City of Pasadena, California; Notice of Applications Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, and Terms and Conditions, 32105-32106 [2018-14776]

Download as PDF Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices the U.S. Army Corps of Engineers on the Tombigbee River, west of the city of Demopolis in Marengo and Sumter Counties, Alabama. The project would occupy 23 acres of federal land. The FEA contains the staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the FEA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. For further information, contact Adam Peer at (202) 502–8449. Dated: July 3, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–14763 Filed 7–10–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission daltland on DSKBBV9HB2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–117–000. Applicants: NextEra Energy, Inc., 700 Universe, LLC, Gulf Power Company. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of NextEra Energy, Inc. Filed Date: 7/3/18. Accession Number: 20180703–5177. Comments Due: 5 p.m. ET 7/24/18. Docket Numbers: EC18–118–000. Applicants: Essential Power Rock Springs, LLC, Old Dominion Electric Cooperative, Inc. Description: Joint Application for Authorization for Disposition and Consolidation of Jurisdictional Facilities and Acquisition of an Existing VerDate Sep<11>2014 16:26 Jul 10, 2018 Jkt 244001 Generation Facility and Request for Expedited Action of Essential Power Rock Springs, LLC. Filed Date: 7/3/18. Accession Number: 20180703–5180. Comments Due: 5 p.m. ET 7/24/18. Docket Numbers: EC18–119–000. Applicants: NextEra Energy, Inc., 700 Universe, LLC, Southern Company— Florida, LLC, Oleander Power Project, Limited Partnership. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of NextEra Energy, Inc., et. al. Filed Date: 7/3/18. Accession Number: 20180703–5183. Comments Due: 5 p.m. ET 7/24/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1961–000. Applicants: South Central MCN LLC. Description: Proposed Transmission Formula Rate Revisions of South Central MCN LLC. Filed Date: 7/3/18. Accession Number: 20180703–5166. Comments Due: 5 p.m. ET 7/24/18. Docket Numbers: ER18–1962–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised ISA, SA No. 4792; Queue No. AB2–038/AB2–041 to be effective 6/4/ 2018. Filed Date: 7/5/18. Accession Number: 20180705–5050. Comments Due: 5 p.m. ET 7/26/18. Docket Numbers: ER18–1963–000. Applicants: Midwest Energy, Inc. Description: Petition for Temporary Waiver of Tariff Provisions of Midwest Energy, Inc. Filed Date: 7/5/18. Accession Number: 20180705–5068. Comments Due: 5 p.m. ET 7/26/18. Docket Numbers: ER18–1964–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–07–05_GIA Self-Fund Vacatur Filing to be effective 6/24/2015. Filed Date: 7/5/18. Accession Number: 20180705–5080. Comments Due: 5 p.m. ET 7/26/18. Docket Numbers: ER18–1965–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–07–05_MPFCA–FCA Self-Fund Filing to be effective 6/24/2015. Filed Date: 7/5/18. Accession Number: 20180705–5083. Comments Due: 5 p.m. ET 7/26/18. Docket Numbers: ER18–1966–000. Applicants: Wisconsin Electric Power Company. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 32105 Description: § 205(d) Rate Filing: 2018 Formula Rate Update Filing to be effective 9/4/2018. Filed Date: 7/5/18. Accession Number: 20180705–5084. Comments Due: 5 p.m. ET 7/26/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 5, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–14831 Filed 7–10–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 1250–020, 14836–000] City of Pasadena, California; Notice of Applications Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, and Terms and Conditions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Applications: Surrender of License and application for (conduit) Exemption from Licensing. b. Project Nos.: 1250–020, 14836–000. c. Date Filed: December 29, 2016. d. Applicant: City of Pasadena, California. e. Name of Project: Azusa Project. f. Location: The project is located on the Azusa Conduit in Los Angeles County, California. The licensed project occupies U.S. lands administered by the U.S. Forest Service. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). E:\FR\FM\11JYN1.SGM 11JYN1 daltland on DSKBBV9HB2PROD with NOTICES 32106 Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices h. Applicant Contact: Arturo Silva, Interim Assistant General Manager— Power Supply, City of Pasadena Water and Power Development, 85 East State Street, Pasadena, California 91101– 3418, telephone: (626) 744–4568. i. FERC Contact: Robert Bell, telephone (202) 502–6062 or email: robert.bell@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: 60 days from the issuance date of this notice by the Commission; reply comments are due 105 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file any motion to intervene, protest, comments, and/or recommendations using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket numbers P–1250–020, and P–14836–000. k. Description of request: In the application filed on December 29, 2016, the City of Pasadena requests that the Commission issue an order granting the Azusa Project an exemption from the licensing requirements of Part I of the Federal Power Act. The City of Pasadena also requests administrative surrender of its license for the Azusa Project facilities excluded under FERC’s definition of a small conduit hydroelectric facility. a. Licensed Facilities: The applicant requests a conduit exemption for the Azusa Hydroelectric Project No. 1250. The applicant proposes to remove the following project facilities from the Commission’s jurisdiction: (1) The forebay; (2) the 24.4-kV generator leads, a 2.3/12-kV transformer, and a short transmission line; (3) an afterbay. The aforementioned facilities would remain operational as part of the water supply facilities operated by the San Gabriel River Water Committee. b. Conduit Exemption: The applicant proposes a conduit exemption for the Azusa Project No. 14836. The proposed project would be located on its water supply system and would consist of: (1) VerDate Sep<11>2014 16:26 Jul 10, 2018 Jkt 244001 An existing 797-foot-long, 38-inch diameter welded steel penstock; (2) an existing powerhouse containing one generating unit having an installed capacity of 3 megawatts; (3) an existing 148-foot-long, 136-inch-wide underground tailrace; and (4) appurtenant facilities. The City of Pasadena, estimates the project would have an average annual generation of 2,890 megawatt-hours that would be sold to a local utility. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number P–1250, or P–14836 in the docket number field to access the documents. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above and at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: July 2, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–14776 Filed 7–10–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL18–182–000] ISO New England Inc.; Notice of Institution of Section 206 Proceeding and Refund Effective Date On July 2, 2018, the Commission issued an order in Docket No. EL18– 182–000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into whether ISO New England Inc.’s Transmission, Markets and Services Tariff is unjust and unreasonable. ISO New England Inc., 164 FERC ¶ 61,003 (2018). The refund effective date in Docket No. EL18–182–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket No. EL18–182–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR E:\FR\FM\11JYN1.SGM 11JYN1

