. Every effort
is made to ensure that a broad
representation of geographic areas,
gender, racial and ethnic minority
groups, and the disabled are given
consideration for membership.
Appointment to this Committee shall be
made without discrimination because of
a person’s race, color, religion, sex
(including gender identity, transgender
status, sexual orientation, and
pregnancy), national origin, age,
disability, or genetic information. An
ethics review is conducted for each
selected nominee.
Signed at Washington, DC, on July 16,
2018.
Matthew M. Miller,
Deputy Assistant Secretary for Veterans’
Employment and Training.
[FR Doc. 2018–15712 Filed 7–20–18; 8:45 am]
BILLING CODE 4510–79–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc.; Vogtle Electric Generating Plant,
Units 3 and 4; Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that the inspections, tests, and analyses
SUMMARY:
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
have been successfully completed, and
that the specified acceptance criteria are
met for the Vogtle Electric Generating
Plant (VEGP), Units 3 and 4.
DATES: The determination of the
successful completion of inspections,
tests, and analyses for VEGP Units 3 and
4 is effective July 23, 2018.
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about NRC dockets to Jennifer
Borges; telephone: 301–287–9127;
email: Jennifer.Borges@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this document
(if that document is available in
ADAMS) is provided the first time that
a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–3025; email: Chandu.Patel@
nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power
Corporation, MEAG Power SPVM, LLC.,
MEAG Power SPVJ, LLC., MEAG Power
SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee)
have submitted Inspections, Tests,
Analyses, and Acceptance Criteria
E:\FR\FM\23JYN1.SGM
23JYN1
Federal Register / Vol. 83, No. 141 / Monday, July 23, 2018 / Notices
(ITAAC) closure notifications (ICNs)
under paragraph 52.99(c)(1) of title 10 of
the Code of Federal Regulations (10
CFR), informing the NRC that the
licensee has successfully performed the
required inspections, tests, and
analyses, and that the acceptance
criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.08c (31), 2.1.02.09b.i (42),
2.1.02.12a.viii (60), 2.1.03.08 (80),
2.1.03.14 (89), 2.2.03.08c.xiv (199),
2.2.04.08b.ii (238), 2.2.04.09b.ii
(243), 2.3.01.03.i (280), 2.3.03.03a
(320), 2.3.03.03b (321), 2.3.03.03d
(323), 2.3.04.08 (335), 2.3.04.09
(336), 2.3.06.09a.i (372),
2.3.06.09a.ii (373), 2.3.06.09b.i
(374), 2.3.07.08.i (409), 2.3.08.02.ii
(416), 2.3.09.03.iv (426), 2.3.11.02.i
(450), 2.3.11.03a (453), 2.3.12.02
(457), 2.3.14.03 (479), 2.4.02.03.i
(500), 2.4.02.03.iii (502), 2.5.01.03h
(518), 2.5.09.02 (576), 2.5.09.03
(577), C.2.6.09.01 (658), C.2.6.12.01
(671), C.2.6.12.02 (672), C.2.6.12.03
(673), C.2.6.12.04 (674), C.2.6.12.05
(675), 2.7.02.03b (704), 3.2.00.08
(757), and C.3.8.01.01 (842).
VEGP Unit 4 ITAAC
2.1.02.08c (31), 2.1.02.09b.i (42),
2.1.02.12a.viii (60), 2.1.03.02c (71),
2.1.03.08 (80), 2.1.03.14 (89),
2.2.03.08c.xiv (199), 2.2.04.08a.i
(235), 2.2.04.08a.ii (236),
2.2.04.08b.ii (238), 2.2.04.09b.ii
(243), 2.3.01.03.i (280), 2.3.03.03b
(321), 2.3.03.03d (323), 2.3.04.08
(335), 2.3.04.09 (336), 2.3.06.09a.i
(372), 2.3.06.09a.ii (373),
2.3.06.09b.i (374), 2.3.07.08.i (409),
2.3.08.02.ii (416), 2.3.09.03.iv (426),
2.3.11.02.i (450), 2.3.11.03a (453),
2.3.12.02 (457), 2.3.14.03 (479),
2.4.02.03.i (500), 2.4.02.03.iii (502),
2.5.01.03h (518), 2.5.02.07c (536),
2.5.09.02 (576), 2.5.09.03 (577),
C.2.6.09.01 (658), 2.7.02.03b (704),
3.1.00.08 (737), 3.2.00.08 (757), and
C.3.8.01.01 (842).
