Exelon Generation Company, LLC; James A. FitzPatrick Nuclear Power Plant, 32691-32696 [2018-15009]
Download as PDF
Federal Register / Vol. 83, No. 135 / Friday, July 13, 2018 / Notices
I. Obtaining Information and
Submitting Comments
submissions available to the public or
entering the comment into ADAMS.
A. Obtaining Information
II. Further Information
The NRC seeks public comment on
the proposed draft section revision of
SRP Section BTP 5–3. The changes
include incorporation of text describing
NRC review of potential nonconservatisms in BTP 5–3, Revision 2,
Subsection B1.1; a reference to a
memorandum describing the results of
the NRC review of the potential nonconservatisms; and numerous textual
updates to incorporate pressuretemperature limit reports, 10 CFR
50.61a, 10 CFR part 52, ‘‘Licenses,
Certifications, and Approvals for
Nuclear Power Plants,’’ clearer citations,
and nozzle language.
Following NRC staff evaluation of
public comments, the NRC intends to
finalize SRP Section BTP 5–3 in
ADAMS and post it on the NRC’s public
website at https://www.nrc.gov/readingrm/doc-collections/nuregs/staff/sr0800/.
The SRP is guidance for the NRC staff.
The SRP is not a substitute for the NRC
regulations, and compliance with the
SRP is not required.
Please refer to Docket ID NRC–2018–
0145 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0145.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The draft
revision and current revision to
NUREG–0800, Section BTP 5–3,
‘‘Fracture Toughness Requirements’’ is
available in ADAMS under Accession
No. ML18071A066 and ML070850035.
The redline-strikeout version comparing
the draft revision 3 and the current
version of revision 2 is available in
ADAMS under Accession No.
ML18130A401.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
sradovich on DSK3GMQ082PROD with NOTICES
B. Submitting Comments
Please include Docket ID NRC–2018–
0145 in your comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
VerDate Sep<11>2014
16:47 Jul 12, 2018
Jkt 244001
III. Backfitting and Issue Finality
Issuance of this draft SRP section, if
finalized, would not constitute
backfitting as defined in 10 CFR 50.109,
(the Backfit Rule) or otherwise be
inconsistent with the issue finality
provisions in 10 CFR part 52. The NRC’s
position is based upon the following
considerations.
1. The draft SRP positions, if
finalized, would not constitute
backfitting, inasmuch as the SRP is
internal guidance to NRC staff directed
at the NRC staff with respect to their
regulatory responsibilities.
The SRP provides internal guidance
to the NRC staff on how to review an
application for NRC regulatory approval
in the form of licensing. Changes in
internal staff guidance are not matters
for which either nuclear power plant
applicants or licensees are protected
under either the Backfit Rule or the
issue finality provisions of 10 CFR part
52.
2. The NRC staff has no intention to
impose the SRP positions on current
licensees or already-issued regulatory
approvals either now or in the future.
The NRC staff does not intend to
impose or apply the positions described
in the draft SRP to existing (already
issued) licenses and regulatory
approvals. Hence, the issuance of a final
SRP, even if considered guidance within
the purview of the issue finality
provisions in 10 CFR part 52, would not
need to be evaluated as if it were a
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
32691
backfit or as being inconsistent with
issue finality provisions. If, in the
future, the NRC staff seeks to impose a
position in the SRP on holders of
already issued licenses in a manner that
does not provide issue finality as
described in the applicable issue finality
provision, then the staff must make the
showing as set forth in the Backfit Rule
or address the criteria for avoiding issue
finality as described in the applicable
issue finality provision.
3. Backfitting and issue finality do
not—with limited exceptions not
applicable here—protect current or
future applicants.
Applicants and potential applicants
are not, with certain exceptions,
protected by either the Backfit Rule or
any issue finality provisions under 10
CFR part 52. This is because neither the
Backfit Rule nor the issue finality
provisions under 10 CFR part 52—with
certain exclusions discussed below—
were intended to apply to every NRC
action that substantially changes the
expectations of current and future
applicants.
The exceptions to the general
principle are applicable whenever an
applicant references a 10 CFR part 52
license (e.g., an early site permit) and/
or NRC regulatory approval (e.g., a
design certification rule) with specified
issue finality provisions. The NRC staff
does not, at this time, intend to impose
the positions represented in the draft
SRP in a manner that is inconsistent
with any issue finality provisions. If, in
the future, the staff seeks to impose a
position in the draft SRP in a manner
which does not provide issue finality as
described in the applicable issue finality
provisions, then the staff must address
the criteria for avoiding issue finality as
described in the applicable issue finality
provision.
Dated at Rockville, Maryland, this 10th day
of July, 2018.
For the Nuclear Regulatory Commission.
