South Carolina Electric & Gas Company; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 33215-33216 [2018-15256]
Download as PDF
Federal Register / Vol. 83, No. 137 / Tuesday, July 17, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1894–211]
South Carolina Electric & Gas
Company; Notice of Application
Tendered for Filing With the
Commission and Soliciting Additional
Study Requests and Establishing
Procedural Schedule for Relicensing
and a Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–1894–211.
c. Date filed: June 28, 2018.
d. Applicant: South Carolina Electric
& Gas Company (SCE&G).
e. Name of Project: Parr Hydroelectric
Project.
f. Location: The existing project is
located on the Broad River, in Newberry
and Fairfield Counties, South Carolina.
The project includes 162.61 acres of
federal lands administered by the U.S.
Forest Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. William
Argentieri, P.E., Manager of Civil
Engineering, South Carolina Electric &
Gas Company, 220 Operation Way, Mail
Code A221, Cayce, SC 29033–3701;
(803) 217–9162; or email at bargentieri@
scana.com.
i. FERC Contact: Monte TerHaar at
(202) 502–6035; or monte.terhaar@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Cooperating agencies: Federal,
state, local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item m below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC 61,076 (2001).
l. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
m. Deadline for filing additional study
requests and requests for cooperating
agency status: August 27, 2018.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–1894–211.
n. Project Description: The project
consists of two developments; the 14.88
Megawatt (MW) Parr Shoals
Development and the 511.2–MW
Fairfield Pumped Storage Development.
The Parr Shoals Development consists
of: (1) The 15-mile-long, 4,250-acre Parr
Reservoir, at full pond elevation 265.3
feet North American Vertical Datum of
1988 (NAVD 88); (2) the 2,690-foot-long
Parr Shoals Dam, which includes a nonoverflow section and powerhouse intake
section; (3) a powerhouse integral with
the dam, with six generating units; and
(4) transmission facilities that consist of
three 950-foot-long, 13.8-kilovolt lines
extending from the hydro station to the
non-project Parr sub-station.
The Fairfield Pumped Storage
Development consists of: (1) The 6,800acre Monticello Reservoir (upper
reservoir), at normal maximum
elevation 424.3 feet NAVD 88, formed
by four earthen dams (A, B, C, and D);
(2) a 265-foot-long gated intake channel,
located between dams B and C; (3) four
800-foot-long surface penstocks
bifurcating into eight penstocks; (4) an
underground generating station, which
houses eight pumped-turbine units; and
(5) transmission facilities that consist of
three 7,000-foot-long lines extending
from the Fairfield switch station to the
non-project V.C. Summer switchyard.
The Fairfield Pumped Storage
Development is operated to generate
during peak demand periods.
Generation usually occurs during the
day, with the upper reservoir
replenished by pumping water at night
(non-peak period). The Parr Shoals
Development serves as the lower
reservoir for the pumped storage project.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room, or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made, as appropriate.
daltland on DSKBBV9HB2PROD with NOTICES
Milestone
Target date
Issue Deficiency Letter (if necessary) ..........................................................................................................................................
Request Additional Information ....................................................................................................................................................
Issue Scoping Document 1 for comments ...................................................................................................................................
Comments on Scoping Document 1 ............................................................................................................................................
Issue Notice of Ready for Environmental Analysis .....................................................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .........................................................
Commission issues EA or draft EA .............................................................................................................................................
Comments on EA or draft EA ......................................................................................................................................................
Commission Issues Final EA (if necessary) ................................................................................................................................
VerDate Sep<11>2014
17:07 Jul 16, 2018
Jkt 244001
PO 00000
Frm 00024
Fmt 4703
33215
Sfmt 4703
E:\FR\FM\17JYN1.SGM
17JYN1
September 2018.
September 2018.
October 2018.
December 2018.
August 2019.
October 2019.
February 2020.
April 2020.
June 2020.
33216
Federal Register / Vol. 83, No. 137 / Tuesday, July 17, 2018 / Notices
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: July 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–15256 Filed 7–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–1990–000]
Dated: July 11, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
daltland on DSKBBV9HB2PROD with NOTICES
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: Stonepeak Kestrel
Energy Marketing LLC
[FR Doc. 2018–15200 Filed 7–16–18; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding Stonepeak
Kestrel Energy Marketing LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 31,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
VerDate Sep<11>2014
17:07 Jul 16, 2018
Jkt 244001
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–280–004.
Applicants: Lee County Generating
Station, LLC.
Description: Compliance filing:
Reactive Tariff Compliance Filing to be
effective 10/11/2017.
Filed Date: 7/11/18.
Accession Number: 20180711–5131.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–366–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: Report Filing: 2018–07–
11_Refund Report for Ameren-Kirkwood
1st Rev WDS to be effective N/A.
Filed Date: 7/11/18.
Accession Number: 20180711–5127.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–1607–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–07–11_Amendment to Manual
Redispatch filing to be effective
5/16/2018.
Filed Date: 7/11/18.
Accession Number: 20180711–5107.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–1611–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Amendment to May 15,
2018 Limited Tariff Waiver Request of
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Midcontinent Independent System
Operator, Inc.
