Notice of Modification of Procedural Schedule; Turlock Irrigation District, Modesto Irrigation District, 31386-31387 [2018-14345]

Download as PDF 31386 Federal Register / Vol. 83, No. 129 / Thursday, July 5, 2018 / Notices interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC there is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 16, 2018. Dated: June 27, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–14344 Filed 7–3–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission amozie on DSK3GDR082PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–113–000. Applicants: Copenhagen Wind Farm, LLC, Stoneray Power Partners, LLC. Description: Application for Authorization under Section 203 of the Federal Power Act and Request for Confidential Treatment and Request for Expedited Action of Copenhagen Wind Farm, LLC, et al. Filed Date: 6/26/18. Accession Number: 20180626–5217. Comments Due: 5 p.m. ET 7/17/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2407–005; ER10–2424–005; ER10–2425–007; ER13–1816–009; ER17–1316–002; ER18–1186–001. Applicants: Lost Lakes Wind Farm LLC, Pioneer Prairie Wind Farm I, LLC, Quilt Block Wind Farm LLC, Rail Splitter Wind Farm, LLC, Sustaining Power Solutions LLC, Turtle Creek Wind Farm LLC. Description: Updated Market Power Analysis for Central Region and Notice VerDate Sep<11>2014 16:43 Jul 03, 2018 Jkt 244001 of Non-Material Change in Status of Lost Lakes Wind Farm LLC, et al. Filed Date: 6/26/18. Accession Number: 20180626–5243. Comments Due: 5 p.m. ET 8/27/18. Docket Numbers: ER15–1332–006; ER10–2398–007; ER10–2399–007; ER10–2400–008; ER10–2401–006; ER10–2402–006; ER10–2403–007; ER10–2406–008; ER10–2409–007; ER10–2410–007; ER10–2411–008; ER10–2412–008; ER10–2414–008; ER11–2935–009; ER11–3414–007; ER13–1816–008; ER14–1933–007; ER15–1333–006; ER16–1724–004; ER17–1315–004; ER17–1318–002; ER17–2087–002. Applicants: Arbuckle Mountain Wind Farm LLC, Blackstone Wind Farm, LLC, Blackstone Wind Farm II LLC, Blue Canyon Windpower LLC, Blue Canyon Windpower II LLC, Blue Canyon Windpower V LLC, Blue Canyon Windpower VI LLC, Cloud County Wind Farm, LLC, Headwaters Wind Farm LLC, High Trail Wind Farm, LLC, Hog Creek Wind Project, LLC, Meadow Lake Wind Farm LLC, Meadow Lake Wind Farm II LLC, Meadow Lake Wind Farm III LLC, Meadow Lake Wind Farm IV LLC, Meadow Lake Wind Farm V LLC, Old Trail Wind Farm, LLC, Paulding Wind Farm II LLC, Paulding Wind Farm III LLC, Redbed Plains Wind Farm LLC, Waverly Wind Farm LLC, Sustaining Power Solutions LLC. Description: Notice of Non-Material Change in Status of Arbuckle Mountain Wind Farm LLC, et al. Filed Date: 6/26/18. Accession Number: 20180626–5239. Comments Due: 5 p.m. ET 7/17/18. Docket Numbers: ER17–512–006. Applicants: Virginia Electric and Power Company. Description: Compliance filing: Informational Filing of VEPCO Docket No. ER17–512–006 to be effective N/A. Filed Date: 6/27/18. Accession Number: 20180627–5001. Comments Due: 5 p.m. ET 7/18/18. Docket Numbers: ER18–1464–003. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2018–06–26_Deficiency response for the Sub-Regional Power Balance Constraints to be effective 6/26/2018. Filed Date: 6/26/18. Accession Number: 20180626–5180. Comments Due: 5 p.m. ET 7/17/18. Docket Numbers: ER18–1859–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–06–27_SA 2840 Entergy ArkansasStuttgart Solar LLC 1st Rev GIA (J348) to be effective 6/18./2018. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Filed Date: 6/27/18. Accession Number: 20180627–5025. Comments Due: 5 p.m. ET 7/18./18. Docket Numbers: ER18–1860–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 767 5th Rev—NITSA with Basin Electric Power Cooperative, Inc. to be effective 7/1/2018. Filed Date: 6/27/18. Accession Number: 20180627–5031. Comments Due: 5 p.m. ET 7/18/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 27, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–14342 Filed 7–3–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 14581–002; Project No. 2299– 082] Notice of Modification of Procedural Schedule; Turlock Irrigation District, Modesto Irrigation District Take notice that the schedule for processing the following hydroelectric applications has been modified. a. Type of Applications: Major Licenses. b. Project Nos.: 14581–002 and 2299– 082. c. Date filed: October 11, 2017. d. Applicant: Turlock Irrigation District and Modesto Irrigation District (Districts). e. Name of Projects: La Grange and Don Pedro Hydroelectric Projects. f. Location: The La Grange Project is located on the Tuolumne River in E:\FR\FM\05JYN1.SGM 05JYN1 Federal Register / Vol. 83, No. 129 / Thursday, July 5, 2018 / Notices Stanislaus and Tuolumne Counties, California. The Don Pedro Project is located on the Tuolumne River in Tuolumne County, California. Portions of both projects occupy public lands managed by the Bureau of Land Management. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contacts: Steve Boyd, Turlock Irrigation District, 333 East Canal Drive, Turlock, California 95381– 0949, (209) 883–8300; and Anna Brathwaite, Modesto Irrigation District, P.O. Box 4060, Modesto, CA 95352, (209) 526–7384. i. FERC Contact: Jim Hastreiter at (503) 552–2760 or james.hastreiter@ ferc.gov. j. Procedural Schedule: The Commission’s November 30, 2017, Notice of Application Ready for Environmental Analysis for each of the projects established July 2018 as the estimated date for issuing the Draft Environmental Impact Statement (EIS). The revised estimate for issuing the Draft EIS is now November 2018. As such, the applications will be processed according to the following revised schedule. Revisions to the schedule may be made as appropriate. If a due date falls on a weekend or holiday, the due date will be the following business day. Milestone Target date Commission issues Draft EIS. Comments on Draft EIS .... Modified Terms and Conditions. Commission issues Final EIS. November 2018. January 2019. March 2019. May 2019. Dated: June 27, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–14345 Filed 7–3–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission amozie on DSK3GDR082PROD with NOTICES1 [Project No. 8315–013] Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests; Eagle Creek Sartell Hydro, LLC Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Request for temporary variance of Article 34. VerDate Sep<11>2014 16:43 Jul 03, 2018 Jkt 244001 b. Project No.: 8315–013. c. Date Filed: June 19, 2018. d. Applicant: Eagle Creek Sartell Hydro, LLC. e. Name of Project: Sartell Dam Hydro Project. f. Location: Mississippi River in Stearns and Benton counties, Minnesota. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Ms. Melissa Rondou, Eagle Creek Sartell Hydro, LLC, 116 N. State Street, P.O. Box 167, Neshkoro, WI 54960, (920) 293–4628 ext. 347, melissa.rondou@ eaglecreekre.com. i. FERC Contact: Mr. Jeremy Jessup, (202) 502–6779, Jeremy.Jessup@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests, is 15 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/doc-sfiling/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket numbers P–8315–013. k. Description of Request: The applicant requests a temporary variance from the run-of-river and reservoir elevation requirements of Article 34 of the license. The variance will allow the licensee to drawdown the reservoir approximately three feet over a six-week period, from August 1 through September 15, 2018. The drawdown is to assist the Minnesota Department of Natural Resources, the Little Rock Lake Association, and the Benton Soil and Water Conservation District to facilitate water quality, fish habitat, and restoration improvements in the reach of the Mississippi River upstream of the project, and at Little Rock Lake, located approximately six miles upstream of the project. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 31387 Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Motions To Intervene, or Protests: Anyone may submit comments, a motion to intervene, or a protest in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, motions to intervene, or protests must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, MOTION TO INTERVENE, or PROTEST as applicable; (2) set forth in the heading the name of the applicant and the project number(s) of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person intervening or protesting; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the application. Agencies may obtain copies of the application directly from the applicant. A copy of any motion to intervene or protest must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource E:\FR\FM\05JYN1.SGM 05JYN1

