Download as PDF 34768 Federal Register / Vol. 83, No. 141 / Monday, July 23, 2018 / Rules and Regulations DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG–2018–0669] RIN 1625–AA00 Safety Zone; Port Huron Float Down, St. Clair River, Port Huron, MI Coast Guard, DHS. Temporary final rule. AGENCY: ACTION: The Coast Guard is establishing a temporary safety zone on the waters of the St. Clair River in the vicinity of Port Huron, MI. This zone is intended to restrict and control movement of vessels in a portion of the St. Clair River. Though this is an unsanctioned, non-permitted marine event, this zone is necessary to provide for the safety of life on the navigable waters during a float down event near Port Huron, MI. DATES: This temporary final rule is effective from 12 p.m. through 8 p.m. on August 19, 2018. ADDRESSES: To view documents mentioned in this preamble as being available in the docket, go to https:// www.regulations.gov, type USCG–2018– 0669 in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this rule. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary rule, call or email Tracy Girard, Prevention Department, Sector Detroit, Coast Guard; telephone 313–568–9564, or email Tracy.M.Girard@uscg.mil. SUPPLEMENTARY INFORMATION: SUMMARY: I. Table of Abbreviations CFR Code of Federal Regulations COTP Captain of the Port Detroit DHS Department of Homeland Security FR Federal Register NPRM Notice of Proposed Rulemaking § Section U.S.C. United States Code amozie on DSK3GDR082PROD with RULES II. Background Information and Regulatory History During the afternoon of August 19, 2018, a non-sanctioned public event is scheduled to take place. The event is advertised over various social-media sites, in which a large number of persons float down a segment of the St. Clair River, using inner tubes and other similar floatation devices. The 2018 float down event will occur between approximately 12 p.m. and 8 p.m. on August 19, 2018. This non-sanctioned VerDate Sep<11>2014 16:12 Jul 20, 2018 Jkt 244001 event has taken place in the month of August annually since 2009. No private or municipal entity requested a marine event permit from the Coast Guard for this event, and it has not received state or federal permits since its inception. The event has drawn over 5,000 participants of various ages annually. Despite plans put together by federal, state and local officials, emergency responders and law enforcement officials have been overburdened pursuing safety during this event. Medical emergencies, people drifting across the international border, and people trespassing on residential property when trying to get out of the water before the designated finish line are some of the numerous difficulties encountered during the float down event. During the 2014 float-down event, a 19-year-old participant died. During the 2016 float down, a wind shift caused thousands of U.S. citizen rafters with no passports to drift into Canadian waters. The current and wind made it impossible for the rafters to paddle back into U.S. waters, necessitating significant coordination with the Canadian authorities. Despite these events, promotional information for the event continues to be published. More than 5,000 people are again anticipated to float down the river this year. No public or private organization holds themselves responsible as the event sponsor. The Coast Guard is issuing this temporary rule without prior notice and opportunity to comment pursuant to authority under section 4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are ‘‘impracticable, unnecessary, or contrary to the public interest.’’ Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for not publishing a notice of proposed rulemaking (NPRM) with respect to this rule because doing so would be impracticable. The Coast Guard did not receive the final details of this float down event in time to publish an NPRM. As such, it is impracticable to publish an NPRM because we lack sufficient time to provide a reasonable comment period and then consider those comments before issuing the rule. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective less than 30 days after publication in the Federal Register. Delaying the effective date of this rule would inhibit the Coast PO 00000 Frm 00016 Fmt 4700 Sfmt 4700 Guard’s ability to protect participants, mariners and vessels from the hazards associated with this event. III. Legal Authority and Need for Rule The Coast Guard is issuing this rule under authority in 33 U.S.C. 1231. The Captain of the Port Detroit (COTP) has determined the float down poses significant risk to public safety and property from 12 p.m. to 8 p.m. on August 19, 2018. The likely combination of large numbers of participants, strong river currents, limited rescue resources, and difficult emergency response scenarios could easily result in serious injuries or fatalities to float down participants and spectators. Therefore, the COTP is establishing a safety zone around the event location to help minimize risks to safety of life and property during this event. IV. Discussion of the Rule This rule establishes a safety zone from 12 p.m. to 8 p.m. on August 19, 2018. The safety zone will begin at Lighthouse Beach and encompass all U.S. waters of the St. Clair River bound by a line starting at a point on land north of Coast Guard Station Port Huron at position 43°00.416′ N; 082°25.333′ W, extending east to the international boundary to a point at position 43°00.416′ N; 082°25.033′ W, following south along the international boundary to a point at position 42°54.500′ N; 082°27.683′ W, extending west to a point on land just north of Stag Island at position 42°54.500′ N; 082°27.966′ W, and following north along the U.S. shoreline to the point of origin (NAD 83). No vessel or person will be permitted to enter the safety zone without obtaining permission from the COTP or a designated representative. Vessel operators must contact the COTP or his on-scene representative to obtain permission to transit