Combined Notice of Filings #1, 30726-30728 [2018-13957]
Download as PDF
30726
Federal Register / Vol. 83, No. 126 / Friday, June 29, 2018 / Notices
IV. Application for Interim Waiver
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
LG also hereby applies for an interim
waiver of the applicable test procedure
requirements for the LG basic models
set forth in the Appendix. LG meets the
criteria for an interim waiver.
LG’s Petition for Waiver is likely to be
granted because the test method
contained in 10 C.F.R. Part 430, Subpart
B, Appendix F clearly does not address
the VSC characteristics of these LG basic
models. Thus, the test procedure does
not accurately measure their energy
consumption. Without waiver relief, LG
would be subject to requirements that
are inapplicable to these products.
Additionally, LG will suffer economic
hardship and be at a competitive
disadvantage if it must wait to rate these
basic models pending a determination
on the petition for waiver.
DOE approval of LG’s interim waiver
application is also supported by sound
public policy. These LG products
employ advanced technology that
increases efficiency and reduces energy
consumption, while offering a new level
of affordable comfort to consumers.
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ID–6627–002]
Combined Notice of Filings #1
Vigue, Peter A.; Notice of
Supplemental Filing
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–107–000.
Applicants: New Covert Generating
Company, LLC.
Description: Application for
Authorization for Disposition of
Jurisdictional Facilities and Request for
Expedited Action of New Covert
Generating Company, LLC.
Filed Date: 6/21/18.
Accession Number: 20180621–5121.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: EC18–108–000.
Applicants: Red Pine Wind Project,
LLC, PGGM Cooperatie U.A.
Description: Joint Application for
Authorization for Disposition of
Jurisdictional Facilities and Request for
Expedited Action of Red Pine Wind
Project, LLC.
Filed Date: 6/22/18.
Accession Number: 20180622–5065.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: EC18–109–000.
Applicants: Rock Falls Wind Farm
LLC, PGGM Cooperatie U.A.
Description: Joint Application for
Authorization for Disposition of
Jurisdictional Facilities and Request for
Confidential Treatment and Expedited
Action of Rock Falls Wind Farm LLC, et.
al.
Filed Date: 6/22/18.
Accession Number: 20180622–5067.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: EC18–110–000.
Applicants: Playa Solar 1, LLC, Playa
Solar 2, LLC, PGGM Cooperatie U.A.
Description: Joint Application for
Authorization for Disposition of
Jurisdictional Facilities, and Request for
Confidential Treatment and Expedited
Action of Playa Solar 1, LLC, et. al.
Filed Date: 6/22/18.
Accession Number: 20180622–5069.
Comments Due: 5 p.m. ET 7/13/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2739–022;
ER14–1219–009; ER16–1732–008;
ER17–993–007; ER18–95–004; ER10–
2729–009; ER17–989–007; ER10–1892–
009; ER10–1854–014; ER17–990–007;
ER17–1946–007; ER17–991–007; ER16–
1652–010; ER11–3320–014; ER10–2744–
015; ER16–2406–008; ER16–2405–008;
ER13–2316–012; ER17–992–007; ER10–
2678–015; ER10–1631–014; ER14–19–
013.
The waiver and interim waiver
requested herein should apply to testing
and rating of the following basic models
that are manufactured by LG:
Take notice that on June 22, 2018,
Peter A. Vigue filed supplements to the
April 24, 2018 and May 11, 2018
applications for authorization to hold
interlocking positions, pursuant to
section 305(b) of the Federal Power Act,
18 U.S.C. 825d(f), and section 45.4 of
the Federal Energy Regulatory
Commission’s (Commission)
Regulations, 18 CFR 45.8.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 13, 2018.
LW2217IVSM
LW1817IVSM
LW1517IVSM
Dated: June 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–14030 Filed 6–28–18; 8:45 am]
[FR Doc. 2018–13960 Filed 6–28–18; 8:45 am]
BILLING CODE 6450–01–P
BILLING CODE 6717–01–P
V. Conclusion
LG respectfully requests that DOE
grant its Petition for Waiver of the
applicable test procedure for specified
basic models, and also grant its
Application for Interim Waiver.
LG requests expedited treatment of
the Petition and Application.
Respectfully submitted,
Scott Harris/s/
Richard C. Wingate,
Vice President, Compliance and General
Counsel.
LG Electronics USA, Inc.
