City of Pasadena, California; Notice of Applications Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, and Terms and Conditions, 32105-32106 [2018-14776]
Download as PDF
Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices
the U.S. Army Corps of Engineers on the
Tombigbee River, west of the city of
Demopolis in Marengo and Sumter
Counties, Alabama. The project would
occupy 23 acres of federal land.
The FEA contains the staff’s analysis
of the potential environmental impacts
of the project and concludes that
licensing the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the FEA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact Adam
Peer at (202) 502–8449.
Dated: July 3, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–14763 Filed 7–10–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–117–000.
Applicants: NextEra Energy, Inc., 700
Universe, LLC, Gulf Power Company.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of NextEra Energy,
Inc.
Filed Date: 7/3/18.
Accession Number: 20180703–5177.
Comments Due: 5 p.m. ET 7/24/18.
Docket Numbers: EC18–118–000.
Applicants: Essential Power Rock
Springs, LLC, Old Dominion Electric
Cooperative, Inc.
Description: Joint Application for
Authorization for Disposition and
Consolidation of Jurisdictional Facilities
and Acquisition of an Existing
VerDate Sep<11>2014
16:26 Jul 10, 2018
Jkt 244001
Generation Facility and Request for
Expedited Action of Essential Power
Rock Springs, LLC.
Filed Date: 7/3/18.
Accession Number: 20180703–5180.
Comments Due: 5 p.m. ET 7/24/18.
Docket Numbers: EC18–119–000.
Applicants: NextEra Energy, Inc., 700
Universe, LLC, Southern Company—
Florida, LLC, Oleander Power Project,
Limited Partnership.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of NextEra Energy,
Inc., et. al.
Filed Date: 7/3/18.
Accession Number: 20180703–5183.
Comments Due: 5 p.m. ET 7/24/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1961–000.
Applicants: South Central MCN LLC.
Description: Proposed Transmission
Formula Rate Revisions of South Central
MCN LLC.
Filed Date: 7/3/18.
Accession Number: 20180703–5166.
Comments Due: 5 p.m. ET 7/24/18.
Docket Numbers: ER18–1962–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA, SA No. 4792; Queue No.
AB2–038/AB2–041 to be effective 6/4/
2018.
Filed Date: 7/5/18.
Accession Number: 20180705–5050.
Comments Due: 5 p.m. ET 7/26/18.
Docket Numbers: ER18–1963–000.
Applicants: Midwest Energy, Inc.
Description: Petition for Temporary
Waiver of Tariff Provisions of Midwest
Energy, Inc.
Filed Date: 7/5/18.
Accession Number: 20180705–5068.
Comments Due: 5 p.m. ET 7/26/18.
Docket Numbers: ER18–1964–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–07–05_GIA Self-Fund Vacatur
Filing to be effective 6/24/2015.
Filed Date: 7/5/18.
Accession Number: 20180705–5080.
Comments Due: 5 p.m. ET 7/26/18.
Docket Numbers: ER18–1965–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–07–05_MPFCA–FCA Self-Fund
Filing to be effective 6/24/2015.
Filed Date: 7/5/18.
Accession Number: 20180705–5083.
Comments Due: 5 p.m. ET 7/26/18.
Docket Numbers: ER18–1966–000.
Applicants: Wisconsin Electric Power
Company.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
32105
Description: § 205(d) Rate Filing: 2018
Formula Rate Update Filing to be
effective 9/4/2018.
Filed Date: 7/5/18.
Accession Number: 20180705–5084.
Comments Due: 5 p.m. ET 7/26/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–14831 Filed 7–10–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 1250–020, 14836–000]
City of Pasadena, California; Notice of
Applications Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, and Terms and
Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Applications: Surrender of
License and application for (conduit)
Exemption from Licensing.
b. Project Nos.: 1250–020, 14836–000.
c. Date Filed: December 29, 2016.
d. Applicant: City of Pasadena,
California.
e. Name of Project: Azusa Project.
f. Location: The project is located on
the Azusa Conduit in Los Angeles
County, California. The licensed project
occupies U.S. lands administered by the
U.S. Forest Service.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
E:\FR\FM\11JYN1.SGM
11JYN1
daltland on DSKBBV9HB2PROD with NOTICES
32106
Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices
h. Applicant Contact: Arturo Silva,
Interim Assistant General Manager—
Power Supply, City of Pasadena Water
and Power Development, 85 East State
Street, Pasadena, California 91101–
3418, telephone: (626) 744–4568.
i. FERC Contact: Robert Bell,
telephone (202) 502–6062 or email:
robert.bell@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: 60
days from the issuance date of this
notice by the Commission; reply
comments are due 105 days from the
issuance date of this notice by the
Commission. The Commission strongly
encourages electronic filing. Please file
any motion to intervene, protest,
comments, and/or recommendations
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket numbers P–1250–020,
and P–14836–000.
k. Description of request: In the
application filed on December 29, 2016,
the City of Pasadena requests that the
Commission issue an order granting the
Azusa Project an exemption from the
licensing requirements of Part I of the
Federal Power Act. The City of
Pasadena also requests administrative
surrender of its license for the Azusa
Project facilities excluded under FERC’s
definition of a small conduit
hydroelectric facility.
a. Licensed Facilities: The applicant
requests a conduit exemption for the
Azusa Hydroelectric Project No. 1250.
