ISO New England Inc.; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 32106-32107 [2018-14773]

Download as PDF daltland on DSKBBV9HB2PROD with NOTICES 32106 Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices h. Applicant Contact: Arturo Silva, Interim Assistant General Manager— Power Supply, City of Pasadena Water and Power Development, 85 East State Street, Pasadena, California 91101– 3418, telephone: (626) 744–4568. i. FERC Contact: Robert Bell, telephone (202) 502–6062 or email: robert.bell@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: 60 days from the issuance date of this notice by the Commission; reply comments are due 105 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file any motion to intervene, protest, comments, and/or recommendations using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket numbers P–1250–020, and P–14836–000. k. Description of request: In the application filed on December 29, 2016, the City of Pasadena requests that the Commission issue an order granting the Azusa Project an exemption from the licensing requirements of Part I of the Federal Power Act. The City of Pasadena also requests administrative surrender of its license for the Azusa Project facilities excluded under FERC’s definition of a small conduit hydroelectric facility. a. Licensed Facilities: The applicant requests a conduit exemption for the Azusa Hydroelectric Project No. 1250. The applicant proposes to remove the following project facilities from the Commission’s jurisdiction: (1) The forebay; (2) the 24.4-kV generator leads, a 2.3/12-kV transformer, and a short transmission line; (3) an afterbay. The aforementioned facilities would remain operational as part of the water supply facilities operated by the San Gabriel River Water Committee. b. Conduit Exemption: The applicant proposes a conduit exemption for the Azusa Project No. 14836. The proposed project would be located on its water supply system and would consist of: (1) VerDate Sep<11>2014 16:26 Jul 10, 2018 Jkt 244001 An existing 797-foot-long, 38-inch diameter welded steel penstock; (2) an existing powerhouse containing one generating unit having an installed capacity of 3 megawatts; (3) an existing 148-foot-long, 136-inch-wide underground tailrace; and (4) appurtenant facilities. The City of Pasadena, estimates the project would have an average annual generation of 2,890 megawatt-hours that would be sold to a local utility. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number P–1250, or P–14836 in the docket number field to access the documents. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above and at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: July 2, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–14776 Filed 7–10–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL18–182–000] ISO New England Inc.; Notice of Institution of Section 206 Proceeding and Refund Effective Date On July 2, 2018, the Commission issued an order in Docket No. EL18– 182–000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into whether ISO New England Inc.’s Transmission, Markets and Services Tariff is unjust and unreasonable. ISO New England Inc., 164 FERC ¶ 61,003 (2018). The refund effective date in Docket No. EL18–182–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket No. EL18–182–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR E:\FR\FM\11JYN1.SGM 11JYN1 Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices daltland on DSKBBV9HB2PROD with NOTICES 385.214, within 21 days of the date of issuance of the order. Filed Date: 7/2/18. Accession Number: 20180702–5054. Comments Due: 5 p.m. ET 7/16/18. Dated: July 2, 2018. Docket Numbers: RP18–952–000. Kimberly D. Bose, Applicants: Equitrans, L.P. Secretary. Description: § 4(d) Rate Filing: [FR Doc. 2018–14773 Filed 7–10–18; 8:45 am] Negotiated Capacity Release BILLING CODE 6717–01–P Agreements—7/1/2018 to be effective 7/1/2018. Filed Date: 7/2/18. DEPARTMENT OF ENERGY Accession Number: 20180702–5127. Comments Due: 5 p.m. ET 7/16/18. Federal Energy Regulatory Docket Numbers: RP18–953–000. Commission Applicants: Gulf South Pipeline Combined Notice of Filings Company, LP. Description: § 4(d) Rate Filing: Take notice that the Commission has Negotiated Rate Agmt (Emera 49472) to received the following Natural Gas Pipeline Rate and Refund Report filings: be effective 7/2/2018. Filed Date: 7/2/18. Filings Instituting Proceedings Accession Number: 20180702–5251. Comments Due: 5 p.m. ET 7/16/18. Docket Numbers: RP10–1398–000. Docket Numbers: RP18–954–000. Applicants: El Paso Natural Gas Applicants: Gulf South Pipeline Company. Description: Report Filing: Refund Company, LP. Description: § 4(d) Rate Filing: Report. Filed Date: 7/2/18. PermCapRel & CapRelNegRateAgmt Accession Number: 20180702–5164. (Pivotal 34691 >ETG 49785, then >So Comments Due: 5 p.m. ET 7/16/18. Jersey 49788) to be effective 7/1/2018. Filed Date: 7/2/18. Docket Numbers: RP15–1022–014. Applicants: Alliance Pipeline L.P. Accession Number: 20180702–5259. Description: Compliance filing Comments Due: 5 p.m. ET 7/16/18. Settlement—Gas Processing to be Docket Numbers: RP18–955–000. effective 8/1/2018. Applicants: Enable Mississippi River Filed Date: 7/2/18. Transmission, LLC. Accession Number: 20180702–5001. Description: § 4(d) Rate Filing: Comments Due: 5 p.m. ET 7/16/18. Negotiated Rate Filing—Ankor—July 1, Docket Numbers: RP18–861–001. 