Jennivine K. Rankin,
Acting Chief, Licensing Branch 3, Division
of Licensing, Siting, and Environmental
Analysis, Office of New Reactors.
[FR Doc. 2018–15035 Filed 7–12–18; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–333; NRC–2018–0143]
Exelon Generation Company, LLC;
James A. FitzPatrick Nuclear Power
Plant
Nuclear Regulatory
Commission.
AGENCY:
E:\FR\FM\13JYN1.SGM
13JYN1
32692
Federal Register / Vol. 83, No. 135 / Friday, July 13, 2018 / Notices
License amendment application;
opportunity to comment, request a
hearing, and to petition for leave to
intervene; order imposing procedures.
ACTION:
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an amendment to Renewed
Facility Operating License No. DPR–59,
issued to Exelon Generation Company,
LLC, for operation of the James A.
FitzPatrick Nuclear Power Plant
(JAFNPP). The proposed amendment
would revise Technical Specification
(TS), TS 2.1.1, ‘‘Reactor Core SLs [Safety
Limits].’’ For this amendment request,
the NRC proposes to determine that it
involves no significant hazards
consideration. Because this amendment
request contains sensitive unclassified
non-safeguards information (SUNSI), an
order imposes procedures to obtain
access to SUNSI for contention
preparation.
SUMMARY:
Submit comments by August 13,
2018. Requests for a hearing or petition
for leave to intervene must be filed by
September 11, 2018. Any potential party
as defined in § 2.4 of title 10 of the Code
of Federal Regulations (10 CFR), who
believes access to SUNSI is necessary to
respond to this notice must request
document access by July 23, 2018.
DATES:
You may submit comments
by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0143. Address
questions about NRC dockets to Jennifer
Borges; telephone: 301–287–9127;
email: Jennifer.Borges@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: May Ma, Office
of Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
sradovich on DSK3GMQ082PROD with NOTICES
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Tanya E. Hood, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington DC
20555–0001; telephone: 301–415–1387,
email: Tanya.Hood@nrc.gov.
SUPPLEMENTARY INFORMATION:
VerDate Sep<11>2014
16:47 Jul 12, 2018
Jkt 244001
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2018–
0143 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0143.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
application for amendment, dated May
17, 2018, is available in ADAMS under
Accession No. ML18137A418.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2018–
0143 in your comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Introduction
The NRC is considering issuance of an
amendment to Renewed Facility
Operating License No. DPR–59, issued
to Exelon Generation Company, LLC, for
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
operation of JAFNPP, located in
Oswego, New York.
The proposed amendment would
revise TS 2.1.1, ‘‘Reactor Core SLs
[Safety Limits]’’ to change Cycle 24
Safety Limit Minimum Critical Power
Ratio (SLMCPR) numeric values
resulting from SLMCPR analyses
performed.
Before any issuance of the proposed
license amendment, the NRC will need
to make the findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and NRC’s regulations.
The NRC has made a proposed
determination that the license
amendment request involves no
significant hazards consideration. Under
the NRC’s regulations in 10 CFR 50.92,
this means that operation of the facility
in accordance with the proposed
amendment would not (1) involve a
significant increase in the probability or
consequences of an accident previously
evaluated; or (2) create the possibility of
a new or different kind of accident from
any accident previously evaluated; or
(3) involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The derivation of the cycle specific Safety
Limit Minimum Critical Power Ratios
(SLMCPRs) for incorporation into the
Technical Specifications (TS), and their use
to determine cycle specific thermal limits,
has been performed using the methodology
discussed in NEDE–24011–P–A, ‘‘General
Electric Standard Application for Reactor
Fuel,’’ Revision 26.
The basis of the SLMCPR calculation is to
ensure that during normal operation and
during abnormal operational transients, at
least 99.9% of all fuel rods in the core do not
experience transition boiling if the limit is
not violated. The new SLMCPRs preserve the
existing margin to transition boiling.
The MCPR safety limit is reevaluated for
each reload using NRC-approved
methodologies. The analyses for JAFNPP,
Cycle 24, have concluded that a
tworecirculation loop MCPR safety limit of
≥1.07, based on the application of Global
Nuclear Fuel’s NRC-approved MCPR safety
limit methodology, will ensure that this
acceptance criterion is met. For single
recirculation loop operation, a MCPR safety
limit of ≥ 1.09 also ensures that this
acceptance criterion is met. The MCPR
operating limits are presented and controlled
in accordance with the JAFNPP Core
Operating Limits Report (COLR).
The requested TS changes do not involve
any plant modifications or operational
changes that could affect system reliability or
E:\FR\FM\13JYN1.SGM
13JYN1
Federal Register / Vol. 83, No. 135 / Friday, July 13, 2018 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
performance or that could affect the
probability of operator error. The requested
changes do not affect any postulated accident
precursors, do not affect any accident
mitigating systems, and do not introduce any
new accident initiation mechanisms.