through this safety zone. Additionally, no one under the age of 18 will be permitted to enter the safety zone if they are not wearing a Coast Guard approved personal floatation device. The COTP or his onscene representative may be contacted via VHF Channel 16. V. Regulatory Analyses We developed this rule after considering numerous statutes and Executive orders related to rulemaking. Below we summarize our analyses based on a number of these statutes and Executive orders, and we discuss First Amendment rights of protestors. E:\FR\FM\23JYR1.SGM 23JYR1 Federal Register / Vol. 83, No. 141 / Monday, July 23, 2018 / Rules and Regulations amozie on DSK3GDR082PROD with RULES A. Regulatory Planning and Review Executive Orders 12866 and 13563 direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits. Executive Order 13771 directs agencies to control regulatory costs through a budgeting process. This rule has not been designated a ‘‘significant regulatory action,’’ under Executive Order 12866. Accordingly, this rule has not been reviewed by the Office of Management and Budget (OMB), and pursuant to OMB guidance it is exempt from the requirements of Executive Order 13771. This regulatory action determination is based on the size, location, duration, and time-of-year of the safety zone. Vessel traffic will not be able to safely transit around this safety zone which will impact a small designated area of the St. Clair River from 12 p.m. until 8 p.m. on August 19, 2018. Moreover, the Coast Guard will issue Broadcast Notice to Mariners (BNM) via VHF–FM marine channel 16 about the zone and the rule allows vessels to seek permission to enter the zone. B. Impact on Small Entities The Regulatory Flexibility Act of 1980, 5 U.S.C. 601–612, as amended, requires Federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term ‘‘small entities’’ comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities. While some owners or operators of vessels intending to transit the safety zone may be small entities, for the reasons stated in section V.A above, this rule will not have a significant economic impact on any vessel owner or operator. Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104–121), we want to assist small entities in understanding this rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the person listed in the FOR FURTHER INFORMATION CONTACT section. Small businesses may send comments on the actions of Federal employees VerDate Sep<11>2014 16:12 Jul 20, 2018 Jkt 244001 who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency’s responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1–888–REG–FAIR (1–888–734–3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard. C. Collection of Information This rule will not call for a new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501–3520). D. Federalism and Indian Tribal Governments A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and have determined that it is consistent with the fundamental federalism principles and preemption requirements described in Executive Order 13132. Also, this rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes. If you believe this rule has implications for federalism or Indian tribes, please contact the person listed in the FOR FURTHER INFORMATION CONTACT section above. E. Unfunded Mandates Reform Act The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531–1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble. PO 00000 Frm 00017 Fmt 4700 Sfmt 4700 34769 F. Environment We have analyzed this rule under Department of Homeland Security Directive 023–01 and Commandant Instruction M16475.1D, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321–4370f), and have determined that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. This rule involves a safety zone lasting eight hours that will prohibit entry into a designated area. It is categorically excluded from further review under paragraph L60(a) of Appendix A, Table 1 of DHS Instruction Manual 023–01–001–01, Rev. 01. A Record of Environmental Consideration supporting this determination is available in the docket where indicated under ADDRESSES. G. Protest Activities The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels. List of Subjects in 33 CFR Part 165 Harbors, Marine safety, Navigation (water), Reporting and recordkeeping requirements, Security measures, Waterways. For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 165 as follows: PART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS 1. The authority citation for part 165 continues to read as follows: ■ Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05–1, 6.04–1, 6.04–6, and 160.5; Department of Homeland Security Delegation No. 0170.1. 2. Add § 165.T09–0669 to read as follows: ■ § 165.T09–0669 Safety Zone; Port Huron Float Down, St. Clair River, Port Huron, MI. (a) Location. A safety zone is established to include all U.S. navigable waters of southern Lake Huron and the St. Clair River adjacent to Port Huron, MI, beginning at Lighthouse Beach and encompassing all U.S. waters of the St. Clair River bound by a line starting at a point on land north of Coast Guard Station Port Huron at position 43°00.416′ N, 082°25.333′ W, extending east to the international boundary to a E:\FR\FM\23JYR1.SGM 23JYR1 34770 Federal Register / Vol. 83, No. 141 / Monday, July 23, 2018 / Rules and Regulations point at position 43°00.416′ N, 082°25.033′ W, following south along the international boundary to a point at position 42°54.500′ N, 082°27.683′ W, extending west to a point on land just north of Stag Island at position 42°54.500′ N, 082°27.966′ W, and following north along the U.S. shoreline to the point of origin (NAD 83). (b) Enforcement period. The regulated area described in paragraph (a) of this section will be in enforced from 12 p.m. through 8 p.m. August 19, 2018. (c) Regulations. (1) No vessel or person may enter, transit through, or anchor within the safety zone unless authorized by the Captain of the Port Detroit (COTP), or