The applicant proposes to remove the
following project facilities from the
Commission’s jurisdiction: (1) The
forebay; (2) the 24.4-kV generator leads,
a 2.3/12-kV transformer, and a short
transmission line; (3) an afterbay. The
aforementioned facilities would remain
operational as part of the water supply
facilities operated by the San Gabriel
River Water Committee.
b. Conduit Exemption: The applicant
proposes a conduit exemption for the
Azusa Project No. 14836. The proposed
project would be located on its water
supply system and would consist of: (1)
VerDate Sep<11>2014
16:26 Jul 10, 2018
Jkt 244001
An existing 797-foot-long, 38-inch
diameter welded steel penstock; (2) an
existing powerhouse containing one
generating unit having an installed
capacity of 3 megawatts; (3) an existing
148-foot-long, 136-inch-wide
underground tailrace; and (4)
appurtenant facilities. The City of
Pasadena, estimates the project would
have an average annual generation of
2,890 megawatt-hours that would be
sold to a local utility.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number P–1250, or
P–14836 in the docket number field to
access the documents. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and at the Commission’s Public
Reference Room, located at 888 First
Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
amendment. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: July 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–14776 Filed 7–10–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–182–000]
ISO New England Inc.; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On July 2, 2018, the Commission
issued an order in Docket No. EL18–
182–000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether ISO New England Inc.’s
Transmission, Markets and Services
Tariff is unjust and unreasonable. ISO
New England Inc., 164 FERC ¶ 61,003
(2018).
The refund effective date in Docket
No. EL18–182–000, established
pursuant to section 206(b) of the FPA,
will be the date of publication of this
notice in the Federal Register.
Any interested person desiring to be
heard in Docket No. EL18–182–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, in accordance
with Rule 214 of the Commission’s
Rules of Practice and Procedure, 18 CFR
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 83, Number 133 (Wednesday, July 11, 2018)]
[Notices]
[Pages 32105-32106]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-14776]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 1250-020, 14836-000]
City of Pasadena, California; Notice of Applications Accepted for
Filing, Soliciting Motions To Intervene and Protests, Ready for
Environmental Analysis, and Soliciting Comments, Recommendations, and
Terms and Conditions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Applications: Surrender of License and application for
(conduit) Exemption from Licensing.
b. Project Nos.: 1250-020, 14836-000.
c. Date Filed: December 29, 2016.
d. Applicant: City of Pasadena, California.
e. Name of Project: Azusa Project.
f. Location: The project is located on the Azusa Conduit in Los
Angeles County, California. The licensed project occupies U.S. lands
administered by the U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
[[Page 32106]]
h. Applicant Contact: Arturo Silva, Interim Assistant General
Manager--Power Supply, City of Pasadena Water and Power Development, 85
East State Street, Pasadena, California 91101-3418, telephone: (626)
744-4568.
i. FERC Contact: Robert Bell, telephone (202) 502-6062 or email:
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: 60 days from the issuance date of this notice by the
Commission; reply comments are due 105 days from the issuance date of
this notice by the Commission. The Commission strongly encourages
electronic filing. Please file any motion to intervene, protest,
comments, and/or recommendations using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. The first page of any filing should
include docket numbers P-1250-020, and P-14836-000.
k. Description of request: In the application filed on December 29,
2016, the City of Pasadena requests that the Commission issue an order
granting the Azusa Project an exemption from the licensing requirements
of Part I of the Federal Power Act. The City of Pasadena also requests
administrative surrender of its license for the Azusa Project
facilities excluded under FERC's definition of a small conduit
hydroelectric facility.
a. Licensed Facilities: The applicant requests a conduit exemption
for the Azusa Hydroelectric Project No. 1250. The applicant proposes to
remove the following project facilities from the Commission's
jurisdiction: (1) The forebay; (2) the 24.4-kV generator leads, a 2.3/
12-kV transformer, and a short transmission line; (3) an afterbay. The
aforementioned facilities would remain operational as part of the water
supply facilities operated by the San Gabriel River Water Committee.
b. Conduit Exemption: The applicant proposes a conduit exemption
for the Azusa Project No. 14836. The proposed project would be located
on its water supply system and would consist of: (1) An existing 797-
foot-long, 38-inch diameter welded steel penstock; (2) an existing
powerhouse containing one generating unit having an installed capacity
of 3 megawatts; (3) an existing 148-foot-long, 136-inch-wide
underground tailrace; and (4) appurtenant facilities. The City of
Pasadena, estimates the project would have an average annual generation
of 2,890 megawatt-hours that would be sold to a local utility.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number P-1250, or P-14836 in the docket number field
to access the documents. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of
new filings and issuances related to this or other pending projects.
For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above and at the Commission's Public Reference Room, located at 888
First Street NE, Room 2A, Washington, DC 20426, or by calling (202)
502-8371.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license amendment.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: July 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-14776 Filed 7-10-18; 8:45 am]