Therefore, the proposed TS changes do not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The SLMCPR is a TS numerical value,
calculated to ensure that during normal
operation and during abnormal operational
transients, at least 99.9% of all fuel rods in
the core do not experience transition boiling
if the limit is not violated. The new
SLMCPRs are calculated using NRCapproved methodology discussed in NEDE–
24011–P–A, ‘‘General Electric Standard
Application for Reactor Fuel,’’ Revision 26.
The proposed changes do not involve any
new modes of operation, any changes to
setpoints, or any plant modifications. The
proposed revised MCPR safety limits have
been shown to be acceptable for Cycle 24
operation. The core operating limits will
continue to be developed using NRCapproved methods. The proposed MCPR
safety limits or methods for establishing the
core operating limits do not result in the
creation of any new precursors to an
accident. Therefore, this change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
There is no significant reduction in the
margin of safety previously approved by the
NRC as a result of the proposed change to the
SLMCPRs. The new SLMCPRs are calculated
using methodology discussed in NEDE–
24011–P–A, ‘‘General Electric Standard
Application for Reactor Fuel,’’ Revision 26.
The SLMCPRs ensure that during normal
operation and during abnormal operational
transients, at least 99.9% of all fuel rods in
the core do not experience transition boiling
if the limit is not violated, thereby preserving
the fuel cladding integrity. Therefore, the
proposed TS changes do not involve a
significant reduction in the margin of safety
previously approved by the NRC.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the license
amendment request involves a no
significant hazards consideration.
The NRC is seeking public comments
on this proposed determination that the
license amendment request involves no
significant hazards consideration. Any
comments received within 30 days after
the date of publication of this notice
will be considered in making any final
determination.
VerDate Sep<11>2014
16:47 Jul 12, 2018
Jkt 244001
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day notice period if the Commission
concludes the amendment involves no
significant hazards consideration. In
addition, the Commission may issue the
amendment prior to the expiration of
the 30-day comment period if
circumstances change during the 30-day
comment period such that failure to act
in a timely way would result, for
example, in derating or shutdown of the
facility. If the Commission takes action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. If the Commission
makes a final no significant hazards
consideration determination, any
hearing will take place after issuance.
The Commission expects that the need
to take this action will occur very
infrequently.
III. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any persons
(petitioner) whose interest may be
affected by this action may file a request
for a hearing and petition for leave to
intervene (petition) with respect to the
action. Petitions shall be filed in
accordance with the Commission’s
‘‘Agency Rules of Practice and
Procedure’’ in 10 CFR part 2. Interested
persons should consult a current copy
of 10 CFR 2.309. The NRC’s regulations
are accessible electronically from the
NRC Library on the NRC’s website at
https://www.nrc.gov/reading-rm/doccollections/cfr/. Alternatively, a copy of
the regulations is available at the NRC’s
Public Document Room, located at One
White Flint North, Room O1–F21, 11555
Rockville Pike (first floor), Rockville,
Maryland 20852. If a petition is filed,
the Commission or a presiding officer
will rule on the petition and, if
appropriate, a notice of a hearing will be
issued.
As required by 10 CFR 2.309(d) the
petition should specifically explain the
reasons why intervention should be
permitted with particular reference to
the following general requirements for
standing: (1) The name, address, and
telephone number of the petitioner; (2)
the nature of the petitioner’s right under
the Act to be made a party to the
proceeding; (3) the nature and extent of
the petitioner’s property, financial, or
other interest in the proceeding; and (4)
the possible effect of any decision or
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
32693
order which may be entered in the
proceeding on the petitioner’s interest.
In accordance with 10 CFR 2.309(f),
the petition must also set forth the
specific contentions which the
petitioner seeks to have litigated in the
proceeding. Each contention must
consist of a specific statement of the
issue of law or fact to be raised or
controverted. In addition, the petitioner
must provide a brief explanation of the
bases for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner must also
provide references to the specific
sources and documents on which the
petitioner intends to rely to support its
position on the issue. The petition must
include sufficient information to show
that a genuine dispute exists with the
applicant or licensee on a material issue
of law or fact. Contentions must be
limited to matters within the scope of
the proceeding. The contention must be
one which, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy the requirements at 10
CFR 2.309(f) with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene. Parties have the opportunity
to participate fully in the conduct of the
hearing with respect to resolution of
that party’s admitted contentions,
including the opportunity to present
evidence, consistent with the NRC’s
regulations, policies, and procedures.
Petitions must be filed no later than
60 days from the date of publication of
this notice. Petitions and motions for
leave to file new or amended
contentions that are filed after the
deadline will not be entertained absent
a determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i) through (iii). The petition
must be filed in accordance with the
filing instructions in the ‘‘Electronic
Submissions (E-Filing)’’ section of this
document.