his on-scene representative. (2) The safety zone is closed to all vessel traffic, except as may be permitted by the COTP or his on-scene representative. (3) The ‘‘on-scene representative’’ of COTP is any Coast Guard commissioned, warrant or petty officer or a Federal, State, or local law enforcement officer designated by or assisting the Captain of the Port Detroit to act on his behalf. (4) Vessel operators shall contact the COTP or his on-scene representative to obtain permission to enter or operate within the safety zone. The COTP or his on-scene representative may be contacted via VHF Channel 16 or at (313) 568–9560. Vessel operators given permission to enter or operate in the regulated area must comply with all directions given to them by the COTP or his on-scene representative. Dated: July 17, 2018. Jeffrey W. Novak, Captain, U.S. Coast Guard, Captain of the Port Detroit. [FR Doc. 2018–15671 Filed 7–20–18; 8:45 am] I. Table of Abbreviations BILLING CODE 9110–04–P CFR Code of Federal Regulations COTP Captain of the Port DHS Department of Homeland Security FR Federal Register LNM Local Notice to Mariners NPRM Notice of proposed rulemaking RNA Regulated Navigation Area § Section U.S.C. United States Code DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket Number USCG–2018–0523] amozie on DSK3GDR082PROD with RULES RIN 1625–AA00; 1625–AA11 Regulated Navigation Area and Safety Zone, Harlem River and Hudson River, Manhattan, NY Coast Guard, DHS. Temporary final rule. AGENCY: ACTION: The Coast Guard is revising a previously established temporary regulated navigation area and safety SUMMARY: VerDate Sep<11>2014 16:12 Jul 20, 2018 Jkt 244001 zone for waters of the Harlem and Hudson Rivers in the vicinity of the Amtrak Spuyten Duyvil Railroad Bridge at mile 7.9 over the Harlem River. The regulated navigation area and safety zone protect personnel, vessels, and the marine environment from potential hazards created by the reinstallation of the swing span portion of the Spuyten Duyvil Railroad Bridge. During heavy lift operations vessels transiting the Hudson River must abide by the established speed restrictions to eliminate vessel wake. During heavy lift operations entry of vessels or persons into this safety zone is prohibited unless specifically authorized by the First District Commander or a designated representative. DATES: This rule is effective without actual notice from July 23, 2018 through September 30, 2018. For the purposes of enforcement, actual notice will be used from July 15, 2018 through July 23, 2018. ADDRESSES: To view documents mentioned in this preamble as being available in the docket, go to https:// www.regulations.gov, type USCG–2018– 0523 in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this rule. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or email Mr. Craig Lapiejko, Waterways Management, First Coast Guard District; telephone (617) 223–8351, email Craig.D.Lapiejko@uscg.mil. You may also call or email Mr. Jeff Yunker, Waterways Management Division, U.S. Coast Guard Sector New York, telephone (718) 354–4195, email Jeff.M.Yunker@uscg.mil. SUPPLEMENTARY INFORMATION: II. Background Information and Regulatory History On May 1, 2018, Amtrak sent the U.S. Coast Guard a letter describing work it would be conducting to remove and replace the moveable portion of the Spuyten Duyvil Railroad Bridge over the Harlem River at mile 7.9. On May 7, 2018, the U.S. Coast Guard District One Bridge Administration notified Amtrak, the bridge owner, that it had no objections to the proposed project. PO 00000 Frm 00018 Fmt 4700 Sfmt 4700 From May 27 to September 29, 2018, Amtrak will be repairing the Spuyten Duyvil Railroad Bridge. This repair project consists of two phases, removal and reinstallation, of the swing span of the bridge. On June 22, 2018, the Coast Guard issued a temporary final rule establishing a regulated navigation area and safety zone that covered both of these phases, 83 FR 29007. On June 26, 2018 the Coast Guard received notification from the repair project contractor that the reinstallation of the swing span of the bridge is potentially delayed and will be conducted over a three-day period between July 15, 2018 and August 4, 2018. As a result the Coast Guard is revising this rule so that the regulated navigation area and safety zone covers the entire three week reinstallation phase that remains to be completed. During the installation of the swing span a barge and support vessels will be staged near the bridge. The swing span will be lifted from a support barge by a heavy lift crane barge and installed. The preparation for and reinstallation of the swing span will take approximately 72 hours. Amtrak anticipates this work will be conducted over a three-day period between July 15, 2018 and August 4, 2018. The Coast Guard is issuing this temporary rule without prior notice and opportunity to comment pursuant to authority under section 4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)(B). This provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are ‘‘impracticable, unnecessary, or contrary to the public interest.’’ Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for not publishing a notice of proposed rulemaking (NPRM) with respect to this rule because the schedule for the reinstallation of the swing span was only recently finalized and provided to the Coast Guard, and timely action is needed to respond to the potential safety hazards associated with this bridge project. The schedule for the repairs and notification to the Coast Guard was delayed by the late finalization of project details, including coordinating the heavy lift operations with the schedules of known waterway users, and writing a Maintenance of Waterway Traffic Plan. It is impracticable and contrary to the public interest to publish an NPRM because we must establish this RNA and safety zone by July 15, 2018, to allow for timely repairs to the bridge’s swing span and promote the safety of the public. E:\FR\FM\23JYR1.SGM 23JYR1