Filed Date: 7/11/18.
Accession Number: 20180711–5129.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–1995–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 5128; Queue
No. AD1–156 to be effective 6/15/2018.
Filed Date: 7/11/18.
Accession Number: 20180711–5042.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–1996–000.
Applicants: Transource Pennsylvania,
LLC.
Description: Application for
Authorization Under Section 205 of the
Federal Power Act of Transource
Pennsylvania, LLC.
Filed Date: 7/11/18.
Accession Number: 20180711–5064.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–1997–000.
Applicants: Transource Maryland,
LLC.
Description: Application for
Authorization Under Section 205 of the
Federal Power Act of Transource
Maryland, LLC.
Filed Date: 7/11/18.
Accession Number: 20180711–5065.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–1998–000.
Applicants: Alabama Power
Company.
Description: Tariff Cancellation:
Teichos Energy (Wildwood Solar) SGIA
Termination Filing to be effective
6/6/2018.
Filed Date: 7/11/18.
Accession Number: 20180711–5089.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–1999–000.
Applicants: FirstEnergy Solutions
Corp.
Description: Request of FirstEnergy
Solutions Corp. for Authorization to
Make Wholesale Power Sales to an
Affiliate.
Filed Date: 7/11/18.
Accession Number: 20180711–5106.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–2000–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions of
APS to be effective 9/10/2018.
Filed Date: 7/11/18.
Accession Number: 20180711–5110.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–2001–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
MidAmerican Energy Company.
E:\FR\FM\17JYN1.SGM
17JYN1
Agencies
[Federal Register Volume 83, Number 137 (Tuesday, July 17, 2018)]
[Notices]
[Pages 33215-33216]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-15256]
[[Page 33215]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1894-211]
South Carolina Electric & Gas Company; Notice of Application
Tendered for Filing With the Commission and Soliciting Additional Study
Requests and Establishing Procedural Schedule for Relicensing and a
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-1894-211.
c. Date filed: June 28, 2018.
d. Applicant: South Carolina Electric & Gas Company (SCE&G).
e. Name of Project: Parr Hydroelectric Project.
f. Location: The existing project is located on the Broad River, in
Newberry and Fairfield Counties, South Carolina. The project includes
162.61 acres of federal lands administered by the U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. William Argentieri, P.E., Manager of
Civil Engineering, South Carolina Electric & Gas Company, 220 Operation
Way, Mail Code A221, Cayce, SC 29033-3701; (803) 217-9162; or email at
[email protected].
i. FERC Contact: Monte TerHaar at (202) 502-6035; or
[email protected].
j. This application is not ready for environmental analysis at this
time.
k. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item m below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC
61,076 (2001).
l. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
m. Deadline for filing additional study requests and requests for
cooperating agency status: August 27, 2018.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first page of any filing should include
docket number P-1894-211.
n. Project Description: The project consists of two developments;
the 14.88 Megawatt (MW) Parr Shoals Development and the 511.2-MW
Fairfield Pumped Storage Development.
The Parr Shoals Development consists of: (1) The 15-mile-long,
4,250-acre Parr Reservoir, at full pond elevation 265.3 feet North
American Vertical Datum of 1988 (NAVD 88); (2) the 2,690-foot-long Parr
Shoals Dam, which includes a non-overflow section and powerhouse intake
section; (3) a powerhouse integral with the dam, with six generating
units; and (4) transmission facilities that consist of three 950-foot-
long, 13.8-kilovolt lines extending from the hydro station to the non-
project Parr sub-station.
The Fairfield Pumped Storage Development consists of: (1) The
6,800-acre Monticello Reservoir (upper reservoir), at normal maximum
elevation 424.3 feet NAVD 88, formed by four earthen dams (A, B, C, and
D); (2) a 265-foot-long gated intake channel, located between dams B
and C; (3) four 800-foot-long surface penstocks bifurcating into eight
penstocks; (4) an underground generating station, which houses eight
pumped-turbine units; and (5) transmission facilities that consist of
three 7,000-foot-long lines extending from the Fairfield switch station
to the non-project V.C. Summer switchyard.
The Fairfield Pumped Storage Development is operated to generate
during peak demand periods. Generation usually occurs during the day,
with the upper reservoir replenished by pumping water at night (non-
peak period). The Parr Shoals Development serves as the lower reservoir
for the pumped storage project.
o. A copy of the application is available for review at the
Commission in the Public Reference Room, or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field, to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made, as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary) September 2018.
Request Additional Information........ September 2018.
Issue Scoping Document 1 for comments. October 2018.
Comments on Scoping Document 1........ December 2018.
Issue Notice of Ready for August 2019.
Environmental Analysis.
Filing of recommendations, preliminary October 2019.
terms and conditions, and fishway
prescriptions.
Commission issues EA or draft EA...... February 2020.
Comments on EA or draft EA............ April 2020.
Commission Issues Final EA (if June 2020.
necessary).
------------------------------------------------------------------------
[[Page 33216]]
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: July 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-15256 Filed 7-16-18; 8:45 am]
BILLING CODE 6717-01-P