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to
establish when the hearing is held. If the
final determination is that the
amendment request involves no
significant hazards consideration, the
E:\FR\FM\13JYN1.SGM
13JYN1
sradovich on DSK3GMQ082PROD with NOTICES
32694
Federal Register / Vol. 83, No. 135 / Friday, July 13, 2018 / Notices
Commission may issue the amendment
and make it immediately effective,
notwithstanding the request for a
hearing. Any hearing would take place
after issuance of the amendment. If the
final determination is that the
amendment request involves a
significant hazards consideration, then
any hearing held would take place
before the issuance of the amendment
unless the Commission finds an
imminent danger to the health or safety
of the public, in which case it will issue
an appropriate order or rule under 10
CFR part 2.
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission no later than 60 days from
the date of publication of this notice.
The petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document, and should
meet the requirements for petitions set
forth in this section, except that under
10 CFR 2.309(h)(2) a State, local
governmental body, or Federallyrecognized Indian Tribe, or agency
thereof does not need to address the
standing requirements in 10 CFR
2.309(d) if the facility is located within
its boundaries. Alternatively, a State,
local governmental body, Federallyrecognized Indian Tribe, or agency
thereof may participate as a non-party
under 10 CFR 2.315(c).
If a hearing is granted, any person
who is not a party to the proceeding and
is not affiliated with or represented by
a party may, at the discretion of the
presiding officer, be permitted to make
a limited appearance pursuant to the
provisions of 10 CFR 2.315(a). A person
making a limited appearance may make
an oral or written statement of his or her
position on the issues but may not
otherwise participate in the proceeding.
A limited appearance may be made at
any session of the hearing or at any
prehearing conference, subject to the
limits and conditions as may be
imposed by the presiding officer. Details
regarding the opportunity to make a
limited appearance will be provided by
the presiding officer if such sessions are
scheduled.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing and petition for
leave to intervene (petition), any motion
or other document filed in the
VerDate Sep<11>2014
16:47 Jul 12, 2018
Jkt 244001
proceeding prior to the submission of a
request for hearing or petition to
intervene, and documents filed by
interested governmental entities that
request to participate under 10 CFR
2.315(c), must be filed in accordance
with the NRC’s E-Filing rule (72 FR
49139; August 28, 2007, as amended at
77 FR 46562; August 3, 2012). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Detailed guidance on
making electronic submissions may be
found in the Guidance for Electronic
Submissions to the NRC and on the NRC
website at https://www.nrc.gov/site-help/
e-submittals.html. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to (1) request a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
submissions and access the E-Filing
system for any proceeding in which it
is participating; and (2) advise the
Secretary that the participant will be
submitting a petition or other
adjudicatory document (even in
instances in which the participant, or its
counsel or representative, already holds
an NRC-issued digital ID certificate).
Based upon this information, the
Secretary will establish an electronic
docket for the hearing in this proceeding
if the Secretary has not already
established an electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public website at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. Once a participant
has obtained a digital ID certificate and
a docket has been created, the
participant can then submit
adjudicatory documents. Submissions
must be in Portable Document Format
(PDF). Additional guidance on PDF
submissions is available on the NRC’s
public website at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
the document is submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the document on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before adjudicatory
documents are filed so that they can
obtain access to the documents via the
E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC’s Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public website at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 6 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, 11555 Rockville Pike,
Rockville, Maryland 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing adjudicatory
documents in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
E:\FR\FM\13JYN1.SGM
13JYN1
Federal Register / Vol. 83, No. 135 / Friday, July 13, 2018 / Notices
sradovich on DSK3GMQ082PROD with NOTICES
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
adams.nrc.gov/ehd, unless excluded
pursuant to an order of the Commission
or the presiding officer. If you do not
have an NRC-issued digital ID certificate
as described above, click cancel when
the link requests certificates and you
will be automatically directed to the
NRC’s electronic hearing dockets where
you will be able to access any publicly
available documents in a particular
hearing docket. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
personal phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. For example, in some
instances, individuals provide home
addresses in order to demonstrate
proximity to a facility or site. With
respect to copyrighted works, except for
limited excerpts that serve the purpose
of the adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
For further details with respect to this
action, see the application for license
amendment dated May 17, 2018.
Attorney for licensee: Donald P.
Ferraro, Assistant General Counsel,
Exelon Generation Company, LLC, 200
Exelon Way, Suite 305, Kennett Square,
PA 19348.
NRC Branch Chief: James G. Danna.
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information for Contention
Preparation
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing Sensitive
Unclassified Non-Safeguards
Information (SUNSI).
