Combined Notice of Filings, 33217-33218 [2018-15199]
Download as PDF
Federal Register / Vol. 83, No. 137 / Tuesday, July 17, 2018 / Notices
Description: § 205(d) Rate Filing:
2018–07–11_SA 3129 MidAmericanGlaciers Edge Wind E&P (J506) to be
effective 6/21/2018.
Filed Date: 7/11/18.
Accession Number: 20180711–5115.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–2002–000.
Applicants: Essential Power Rock
Springs, LLC.
Description: § 205(d) Rate Filing:
Reactive Rate Schedule to be effective
12/31/9998.
Filed Date: 7/11/18.
Accession Number: 20180711–5137.
Comments Due: 5 p.m. ET 8/1/18.
Docket Numbers: ER18–2003–000.
Applicants: Lorenzo Wind, LLC.
Description: Baseline eTariff Filing:
Lorenzo Wind,LLC Application for
Market-Based Rate Authority to be
effective 9/1/2018.
Filed Date: 7/11/18.
Accession Number: 20180711–5153.
Comments Due: 5 p.m. ET 8/1/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 11, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–15198 Filed 7–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
[Project No. 1894–211]
Notice of Settlement Agreement and
Soliciting Comments: South Carolina
Electric & Gas Company
Take notice that the following
settlement agreement has been filed
with the Commission and is available
for public inspection.
VerDate Sep<11>2014
17:07 Jul 16, 2018
Jkt 244001
a. Type of Application: Settlement
Agreement.
b. Project No.: P–1894–211.
c. Date filed: June 28, 2018.
d. Applicant: South Carolina Electric
& Gas Company (SCE&G).
e. Name of Project: Parr Hydroelectric
Project.
f. Location: The existing project is
located on the Broad River, in Newberry
and Fairfield Counties, South Carolina.
The project includes 162.61 acres of
federal lands administered by the U.S.
Forest Service.
g. Filed Pursuant to: Rule 602 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.602.
h. Applicant Contact: Mr. William
Argentieri, P.E., Manager of Civil
Engineering, South Carolina Electric &
Gas Company, 220 Operation Way, Mail
Code A221, Cayce, SC 29033–3701;
(803) 217–9162; or email bargentieri@
scana.com.
i. FERC Contact: Monte TerHaar at
(202) 502–6035; or monte.terhaar@
ferc.gov.
j. Deadline for filing comments:
Comments on the Settlement Agreement
are due August 13, 2018. Reply
comments are due August 27, 2018.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–1894–211.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Settlement: SCE&G
filed a Settlement Agreement on behalf
of itself, American Rivers, American
Whitewater, Congaree Riverkeeper, Mr.
Jeffrey Carter, and the South Carolina
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
33217
Department of Natural Resources. The
U.S. Fish and Wildlife Service and the
National Marine Fisheries Service are
currently reviewing the Settlement
Agreement. The purpose of the
Settlement Agreement is to resolve,
among the signatories, all issues
associated with issuance of a new
license for the project regarding
recreation; flow fluctuations
downstream from Parr Shoals Dam;
fisheries habitat in Monticello
Reservoir; monitoring of American eel
and freshwater mussels; diadromous
fish protection; enhancement of aquatic
habitat; water quality; shoreline
management and erosion in Parr and
Monticello Reservoirs; and historic
properties. SCE&G requests that the
Commission accept and incorporate into
any new license measures as described
in Appendix A of the Settlement
Agreement. In addition, Appendix B of
the Settlement Agreement includes offlicense agreements between the
signatories of the Settlement Agreement.
l. A copy of the Settlement Agreement
is available for review at the
Commission in the Public Reference
Room, or may be viewed on the
Commission’s website at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: July 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–15255 Filed 7–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18–64–000.
Applicants: Columbia Gas of Ohio,
Inc.
E:\FR\FM\17JYN1.SGM
17JYN1
33218
Federal Register / Vol. 83, No. 137 / Tuesday, July 17, 2018 / Notices
Description: Tariff filing per
284.123(b),(e)/: COH Rates effective June
29 2018.
