Download as PDF 30726 Federal Register / Vol. 83, No. 126 / Friday, June 29, 2018 / Notices IV. Application for Interim Waiver DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY LG also hereby applies for an interim waiver of the applicable test procedure requirements for the LG basic models set forth in the Appendix. LG meets the criteria for an interim waiver. LG’s Petition for Waiver is likely to be granted because the test method contained in 10 C.F.R. Part 430, Subpart B, Appendix F clearly does not address the VSC characteristics of these LG basic models. Thus, the test procedure does not accurately measure their energy consumption. Without waiver relief, LG would be subject to requirements that are inapplicable to these products. Additionally, LG will suffer economic hardship and be at a competitive disadvantage if it must wait to rate these basic models pending a determination on the petition for waiver. DOE approval of LG’s interim waiver application is also supported by sound public policy. These LG products employ advanced technology that increases efficiency and reduces energy consumption, while offering a new level of affordable comfort to consumers. Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. ID–6627–002] Combined Notice of Filings #1 Vigue, Peter A.; Notice of Supplemental Filing Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–107–000. Applicants: New Covert Generating Company, LLC. Description: Application for Authorization for Disposition of Jurisdictional Facilities and Request for Expedited Action of New Covert Generating Company, LLC. Filed Date: 6/21/18. Accession Number: 20180621–5121. Comments Due: 5 p.m. ET 7/12/18. Docket Numbers: EC18–108–000. Applicants: Red Pine Wind Project, LLC, PGGM Cooperatie U.A. Description: Joint Application for Authorization for Disposition of Jurisdictional Facilities and Request for Expedited Action of Red Pine Wind Project, LLC. Filed Date: 6/22/18. Accession Number: 20180622–5065. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: EC18–109–000. Applicants: Rock Falls Wind Farm LLC, PGGM Cooperatie U.A. Description: Joint Application for Authorization for Disposition of Jurisdictional Facilities and Request for Confidential Treatment and Expedited Action of Rock Falls Wind Farm LLC, et. al. Filed Date: 6/22/18. Accession Number: 20180622–5067. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: EC18–110–000. Applicants: Playa Solar 1, LLC, Playa Solar 2, LLC, PGGM Cooperatie U.A. Description: Joint Application for Authorization for Disposition of Jurisdictional Facilities, and Request for Confidential Treatment and Expedited Action of Playa Solar 1, LLC, et. al. Filed Date: 6/22/18. Accession Number: 20180622–5069. Comments Due: 5 p.m. ET 7/13/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2739–022; ER14–1219–009; ER16–1732–008; ER17–993–007; ER18–95–004; ER10– 2729–009; ER17–989–007; ER10–1892– 009; ER10–1854–014; ER17–990–007; ER17–1946–007; ER17–991–007; ER16– 1652–010; ER11–3320–014; ER10–2744– 015; ER16–2406–008; ER16–2405–008; ER13–2316–012; ER17–992–007; ER10– 2678–015; ER10–1631–014; ER14–19– 013. The waiver and interim waiver requested herein should apply to testing and rating of the following basic models that are manufactured by LG: Take notice that on June 22, 2018, Peter A. Vigue filed supplements to the April 24, 2018 and May 11, 2018 applications for authorization to hold interlocking positions, pursuant to section 305(b) of the Federal Power Act, 18 U.S.C. 825d(f), and section 45.4 of the Federal Energy Regulatory Commission’s (Commission) Regulations, 18 CFR 45.8. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 13, 2018. LW2217IVSM LW1817IVSM LW1517IVSM Dated: June 22, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–14030 Filed 6–28–18; 8:45 am] [FR Doc. 2018–13960 Filed 6–28–18; 8:45 am] BILLING CODE 6450–01–P BILLING CODE 6717–01–P V. Conclusion LG respectfully requests that DOE grant its Petition for Waiver of the applicable test procedure for specified basic models, and also grant its Application for Interim Waiver. LG requests expedited treatment of the Petition and Application. Respectfully submitted, Scott Harris/s/ Richard C. Wingate, Vice President, Compliance and General Counsel. LG Electronics USA, Inc. 1000 Sylvan Avenue Englewood Cliffs, NJ 07632 (201) 816–2000 Scott Blake Harris Stephanie Weiner John A. Hodges Harris, Wiltshire & Grannis LLP 1919 M Street, NW, 8th Floor Washington, DC 20036 (202) 730–1313 Counsel to LG Electronics USA, Inc. April 6, 2018 sradovich on DSK3GMQ082PROD with NOTICES Appendix VerDate Sep<11>2014 17:58 Jun 28, 2018 Jkt 244001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 E:\FR\FM\29JNN1.SGM 29JNN1 sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 83, No. 126 / Friday, June 29, 2018 / Notices Applicants: LS Power Marketing, LLC, Armstrong Power, LLC, Aurora Generation, LLC, Bath County Energy, LLC, Buchanan Energy Services Company, LLC, Buchanan Generation, LLC, Chambersburg Energy, LLC, Columbia Energy LLC, Doswell Limited Partnership, Gans Energy, LLC, Helix Ironwood, LLC, Hunlock Energy, LLC, LifeEnergy, LLC, LSP University Park, LLC, Riverside Generating Company, L.L.C., Rockford Power, LLC, Rockford Power II, LLC, Seneca Generation, LLC, Springdale Energy, LLC, Troy Energy, LLC, University Park Energy, LLC, West Deptford Energy, LLC. Description: Notification of Change in Status of the LS PJM MBR Sellers. Filed Date: 6/22/18. Accession Number: 20180622–5133. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER16–1226–001. Applicants: New Covert Generating Company, LLC. Description: Compliance filing: Informational Filing Pursuant to Schedule 2 of the PJM OATT to be effective N/A. Filed Date: 6/22/18. Accession Number: 20180622–5081. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER17–424–004. Applicants: Footprint Power Salem Harbor Development LP. Description: Notice of Non-Material Change in Status of Footprint Power Salem Harbor Development LP. Filed Date: 6/22/18. Accession Number: 20180622–5115. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–784–002. Applicants: Upstream Wind Energy LLC. Description: Notification of Change in Facts Under Market-Based Rate Authority of Upstream Wind Energy LLC. Filed Date: 6/22/18. Accession Number: 20180622–5109. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–954–002. Applicants: Appalachian Power Company. Description: Tariff Amendment: OATT-Attachment K, AEPTX Rate Update—Amendment to be effective 12/31/9998. Filed Date: 6/22/18. Accession Number: 20180622–5141. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–1701–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 1628R12 Western Farmers Electric Cooperative NITSA NOA to be effective 5/1/2018. Filed Date: 6/22/18. VerDate Sep<11>2014 17:58 Jun 28, 2018 Jkt 244001 Accession Number: 20180622–5113. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–1813–000. Applicants: Power Up Energy, LLC. Description: Baseline eTariff Filing: Market-Based Rate Tariff Application to be effective 6/22/2018. Filed Date: 6/21/18. Accession Number: 20180621–5112. Comments Due: 5 p.m. ET 7/12/18. Docket Numbers: ER18–1814–000. Applicants: El Paso Electric Company. Description: § 205(d) Rate Filing: Rate Schedule No. 114 Agreement on Interconnection Study Costs to be effective 8/20/2018. Filed Date: 6/21/18. Accession Number: 20180621–5114. Comments Due: 5 p.m. ET 7/12/18. Docket Numbers: ER18–1815–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of ISA SA No. 4226; Queue No. V1–012 to be effective 6/15/2018. Filed Date: 6/22/18. Accession Number: 20180622–5044. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–1816–000. Applicants: Midwest Power Transmission Arkansas, LLC. Description: Compliance filing: Compliance Filing Docket No. E18–14 to be effective 10/26/2017. Filed Date: 6/22/18. Accession Number: 20180622–5052. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–1817–000. Applicants: New York Transco, LLC. Description: Petition of New York Transco LLC for Limited Waiver of Tariff Provisions, et al. Filed Date: 6/22/18. Accession Number: 20180622–5072. Comments Due: 5 p.m. ET 7/2/18. Docket Numbers: ER18–1818–000. Applicants: Portland General Electric Company. Description: § 205(d) Rate Filing: Attachment C Filing to be effective 6/25/2018. Filed Date: 6/22/18. Accession Number: 20180622–5080. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–1819–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–06–22 SA 3122 Pioneer-NIPSCO Interconnection Agreement to be effective 6/20/2018. Filed Date: 6/22/18. Accession Number: 20180622–5085. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–1820–000. Applicants: PJM Interconnection, L.L.C. PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 30727 Description: § 205(d) Rate Filing: Original ISA, SA No. 5106; Queue No. AB2–043 to be effective 5/23/2018. Filed Date: 6/22/18. Accession Number: 20180622–5107. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–1821–000. Applicants: Walleye Power, LLC. Description: Compliance filing: Notice of Succession to be effective 6/23/2018. Filed Date: 6/22/18. Accession Number: 20180622–5127. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–1822–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2018–06–22 Amendment to TCA to add Citizens Sycamore-Penasquitos as PTO to be effective 8/31/2018. Filed Date: 6/22/18. Accession Number: 20180622–5128. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–1823–000. Applicants: Walleye Power, LLC. Description: Compliance filing: Notice of Succession to be effective 12/31/9998. Filed Date: 6/22/18. Accession Number: 20180622–5134. Comments Due: 5 p.m. ET 7/13/18. Docket Numbers: ER18–1824–000. Applicants: Southwestern Electric Power Company. Description: § 205(d) Rate Filing: Revised and Restated Prescott PSA to be effective 5/31/2018. Filed Date: 6/22/18. Accession Number: 20180622–5142. Comments Due: 5 p.m. ET 7/13/18. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES18–42–000. Applicants: Indianapolis Power & Light Company. Description: Application of Indianapolis Power & Light Company under Section 204 of the Federal Power Act for Order Authorizing Issuance of Short-Term Debt Instruments. Filed Date: 6/21/18. Accession Number: 20180621–5120. Comments Due: 5 p.m. ET 7/12/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. E:\FR\FM\29JNN1.SGM 29JNN1 30728 Federal Register / Vol. 83, No. 126 / Friday, June 29, 2018 / Notices eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 22, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–13957 Filed 6–28–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP15–550–000, CP15–551– 000, and CP15–551–001] sradovich on DSK3GMQ082PROD with NOTICES Notice of Availability of the Draft Environmental Impact Statement for the Proposed Calcasieu Pass Project; Venture Global Calcasieu Pass, LLC, TransCameron Pipeline, LLC The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Calcasieu Pass Project, proposed by Venture Global Calcasieu Pass, LLC (Venture Global Calcasieu Pass) and TransCameron Pipeline, LLC (TransCameron Pipeline) in the abovereferenced dockets. Venture Global Calcasieu Pass requests authorization to site, construct, and operate a natural gas liquefaction and storage facility, and marine export terminal in Cameron Parish, Louisiana. TransCameron Pipeline requests authorization to construct, install, and operate certain natural gas pipeline facilities also in Cameron Parish, Louisiana. The new liquefaction facilities would have a design production capacity of 12 million metric ton of liquefied natural gas (LNG) per annum. The draft EIS assesses the potential environmental effects of the construction and operation of the Calcasieu Pass Project in accordance with the requirements of the National Environmental Policy Act. The FERC staff concludes that approval of the proposed project would have some adverse environmental impacts; however, all of these impacts would be reduced to less-than-significant levels with the implementation of Venture Global Calcasieu Pass’ and TransCameron Pipeline’s proposed VerDate Sep<11>2014 17:58 Jun 28, 2018 Jkt 244001 mitigation measures and the additional measures recommended in the draft EIS. The U.S. Army Corps of Engineers, U.S. Coast Guard, U.S. Department of Energy, U.S. Environmental Protection Agency, and U.S. Department of Transportation participated as cooperating agencies in the preparation of the draft EIS. Cooperating agencies have jurisdiction by law or special expertise with respect to resources potentially affected by the proposal and participate in the National Environmental Policy Act analysis. Although the cooperating agencies provided input on the conclusions and recommendations presented in the draft EIS, the agencies will present their own conclusions and recommendations in their respective Records of Decision for the project. The draft EIS addresses the potential environmental effects of the construction and operation of the following project facilities: • Nine integrated pre-cooled single mixed refrigerant (SMR) blocks; • two full-containment aboveground LNG storage tanks, each with a usable capacity of approximately 200,000 cubic meters; • a 1,500-foot by 3,000-foot turning basin adjacent to the Calcasieu River Ship Channel; • two LNG berthing docks, each designed to handle carriers of 120,000 to 210,000 cubic meter cargo capacity; • a 720 megawatt natural gas-fired combined cycle gas turbine electric generation facility; • approximately 23.4 miles of 42inch-diameter pipeline to bring feed gas from interconnections with ANR Pipeline Company, Texas Eastern Transmission, LP, and Bridgeline Holdings, LP to the terminal site; • one meter station; • three mainline valves; and • one pig launcher at the meter station and one pig receiver at the gas gate station on the terminal site. The FERC staff mailed copies of the draft EIS to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; libraries in the project area; and parties to this proceeding. Paper copy versions of this EIS were mailed to those specifically requesting them; all others received a CD version. In addition, the EIS is available for public viewing on the FERC’s website (www.ferc.gov) using PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 the eLibrary link. A limited number of hardcopies of the EIS are available for distribution and public inspection at: Federal Energy Regulatory Commission Public Reference Room, 888 First Street NE, Room 2A, Washington, DC 20426, (202) 502–8371. Any person wishing to comment on the draft EIS may do so. To ensure consideration of your comments on the proposal in the draft EIS, it is important that the Commission receive your comments on or before 5:00 p.m. Eastern Time on August 13, 2018. For your convenience, there are four methods you can use to submit your comments with the Commission. The Commission will provide equal consideration to all comments received, whether filed in written form or provided verbally. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on eRegister. You must select the type of filing you are making. If you are filing a comment on a particular project, please select Comment on a Filing; (3) You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the project docket numbers (CP15–550– 000, CP15–551–000, and CP15–551– 001) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. (4) In lieu of sending written or electronic comments, the Commission invites you to attend the public comment session its staff will conduct in the project area to receive comments on the draft EIS, scheduled as follows: E:\FR\FM\29JNN1.SGM 29JNN1