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request access to SUNSI. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
submitted later than 10 days after
publication of this notice will not be
considered absent a showing of good
cause for the late filing, addressing why
the request could not have been filed
earlier.
VerDate Sep<11>2014
16:47 Jul 12, 2018
Jkt 244001
32695
C. The requester shall submit a letter
requesting permission to access SUNSI
to the Office of the Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Associate
General Counsel for Hearings,
Enforcement and Administration, Office
of the General Counsel, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001. The expedited delivery
or courier mail address for both offices
is: U.S. Nuclear Regulatory Commission,
11555 Rockville Pike, Rockville,
Maryland 20852. The email address for
the Office of the Secretary and the
Office of the General Counsel are
Hearing.Docket@nrc.gov and
OGCmailcenter@nrc.gov, respectively.1
The request must include the following
information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1); and
(3) The identity of the individual or
entity requesting access to SUNSI and
the requester’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention.
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 2 setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
later than 25 days after receipt of (or
access to) that information. However, if
more than 25 days remain between the
petitioner’s receipt of (or access to) the
information and the deadline for filing
all other contentions (as established in
the notice of hearing or opportunity for
hearing), the petitioner may file its
SUNSI contentions by that later
deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff after a
determination on standing and requisite
need, the NRC staff shall immediately
notify the requestor in writing, briefly
stating the reason or reasons for the
denial.
(2) The requester may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an Administrative Law Judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
(3) Further appeals of decisions under
this paragraph must be made pursuant
to 10 CFR 2.311.
H. Review of Grants of Access. A
party other than the requester may
challenge an NRC staff determination
granting access to SUNSI whose release
would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed within 5 days of
the notification by the NRC staff of its
grant of access and must be filed with:
(a) The presiding officer designated in
this proceeding; (b) if no presiding
officer has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another Administrative
Judge, or an Administrative Law Judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’
the initial request to access SUNSI under these
procedures should be submitted as described in this
paragraph.
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
E:\FR\FM\13JYN1.SGM
13JYN1
32696
Federal Register / Vol. 83, No. 135 / Friday, July 13, 2018 / Notices
been designated to rule on information
access issues, with that officer.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
standing and who have propounded
contentions meeting the specificity and
basis requirements in 10 CFR part 2.
The attachment to this Order
summarizes the general target schedule
for processing and resolving requests
under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 10th of
July 2018.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING
Day
Event/activity
0 ........................
Publication of FEDERAL REGISTER notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information:
Supporting the standing of a potential party identified by name and address; describing the need for the information in order
for the potential party to participate meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; and (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 petitioner/requestor reply).
U.S. Nuclear Regulatory Commission (NRC) staff informs the requester of the staff’s determination whether the request for
access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents).
If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for petitioner/requester to file a motion seeking a ruling
to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief
Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any
party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to
file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and
file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure
Agreement for SUNSI.
If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access
to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a
final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order.
Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days
remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as
established in the notice of opportunity to request a hearing and petition for leave to intervene), the petitioner may file its
SUNSI contentions by that later deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
10 ......................
60 ......................
20 ......................
25 ......................
30 ......................
40 ......................
A .......................
A + 3 .................
A + 28 ...............
A + 53 ...............
A + 60 ...............
>A + 60 .............
[FR Doc. 2018–15009 Filed 7–12–18; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
sradovich on DSK3GMQ082PROD with NOTICES
[Docket No. 40–8584; NRC–2018–0141]
Kennecott Uranium Company;
Sweetwater Uranium Project
Nuclear Regulatory
Commission.
ACTION: License renewal; issuance.
AGENCY:
3 Requesters should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007, as amended at 77 FR
VerDate Sep<11>2014
16:47 Jul 12, 2018
Jkt 244001
SUMMARY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing a renewed
license to Kennecott Uranium Company
(KUC) for its Sweetwater Uranium
Project (SUP), located in Sweetwater
County, Wyoming, for Materials License
SUA–1350. The license authorizes KUC
to possess uranium source and
byproduct material at the SUP. In
addition, the license authorizes KUC to
operate its facilities as proposed in its
license renewal application, as
amended, and as prescribed in the
license, after a pre-operational
inspection has been completed at the
SUP and any safety issues resolved. The
renewed license expires on November 9,
2024.
DATES: The license referenced in this
document is available on July 6, 2018.
ADDRESSES: Please refer to Docket ID
NRC–2018–0141 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0141. Address
46562; August 3, 2012) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
E:\FR\FM\13JYN1.SGM
13JYN1
Agencies
[Federal Register Volume 83, Number 135 (Friday, July 13, 2018)]
[Notices]
[Pages 32691-32696]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-15009]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-333; NRC-2018-0143]
Exelon Generation Company, LLC; James A. FitzPatrick Nuclear
Power Plant
AGENCY: Nuclear Regulatory Commission.