Agencies

[Federal Register Volume 83, Number 141 (Monday, July 23, 2018)]
[Rules and Regulations]
[Pages 34768-34770]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-15671]



[[Page 34768]]

-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 165

[Docket No. USCG-2018-0669]
RIN 1625-AA00


Safety Zone; Port Huron Float Down, St. Clair River, Port Huron, 
MI

AGENCY: Coast Guard, DHS.

ACTION: Temporary final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is establishing a temporary safety zone on the 
waters of the St. Clair River in the vicinity of Port Huron, MI. This 
zone is intended to restrict and control movement of vessels in a 
portion of the St. Clair River. Though this is an unsanctioned, non-
permitted marine event, this zone is necessary to provide for the 
safety of life on the navigable waters during a float down event near 
Port Huron, MI.

DATES: This temporary final rule is effective from 12 p.m. through 8 
p.m. on August 19, 2018.

ADDRESSES: To view documents mentioned in this preamble as being 
available in the docket, go to https://www.regulations.gov, type USCG-
2018-0669 in the ``SEARCH'' box and click ``SEARCH.'' Click on Open 
Docket Folder on the line associated with this rule.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary rule, call or email Tracy Girard, Prevention Department, 
Sector Detroit, Coast Guard; telephone 313-568-9564, or email 
[email protected].

