Notice of Proposed Administrative Settlement Agreement and Order on Consent for De Minimis Share of Reimbursement for Removal Action for the Ector Drum Site, Odessa, Texas, 31972 [2018-14742]

Download as PDF 31972 Federal Register / Vol. 83, No. 132 / Tuesday, July 10, 2018 / Notices Total estimated cost: $5,446,444 (per year), includes $116,480 annualized capital or operation & maintenance costs. Changes in estimates: There is no change in hours in the total estimated respondent burden compared with the ICR currently approved by OMB. Dated: June 6, 2018. Richard A. Wayland, Director, Air Quality Assessment Division, Office of Air Quality Planning and Standards. [FR Doc. 2018–14741 Filed 7–9–18; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [9980–35–Region 6] Notice of Proposed Administrative Settlement Agreement and Order on Consent for De Minimis Share of Reimbursement for Removal Action for the Ector Drum Site, Odessa, Texas Environmental Protection Agency (EPA). ACTION: Notice of proposed settlement; request for public comment. AGENCY: In accordance with the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended (‘‘CERCLA’’), notice is hereby given that the Environmental Protection Agency (‘‘EPA’’), has entered into a proposed settlement, embodied in an Administrative Settlement Agreement and Order on Consent for Removal Action (‘‘Settlement Agreement’’), with Nexeo Solutions, LLC and Ashland, LLC. Under the Settlement Agreement, Nexeo Solutions, LLC on behalf of Nexeo Solutions, LLC and on behalf of Ashland, LLC will pay EPA $31,111.71. Nexeo Solutions, LLC is paying a de minimis share of the costs incurred for a removal action and cleanup involving the removal of waste drums, containers, totes, etc. and associated chemicals and contaminated soil from an abandoned drum recycling facility located in Odessa, Texas. Total costs of the removal action was approximately $3,345,345.11. For thirty (30) days beginning the date of publication of this notice, the Agency will receive written comments relating to this notice and will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper or amozie on DSK3GDR082PROD with NOTICES1 SUMMARY: VerDate Sep<11>2014 17:27 Jul 09, 2018 Jkt 244001 inadequate. The Agency’s response to any comments received will be available for public inspection at 1445 Ross Avenue, Dallas, Texas 75202–2733. DATES: Comments must be submitted on or before August 9, 2018. ADDRESSES: The Settlement Agreement is available for public inspection at 1445 Ross Avenue, Dallas, Texas 75202–2733 or by calling 214–665–6529. Comments should reference the Ector Drum Superfund Site, d/b/a Lone Star Drum Superfund Site (‘‘Site’’), located in the city of Odessa, Ector County, Texas and be addressed to David Eppler, Enforcement Officer, Superfund Division (6SF–TE), U.S. Environmental Protection Agency, 1445 Ross Avenue, Dallas, Texas 75202–2733; or email: eppler.david@epa.gov; and should reference EPA CERCLA Docket Number 06–01–17. EPA’s response to any comments received will be available for public inspection at the same address. FOR FURTHER INFORMATION CONTACT: James E. Costello, Practice Group Leader, 1445 Ross Avenue, Dallas, Texas 75202–2733; or call (214) 665– 8045. Dated: June 19, 2018. David Gray, Deputy Regional Administrator (6RA). [FR Doc. 2018–14742 Filed 7–9–18; 8:45 am] BILLING CODE 6560–50–P FEDERAL RESERVE SYSTEM Change in Bank Control Notices; Acquisitions of Shares of a Bank or Bank Holding Company The notificants listed below have applied under the Change in Bank Control Act (12 U.S.C. 1817(j)) and § 225.41 of the Board’s Regulation Y (12 CFR 225.41) to acquire shares of a bank or bank holding company. The factors that are considered in acting on the notices are set forth in paragraph 7 of the Act (12 U.S.C. 1817(j)(7)). The notices are available for immediate inspection at the Federal Reserve Bank indicated. The notices also will be available for inspection at the offices of the Board of Governors. Interested persons may express their views in writing to the Reserve Bank indicated for that notice or to the offices of the Board of Governors. Comments must be received not later than July 25, 2018. A. Federal Reserve Bank of Chicago (Colette A. Fried, Assistant Vice President) 230 South LaSalle Street, Chicago, Illinois 60690–1414: 1. John D. Anderson, Malvern, Pennsylvania, Mark E. Anderson, PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Bolingbrook, Illinois, and Thomas M. Anderson III, Leeds, Alabama, together as a group acting in concert; to retain voting shares of NBE Bancshares, Inc., and thereby indirectly retain shares of Pioneer State Bank, both of Earlville, Illinois. Board of Governors of the Federal Reserve System, July 5, 2018. Yao-Chin Chao, Assistant Secretary of the Board. [FR Doc. 2018–14720 Filed 7–9–18; 8:45 am] BILLING CODE P FEDERAL RESERVE SYSTEM Formations of, Acquisitions by, and Mergers of Savings and Loan Holding Companies The companies listed in this notice have applied to the Board for approval, pursuant to the Home Owners’ Loan Act (12 U.S.C. 1461 et seq.) (HOLA), Regulation LL (12 CFR part 238), and Regulation MM (12 CFR part 239), and all other applicable statutes and regulations to become a savings and loan holding company and/or to acquire the assets or the ownership of, control of, or the power to vote shares of a savings association and nonbanking companies owned by the savings and loan holding company, including the companies listed below. The applications listed below, as well as other related filings required by the Board, are available for immediate inspection at the Federal Reserve Bank indicated. The application also will be available for inspection at the offices of the Board of Governors. Interested persons may express their views in writing on the standards enumerated in the HOLA (12 U.S.C. 1467a(e)). If the proposal also involves the acquisition of a nonbanking company, the review also includes whether the acquisition of the nonbanking company complies with the standards in section 10(c)(4)(B) of the HOLA (12 U.S.C. 1467a(c)(4)(B)). Unless otherwise noted, nonbanking activities will be conducted throughout the United States. Unless otherwise noted, comments regarding each of these applications must be received at the Reserve Bank indicated or the offices of the Board of Governors not later than August 1, 2018. A. Federal Reserve Bank of Boston (Prabal Chakrabarti, Senior Vice President) 600 Atlantic Avenue, Boston, Massachusetts 02210–2204. Comments can also be sent electronically to BOS.SRC.Applications.Comments@ bos.frb.org: 1. Jamestown Trust #1, the Jamestown Trust #2, the Jamestown Trust #3, the E:\FR\FM\10JYN1.SGM 10JYN1