[[Page 32692]]
ACTION: License amendment application; opportunity to comment, request
a hearing, and to petition for leave to intervene; order imposing
procedures.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an amendment to Renewed Facility Operating License No. DPR-
59, issued to Exelon Generation Company, LLC, for operation of the
James A. FitzPatrick Nuclear Power Plant (JAFNPP). The proposed
amendment would revise Technical Specification (TS), TS 2.1.1,
``Reactor Core SLs [Safety Limits].'' For this amendment request, the
NRC proposes to determine that it involves no significant hazards
consideration. Because this amendment request contains sensitive
unclassified non-safeguards information (SUNSI), an order imposes
procedures to obtain access to SUNSI for contention preparation.
DATES: Submit comments by August 13, 2018. Requests for a hearing or
petition for leave to intervene must be filed by September 11, 2018.
Any potential party as defined in Sec. 2.4 of title 10 of the Code of
Federal Regulations (10 CFR), who believes access to SUNSI is necessary
to respond to this notice must request document access by July 23,
2018.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0143. Address
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: May Ma, Office of Administration, Mail
Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Tanya E. Hood, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC
20555-0001; telephone: 301-415-1387, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2018-0143 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0143.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. The
application for amendment, dated May 17, 2018, is available in ADAMS
under Accession No. ML18137A418.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2018-0143 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Introduction
The NRC is considering issuance of an amendment to Renewed Facility
Operating License No. DPR-59, issued to Exelon Generation Company, LLC,
for operation of JAFNPP, located in Oswego, New York.
The proposed amendment would revise TS 2.1.1, ``Reactor Core SLs
[Safety Limits]'' to change Cycle 24 Safety Limit Minimum Critical
Power Ratio (SLMCPR) numeric values resulting from SLMCPR analyses
performed.
Before any issuance of the proposed license amendment, the NRC will
need to make the findings required by the Atomic Energy Act of 1954, as
amended (the Act), and NRC's regulations.
The NRC has made a proposed determination that the license
amendment request involves no significant hazards consideration. Under
the NRC's regulations in 10 CFR 50.92, this means that operation of the
facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. As
required by 10 CFR 50.91(a), the licensee has provided its analysis of
the issue of no significant hazards consideration, which is presented
below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The derivation of the cycle specific Safety Limit Minimum
Critical Power Ratios (SLMCPRs) for incorporation into the Technical
Specifications (TS), and their use to determine cycle specific
thermal limits, has been performed using the methodology discussed
in NEDE-24011-P-A, ``General Electric Standard Application for
Reactor Fuel,'' Revision 26.
The basis of the SLMCPR calculation is to ensure that during
normal operation and during abnormal operational transients, at
least 99.9% of all fuel rods in the core do not experience
transition boiling if the limit is not violated. The new SLMCPRs
preserve the existing margin to transition boiling.
The MCPR safety limit is reevaluated for each reload using NRC-
approved methodologies. The analyses for JAFNPP, Cycle 24, have
concluded that a tworecirculation loop MCPR safety limit of >=1.07,
based on the application of Global Nuclear Fuel's NRC-approved MCPR
safety limit methodology, will ensure that this acceptance criterion
is met. For single recirculation loop operation, a MCPR safety limit
of >= 1.09 also ensures that this acceptance criterion is met. The
MCPR operating limits are presented and controlled in accordance
with the JAFNPP Core Operating Limits Report (COLR).
The requested TS changes do not involve any plant modifications
or operational changes that could affect system reliability or
[[Page 32693]]
performance or that could affect the probability of operator error.
The requested changes do not affect any postulated accident
precursors, do not affect any accident mitigating systems, and do
not introduce any new accident initiation mechanisms. Therefore, the
proposed TS changes do not involve a significant increase in the
probability or consequences of an accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The SLMCPR is a TS numerical value, calculated to ensure that
during normal operation and during abnormal operational transients,
at least 99.9% of all fuel rods in the core do not experience
transition boiling if the limit is not violated. The new SLMCPRs are
calculated using NRC-approved methodology discussed in NEDE-24011-P-
A, ``General Electric Standard Application for Reactor Fuel,''
Revision 26. The proposed changes do not involve any new modes of
operation, any changes to setpoints, or any plant modifications. The
proposed revised MCPR safety limits have been shown to be acceptable
for Cycle 24 operation. The core operating limits will continue to
be developed using NRC-approved methods. The proposed MCPR safety
limits or methods for establishing the core operating limits do not
result in the creation of any new precursors to an accident.