The ITAAC for VEGP Unit 3 are in
Appendix C of the VEGP Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP Unit 4 are in Appendix C of VEGP
Unit 4 combined license (ADAMS
Accession No. ML14100A135).
amozie on DSK3GDR082PROD with NOTICES1
II. NRC Staff Determination of
Completion of ITAAC
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
VerDate Sep<11>2014
17:59 Jul 20, 2018
Jkt 244001
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs. Each ICN
presents a narrative description of how
the ITAAC was completed. The NRC’s
ICN review process involves a
determination on whether, among other
things: (1) Each ICN provides sufficient
information, including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed.
The NRC staff’s determination of the
successful completion of these ITAAC is
based on information available at this
time and is subject to the licensee’s
ability to maintain the condition that
the acceptance criteria are met. If the
staff receives new information that
suggests the staff’s determination on any
of these ITAAC is incorrect, then the
staff will determine whether to reopen
that ITAAC (including withdrawing the
staff’s determination on that ITAAC).
The NRC staff’s determination will be
used to support a subsequent finding,
pursuant to 10 CFR 52.103(g), at the end
of construction that all acceptance
criteria in the combined license are met.
The ITAAC closure process is not
finalized for these ITAAC until the NRC
makes an affirmative finding under 10
CFR 52.103(g). Any future updates to
the status of these ITAAC will be
reflected on the NRC’s website at https://
www.nrc.gov/reactors/new-reactors/
oversight/itaac.html.
This notice fulfills the staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
successful completion of inspections,
tests and analyses.
Vogtle Electric Generating Plant Unit 3,
Docket No. 5200025
A complete list of the review status
for VEGP Unit 3 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s website at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/vog3icnsr.pdf.
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
34891
Vogtle Electric Generating Plant Unit 4,
Docket No. 5200026
A complete list of the review status
for VEGP Unit 4 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s website at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/vog4icnsr.pdf.
Dated at Rockville, Maryland, this 18th day
of July, 2018.
For the Nuclear Regulatory Commission.
Paul B. Kallan,
Acting Chief, Licensing Branch 4, Division
of Licensing, Siting, and Environmental
Analysis, Office of New Reactors.
[FR Doc. 2018–15683 Filed 7–20–18; 8:45 am]
BILLING CODE 7590–01–P
SECURITIES AND EXCHANGE
COMMISSION
[Release No. 34–83651; File Nos. SR–
ICEEU–2017–016 and SR–ICEEU–2017–017]
Self-Regulatory Organizations; ICE
Clear Europe Limited; Order Approving
Proposed Rule Changes Related to the
ICE Clear Europe Recovery and WindDown Plans
July 17, 2018.
I. Introduction
On December 29, 2017, ICE Clear
Europe Limited (‘‘ICE Clear Europe’’)
filed with the Securities and Exchange
Commission, pursuant to Section
19(b)(1) of the Securities Exchange Act
of 1934 (‘‘Exchange Act’’),1 and Rule
19b–4 thereunder,2 proposed rule
changes related to its Recovery Plan and
Wind-Down Plan. The proposed rule
changes were published for comment in
the Federal Register on January 19,
2018.3 On February 27, 2018, the
Commission designated a longer period
for Commission action on the proposed
rule changes.4 On April 17, 2018, the
Commission instituted proceedings
1 15
U.S.C. 78s(b)(1).
CFR 240.19b–4.
3 Exchange Act Release No. 82496 (Jan. 12, 2018),
83 FR 2855 (Jan. 19, 2018) (SR–ICEEU–2017–016)
(‘‘Recovery Plan Notice’’); Exchange Act Release
No. 82497 (Jan. 12, 2018), 83 FR 2847 (Jan. 19,
2018) (SR–ICEEU–2017–017) (‘‘Wind-Down Plan
Notice’’).
4 Exchange Act Release No. 82786 (Feb. 27, 2018),
83 FR 9345 (Mar. 5, 2018) (SR–ICEEU–2017–016);
Exchange Act Release No. 82782 (Feb. 27, 2018), 83
FR 9351 (Mar. 5, 2018) (SR–ICEEU–2017–017).
2 17
E:\FR\FM\23JYN1.SGM
23JYN1
Agencies
[Federal Register Volume 83, Number 141 (Monday, July 23, 2018)]
[Notices]
[Pages 34890-34891]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-15683]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc.; Vogtle Electric
Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that the inspections, tests, and analyses have been
successfully completed, and that the specified acceptance criteria are
met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
DATES: The determination of the successful completion of inspections,
tests, and analyses for VEGP Units 3 and 4 is effective July 23, 2018.
