Federal Register / Vol. 83, No. 140 / Friday, July 20, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–518–000]
daltland on DSKBBV9HB2PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on July 6, 2018,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street,
Houston, Texas 77002–2700, filed in
Docket No. CP18–518–000 a prior notice
request pursuant to sections 157.205,
and 157.216 of the Commission’s
regulations under the Natural Gas Act
for authorization to abandon 12
injection/withdrawal wells and
associated pipelines and appurtenances
at five of Columbia’s Ohio storage fields
located in Ashland, Medina, and
Richland counties, Ohio. Columbia
proposes to abandon these facilities
under authorities granted by its blanket
certificate issued in Docket No. CP83–
76–000, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Linda
Farquhar, Manager, Project
Determinations & Regulatory
Administration, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Houston, Texas 77002–2700 at
(832) 320–5685 or at linda_farquhar@
transcanada.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
VerDate Sep<11>2014
18:06 Jul 19, 2018
Jkt 244001
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s website (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy regulatory Commission, 888
First Street NE, Washington, DC 20426.
Dated: July 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–15559 Filed 7–19–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Docket Nos.
Stella Wind Farm, LLC ................
Calpine Mid-Merit II, LLC ............
GenOn Holdco 10, LLC ...............
CED Upton County Solar, LLC ...
CED Wistaria Solar, LLC .............
Walnut Ridge Wind, LLC .............
Pine River Wind Energy LLC ......
Sholes Wind Energy, LLC ...........
EG18–72–000
EG18–73–000
EG18–74–000
EG18–75–000
EG18–76–000
EG18–77–000
EG18–78–000
EG18–79–000
Take notice that during the month of
June 2018, the status of the abovecaptioned entities as Exempt Wholesale
Generators Companies became effective
by operation of the Commission’s
regulations. 18 CFR 366.7(a) (2017).
Dated: July 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–15558 Filed 7–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD18–5–000]
Billing Procedures for Annual Charges
for the Costs of Other Federal
Agencies for Administering Part I of
the Federal Power Act; Notice
Reporting Costs for Other Federal
Agencies’ Administrative Annual
Charges for Fiscal Year 2017
1. The Federal Energy Regulatory
Commission (Commission) is required
to determine the reasonableness of costs
incurred by other Federal agencies
(OFAs) 1 in connection with their
participation in the Commission’s
proceedings under the Federal Power
Act (FPA) Part I 2 when those agencies
seek to include such costs in the
administrative charges licensees must
pay to reimburse the United States for
the cost of administering Part I.3 The
Commission’s Order on Remand and
1 The OFAs include: the U.S. Department of the
Interior (Bureau of Indian Affairs, Bureau of Land
Management, Bureau of Reclamation, National Park
Service, U.S. Fish and Wildlife Service, Office of
the Solicitor, Office of Environmental Policy &
Compliance, Office of Hearings and Appeals, and
Office of Policy Analysis); the U.S. Department of
Agriculture (U.S. Forest Service); the U.S.
Department of Commerce (National Marine
Fisheries Service); and the U.S. Army Corps of
Engineers.
2 16 U.S.C. 791a–823d (2012).
3 See id. 803(e)(1) and 42 U.S.C. 7178.
E:\FR\FM\20JYN1.SGM
20JYN1
Agencies
[Federal Register Volume 83, Number 140 (Friday, July 20, 2018)]
[Notices]
[Page 34568]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-15558]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Stella Wind Farm, LLC................... EG18-72-000
Calpine Mid-Merit II, LLC............... EG18-73-000
GenOn Holdco 10, LLC.................... EG18-74-000
CED Upton County Solar, LLC............. EG18-75-000
CED Wistaria Solar, LLC................. EG18-76-000
Walnut Ridge Wind, LLC.................. EG18-77-000
Pine River Wind Energy LLC.............. EG18-78-000
Sholes Wind Energy, LLC................. EG18-79-000
------------------------------------------------------------------------
Take notice that during the month of June 2018, the status of the
above-captioned entities as Exempt Wholesale Generators Companies
became effective by operation of the Commission's regulations. 18 CFR
366.7(a) (2017).
Dated: July 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-15558 Filed 7-19-18; 8:45 am]