Notice of Modification of Procedural Schedule; Turlock Irrigation District, Modesto Irrigation District, 31386-31387 [2018-14345]
Download as PDF
31386
Federal Register / Vol. 83, No. 129 / Thursday, July 5, 2018 / Notices
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
Reference Room in Washington, DC
there is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 16, 2018.
Dated: June 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–14344 Filed 7–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
amozie on DSK3GDR082PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–113–000.
Applicants: Copenhagen Wind Farm,
LLC, Stoneray Power Partners, LLC.
Description: Application for
Authorization under Section 203 of the
Federal Power Act and Request for
Confidential Treatment and Request for
Expedited Action of Copenhagen Wind
Farm, LLC, et al.
Filed Date: 6/26/18.
Accession Number: 20180626–5217.
Comments Due: 5 p.m. ET 7/17/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2407–005;
ER10–2424–005; ER10–2425–007;
ER13–1816–009; ER17–1316–002;
ER18–1186–001.
Applicants: Lost Lakes Wind Farm
LLC, Pioneer Prairie Wind Farm I, LLC,
Quilt Block Wind Farm LLC, Rail
Splitter Wind Farm, LLC, Sustaining
Power Solutions LLC, Turtle Creek
Wind Farm LLC.
Description: Updated Market Power
Analysis for Central Region and Notice
VerDate Sep<11>2014
16:43 Jul 03, 2018
Jkt 244001
of Non-Material Change in Status of Lost
Lakes Wind Farm LLC, et al.
Filed Date: 6/26/18.
Accession Number: 20180626–5243.
Comments Due: 5 p.m. ET 8/27/18.
Docket Numbers: ER15–1332–006;
ER10–2398–007; ER10–2399–007;
ER10–2400–008; ER10–2401–006;
ER10–2402–006; ER10–2403–007;
ER10–2406–008; ER10–2409–007;
ER10–2410–007; ER10–2411–008;
ER10–2412–008; ER10–2414–008;
ER11–2935–009; ER11–3414–007;
ER13–1816–008; ER14–1933–007;
ER15–1333–006; ER16–1724–004;
ER17–1315–004; ER17–1318–002;
ER17–2087–002.
Applicants: Arbuckle Mountain Wind
Farm LLC, Blackstone Wind Farm, LLC,
Blackstone Wind Farm II LLC, Blue
Canyon Windpower LLC, Blue Canyon
Windpower II LLC, Blue Canyon
Windpower V LLC, Blue Canyon
Windpower VI LLC, Cloud County
Wind Farm, LLC, Headwaters Wind
Farm LLC, High Trail Wind Farm, LLC,
Hog Creek Wind Project, LLC, Meadow
Lake Wind Farm LLC, Meadow Lake
Wind Farm II LLC, Meadow Lake Wind
Farm III LLC, Meadow Lake Wind Farm
IV LLC, Meadow Lake Wind Farm V
LLC, Old Trail Wind Farm, LLC,
Paulding Wind Farm II LLC, Paulding
Wind Farm III LLC, Redbed Plains Wind
Farm LLC, Waverly Wind Farm LLC,
Sustaining Power Solutions LLC.
Description: Notice of Non-Material
Change in Status of Arbuckle Mountain
Wind Farm LLC, et al.
Filed Date: 6/26/18.
Accession Number: 20180626–5239.
Comments Due: 5 p.m. ET 7/17/18.
Docket Numbers: ER17–512–006.
Applicants: Virginia Electric and
Power Company.
Description: Compliance filing:
Informational Filing of VEPCO Docket
No. ER17–512–006 to be effective N/A.
Filed Date: 6/27/18.
Accession Number: 20180627–5001.
Comments Due: 5 p.m. ET 7/18/18.
Docket Numbers: ER18–1464–003.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–06–26_Deficiency response for the
Sub-Regional Power Balance Constraints
to be effective 6/26/2018.
Filed Date: 6/26/18.
Accession Number: 20180626–5180.
Comments Due: 5 p.m. ET 7/17/18.
Docket Numbers: ER18–1859–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–06–27_SA 2840 Entergy ArkansasStuttgart Solar LLC 1st Rev GIA (J348)
to be effective 6/18./2018.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Filed Date: 6/27/18.
Accession Number: 20180627–5025.
Comments Due: 5 p.m. ET 7/18./18.
Docket Numbers: ER18–1860–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
767 5th Rev—NITSA with Basin Electric
Power Cooperative, Inc. to be effective
7/1/2018.
Filed Date: 6/27/18.
Accession Number: 20180627–5031.
Comments Due: 5 p.m. ET 7/18/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–14342 Filed 7–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 14581–002; Project No. 2299–
082]
Notice of Modification of Procedural
Schedule; Turlock Irrigation District,
Modesto Irrigation District
Take notice that the schedule for
processing the following hydroelectric
applications has been modified.
a. Type of Applications: Major
Licenses.
b. Project Nos.: 14581–002 and 2299–
082.
c. Date filed: October 11, 2017.
d. Applicant: Turlock Irrigation
District and Modesto Irrigation District
(Districts).
e. Name of Projects: La Grange and
Don Pedro Hydroelectric Projects.
