Swan Lake North Hydro LLC; Notice of Modification of Procedural Schedule, 34566 [2018-15485]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
34566
Federal Register / Vol. 83, No. 140 / Friday, July 20, 2018 / Notices
Docket No. ER18–1403, Southwest
Power Pool, Inc.
Docket No. ER18–1426, Southwest
Power Pool, Inc.
Docket No. ER18–1542, Southwest
Power Pool, Inc.
Docket No. ER18–1562, Southwest
Power Pool, Inc.
Docket No. ER18–1568, Southwest
Power Pool, Inc.
Docket No. ER18–1572, Southwest
Power Pool, Inc.
Docket No. ER18–1590, Southwest
Power Pool, Inc.
Docket No. ER18–1632, Southwest
Power Pool, Inc.
Docket No. ER18–1643, Southwest
Power Pool, Inc.
Docket No. ER18–1662, Southwest
Power Pool, Inc.
Docket No. ER18–1680, Southwest
Power Pool, Inc.
Docket No. ER18–1701, Southwest
Power Pool, Inc.
Docket No. ER18–1702, Southwest
Power Pool, Inc.
Docket No. ER18–1742, Southwest
Power Pool, Inc.
Docket No. ER18–1747, Southwest
Power Pool, Inc.
Docket No. ER18–1753, Southwest
Power Pool, Inc.
Docket No. ER18–1756, Southwest
Power Pool, Inc.
Docket No. ER18–1757, Southwest
Power Pool, Inc.
Docket No. ER18–1768, Southwest
Power Pool, Inc.
Docket No. ER18–1776, Southwest
Power Pool, Inc.
Docket No. ER18–1780, Southwest
Power Pool, Inc.
Docket No. ER18–1781, Southwest
Power Pool, Inc.
Docket No. ER18–1789, Southwest
Power Pool, Inc.
Docket No. ER18–1811, Southwest
Power Pool, Inc.
Docket No. ER18–1816, Midwest Power
Transmission Arkansas, LLC
Docket No. ER18–1838, Southwest
Power Pool, Inc.
Docket No. ER18–1854, Southwest
Power Pool, Inc.
Docket No. ER18–1864, Southwest
Power Pool, Inc.
Docket No. ER18–1867, Southwest
Power Pool, Inc.
Docket No. ER18–1872, Southwest
Power Pool, Inc.
Docket No. ER18–1881, Southwest
Power Pool, Inc. Docket No. ER18–
1898, Southwest Power Pool, Inc.
Docket No. ER18–1904, Southwest
Power Pool, Inc.
Docket No. ER18–1919, Southwest
Power Pool, Inc.
Docket No. ER18–1921, Southwest
Power Pool, Inc.
VerDate Sep<11>2014
18:06 Jul 19, 2018
Jkt 244001
Docket No. ER18–1923, Southwest
Power Pool, Inc.
Docket No. ER18–1963, Midwest Energy,
Inc.
Docket No. TX18–1, AEP Energy
Partners, Inc.
This meeting is open to the public.
For more information, contact Patrick
Clarey, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov.
Dated: July 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–15479 Filed 7–19–18; 8:45 am]
BILLING CODE 6717–01–P
to the following revised schedule.
Revisions to the schedule may be made
as appropriate. If a date falls on a
weekend or holiday, the due date will
be the following business day.
Milestone
Commission Issues Draft EIS ...
Comments on Draft EIS ...........
Commission Issues Final EIS ...
Target date
September
2018.
November
2018.
January
2019.
Dated: July 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–15485 Filed 7–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Project No. 13318–003]
Federal Energy Regulatory
Commission
Swan Lake North Hydro LLC; Notice of
Modification of Procedural Schedule
Combined Notice of Filings
Take notice that the schedule for
processing the following hydroelectric
application has been modified.
a. Type of Application: Original
License (Major Project).
b. Project No.: 13318–003.
c. Date Filed: October 28, 2015.
d. Applicant: Swan Lake North Hydro
LLC.
e. Name of Project: Swan Lake North
Pumped Storage Hydroelectric Project.
f. Location: The project would be
located about 11 miles northeast of
Klamath Falls, in Klamath County,
Oregon. The project would occupy
about 730 acres of federal lands
administered by the Bureau of Land
Management and the Bureau of
Reclamation, state lands, and private
lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Erik Steimle,
Rye Development LLC, 745 Atlantic
Avenue, 8th Floor, Boston, MA 02111.