Filed Date: 7/9/18.
Accession Number: 201807095045.
Comments/Protests Due: 5 p.m. ET
7/30/18.
Docket Numbers: RP18–966–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update
(Pioneer July 2018) to be effective
7/11/2018.
Filed Date: 7/10/18.
Accession Number: 20180710–5154.
Comments Due: 5 p.m. ET 7/23/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 11, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–15199 Filed 7–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: July 19, 2018, 10:00 a.m.
PLACE: Room 2C, 888 First Street NE,
Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.*
Note—Items listed on the agenda may
be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
website at https://ferc.capitol
connection.org/ using the eLibrary link,
or may be examined in the
Commission’s Public Reference Room.
1046TH—MEETING
Item No.
Docket No.
Company
Administrative
A–1 ......................
A–2 ......................
AD18–1–000 ...........................................
AD18–2–000 ...........................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Electric
E–1
E–2
E–3
E–4
......................
......................
......................
......................
RM18–2–000 ...........................................
RM18–15–000 .........................................
RR17–6–000 ...........................................
EL15–67–003 ..........................................
ER15–2562–002 .....................................
ER17–950–003 .......................................
EL17–68–000 ..........................................
EL17–84–001 ..........................................
EL17–90–001 ..........................................
EL17–94–000 ..........................................
E–5 ......................
E–6 ......................
ER18–579–002 .......................................
ER18–680–000 (Not Consolidated) ........
EL18–146–000 ........................................
EL15–95–003 ..........................................
Cyber Security Incident Reporting Reliability Standards.
Revisions to Parts 45 and 46 of the Commission’s Regulations.
North American Electric Reliability Corporation.
Linden VFT, LLC v. PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
Linden VFT, LLC v. PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
Linden VFT, LLC v. Public Service Electric and Gas Company and PJM Interconnection, L.L.C.
New York Power Authority v. PJM Interconnection, L.L.C. and PJM Transmission
Owners in their Collective Capacity.
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
KCP&L Greater Missouri Operations Company.
Delaware Public Service Commission and Maryland Public Service Commission
v. PJM Interconnection, L.L.C. and Certain Transmission Owners Designated
under CTOA RS FERC No. 42.
Gas
daltland on DSKBBV9HB2PROD with NOTICES
G–1 .....................
OR14–4–002 ...........................................
Guttman Energy, Inc. and PBF Holding Company LLC v. Buckeye Pipe Line
Company, L.P. and Laurel Pipe Line Company, L.P.
Hydro
H–1 .....................
H–2 .....................
H–3 .....................
OMITTED ................................................
P–2114–296 ............................................
P–12611–011 ..........................................
Public Utility District No. 2 of Grant County, Washington.
Verdant Power, LLC.
Certificates
C–1 .....................
VerDate Sep<11>2014
CP17–80–000 .........................................
17:07 Jul 16, 2018
Jkt 244001
PO 00000
Frm 00027
Columbia Gas Transmission, LLC.
Fmt 4703
Sfmt 4703
E:\FR\FM\17JYN1.SGM
17JYN1
Agencies
[Federal Register Volume 83, Number 137 (Tuesday, July 17, 2018)]
[Notices]
[Pages 33217-33218]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-15199]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18-64-000.
Applicants: Columbia Gas of Ohio, Inc.
[[Page 33218]]
Description: Tariff filing per 284.123(b),(e)/: COH Rates effective
June 29 2018.
Filed Date: 7/9/18.
Accession Number: 201807095045.
Comments/Protests Due: 5 p.m. ET 7/30/18.
Docket Numbers: RP18-966-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agreement
Update (Pioneer July 2018) to be effective 7/11/2018.
Filed Date: 7/10/18.
Accession Number: 20180710-5154.
Comments Due: 5 p.m. ET 7/23/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified date(s). Protests may be considered,
but intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 11, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-15199 Filed 7-16-18; 8:45 am]
BILLING CODE 6717-01-P