Agencies

[Federal Register Volume 83, Number 126 (Friday, June 29, 2018)]
[Notices]
[Pages 30726-30728]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13957]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC18-107-000.
    Applicants: New Covert Generating Company, LLC.
    Description: Application for Authorization for Disposition of 
Jurisdictional Facilities and Request for Expedited Action of New 
Covert Generating Company, LLC.
    Filed Date: 6/21/18.
    Accession Number: 20180621-5121.
    Comments Due: 5 p.m. ET 7/12/18.

    Docket Numbers: EC18-108-000.
    Applicants: Red Pine Wind Project, LLC, PGGM Cooperatie U.A.
    Description: Joint Application for Authorization for Disposition of 
Jurisdictional Facilities and Request for Expedited Action of Red Pine 
Wind Project, LLC.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5065.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: EC18-109-000.
    Applicants: Rock Falls Wind Farm LLC, PGGM Cooperatie U.A.
    Description: Joint Application for Authorization for Disposition of 
Jurisdictional Facilities and Request for Confidential Treatment and 
Expedited Action of Rock Falls Wind Farm LLC, et. al.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5067.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: EC18-110-000.
    Applicants: Playa Solar 1, LLC, Playa Solar 2, LLC, PGGM Cooperatie 
U.A.
    Description: Joint Application for Authorization for Disposition of 
Jurisdictional Facilities, and Request for Confidential Treatment and 
Expedited Action of Playa Solar 1, LLC, et. al.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5069.
    Comments Due: 5 p.m. ET 7/13/18.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2739-022; ER14-1219-009; ER16-1732-008; ER17-
993-007; ER18-95-004; ER10-2729-009; ER17-989-007; ER10-1892-009; ER10-
1854-014; ER17-990-007; ER17-1946-007; ER17-991-007; ER16-1652-010; 
ER11-3320-014; ER10-2744-015; ER16-2406-008; ER16-2405-008; ER13-2316-
012; ER17-992-007; ER10-2678-015; ER10-1631-014; ER14-19-013.