1000 Sylvan Avenue
Englewood Cliffs, NJ 07632
(201) 816–2000
Scott Blake Harris
Stephanie Weiner
John A. Hodges
Harris, Wiltshire & Grannis LLP
1919 M Street, NW, 8th Floor
Washington, DC 20036
(202) 730–1313
Counsel to LG Electronics USA, Inc.
April 6, 2018
sradovich on DSK3GMQ082PROD with NOTICES
Appendix
VerDate Sep<11>2014
17:58 Jun 28, 2018
Jkt 244001
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
E:\FR\FM\29JNN1.SGM
29JNN1
sradovich on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 83, No. 126 / Friday, June 29, 2018 / Notices
Applicants: LS Power Marketing, LLC,
Armstrong Power, LLC, Aurora
Generation, LLC, Bath County Energy,
LLC, Buchanan Energy Services
Company, LLC, Buchanan Generation,
LLC, Chambersburg Energy, LLC,
Columbia Energy LLC, Doswell Limited
Partnership, Gans Energy, LLC, Helix
Ironwood, LLC, Hunlock Energy, LLC,
LifeEnergy, LLC, LSP University Park,
LLC, Riverside Generating Company,
L.L.C., Rockford Power, LLC, Rockford
Power II, LLC, Seneca Generation, LLC,
Springdale Energy, LLC, Troy Energy,
LLC, University Park Energy, LLC, West
Deptford Energy, LLC.
Description: Notification of Change in
Status of the LS PJM MBR Sellers.
Filed Date: 6/22/18.
Accession Number: 20180622–5133.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER16–1226–001.
Applicants: New Covert Generating
Company, LLC.
Description: Compliance filing:
Informational Filing Pursuant to
Schedule 2 of the PJM OATT to be
effective N/A.
Filed Date: 6/22/18.
Accession Number: 20180622–5081.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER17–424–004.
Applicants: Footprint Power Salem
Harbor Development LP.
Description: Notice of Non-Material
Change in Status of Footprint Power
Salem Harbor Development LP.
Filed Date: 6/22/18.
Accession Number: 20180622–5115.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–784–002.
Applicants: Upstream Wind Energy
LLC.
Description: Notification of Change in
Facts Under Market-Based Rate
Authority of Upstream Wind Energy
LLC.
Filed Date: 6/22/18.
Accession Number: 20180622–5109.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–954–002.
Applicants: Appalachian Power
Company.
Description: Tariff Amendment:
OATT-Attachment K, AEPTX Rate
Update—Amendment to be effective
12/31/9998.
Filed Date: 6/22/18.
Accession Number: 20180622–5141.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–1701–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
1628R12 Western Farmers Electric
Cooperative NITSA NOA to be effective
5/1/2018.
Filed Date: 6/22/18.
VerDate Sep<11>2014
17:58 Jun 28, 2018
Jkt 244001
Accession Number: 20180622–5113.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–1813–000.
Applicants: Power Up Energy, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Tariff Application to
be effective 6/22/2018.
Filed Date: 6/21/18.
Accession Number: 20180621–5112.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: ER18–1814–000.
Applicants: El Paso Electric Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 114 Agreement on
Interconnection Study Costs to be
effective 8/20/2018.
Filed Date: 6/21/18.
Accession Number: 20180621–5114.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: ER18–1815–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA SA No.
4226; Queue No. V1–012 to be effective
6/15/2018.
Filed Date: 6/22/18.
Accession Number: 20180622–5044.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–1816–000.
Applicants: Midwest Power
Transmission Arkansas, LLC.
Description: Compliance filing:
Compliance Filing Docket No. E18–14 to
be effective 10/26/2017.
Filed Date: 6/22/18.
Accession Number: 20180622–5052.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–1817–000.
Applicants: New York Transco, LLC.
Description: Petition of New York
Transco LLC for Limited Waiver of
Tariff Provisions, et al.
Filed Date: 6/22/18.
Accession Number: 20180622–5072.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: ER18–1818–000.
Applicants: Portland General Electric
Company.
Description: § 205(d) Rate Filing:
Attachment C Filing to be effective
6/25/2018.
Filed Date: 6/22/18.
Accession Number: 20180622–5080.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–1819–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–06–22 SA 3122 Pioneer-NIPSCO
Interconnection Agreement to be
effective 6/20/2018.
Filed Date: 6/22/18.
Accession Number: 20180622–5085.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–1820–000.
Applicants: PJM Interconnection,
L.L.C.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
30727
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5106; Queue No.
AB2–043 to be effective 5/23/2018.