Telephone: (503) 998–0230; Email:
erik@ryedevelopment.com.
i. FERC Contact: Dianne Rodman at
(202) 502–6077 or dianne.rodman@
ferc.gov.
j. Procedural Schedule: The
Commission’s December 20, 2017
Notice of Application Ready for
Environmental Analysis established
August 2018 as the estimated date for
issuing the Draft Environmental Impact
Statement (EIS). The revised estimate
for issuing the Draft EIS is now
September 2018. As such, the
application will be processed according
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP17–248–000.
Applicants: Dakota Natural Gas, LLC.
Description: Application for a Limited
Jurisdiction Hinshaw Blanket Certificate
and Approval of Rates, et al. and
Request for Expedited Treatment of
Dakota Natural Gas, LLC.
Filed Date: 6/28/18.
Accession Number: 20180628–5177.
Comments Due: 5 p.m. ET 7/20/18.
Docket Numbers: RP17–248–000.
Applicants: Kern River Gas
Transmission Company.
Description: Kern River Gas
Transmission Company submits tariff
filing per 154.501: Refund Report.
Filed Date: 7/10/18.
Accession Number: 20180710–5116.
Comments Due: 5 p.m. ET 7/23/18.
Docket Numbers: RP18–556–002.
Applicants: Southern Natural Gas
Company, L.L.C.
Description: Compliance filing Rate
Case Settlement—2018 Implementation
to be effective 9/1/2018.
Filed Date: 7/11/18.
Accession Number: 20180711–5018.
Comments Due: 5 p.m. ET 7/23/18.
Docket Numbers: RP18–967–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: Gulf
Markets—MC Global NRA and NonConforming Agrmt to be effective 8/1/
2018.
E:\FR\FM\20JYN1.SGM
20JYN1
Agencies
[Federal Register Volume 83, Number 140 (Friday, July 20, 2018)]
[Notices]
[Page 34566]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-15485]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13318-003]
Swan Lake North Hydro LLC; Notice of Modification of Procedural
Schedule
Take notice that the schedule for processing the following
hydroelectric application has been modified.
a. Type of Application: Original License (Major Project).
b. Project No.: 13318-003.
c. Date Filed: October 28, 2015.
d. Applicant: Swan Lake North Hydro LLC.
e. Name of Project: Swan Lake North Pumped Storage Hydroelectric
Project.
f. Location: The project would be located about 11 miles northeast
of Klamath Falls, in Klamath County, Oregon. The project would occupy
about 730 acres of federal lands administered by the Bureau of Land
Management and the Bureau of Reclamation, state lands, and private
lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Erik Steimle, Rye Development LLC, 745
Atlantic Avenue, 8th Floor, Boston, MA 02111. Telephone: (503) 998-
0230; Email: [email protected].
i. FERC Contact: Dianne Rodman at (202) 502-6077 or
[email protected].
j. Procedural Schedule: The Commission's December 20, 2017 Notice
of Application Ready for Environmental Analysis established August 2018
as the estimated date for issuing the Draft Environmental Impact
Statement (EIS). The revised estimate for issuing the Draft EIS is now
September 2018. As such, the application will be processed according to
the following revised schedule. Revisions to the schedule may be made
as appropriate. If a date falls on a weekend or holiday, the due date
will be the following business day.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission Issues Draft EIS............... September 2018.
Comments on Draft EIS..................... November 2018.
Commission Issues Final EIS............... January 2019.
------------------------------------------------------------------------
Dated: July 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-15485 Filed 7-19-18; 8:45 am]