Notice of Settlement Agreement and Soliciting Comments: South Carolina Electric & Gas Company, 33217 [2018-15255]

Download as PDF Federal Register / Vol. 83, No. 137 / Tuesday, July 17, 2018 / Notices Description: § 205(d) Rate Filing: 2018–07–11_SA 3129 MidAmericanGlaciers Edge Wind E&P (J506) to be effective 6/21/2018. Filed Date: 7/11/18. Accession Number: 20180711–5115. Comments Due: 5 p.m. ET 8/1/18. Docket Numbers: ER18–2002–000. Applicants: Essential Power Rock Springs, LLC. Description: § 205(d) Rate Filing: Reactive Rate Schedule to be effective 12/31/9998. Filed Date: 7/11/18. Accession Number: 20180711–5137. Comments Due: 5 p.m. ET 8/1/18. Docket Numbers: ER18–2003–000. Applicants: Lorenzo Wind, LLC. Description: Baseline eTariff Filing: Lorenzo Wind,LLC Application for Market-Based Rate Authority to be effective 9/1/2018. Filed Date: 7/11/18. Accession Number: 20180711–5153. Comments Due: 5 p.m. ET 8/1/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 11, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–15198 Filed 7–16–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission daltland on DSKBBV9HB2PROD with NOTICES [Project No. 1894–211] Notice of Settlement Agreement and Soliciting Comments: South Carolina Electric & Gas Company Take notice that the following settlement agreement has been filed with the Commission and is available for public inspection. VerDate Sep<11>2014 17:07 Jul 16, 2018 Jkt 244001 a. Type of Application: Settlement Agreement. b. Project No.: P–1894–211. c. Date filed: June 28, 2018. d. Applicant: South Carolina Electric & Gas Company (SCE&G). e. Name of Project: Parr Hydroelectric Project. f. Location: The existing project is located on the Broad River, in Newberry and Fairfield Counties, South Carolina. The project includes 162.61 acres of federal lands administered by the U.S. Forest Service. g. Filed Pursuant to: Rule 602 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.602. h. Applicant Contact: Mr. William Argentieri, P.E., Manager of Civil Engineering, South Carolina Electric & Gas Company, 220 Operation Way, Mail Code A221, Cayce, SC 29033–3701; (803) 217–9162; or email bargentieri@ scana.com. i. FERC Contact: Monte TerHaar at (202) 502–6035; or monte.terhaar@ ferc.gov. j. Deadline for filing comments: Comments on the Settlement Agreement are due August 13, 2018. Reply comments are due August 27, 2018. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–1894–211. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Settlement: SCE&G filed a Settlement Agreement on behalf of itself, American Rivers, American Whitewater, Congaree Riverkeeper, Mr. Jeffrey Carter, and the South Carolina PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 33217 Department of Natural Resources. The U.S. Fish and Wildlife Service and the National Marine Fisheries Service are currently reviewing the Settlement Agreement. The purpose of the Settlement Agreement is to resolve, among the signatories, all issues associated with issuance of a new license for the project regarding recreation; flow fluctuations downstream from Parr Shoals Dam; fisheries habitat in Monticello Reservoir; monitoring of American eel and freshwater mussels; diadromous fish protection; enhancement of aquatic habitat; water quality; shoreline management and erosion in Parr and Monticello Reservoirs; and historic properties. SCE&G requests that the Commission accept and incorporate into any new license measures as described in Appendix A of the Settlement Agreement. In addition, Appendix B of the Settlement Agreement includes offlicense agreements between the signatories of the Settlement Agreement. l. A copy of the Settlement Agreement is available for review at the Commission in the Public Reference Room, or may be viewed on the Commission’s website at https:// www.ferc.gov, using the eLibrary link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: July 11, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–15255 Filed 7–16–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Number: PR18–64–000. Applicants: Columbia Gas of Ohio, Inc. E:\FR\FM\17JYN1.SGM 17JYN1

Agencies

[Federal Register Volume 83, Number 137 (Tuesday, July 17, 2018)]
[Notices]
[Page 33217]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-15255]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1894-211]


Notice of Settlement Agreement and Soliciting Comments: South 
Carolina Electric & Gas Company

    Take notice that the following settlement agreement has been filed 
with the Commission and is available for public inspection.
    a. Type of Application: Settlement Agreement.
    b. Project No.: P-1894-211.
    c. Date filed: June 28, 2018.
    d. Applicant: South Carolina Electric & Gas Company (SCE&G).
    e. Name of Project: Parr Hydroelectric Project.
    f. Location: The existing project is located on the Broad River, in 
Newberry and Fairfield Counties, South Carolina. The project includes 
162.61 acres of federal lands administered by the U.S. Forest Service.
    g. Filed Pursuant to: Rule 602 of the Commission's Rules of 
Practice and Procedure, 18 CFR 385.602.
    h. Applicant Contact: Mr. William Argentieri, P.E., Manager of 
Civil Engineering, South Carolina Electric & Gas Company, 220 Operation 
Way, Mail Code A221, Cayce, SC 29033-3701; (803) 217-9162; or email 
[email protected].
    i. FERC Contact: Monte TerHaar at (202) 502-6035; or 
[email protected].
    j. Deadline for filing comments: Comments on the Settlement 
Agreement are due August 13, 2018. Reply comments are due August 27, 
2018.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-1894-211.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. Description of Settlement: SCE&G filed a Settlement Agreement on 
behalf of itself, American Rivers, American Whitewater, Congaree 
Riverkeeper, Mr. Jeffrey Carter, and the South Carolina Department of 
Natural Resources. The U.S. Fish and Wildlife Service and the National 
Marine Fisheries Service are currently reviewing the Settlement 
Agreement. The purpose of the Settlement Agreement is to resolve, among 
the signatories, all issues associated with issuance of a new license 
for the project regarding recreation; flow fluctuations downstream from 
Parr Shoals Dam; fisheries habitat in Monticello Reservoir; monitoring 
of American eel and freshwater mussels; diadromous fish protection; 
enhancement of aquatic habitat; water quality; shoreline management and 
erosion in Parr and Monticello Reservoirs; and historic properties. 
SCE&G requests that the Commission accept and incorporate into any new 
license measures as described in Appendix A of the Settlement 
Agreement. In addition, Appendix B of the Settlement Agreement includes 
off-license agreements between the signatories of the Settlement 
Agreement.
    l. A copy of the Settlement Agreement is available for review at 
the Commission in the Public Reference Room, or may be viewed on the 
Commission's website at https://www.ferc.gov, using the eLibrary link. 
Enter the docket number, excluding the last three digits in the docket 
number field, to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: July 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-15255 Filed 7-16-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.