Filed Date: 6/22/18.
Accession Number: 20180622–5107.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–1821–000.
Applicants: Walleye Power, LLC.
Description: Compliance filing: Notice
of Succession to be effective 6/23/2018.
Filed Date: 6/22/18.
Accession Number: 20180622–5127.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–1822–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2018–06–22 Amendment to TCA to add
Citizens Sycamore-Penasquitos as PTO
to be effective 8/31/2018.
Filed Date: 6/22/18.
Accession Number: 20180622–5128.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–1823–000.
Applicants: Walleye Power, LLC.
Description: Compliance filing: Notice
of Succession to be effective
12/31/9998.
Filed Date: 6/22/18.
Accession Number: 20180622–5134.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18–1824–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
Revised and Restated Prescott PSA to be
effective 5/31/2018.
Filed Date: 6/22/18.
Accession Number: 20180622–5142.
Comments Due: 5 p.m. ET 7/13/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–42–000.
Applicants: Indianapolis Power &
Light Company.
Description: Application of
Indianapolis Power & Light Company
under Section 204 of the Federal Power
Act for Order Authorizing Issuance of
Short-Term Debt Instruments.
Filed Date: 6/21/18.
Accession Number: 20180621–5120.
Comments Due: 5 p.m. ET 7/12/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
E:\FR\FM\29JNN1.SGM
29JNN1
30728
Federal Register / Vol. 83, No. 126 / Friday, June 29, 2018 / Notices
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13957 Filed 6–28–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP15–550–000, CP15–551–
000, and CP15–551–001]
sradovich on DSK3GMQ082PROD with NOTICES
Notice of Availability of the Draft
Environmental Impact Statement for
the Proposed Calcasieu Pass Project;
Venture Global Calcasieu Pass, LLC,
TransCameron Pipeline, LLC
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a draft
environmental impact statement (EIS)
for the Calcasieu Pass Project, proposed
by Venture Global Calcasieu Pass, LLC
(Venture Global Calcasieu Pass) and
TransCameron Pipeline, LLC
(TransCameron Pipeline) in the abovereferenced dockets. Venture Global
Calcasieu Pass requests authorization to
site, construct, and operate a natural gas
liquefaction and storage facility, and
marine export terminal in Cameron
Parish, Louisiana. TransCameron
Pipeline requests authorization to
construct, install, and operate certain
natural gas pipeline facilities also in
Cameron Parish, Louisiana. The new
liquefaction facilities would have a
design production capacity of 12
million metric ton of liquefied natural
gas (LNG) per annum.
The draft EIS assesses the potential
environmental effects of the
construction and operation of the
Calcasieu Pass Project in accordance
with the requirements of the National
Environmental Policy Act. The FERC
staff concludes that approval of the
proposed project would have some
adverse environmental impacts;
however, all of these impacts would be
reduced to less-than-significant levels
with the implementation of Venture
Global Calcasieu Pass’ and
TransCameron Pipeline’s proposed
VerDate Sep<11>2014
17:58 Jun 28, 2018
Jkt 244001
mitigation measures and the additional
measures recommended in the draft EIS.
The U.S. Army Corps of Engineers,
U.S. Coast Guard, U.S. Department of
Energy, U.S. Environmental Protection
Agency, and U.S. Department of
Transportation participated as
cooperating agencies in the preparation
of the draft EIS. Cooperating agencies
have jurisdiction by law or special
expertise with respect to resources
potentially affected by the proposal and
participate in the National
Environmental Policy Act analysis.
Although the cooperating agencies
provided input on the conclusions and
recommendations presented in the draft
EIS, the agencies will present their own
conclusions and recommendations in
their respective Records of Decision for
the project.
The draft EIS addresses the potential
environmental effects of the
construction and operation of the
following project facilities:
• Nine integrated pre-cooled single
mixed refrigerant (SMR) blocks;
• two full-containment aboveground
LNG storage tanks, each with a usable
capacity of approximately 200,000 cubic
meters;
• a 1,500-foot by 3,000-foot turning
basin adjacent to the Calcasieu River
Ship Channel;
• two LNG berthing docks, each
designed to handle carriers of 120,000 to
210,000 cubic meter cargo capacity;
• a 720 megawatt natural gas-fired
combined cycle gas turbine electric
generation facility;
• approximately 23.4 miles of 42inch-diameter pipeline to bring feed gas
from interconnections with ANR
Pipeline Company, Texas Eastern
Transmission, LP, and Bridgeline
Holdings, LP to the terminal site;
• one meter station;
• three mainline valves; and
• one pig launcher at the meter
station and one pig receiver at the gas
gate station on the terminal site.