f. Location: The La Grange Project is
located on the Tuolumne River in
E:\FR\FM\05JYN1.SGM
05JYN1
Federal Register / Vol. 83, No. 129 / Thursday, July 5, 2018 / Notices
Stanislaus and Tuolumne Counties,
California. The Don Pedro Project is
located on the Tuolumne River in
Tuolumne County, California. Portions
of both projects occupy public lands
managed by the Bureau of Land
Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Steve Boyd,
Turlock Irrigation District, 333 East
Canal Drive, Turlock, California 95381–
0949, (209) 883–8300; and Anna
Brathwaite, Modesto Irrigation District,
P.O. Box 4060, Modesto, CA 95352,
(209) 526–7384.
i. FERC Contact: Jim Hastreiter at
(503) 552–2760 or james.hastreiter@
ferc.gov.
j. Procedural Schedule: The
Commission’s November 30, 2017,
Notice of Application Ready for
Environmental Analysis for each of the
projects established July 2018 as the
estimated date for issuing the Draft
Environmental Impact Statement (EIS).
The revised estimate for issuing the
Draft EIS is now November 2018. As
such, the applications will be processed
according to the following revised
schedule. Revisions to the schedule may
be made as appropriate. If a due date
falls on a weekend or holiday, the due
date will be the following business day.
Milestone
Target date
Commission issues Draft
EIS.
Comments on Draft EIS ....
Modified Terms and Conditions.
Commission issues Final
EIS.
November 2018.
January 2019.
March 2019.
May 2019.
Dated: June 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–14345 Filed 7–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
amozie on DSK3GDR082PROD with NOTICES1
[Project No. 8315–013]
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests; Eagle
Creek Sartell Hydro, LLC
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Request for
temporary variance of Article 34.
VerDate Sep<11>2014
16:43 Jul 03, 2018
Jkt 244001
b. Project No.: 8315–013.
c. Date Filed: June 19, 2018.
d. Applicant: Eagle Creek Sartell
Hydro, LLC.
e. Name of Project: Sartell Dam Hydro
Project.
f. Location: Mississippi River in
Stearns and Benton counties,
Minnesota.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Ms. Melissa
Rondou, Eagle Creek Sartell Hydro, LLC,
116 N. State Street, P.O. Box 167,
Neshkoro, WI 54960, (920) 293–4628
ext. 347, melissa.rondou@
eaglecreekre.com.
i. FERC Contact: Mr. Jeremy Jessup,
(202) 502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests, is 15
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket numbers P–8315–013.
k. Description of Request: The
applicant requests a temporary variance
from the run-of-river and reservoir
elevation requirements of Article 34 of
the license. The variance will allow the
licensee to drawdown the reservoir
approximately three feet over a six-week
period, from August 1 through
September 15, 2018. The drawdown is
to assist the Minnesota Department of
Natural Resources, the Little Rock Lake
Association, and the Benton Soil and
Water Conservation District to facilitate
water quality, fish habitat, and
restoration improvements in the reach
of the Mississippi River upstream of the
project, and at Little Rock Lake, located
approximately six miles upstream of the
project.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
31387
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions To Intervene,
or Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
MOTION TO INTERVENE, or PROTEST
as applicable; (2) set forth in the
heading the name of the applicant and
the project number(s) of the application
to which the filing responds; (3) furnish
the name, address, and telephone
number of the person intervening or
protesting; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the application.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any motion to intervene or
protest must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
E:\FR\FM\05JYN1.SGM
05JYN1
Agencies
[Federal Register Volume 83, Number 129 (Thursday, July 5, 2018)]
[Notices]
[Pages 31386-31387]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-14345]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Project No. 14581-002; Project No. 2299-082]
Notice of Modification of Procedural Schedule; Turlock Irrigation
District, Modesto Irrigation District
Take notice that the schedule for processing the following
hydroelectric applications has been modified.
a. Type of Applications: Major Licenses.
b. Project Nos.: 14581-002 and 2299-082.
c. Date filed: October 11, 2017.
d. Applicant: Turlock Irrigation District and Modesto Irrigation
District (Districts).
e. Name of Projects: La Grange and Don Pedro Hydroelectric
Projects.
f. Location: The La Grange Project is located on the Tuolumne River
in
[[Page 31387]]
Stanislaus and Tuolumne Counties, California. The Don Pedro Project is
located on the Tuolumne River in Tuolumne County, California. Portions
of both projects occupy public lands managed by the Bureau of Land
Management.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contacts: Steve Boyd, Turlock Irrigation District, 333
East Canal Drive, Turlock, California 95381-0949, (209) 883-8300; and
Anna Brathwaite, Modesto Irrigation District, P.O. Box 4060, Modesto,
CA 95352, (209) 526-7384.
i. FERC Contact: Jim Hastreiter at (503) 552-2760 or
[email protected].
j. Procedural Schedule: The Commission's November 30, 2017, Notice
of Application Ready for Environmental Analysis for each of the
projects established July 2018 as the estimated date for issuing the
Draft Environmental Impact Statement (EIS). The revised estimate for
issuing the Draft EIS is now November 2018. As such, the applications
will be processed according to the following revised schedule.
Revisions to the schedule may be made as appropriate. If a due date
falls on a weekend or holiday, the due date will be the following
business day.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues Draft EIS............ November 2018.
Comments on Draft EIS.................. January 2019.
Modified Terms and Conditions.......... March 2019.
Commission issues Final EIS............ May 2019.
------------------------------------------------------------------------
Dated: June 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-14345 Filed 7-3-18; 8:45 am]
BILLING CODE 6717-01-P