2018 #6032 to be effective 7/1/2018. Applicants: Equitrans, L.P. Filed Date: 7/2/18. Description: Compliance filing Accession Number: 20180702–5267. Scheduling Priority Exemption for Comments Due: 5 p.m. ET 7/16/18. Reservation Charge Credits Compliance Docket Numbers: RP18–891–001. Filing to be effective 7/1/2018. Applicants: Eastern Shore Natural Gas Filed Date: 7/2/18. Company. Accession Number: 20180702–5102. Description: Tariff Amendment: Comments Due: 5 p.m. ET 7/16/18. Amended Non-Conforming Letter Docket Numbers: RP18–940–001. Agreements-Easton/CUC–MD to be Applicants: Empire Pipeline, Inc. effective 5/1/2018. Description: Tariff Amendment: Errata Filed Date: 7/3/18. Empire Rate Case—June 2018 to be Accession Number: 20180703–5108. effective 1/1/2019. Comments Due: 5 p.m. ET 7/16/18. Filed Date: 7/2/18. Docket Numbers: RP18–956–000. Accession Number: 20180702–5101. Applicants: WTG Hugoton, LP. Comments Due: 5 p.m. ET 7/16/18. Description: § 4(d) Rate Filing: Annual Docket Numbers: RP18–950–000. Fuel Retention Percentage Filing 2018– Applicants: Dominion Energy Cove 2019 to be effective 7/2/2018. Point LNG, LP. Filed Date: 7/3/18. Description: Compliance filing Accession Number: 20180703–5000. DECP—2018 Penalty Revenue Comments Due: 5 p.m. ET 7/16/18. Distribution. Docket Numbers: RP18–957–000. Filed Date: 7/2/18. Accession Number: 20180702–5044. Applicants: Midcontinent Express Comments Due: 5 p.m. ET 7/16/18. Pipeline LLC. Description: § 4(d) Rate Filing: Docket Numbers: RP18–951–000. Chesapeake/BCE-Mach LLC Negotiated Applicants: Dominion Energy Rate to be effective 7/1/2018. Transmission, Inc. Filed Date: 7/3/18. Description: Compliance filing DETI— Accession Number: 20180703–5045. 2018 Overrun and Penalty Revenue Comments Due: 5 p.m. ET 7/16/18. Distribution. VerDate Sep<11>2014 16:26 Jul 10, 2018 Jkt 244001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 32107 Docket Numbers: RP18–958–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: Neg Rate 2018–07–03 BP (2Ks) to be effective 7/4/2018. Filed Date: 7/3/18. Accession Number: 20180703–5117. Comments Due: 5 p.m. ET 7/16/18. Docket Numbers: RP18–959–000. Applicants: Texas Eastern Transmission, LP. Description: Compliance filing TETLP Notice Regarding Non-Jurisdictional Facilities. Filed Date: 7/3/18. Accession Number: 20180703–5158. Comments Due: 5 p.m. ET 7/16/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 5, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–14832 Filed 7–10–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–504–000] Notice of Request Under Blanket Authorization; Transwestern Pipeline Company, LLC Take notice that on June 14, 2018, Transwestern Pipeline Company, LLC (Transwestern), 1300 Main Street, Houston, Texas 7700, filed a Prior Notice Request pursuant to sections 157.203, 157.205, and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA) for authorization to abandon in place the Atoka 3 Compressor Station consisting of five natural gas compressor engines, E:\FR\FM\11JYN1.SGM 11JYN1

Agencies

[Federal Register Volume 83, Number 133 (Wednesday, July 11, 2018)]
[Notices]
[Pages 32106-32107]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-14773]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL18-182-000]


ISO New England Inc.; Notice of Institution of Section 206 
Proceeding and Refund Effective Date

    On July 2, 2018, the Commission issued an order in Docket No. EL18-
182-000, pursuant to section 206 of the Federal Power Act (FPA), 16 
U.S.C. 824e (2012), instituting an investigation into whether ISO New 
England Inc.'s Transmission, Markets and Services Tariff is unjust and 
unreasonable. ISO New England Inc., 164 FERC ] 61,003 (2018).
    The refund effective date in Docket No. EL18-182-000, established 
pursuant to section 206(b) of the FPA, will be the date of publication 
of this notice in the Federal Register.
    Any interested person desiring to be heard in Docket No. EL18-182-
000 must file a notice of intervention or motion to intervene, as 
appropriate, with the Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426, in accordance with Rule 214 of the 
Commission's Rules of Practice and Procedure, 18 CFR

[[Page 32107]]

385.214, within 21 days of the date of issuance of the order.

    Dated: July 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-14773 Filed 7-10-18; 8:45 am]
 BILLING CODE 6717-01-P