The FERC staff mailed copies of the
draft EIS to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
libraries in the project area; and parties
to this proceeding. Paper copy versions
of this EIS were mailed to those
specifically requesting them; all others
received a CD version. In addition, the
EIS is available for public viewing on
the FERC’s website (www.ferc.gov) using
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
the eLibrary link. A limited number of
hardcopies of the EIS are available for
distribution and public inspection at:
Federal Energy Regulatory Commission
Public Reference Room, 888 First Street
NE, Room 2A, Washington, DC 20426,
(202) 502–8371.
Any person wishing to comment on
the draft EIS may do so. To ensure
consideration of your comments on the
proposal in the draft EIS, it is important
that the Commission receive your
comments on or before 5:00 p.m.
Eastern Time on August 13, 2018.
For your convenience, there are four
methods you can use to submit your
comments with the Commission. The
Commission will provide equal
consideration to all comments received,
whether filed in written form or
provided verbally. The Commission
encourages electronic filing of
comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature located on the Commission’s
website (www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on eRegister. You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select Comment on a
Filing;
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket numbers (CP15–550–
000, CP15–551–000, and CP15–551–
001) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
(4) In lieu of sending written or
electronic comments, the Commission
invites you to attend the public
comment session its staff will conduct
in the project area to receive comments
on the draft EIS, scheduled as follows:
E:\FR\FM\29JNN1.SGM
29JNN1
Agencies
[Federal Register Volume 83, Number 126 (Friday, June 29, 2018)]
[Notices]
[Pages 30726-30728]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13957]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-107-000.
Applicants: New Covert Generating Company, LLC.
Description: Application for Authorization for Disposition of
Jurisdictional Facilities and Request for Expedited Action of New
Covert Generating Company, LLC.
Filed Date: 6/21/18.
Accession Number: 20180621-5121.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: EC18-108-000.
Applicants: Red Pine Wind Project, LLC, PGGM Cooperatie U.A.
Description: Joint Application for Authorization for Disposition of
Jurisdictional Facilities and Request for Expedited Action of Red Pine
Wind Project, LLC.
Filed Date: 6/22/18.
Accession Number: 20180622-5065.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: EC18-109-000.
Applicants: Rock Falls Wind Farm LLC, PGGM Cooperatie U.A.
Description: Joint Application for Authorization for Disposition of
Jurisdictional Facilities and Request for Confidential Treatment and
Expedited Action of Rock Falls Wind Farm LLC, et. al.
Filed Date: 6/22/18.
Accession Number: 20180622-5067.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: EC18-110-000.
Applicants: Playa Solar 1, LLC, Playa Solar 2, LLC, PGGM Cooperatie
U.A.
Description: Joint Application for Authorization for Disposition of
Jurisdictional Facilities, and Request for Confidential Treatment and
Expedited Action of Playa Solar 1, LLC, et. al.
Filed Date: 6/22/18.
Accession Number: 20180622-5069.
Comments Due: 5 p.m. ET 7/13/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2739-022; ER14-1219-009; ER16-1732-008; ER17-
993-007; ER18-95-004; ER10-2729-009; ER17-989-007; ER10-1892-009; ER10-
1854-014; ER17-990-007; ER17-1946-007; ER17-991-007; ER16-1652-010;
ER11-3320-014; ER10-2744-015; ER16-2406-008; ER16-2405-008; ER13-2316-
012; ER17-992-007; ER10-2678-015; ER10-1631-014; ER14-19-013.
[[Page 30727]]
Applicants: LS Power Marketing, LLC, Armstrong Power, LLC, Aurora
Generation, LLC, Bath County Energy, LLC, Buchanan Energy Services
Company, LLC, Buchanan Generation, LLC, Chambersburg Energy, LLC,
Columbia Energy LLC, Doswell Limited Partnership, Gans Energy, LLC,
Helix Ironwood, LLC, Hunlock Energy, LLC, LifeEnergy, LLC, LSP
University Park, LLC, Riverside Generating Company, L.L.C., Rockford
Power, LLC, Rockford Power II, LLC, Seneca Generation, LLC, Springdale
Energy, LLC, Troy Energy, LLC, University Park Energy, LLC, West
Deptford Energy, LLC.
Description: Notification of Change in Status of the LS PJM MBR
Sellers.
Filed Date: 6/22/18.