Agencies

[Federal Register Volume 83, Number 132 (Tuesday, July 10, 2018)]
[Notices]
[Page 31972]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-14742]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[9980-35-Region 6]


Notice of Proposed Administrative Settlement Agreement and Order 
on Consent for De Minimis Share of Reimbursement for Removal Action for 
the Ector Drum Site, Odessa, Texas

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of proposed settlement; request for public comment.

-----------------------------------------------------------------------

SUMMARY: In accordance with the Comprehensive Environmental Response, 
Compensation and Liability Act of 1980, as amended (``CERCLA''), notice 
is hereby given that the Environmental Protection Agency (``EPA''), has 
entered into a proposed settlement, embodied in an Administrative 
Settlement Agreement and Order on Consent for Removal Action 
(``Settlement Agreement''), with Nexeo Solutions, LLC and Ashland, LLC. 
Under the Settlement Agreement, Nexeo Solutions, LLC on behalf of Nexeo 
Solutions, LLC and on behalf of Ashland, LLC will pay EPA $31,111.71. 
Nexeo Solutions, LLC is paying a de minimis share of the costs incurred 
for a removal action and cleanup involving the removal of waste drums, 
containers, totes, etc. and associated chemicals and contaminated soil 
from an abandoned drum recycling facility located in Odessa, Texas. 
Total costs of the removal action was approximately $3,345,345.11.
    For thirty (30) days beginning the date of publication of this 
notice, the Agency will receive written comments relating to this 
notice and will receive written comments relating to the settlement. 
The Agency will consider all comments received and may modify or 
withdraw its consent to the settlement if comments received disclose 
facts or considerations which indicate that the settlement is 
inappropriate, improper or inadequate. The Agency's response to any 
comments received will be available for public inspection at 1445 Ross 
Avenue, Dallas, Texas 75202-2733.

DATES: Comments must be submitted on or before August 9, 2018.

ADDRESSES: The Settlement Agreement is available for public inspection 
at 1445 Ross Avenue, Dallas, Texas 75202-2733 or by calling 214-665-
6529. Comments should reference the Ector Drum Superfund Site, d/b/a 
Lone Star Drum Superfund Site (``Site''), located in the city of 
Odessa, Ector County, Texas and be addressed to David Eppler, 
Enforcement Officer, Superfund Division (6SF-TE), U.S. Environmental 
Protection Agency, 1445 Ross Avenue, Dallas, Texas 75202-2733; or 
email: [email protected]; and should reference EPA CERCLA Docket 
Number 06-01-17. EPA's response to any comments received will be 
available for public inspection at the same address.

FOR FURTHER INFORMATION CONTACT: James E. Costello, Practice Group 
Leader, 1445 Ross Avenue, Dallas, Texas 75202-2733; or call (214) 665-
8045.

    Dated: June 19, 2018.
David Gray,
Deputy Regional Administrator (6RA).
[FR Doc. 2018-14742 Filed 7-9-18; 8:45 am]
 BILLING CODE 6560-50-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.