SUPPLEMENTARY INFORMATION:

I. Table of Abbreviations

CFR Code of Federal Regulations
COTP Captain of the Port Detroit
DHS Department of Homeland Security
FR Federal Register
NPRM Notice of Proposed Rulemaking
Sec.  Section
U.S.C. United States Code

II. Background Information and Regulatory History

    During the afternoon of August 19, 2018, a non-sanctioned public 
event is scheduled to take place. The event is advertised over various 
social-media sites, in which a large number of persons float down a 
segment of the St. Clair River, using inner tubes and other similar 
floatation devices. The 2018 float down event will occur between 
approximately 12 p.m. and 8 p.m. on August 19, 2018. This non-
sanctioned event has taken place in the month of August annually since 
2009.
    No private or municipal entity requested a marine event permit from 
the Coast Guard for this event, and it has not received state or 
federal permits since its inception. The event has drawn over 5,000 
participants of various ages annually. Despite plans put together by 
federal, state and local officials, emergency responders and law 
enforcement officials have been overburdened pursuing safety during 
this event. Medical emergencies, people drifting across the 
international border, and people trespassing on residential property 
when trying to get out of the water before the designated finish line 
are some of the numerous difficulties encountered during the float down 
event.
    During the 2014 float-down event, a 19-year-old participant died. 
During the 2016 float down, a wind shift caused thousands of U.S. 
citizen rafters with no passports to drift into Canadian waters. The 
current and wind made it impossible for the rafters to paddle back into 
U.S. waters, necessitating significant coordination with the Canadian 
authorities. Despite these events, promotional information for the 
event continues to be published. More than 5,000 people are again 
anticipated to float down the river this year. No public or private 
organization holds themselves responsible as the event sponsor.
    The Coast Guard is issuing this temporary rule without prior notice 
and opportunity to comment pursuant to authority under section 4(a) of 
the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This 
provision authorizes an agency to issue a rule without prior notice and 
opportunity to comment when the agency for good cause finds that those 
procedures are ``impracticable, unnecessary, or contrary to the public 
interest.'' Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good 
cause exists for not publishing a notice of proposed rulemaking (NPRM) 
with respect to this rule because doing so would be impracticable. The 
Coast Guard did not receive the final details of this float down event 
in time to publish an NPRM. As such, it is impracticable to publish an 
NPRM because we lack sufficient time to provide a reasonable comment 
period and then consider those comments before issuing the rule.
    Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause 
exists for making this rule effective less than 30 days after 
publication in the Federal Register. Delaying the effective date of 
this rule would inhibit the Coast Guard's ability to protect 
participants, mariners and vessels from the hazards associated with 
this event.

III. Legal Authority and Need for Rule

    The Coast Guard is issuing this rule under authority in 33 U.S.C. 
1231. The Captain of the Port Detroit (COTP) has determined the float 
down poses significant risk to public safety and property from 12 p.m. 
to 8 p.m. on August 19, 2018. The likely combination of large numbers 
of participants, strong river currents, limited rescue resources, and 
difficult emergency response scenarios could easily result in serious 
injuries or fatalities to float down participants and spectators. 
Therefore, the COTP is establishing a safety zone around the event 
location to help minimize risks to safety of life and property during 
this event.

IV. Discussion of the Rule

    This rule establishes a safety zone from 12 p.m. to 8 p.m. on 
August 19, 2018. The safety zone will begin at Lighthouse Beach and 
encompass all U.S. waters of the St. Clair River bound by a line 
starting at a point on land north of Coast Guard Station Port Huron at 
position 43[deg]00.416' N; 082[deg]25.333' W, extending east to the 
international boundary to a point at position 43[deg]00.416' N; 
082[deg]25.033' W, following south along the international boundary to 
a point at position 42[deg]54.500' N; 082[deg]27.683' W, extending west 
to a point on land just north of Stag Island at position 42[deg]54.500' 
N; 082[deg]27.966' W, and following north along the U.S. shoreline to 
the point of origin (NAD 83). No vessel or person will be permitted to 
enter the safety zone without obtaining permission from the COTP or a 
designated representative. Vessel operators must contact the COTP or 
his on-scene representative to obtain permission to transit through 
this safety zone. Additionally, no one under the age of 18 will be 
permitted to enter the safety zone if they are not wearing a Coast 
Guard approved personal floatation device. The COTP or his on-scene 
representative may be contacted via VHF Channel 16.