[[Page 30727]]

    Applicants: LS Power Marketing, LLC, Armstrong Power, LLC, Aurora 
Generation, LLC, Bath County Energy, LLC, Buchanan Energy Services 
Company, LLC, Buchanan Generation, LLC, Chambersburg Energy, LLC, 
Columbia Energy LLC, Doswell Limited Partnership, Gans Energy, LLC, 
Helix Ironwood, LLC, Hunlock Energy, LLC, LifeEnergy, LLC, LSP 
University Park, LLC, Riverside Generating Company, L.L.C., Rockford 
Power, LLC, Rockford Power II, LLC, Seneca Generation, LLC, Springdale 
Energy, LLC, Troy Energy, LLC, University Park Energy, LLC, West 
Deptford Energy, LLC.
    Description: Notification of Change in Status of the LS PJM MBR 
Sellers.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5133.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER16-1226-001.
    Applicants: New Covert Generating Company, LLC.
    Description: Compliance filing: Informational Filing Pursuant to 
Schedule 2 of the PJM OATT to be effective N/A.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5081.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER17-424-004.
    Applicants: Footprint Power Salem Harbor Development LP.
    Description: Notice of Non-Material Change in Status of Footprint 
Power Salem Harbor Development LP.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5115.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-784-002.
    Applicants: Upstream Wind Energy LLC.
    Description: Notification of Change in Facts Under Market-Based 
Rate Authority of Upstream Wind Energy LLC.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5109.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-954-002.
    Applicants: Appalachian Power Company.
    Description: Tariff Amendment: OATT-Attachment K, AEPTX Rate 
Update--Amendment to be effective 12/31/9998.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5141.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-1701-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Tariff Amendment: 1628R12 Western Farmers Electric 
Cooperative NITSA NOA to be effective 5/1/2018.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5113.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-1813-000.
    Applicants: Power Up Energy, LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Tariff 
Application to be effective 6/22/2018.
    Filed Date: 6/21/18.
    Accession Number: 20180621-5112.
    Comments Due: 5 p.m. ET 7/12/18.

    Docket Numbers: ER18-1814-000.
    Applicants: El Paso Electric Company.
    Description: Sec.  205(d) Rate Filing: Rate Schedule No. 114 
Agreement on Interconnection Study Costs to be effective 8/20/2018.
    Filed Date: 6/21/18.
    Accession Number: 20180621-5114.
    Comments Due: 5 p.m. ET 7/12/18.

    Docket Numbers: ER18-1815-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of ISA SA 
No. 4226; Queue No. V1-012 to be effective 6/15/2018.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5044.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-1816-000.
    Applicants: Midwest Power Transmission Arkansas, LLC.
    Description: Compliance filing: Compliance Filing Docket No. E18-14 
to be effective 10/26/2017.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5052.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-1817-000.
    Applicants: New York Transco, LLC.
    Description: Petition of New York Transco LLC for Limited Waiver of 
Tariff Provisions, et al.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5072.
    Comments Due: 5 p.m. ET 7/2/18.

    Docket Numbers: ER18-1818-000.
    Applicants: Portland General Electric Company.
    Description: Sec.  205(d) Rate Filing: Attachment C Filing to be 
effective 6/25/2018.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5080.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-1819-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2018-06-22 SA 3122 Pioneer-
NIPSCO Interconnection Agreement to be effective 6/20/2018.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5085.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-1820-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, SA No. 5106; 
Queue No. AB2-043 to be effective 5/23/2018.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5107.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-1821-000.
    Applicants: Walleye Power, LLC.
    Description: Compliance filing: Notice of Succession to be 
effective 6/23/2018.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5127.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-1822-000.
    Applicants: California Independent System Operator Corporation.
    Description: Sec.  205(d) Rate Filing: 2018-06-22 Amendment to TCA 
to add Citizens Sycamore-Penasquitos as PTO to be effective 8/31/2018.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5128.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-1823-000.
    Applicants: Walleye Power, LLC.
    Description: Compliance filing: Notice of Succession to be 
effective 12/31/9998.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5134.
    Comments Due: 5 p.m. ET 7/13/18.

    Docket Numbers: ER18-1824-000.
    Applicants: Southwestern Electric Power Company.
    Description: Sec.  205(d) Rate Filing: Revised and Restated 
Prescott PSA to be effective 5/31/2018.
    Filed Date: 6/22/18.
    Accession Number: 20180622-5142.
    Comments Due: 5 p.m. ET 7/13/18.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES18-42-000.
    Applicants: Indianapolis Power & Light Company.
    Description: Application of Indianapolis Power & Light Company 
under Section 204 of the Federal Power Act for Order Authorizing 
Issuance of Short-Term Debt Instruments.
    Filed Date: 6/21/18.
    Accession Number: 20180621-5120.
    Comments Due: 5 p.m. ET 7/12/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

[[Page 30728]]

    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-13957 Filed 6-28-18; 8:45 am]