Therefore, this change does not create the possibility of a new or
different kind of accident from any previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
There is no significant reduction in the margin of safety
previously approved by the NRC as a result of the proposed change to
the SLMCPRs. The new SLMCPRs are calculated using methodology
discussed in NEDE-24011-P-A, ``General Electric Standard Application
for Reactor Fuel,'' Revision 26. The SLMCPRs ensure that during
normal operation and during abnormal operational transients, at
least 99.9% of all fuel rods in the core do not experience
transition boiling if the limit is not violated, thereby preserving
the fuel cladding integrity. Therefore, the proposed TS changes do
not involve a significant reduction in the margin of safety
previously approved by the NRC.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
license amendment request involves a no significant hazards
consideration.
The NRC is seeking public comments on this proposed determination
that the license amendment request involves no significant hazards
consideration. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no
significant hazards consideration. In addition, the Commission may
issue the amendment prior to the expiration of the 30-day comment
period if circumstances change during the 30-day comment period such
that failure to act in a timely way would result, for example, in
derating or shutdown of the facility. If the Commission takes action
prior to the expiration of either the comment period or the notice
period, it will publish in the Federal Register a notice of issuance.
If the Commission makes a final no significant hazards consideration
determination, any hearing will take place after issuance. The
Commission expects that the need to take this action will occur very
infrequently.
III. Opportunity To Request a Hearing and Petition for Leave To
Intervene
Within 60 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and petition for leave to intervene
(petition) with respect to the action. Petitions shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested persons should consult a
current copy of 10 CFR 2.309. The NRC's regulations are accessible
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of
the regulations is available at the NRC's Public Document Room, located
at One White Flint North, Room O1-F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. If a petition is filed, the
Commission or a presiding officer will rule on the petition and, if
appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically
explain the reasons why intervention should be permitted with
particular reference to the following general requirements for
standing: (1) The name, address, and telephone number of the
petitioner; (2) the nature of the petitioner's right under the Act to
be made a party to the proceeding; (3) the nature and extent of the
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions which the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to the specific sources and
documents on which the petitioner intends to rely to support its
position on the issue. The petition must include sufficient information
to show that a genuine dispute exists with the applicant or licensee on
a material issue of law or fact. Contentions must be limited to matters
within the scope of the proceeding. The contention must be one which,
if proven, would entitle the petitioner to relief. A petitioner who
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of
publication of this notice. Petitions and motions for leave to file new
or amended contentions that are filed after the deadline will not be
entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in
accordance with the filing instructions in the ``Electronic Submissions
(E-Filing)'' section of this document.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to establish when the hearing is held. If the final determination is
that the amendment request involves no significant hazards
consideration, the
[[Page 32694]]
Commission may issue the amendment and make it immediately effective,
notwithstanding the request for a hearing. Any hearing would take place
after issuance of the amendment. If the final determination is that the
amendment request involves a significant hazards consideration, then
any hearing held would take place before the issuance of the amendment
unless the Commission finds an imminent danger to the health or safety
of the public, in which case it will issue an appropriate order or rule
under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission no later
than 60 days from the date of publication of this notice. The petition
must be filed in accordance with the filing instructions in the
``Electronic Submissions (E-Filing)'' section of this document, and
should meet the requirements for petitions set forth in this section,
except that under 10 CFR 2.309(h)(2) a State, local governmental body,
or Federally-recognized Indian Tribe, or agency thereof does not need
to address the standing requirements in 10 CFR 2.309(d) if the facility
is located within its boundaries. Alternatively, a State, local
governmental body, Federally-recognized Indian Tribe, or agency thereof
may participate as a non-party under 10 CFR 2.315(c).
If a hearing is granted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562; August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit
paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at [email protected], or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a
digital ID certificate and a docket has been created, the participant
can then submit adjudicatory documents. Submissions must be in Portable
Document Format (PDF). Additional guidance on PDF submissions is
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time the document is submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
document on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before adjudicatory documents are
filed so that they can obtain access to the documents via the E-Filing
system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public website at https://www.nrc.gov/site-help/e-submittals.html, by
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on all other
participants. Filing is considered complete by first-class mail as of
the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
[[Page 32695]]
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC-issued
digital ID certificate as described above, click cancel when the link
requests certificates and you will be automatically directed to the
NRC's electronic hearing dockets where you will be able to access any
publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy information,
such as social security numbers, home addresses, or personal phone
numbers in their filings, unless an NRC regulation or other law
requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
For further details with respect to this action, see the
application for license amendment dated May 17, 2018.
Attorney for licensee: Donald P. Ferraro, Assistant General
Counsel, Exelon Generation Company, LLC, 200 Exelon Way, Suite 305,
Kennett Square, PA 19348.
NRC Branch Chief: James G. Danna.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request access to SUNSI. A ``potential party'' is any person who
intends to participate as a party by demonstrating standing and filing
an admissible contention under 10 CFR 2.309. Requests for access to
SUNSI submitted later than 10 days after publication of this notice
will not be considered absent a showing of good cause for the late
filing, addressing why the request could not have been filed earlier.