Agencies

[Federal Register Volume 83, Number 129 (Thursday, July 5, 2018)]
[Notices]
[Pages 31386-31387]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-14345]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[ Project No. 14581-002; Project No. 2299-082]


Notice of Modification of Procedural Schedule; Turlock Irrigation 
District, Modesto Irrigation District

    Take notice that the schedule for processing the following 
hydroelectric applications has been modified.
    a. Type of Applications: Major Licenses.
    b. Project Nos.: 14581-002 and 2299-082.
    c. Date filed: October 11, 2017.
    d. Applicant: Turlock Irrigation District and Modesto Irrigation 
District (Districts).
    e. Name of Projects: La Grange and Don Pedro Hydroelectric 
Projects.
    f. Location: The La Grange Project is located on the Tuolumne River 
in

[[Page 31387]]

Stanislaus and Tuolumne Counties, California. The Don Pedro Project is 
located on the Tuolumne River in Tuolumne County, California. Portions 
of both projects occupy public lands managed by the Bureau of Land 
Management.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contacts: Steve Boyd, Turlock Irrigation District, 333 
East Canal Drive, Turlock, California 95381-0949, (209) 883-8300; and 
Anna Brathwaite, Modesto Irrigation District, P.O. Box 4060, Modesto, 
CA 95352, (209) 526-7384.
    i. FERC Contact: Jim Hastreiter at (503) 552-2760 or 
[email protected].
    j. Procedural Schedule: The Commission's November 30, 2017, Notice 
of Application Ready for Environmental Analysis for each of the 
projects established July 2018 as the estimated date for issuing the 
Draft Environmental Impact Statement (EIS). The revised estimate for 
issuing the Draft EIS is now November 2018. As such, the applications 
will be processed according to the following revised schedule. 
Revisions to the schedule may be made as appropriate. If a due date 
falls on a weekend or holiday, the due date will be the following 
business day.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Commission issues Draft EIS............  November 2018.
Comments on Draft EIS..................  January 2019.
Modified Terms and Conditions..........  March 2019.
Commission issues Final EIS............  May 2019.
------------------------------------------------------------------------


    Dated: June 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-14345 Filed 7-3-18; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.