32106
Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices
h. Applicant Contact: Arturo Silva,
Interim Assistant General Manager—
Power Supply, City of Pasadena Water
and Power Development, 85 East State
Street, Pasadena, California 91101–
3418, telephone: (626) 744–4568.
i. FERC Contact: Robert Bell,
telephone (202) 502–6062 or email:
robert.bell@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: 60
days from the issuance date of this
notice by the Commission; reply
comments are due 105 days from the
issuance date of this notice by the
Commission. The Commission strongly
encourages electronic filing. Please file
any motion to intervene, protest,
comments, and/or recommendations
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket numbers P–1250–020,
and P–14836–000.
k. Description of request: In the
application filed on December 29, 2016,
the City of Pasadena requests that the
Commission issue an order granting the
Azusa Project an exemption from the
licensing requirements of Part I of the
Federal Power Act. The City of
Pasadena also requests administrative
surrender of its license for the Azusa
Project facilities excluded under FERC’s
definition of a small conduit
hydroelectric facility.
a. Licensed Facilities: The applicant
requests a conduit exemption for the
Azusa Hydroelectric Project No. 1250.
The applicant proposes to remove the
following project facilities from the
Commission’s jurisdiction: (1) The
forebay; (2) the 24.4-kV generator leads,
a 2.3/12-kV transformer, and a short
transmission line; (3) an afterbay. The
aforementioned facilities would remain
operational as part of the water supply
facilities operated by the San Gabriel
River Water Committee.
b. Conduit Exemption: The applicant
proposes a conduit exemption for the
Azusa Project No. 14836. The proposed
project would be located on its water
supply system and would consist of: (1)
VerDate Sep<11>2014
16:26 Jul 10, 2018
Jkt 244001
An existing 797-foot-long, 38-inch
diameter welded steel penstock; (2) an
existing powerhouse containing one
generating unit having an installed
capacity of 3 megawatts; (3) an existing
148-foot-long, 136-inch-wide
underground tailrace; and (4)
appurtenant facilities. The City of
Pasadena, estimates the project would
have an average annual generation of
2,890 megawatt-hours that would be
sold to a local utility.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number P–1250, or
P–14836 in the docket number field to
access the documents. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and at the Commission’s Public
Reference Room, located at 888 First
Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
amendment. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: July 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–14776 Filed 7–10–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–182–000]
ISO New England Inc.; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On July 2, 2018, the Commission
issued an order in Docket No. EL18–
182–000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether ISO New England Inc.’s
Transmission, Markets and Services
Tariff is unjust and unreasonable. ISO
New England Inc., 164 FERC ¶ 61,003
(2018).
The refund effective date in Docket
No. EL18–182–000, established
pursuant to section 206(b) of the FPA,
will be the date of publication of this
notice in the Federal Register.
Any interested person desiring to be
heard in Docket No. EL18–182–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, in accordance
with Rule 214 of the Commission’s
Rules of Practice and Procedure, 18 CFR
E:\FR\FM\11JYN1.SGM
11JYN1
Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices
daltland on DSKBBV9HB2PROD with NOTICES
385.214, within 21 days of the date of
issuance of the order.
Filed Date: 7/2/18.
Accession Number: 20180702–5054.
Comments Due: 5 p.m. ET 7/16/18.
Dated: July 2, 2018.
Docket Numbers: RP18–952–000.
Kimberly D. Bose,
Applicants: Equitrans, L.P.
Secretary.
Description: § 4(d) Rate Filing:
[FR Doc. 2018–14773 Filed 7–10–18; 8:45 am]
Negotiated Capacity Release
BILLING CODE 6717–01–P
Agreements—7/1/2018 to be effective
7/1/2018.
Filed Date: 7/2/18.
DEPARTMENT OF ENERGY
Accession Number: 20180702–5127.
Comments Due: 5 p.m. ET 7/16/18.
Federal Energy Regulatory
Docket Numbers: RP18–953–000.
Commission
Applicants: Gulf South Pipeline
Combined Notice of Filings
Company, LP.
Description: § 4(d) Rate Filing:
Take notice that the Commission has
Negotiated Rate Agmt (Emera 49472) to
received the following Natural Gas
Pipeline Rate and Refund Report filings: be effective 7/2/2018.
Filed Date: 7/2/18.
Filings Instituting Proceedings
Accession Number: 20180702–5251.
Comments Due: 5 p.m. ET 7/16/18.
Docket Numbers: RP10–1398–000.
Docket Numbers: RP18–954–000.
Applicants: El Paso Natural Gas
Applicants: Gulf South Pipeline
Company.
Description: Report Filing: Refund
Company, LP.
Description: § 4(d) Rate Filing:
Report.
Filed Date: 7/2/18.
PermCapRel & CapRelNegRateAgmt
Accession Number: 20180702–5164.
(Pivotal 34691 >ETG 49785, then >So
Comments Due: 5 p.m. ET 7/16/18.
Jersey 49788) to be effective 7/1/2018.
Filed Date: 7/2/18.