C. The requester shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001. The expedited delivery or courier mail address for both
offices is: U.S. Nuclear Regulatory Commission, 11555 Rockville Pike,
Rockville, Maryland 20852. The email address for the Office of the
Secretary and the Office of the General Counsel are
[email protected] and [email protected], respectively.\1\ The
request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1); and
(3) The identity of the individual or entity requesting access to
SUNSI and the requester's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention.
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
receipt of (or access to) that information. However, if more than 25
days remain between the petitioner's receipt of (or access to) the
information and the deadline for filing all other contentions (as
established in the notice of hearing or opportunity for hearing), the
petitioner may file its SUNSI contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
after a determination on standing and requisite need, the NRC staff
shall immediately notify the requestor in writing, briefly stating the
reason or reasons for the denial.
(2) The requester may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an Administrative Law Judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
(3) Further appeals of decisions under this paragraph must be made
pursuant to 10 CFR 2.311.
H. Review of Grants of Access. A party other than the requester may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed within 5 days of the notification by the
NRC staff of its grant of access and must be filed with: (a) The
presiding officer designated in this proceeding; (b) if no presiding
officer has been appointed, the Chief Administrative Judge, or if he or
she is unavailable, another Administrative Judge, or an Administrative
Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if
another officer has
[[Page 32696]]
been designated to rule on information access issues, with that
officer.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requesters should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77
FR 46562; August 3, 2012) apply to appeals of NRC staff
determinations (because they must be served on a presiding officer
or the Commission, as applicable), but not to the initial SUNSI
request submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR part 2. The
attachment to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 10th of July 2018.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
in This Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0........................ Publication of Federal Register notice of
hearing and opportunity to petition for
leave to intervene, including order with
instructions for access requests.
10....................... Deadline for submitting requests for access
to Sensitive Unclassified Non-Safeguards
Information (SUNSI) with information:
Supporting the standing of a potential party
identified by name and address; describing
the need for the information in order for
the potential party to participate
meaningfully in an adjudicatory proceeding.
60....................... Deadline for submitting petition for
intervention containing: (i) Demonstration
of standing; and (ii) all contentions whose
formulation does not require access to SUNSI
(+25 Answers to petition for intervention;
+7 petitioner/requestor reply).
20....................... U.S. Nuclear Regulatory Commission (NRC)
staff informs the requester of the staff's
determination whether the request for access
provides a reasonable basis to believe
standing can be established and shows need
for SUNSI. (NRC staff also informs any party
to the proceeding whose interest independent
of the proceeding would be harmed by the
release of the information.) If NRC staff
makes the finding of need for SUNSI and
likelihood of standing, NRC staff begins
document processing (preparation of
redactions or review of redacted documents).
25....................... If NRC staff finds no ``need'' or no
likelihood of standing, the deadline for
petitioner/requester to file a motion
seeking a ruling to reverse the NRC staff's
denial of access; NRC staff files copy of
access determination with the presiding
officer (or Chief Administrative Judge or
other designated officer, as appropriate).
If NRC staff finds ``need'' for SUNSI, the
deadline for any party to the proceeding
whose interest independent of the proceeding
would be harmed by the release of the
information to file a motion seeking a
ruling to reverse the NRC staff's grant of
access.
30....................... Deadline for NRC staff reply to motions to
reverse NRC staff determination(s).
40....................... (Receipt +30) If NRC staff finds standing and
need for SUNSI, deadline for NRC staff to
complete information processing and file
motion for Protective Order and draft Non-
Disclosure Affidavit. Deadline for applicant/
licensee to file Non-Disclosure Agreement
for SUNSI.
A........................ If access granted: Issuance of presiding
officer or other designated officer decision
on motion for protective order for access to
sensitive information (including schedule
for providing access and submission of
contentions) or decision reversing a final
adverse determination by the NRC staff.
A + 3.................... Deadline for filing executed Non-Disclosure
Affidavits. Access provided to SUNSI
consistent with decision issuing the
protective order.
A + 28................... Deadline for submission of contentions whose
development depends upon access to SUNSI.
However, if more than 25 days remain between
the petitioner's receipt of (or access to)
the information and the deadline for filing
all other contentions (as established in the
notice of opportunity to request a hearing
and petition for leave to intervene), the
petitioner may file its SUNSI contentions by
that later deadline.
A + 53................... (Contention receipt +25) Answers to
contentions whose development depends upon
access to SUNSI.
A + 60................... (Answer receipt +7) Petitioner/Intervenor
reply to answers.
>A + 60.................. Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2018-15009 Filed 7-12-18; 8:45 am]