Agencies

[Federal Register Volume 83, Number 133 (Wednesday, July 11, 2018)]
[Notices]
[Pages 32105-32106]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-14776]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 1250-020, 14836-000]


City of Pasadena, California; Notice of Applications Accepted for 
Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, and 
Terms and Conditions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Applications: Surrender of License and application for 
(conduit) Exemption from Licensing.
    b. Project Nos.: 1250-020, 14836-000.
    c. Date Filed: December 29, 2016.
    d. Applicant: City of Pasadena, California.
    e. Name of Project: Azusa Project.
    f. Location: The project is located on the Azusa Conduit in Los 
Angeles County, California. The licensed project occupies U.S. lands 
administered by the U.S. Forest Service.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).

[[Page 32106]]

    h. Applicant Contact: Arturo Silva, Interim Assistant General 
Manager--Power Supply, City of Pasadena Water and Power Development, 85 
East State Street, Pasadena, California 91101-3418, telephone: (626) 
744-4568.
    i. FERC Contact: Robert Bell, telephone (202) 502-6062 or email: 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: 60 days from the issuance date of this notice by the 
Commission; reply comments are due 105 days from the issuance date of 
this notice by the Commission. The Commission strongly encourages 
electronic filing. Please file any motion to intervene, protest, 
comments, and/or recommendations using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. The first page of any filing should 
include docket numbers P-1250-020, and P-14836-000.
    k. Description of request: In the application filed on December 29, 
2016, the City of Pasadena requests that the Commission issue an order 
granting the Azusa Project an exemption from the licensing requirements 
of Part I of the Federal Power Act. The City of Pasadena also requests 
administrative surrender of its license for the Azusa Project 
facilities excluded under FERC's definition of a small conduit 
hydroelectric facility.
    a. Licensed Facilities: The applicant requests a conduit exemption 
for the Azusa Hydroelectric Project No. 1250. The applicant proposes to 
remove the following project facilities from the Commission's 
jurisdiction: (1) The forebay; (2) the 24.4-kV generator leads, a 2.3/
12-kV transformer, and a short transmission line; (3) an afterbay. The 
aforementioned facilities would remain operational as part of the water 
supply facilities operated by the San Gabriel River Water Committee.
    b. Conduit Exemption: The applicant proposes a conduit exemption 
for the Azusa Project No. 14836. The proposed project would be located 
on its water supply system and would consist of: (1) An existing 797-
foot-long, 38-inch diameter welded steel penstock; (2) an existing 
powerhouse containing one generating unit having an installed capacity 
of 3 megawatts; (3) an existing 148-foot-long, 136-inch-wide 
underground tailrace; and (4) appurtenant facilities. The City of 
Pasadena, estimates the project would have an average annual generation 
of 2,890 megawatt-hours that would be sold to a local utility.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number P-1250, or P-14836 in the docket number field 
to access the documents. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of 
new filings and issuances related to this or other pending projects. 
For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above and at the Commission's Public Reference Room, located at 888 
First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 
502-8371.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license amendment. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: July 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-14776 Filed 7-10-18; 8:45 am]