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. The
ADAMS accession number for each document referenced in this document
(if that document is available in ADAMS) is provided the first time
that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-3025; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG
Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee) have submitted Inspections,
Tests, Analyses, and Acceptance Criteria
[[Page 34891]]
(ITAAC) closure notifications (ICNs) under paragraph 52.99(c)(1) of
title 10 of the Code of Federal Regulations (10 CFR), informing the NRC
that the licensee has successfully performed the required inspections,
tests, and analyses, and that the acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.08c (31), 2.1.02.09b.i (42), 2.1.02.12a.viii (60), 2.1.03.08
(80), 2.1.03.14 (89), 2.2.03.08c.xiv (199), 2.2.04.08b.ii (238),
2.2.04.09b.ii (243), 2.3.01.03.i (280), 2.3.03.03a (320), 2.3.03.03b
(321), 2.3.03.03d (323), 2.3.04.08 (335), 2.3.04.09 (336), 2.3.06.09a.i
(372), 2.3.06.09a.ii (373), 2.3.06.09b.i (374), 2.3.07.08.i (409),
2.3.08.02.ii (416), 2.3.09.03.iv (426), 2.3.11.02.i (450), 2.3.11.03a
(453), 2.3.12.02 (457), 2.3.14.03 (479), 2.4.02.03.i (500),
2.4.02.03.iii (502), 2.5.01.03h (518), 2.5.09.02 (576), 2.5.09.03
(577), C.2.6.09.01 (658), C.2.6.12.01 (671), C.2.6.12.02 (672),
C.2.6.12.03 (673), C.2.6.12.04 (674), C.2.6.12.05 (675), 2.7.02.03b
(704), 3.2.00.08 (757), and C.3.8.01.01 (842).
VEGP Unit 4 ITAAC
2.1.02.08c (31), 2.1.02.09b.i (42), 2.1.02.12a.viii (60),
2.1.03.02c (71), 2.1.03.08 (80), 2.1.03.14 (89), 2.2.03.08c.xiv (199),
2.2.04.08a.i (235), 2.2.04.08a.ii (236), 2.2.04.08b.ii (238),
2.2.04.09b.ii (243), 2.3.01.03.i (280), 2.3.03.03b (321), 2.3.03.03d
(323), 2.3.04.08 (335), 2.3.04.09 (336), 2.3.06.09a.i (372),
2.3.06.09a.ii (373), 2.3.06.09b.i (374), 2.3.07.08.i (409),
2.3.08.02.ii (416), 2.3.09.03.iv (426), 2.3.11.02.i (450), 2.3.11.03a
(453), 2.3.12.02 (457), 2.3.14.03 (479), 2.4.02.03.i (500),
2.4.02.03.iii (502), 2.5.01.03h (518), 2.5.02.07c (536), 2.5.09.02
(576), 2.5.09.03 (577), C.2.6.09.01 (658), 2.7.02.03b (704), 3.1.00.08
(737), 3.2.00.08 (757), and C.3.8.01.01 (842).
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs. Each ICN presents a narrative
description of how the ITAAC was completed. The NRC's ICN review
process involves a determination on whether, among other things: (1)
Each ICN provides sufficient information, including a summary of the
methodology used to perform the ITAAC, to demonstrate that the
inspections, tests, and analyses have been successfully completed; (2)
each ICN provides sufficient information to demonstrate that the
acceptance criteria of the ITAAC are met; and (3) any NRC inspections
for the ITAAC have been completed and any ITAAC findings associated
with that ITAAC have been closed.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the staff receives new information that suggests
the staff's determination on any of these ITAAC is incorrect, then the
staff will determine whether to reopen that ITAAC (including
withdrawing the staff's determination on that ITAAC). The NRC staff's
determination will be used to support a subsequent finding, pursuant to
10 CFR 52.103(g), at the end of construction that all acceptance
criteria in the combined license are met. The ITAAC closure process is
not finalized for these ITAAC until the NRC makes an affirmative
finding under 10 CFR 52.103(g). Any future updates to the status of
these ITAAC will be reflected on the NRC's website at https://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
This notice fulfills the staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests and analyses.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession Number for each VEF, and the ADAMS
Accession Numbers for the inspection reports associated with these
specific ITAAC, can be found on the NRC's website at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog3-icnsr.pdf.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession Number for each VEF, and the ADAMS
Accession Numbers for the inspection reports associated with these
specific ITAAC, can be found on the NRC's website at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog4-icnsr.pdf.
Dated at Rockville, Maryland, this 18th day of July, 2018.
For the Nuclear Regulatory Commission.
Paul B. Kallan,
Acting Chief, Licensing Branch 4, Division of Licensing, Siting, and
Environmental Analysis, Office of New Reactors.