Accession Number: 20180622-5133.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER16-1226-001.
Applicants: New Covert Generating Company, LLC.
Description: Compliance filing: Informational Filing Pursuant to
Schedule 2 of the PJM OATT to be effective N/A.
Filed Date: 6/22/18.
Accession Number: 20180622-5081.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER17-424-004.
Applicants: Footprint Power Salem Harbor Development LP.
Description: Notice of Non-Material Change in Status of Footprint
Power Salem Harbor Development LP.
Filed Date: 6/22/18.
Accession Number: 20180622-5115.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-784-002.
Applicants: Upstream Wind Energy LLC.
Description: Notification of Change in Facts Under Market-Based
Rate Authority of Upstream Wind Energy LLC.
Filed Date: 6/22/18.
Accession Number: 20180622-5109.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-954-002.
Applicants: Appalachian Power Company.
Description: Tariff Amendment: OATT-Attachment K, AEPTX Rate
Update--Amendment to be effective 12/31/9998.
Filed Date: 6/22/18.
Accession Number: 20180622-5141.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-1701-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 1628R12 Western Farmers Electric
Cooperative NITSA NOA to be effective 5/1/2018.
Filed Date: 6/22/18.
Accession Number: 20180622-5113.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-1813-000.
Applicants: Power Up Energy, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Tariff
Application to be effective 6/22/2018.
Filed Date: 6/21/18.
Accession Number: 20180621-5112.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: ER18-1814-000.
Applicants: El Paso Electric Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 114
Agreement on Interconnection Study Costs to be effective 8/20/2018.
Filed Date: 6/21/18.
Accession Number: 20180621-5114.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: ER18-1815-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of ISA SA
No. 4226; Queue No. V1-012 to be effective 6/15/2018.
Filed Date: 6/22/18.
Accession Number: 20180622-5044.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-1816-000.
Applicants: Midwest Power Transmission Arkansas, LLC.
Description: Compliance filing: Compliance Filing Docket No. E18-14
to be effective 10/26/2017.
Filed Date: 6/22/18.
Accession Number: 20180622-5052.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-1817-000.
Applicants: New York Transco, LLC.
Description: Petition of New York Transco LLC for Limited Waiver of
Tariff Provisions, et al.
Filed Date: 6/22/18.
Accession Number: 20180622-5072.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: ER18-1818-000.
Applicants: Portland General Electric Company.
Description: Sec. 205(d) Rate Filing: Attachment C Filing to be
effective 6/25/2018.
Filed Date: 6/22/18.
Accession Number: 20180622-5080.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-1819-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-06-22 SA 3122 Pioneer-
NIPSCO Interconnection Agreement to be effective 6/20/2018.
Filed Date: 6/22/18.
Accession Number: 20180622-5085.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-1820-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, SA No. 5106;
Queue No. AB2-043 to be effective 5/23/2018.
Filed Date: 6/22/18.
Accession Number: 20180622-5107.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-1821-000.
Applicants: Walleye Power, LLC.
Description: Compliance filing: Notice of Succession to be
effective 6/23/2018.
Filed Date: 6/22/18.
Accession Number: 20180622-5127.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-1822-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2018-06-22 Amendment to TCA
to add Citizens Sycamore-Penasquitos as PTO to be effective 8/31/2018.
Filed Date: 6/22/18.
Accession Number: 20180622-5128.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-1823-000.
Applicants: Walleye Power, LLC.
Description: Compliance filing: Notice of Succession to be
effective 12/31/9998.
Filed Date: 6/22/18.
Accession Number: 20180622-5134.
Comments Due: 5 p.m. ET 7/13/18.
Docket Numbers: ER18-1824-000.
Applicants: Southwestern Electric Power Company.
Description: Sec. 205(d) Rate Filing: Revised and Restated
Prescott PSA to be effective 5/31/2018.
Filed Date: 6/22/18.
Accession Number: 20180622-5142.
Comments Due: 5 p.m. ET 7/13/18.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES18-42-000.
Applicants: Indianapolis Power & Light Company.
Description: Application of Indianapolis Power & Light Company
under Section 204 of the Federal Power Act for Order Authorizing
Issuance of Short-Term Debt Instruments.
Filed Date: 6/21/18.
Accession Number: 20180621-5120.
Comments Due: 5 p.m. ET 7/12/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
[[Page 30728]]
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 22, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-13957 Filed 6-28-18; 8:45 am]
BILLING CODE 6717-01-P