V. Regulatory Analyses

    We developed this rule after considering numerous statutes and 
Executive orders related to rulemaking. Below we summarize our analyses 
based on a number of these statutes and Executive orders, and we 
discuss First Amendment rights of protestors.

[[Page 34769]]

A. Regulatory Planning and Review

    Executive Orders 12866 and 13563 direct agencies to assess the 
costs and benefits of available regulatory alternatives and, if 
regulation is necessary, to select regulatory approaches that maximize 
net benefits. Executive Order 13771 directs agencies to control 
regulatory costs through a budgeting process. This rule has not been 
designated a ``significant regulatory action,'' under Executive Order 
12866. Accordingly, this rule has not been reviewed by the Office of 
Management and Budget (OMB), and pursuant to OMB guidance it is exempt 
from the requirements of Executive Order 13771.
    This regulatory action determination is based on the size, 
location, duration, and time-of-year of the safety zone. Vessel traffic 
will not be able to safely transit around this safety zone which will 
impact a small designated area of the St. Clair River from 12 p.m. 
until 8 p.m. on August 19, 2018. Moreover, the Coast Guard will issue 
Broadcast Notice to Mariners (BNM) via VHF-FM marine channel 16 about 
the zone and the rule allows vessels to seek permission to enter the 
zone.

B. Impact on Small Entities

    The Regulatory Flexibility Act of 1980, 5 U.S.C. 601-612, as 
amended, requires Federal agencies to consider the potential impact of 
regulations on small entities during rulemaking. The term ``small 
entities'' comprises small businesses, not-for-profit organizations 
that are independently owned and operated and are not dominant in their 
fields, and governmental jurisdictions with populations of less than 
50,000. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule 
will not have a significant economic impact on a substantial number of 
small entities.
    While some owners or operators of vessels intending to transit the 
safety zone may be small entities, for the reasons stated in section 
V.A above, this rule will not have a significant economic impact on any 
vessel owner or operator.
    Under section 213(a) of the Small Business Regulatory Enforcement 
Fairness Act of 1996 (Pub. L. 104-121), we want to assist small 
entities in understanding this rule. If the rule would affect your 
small business, organization, or governmental jurisdiction and you have 
questions concerning its provisions or options for compliance, please 
contact the person listed in the FOR FURTHER INFORMATION CONTACT 
section.
    Small businesses may send comments on the actions of Federal 
employees who enforce, or otherwise determine compliance with, Federal 
regulations to the Small Business and Agriculture Regulatory 
Enforcement Ombudsman and the Regional Small Business Regulatory 
Fairness Boards. The Ombudsman evaluates these actions annually and 
rates each agency's responsiveness to small business. If you wish to 
comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR 
(1-888-734-3247). The Coast Guard will not retaliate against small 
entities that question or complain about this rule or any policy or 
action of the Coast Guard.

C. Collection of Information

    This rule will not call for a new collection of information under 
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

D. Federalism and Indian Tribal Governments

    A rule has implications for federalism under Executive Order 13132, 
Federalism, if it has a substantial direct effect on the States, on the 
relationship between the national government and the States, or on the 
distribution of power and responsibilities among the various levels of 
government. We have analyzed this rule under that Order and have 
determined that it is consistent with the fundamental federalism 
principles and preemption requirements described in Executive Order 
13132.
    Also, this rule does not have tribal implications under Executive 
Order 13175, Consultation and Coordination with Indian Tribal 
Governments, because it does not have a substantial direct effect on 
one or more Indian tribes, on the relationship between the Federal 
Government and Indian tribes, or on the distribution of power and 
responsibilities between the Federal Government and Indian tribes. If 
you believe this rule has implications for federalism or Indian tribes, 
please contact the person listed in the FOR FURTHER INFORMATION CONTACT 
section above.

E. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) 
requires Federal agencies to assess the effects of their discretionary 
regulatory actions. In particular, the Act addresses actions that may 
result in the expenditure by a State, local, or tribal government, in 
the aggregate, or by the private sector of $100,000,000 (adjusted for 
inflation) or more in any one year. Though this rule will not result in 
such an expenditure, we do discuss the effects of this rule elsewhere 
in this preamble.

F. Environment

    We have analyzed this rule under Department of Homeland Security 
Directive 023-01 and Commandant Instruction M16475.1D, which guide the 
Coast Guard in complying with the National Environmental Policy Act of 
1969 (42 U.S.C. 4321-4370f), and have determined that this action is 
one of a category of actions that do not individually or cumulatively 
have a significant effect on the human environment. This rule involves 
a safety zone lasting eight hours that will prohibit entry into a 
designated area. It is categorically excluded from further review under 
paragraph L60(a) of Appendix A, Table 1 of DHS Instruction Manual 023-
01-001-01, Rev. 01. A Record of Environmental Consideration supporting 
this determination is available in the docket where indicated under 
ADDRESSES.

G. Protest Activities

    The Coast Guard respects the First Amendment rights of protesters. 
Protesters are asked to contact the person listed in the FOR FURTHER 
INFORMATION CONTACT section to coordinate protest activities so that 
your message can be received without jeopardizing the safety or 
security of people, places or vessels.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements, Security measures, Waterways.

    For the reasons discussed in the preamble, the Coast Guard amends 
33 CFR part 165 as follows:

PART 165--REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS

0
1. The authority citation for part 165 continues to read as follows:

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1, 6.04-1, 
6.04-6, and 160.5; Department of Homeland Security Delegation No. 
0170.1.

0
 2. Add Sec.  165.T09-0669 to read as follows:


Sec.  165.T09-0669  Safety Zone; Port Huron Float Down, St. Clair 
River, Port Huron, MI.

    (a) Location. A safety zone is established to include all U.S. 
navigable waters of southern Lake Huron and the St. Clair River 
adjacent to Port Huron, MI, beginning at Lighthouse Beach and 
encompassing all U.S. waters of the St. Clair River bound by a line 
starting at a point on land north of Coast Guard Station Port Huron at 
position 43[deg]00.416' N, 082[deg]25.333' W, extending east to the 
international boundary to a

[[Page 34770]]

point at position 43[deg]00.416' N, 082[deg]25.033' W, following south 
along the international boundary to a point at position 42[deg]54.500' 
N, 082[deg]27.683' W, extending west to a point on land just north of 
Stag Island at position 42[deg]54.500' N, 082[deg]27.966' W, and 
following north along the U.S. shoreline to the point of origin (NAD 
83).
    (b) Enforcement period. The regulated area described in paragraph 
(a) of this section will be in enforced from 12 p.m. through 8 p.m. 
August 19, 2018.
    (c) Regulations. (1) No vessel or person may enter, transit 
through, or anchor within the safety zone unless authorized by the 
Captain of the Port Detroit (COTP), or his on-scene representative.
    (2) The safety zone is closed to all vessel traffic, except as may 
be permitted by the COTP or his on-scene representative.
    (3) The ``on-scene representative'' of COTP is any Coast Guard 
commissioned, warrant or petty officer or a Federal, State, or local 
law enforcement officer designated by or assisting the Captain of the 
Port Detroit to act on his behalf.
    (4) Vessel operators shall contact the COTP or his on-scene 
representative to obtain permission to enter or operate within the 
safety zone. The COTP or his on-scene representative may be contacted 
via VHF Channel 16 or at (313) 568-9560. Vessel operators given 
permission to enter or operate in the regulated area must comply with 
all directions given to them by the COTP or his on-scene 
representative.

    Dated: July 17, 2018.
Jeffrey W. Novak,
Captain, U.S. Coast Guard, Captain of the Port Detroit.