Docket Numbers: RP15–1022–014.
Applicants: Alliance Pipeline L.P.
Accession Number: 20180702–5259.
Description: Compliance filing
Comments Due: 5 p.m. ET 7/16/18.
Settlement—Gas Processing to be
Docket Numbers: RP18–955–000.
effective 8/1/2018.
Applicants: Enable Mississippi River
Filed Date: 7/2/18.
Transmission, LLC.
Accession Number: 20180702–5001.
Description: § 4(d) Rate Filing:
Comments Due: 5 p.m. ET 7/16/18.
Negotiated Rate Filing—Ankor—July 1,
Docket Numbers: RP18–861–001.
2018 #6032 to be effective 7/1/2018.
Applicants: Equitrans, L.P.
Filed Date: 7/2/18.
Description: Compliance filing
Accession Number: 20180702–5267.
Scheduling Priority Exemption for
Comments Due: 5 p.m. ET 7/16/18.
Reservation Charge Credits Compliance
Docket Numbers: RP18–891–001.
Filing to be effective 7/1/2018.
Applicants: Eastern Shore Natural Gas
Filed Date: 7/2/18.
Company.
Accession Number: 20180702–5102.
Description: Tariff Amendment:
Comments Due: 5 p.m. ET 7/16/18.
Amended Non-Conforming Letter
Docket Numbers: RP18–940–001.
Agreements-Easton/CUC–MD to be
Applicants: Empire Pipeline, Inc.
effective 5/1/2018.
Description: Tariff Amendment: Errata
Filed Date: 7/3/18.
Empire Rate Case—June 2018 to be
Accession Number: 20180703–5108.
effective 1/1/2019.
Comments Due: 5 p.m. ET 7/16/18.
Filed Date: 7/2/18.
Docket Numbers: RP18–956–000.
Accession Number: 20180702–5101.
Applicants: WTG Hugoton, LP.
Comments Due: 5 p.m. ET 7/16/18.
Description: § 4(d) Rate Filing: Annual
Docket Numbers: RP18–950–000.
Fuel Retention Percentage Filing 2018–
Applicants: Dominion Energy Cove
2019 to be effective 7/2/2018.
Point LNG, LP.
Filed Date: 7/3/18.
Description: Compliance filing
Accession Number: 20180703–5000.
DECP—2018 Penalty Revenue
Comments Due: 5 p.m. ET 7/16/18.
Distribution.
Docket Numbers: RP18–957–000.
Filed Date: 7/2/18.
Accession Number: 20180702–5044.
Applicants: Midcontinent Express
Comments Due: 5 p.m. ET 7/16/18.
Pipeline LLC.
Description: § 4(d) Rate Filing:
Docket Numbers: RP18–951–000.
Chesapeake/BCE-Mach LLC Negotiated
Applicants: Dominion Energy
Rate to be effective 7/1/2018.
Transmission, Inc.
Filed Date: 7/3/18.
Description: Compliance filing DETI—
Accession Number: 20180703–5045.
2018 Overrun and Penalty Revenue
Comments Due: 5 p.m. ET 7/16/18.
Distribution.
VerDate Sep<11>2014
16:26 Jul 10, 2018
Jkt 244001
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
32107
Docket Numbers: RP18–958–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2018–07–03 BP (2Ks) to be
effective 7/4/2018.
Filed Date: 7/3/18.
Accession Number: 20180703–5117.
Comments Due: 5 p.m. ET 7/16/18.
Docket Numbers: RP18–959–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing TETLP
Notice Regarding Non-Jurisdictional
Facilities.
Filed Date: 7/3/18.
Accession Number: 20180703–5158.
Comments Due: 5 p.m. ET 7/16/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–14832 Filed 7–10–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–504–000]
Notice of Request Under Blanket
Authorization; Transwestern Pipeline
Company, LLC
Take notice that on June 14, 2018,
Transwestern Pipeline Company, LLC
(Transwestern), 1300 Main Street,
Houston, Texas 7700, filed a Prior
Notice Request pursuant to sections
157.203, 157.205, and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA) for authorization
to abandon in place the Atoka 3
Compressor Station consisting of five
natural gas compressor engines,
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 83, Number 133 (Wednesday, July 11, 2018)]
[Notices]
[Pages 32106-32107]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-14773]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL18-182-000]
ISO New England Inc.; Notice of Institution of Section 206
Proceeding and Refund Effective Date
On July 2, 2018, the Commission issued an order in Docket No. EL18-
182-000, pursuant to section 206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an investigation into whether ISO New
England Inc.'s Transmission, Markets and Services Tariff is unjust and
unreasonable. ISO New England Inc., 164 FERC ] 61,003 (2018).
The refund effective date in Docket No. EL18-182-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL18-182-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426, in accordance with Rule 214 of the
Commission's Rules of Practice and Procedure, 18 CFR
[[Page 32107]]
385.214, within 21 days of the date of issuance of the order.
Dated: July 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-14773 Filed 7-10-18; 8:45 am]