Federal Register / Vol. 83, No. 124 / Wednesday, June 27, 2018 / Notices
issued in Docket No. CP82–479–000.
Southern Star requests authorization to
increase the maximum operating
pressure on Southern Star’s Blue
Mountain Chisholm Trail Lateral (also
referred to herein as Line VP–079)
pipeline in Grady County, Oklahoma to
its designed maximum allowable
operating pressure (MAOP) of 1460 psig,
all as more fully set forth in the
application, which is open to the public
for inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Cindy
Thompson, Manager, Regulatory,
Southern Star Central Gas Pipeline, Inc.,
4700 Highway 56, Owensboro,
Kentucky 42301 or phone (270) 852–
4655, or by email at
Cindy.C.Thompson@sscgp.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
daltland on DSKBBV9HB2PROD with NOTICES
Ameren Illinois Company .............................................................................................................
Ameren Transmission Company of Illinois .................................................................................
American Transmission Company, LLC .......................................................................................
GridLiance West Transco LLC ......................................................................................................
International Transmission Company ...........................................................................................
ITC Midwest, LLC ..........................................................................................................................
Northern States Power Company, a Minnesota corporation .......................................................
Northern States Power Company, a Wisconsin corporation .......................................................
Public Service Company of Colorado ...........................................................................................
Southern California Edison Company ..........................................................................................
TransCanyon DCR, LLC .................................................................................................................
Southwestern Public Service Company ........................................................................................
Virginia Electric and Power Company .........................................................................................
On June 21, 2018, the Commission
issued an order in Docket Nos. EL18–
155–000, EL18–156–000, EL18–157–
000, EL18–158–000, EL18–159–000,
EL18–160–000, EL18–161–000, EL18–
162–000, EL18–163–000, EL18–164–
000, EL18–165–000, EL18–166–000, and
EL18–167–000, pursuant to section 206
of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting
investigations into whether the
transmission formula rates of Ameren
VerDate Sep<11>2014
16:58 Jun 26, 2018
Jkt 244001
Illinois Company, Ameren Transmission
Company of Illinois, American
Transmission Company, LLC,
GridLiance West Transco LLC,
International Transmission Company,
ITC Midwest, LLC, Northern States
Power Company, a Minnesota
corporation, Northern States Power
Company, a Wisconsin corporation,
Public Service Company of Colorado,
Southern California Edison Company,
TransCanyon DCR, LLC, Southwestern
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
30163
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13848 Filed 6–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Institution of Section 206
Proceedings and Refund Effective Date
Docket Nos. EL18–155–000.
Docket Nos. EL18–156–000.
Docket Nos. EL18–157–000.
Docket Nos. EL18–158–000.
Docket Nos. EL18–159–000.
Docket Nos. EL18–160–000.
Docket Nos. EL18–161–000.
Docket Nos. EL18–162–000.
Docket Nos. EL18–163–000.
Docket Nos. EL18–164–000.
Docket Nos. EL18–165–000.
Docket Nos. EL18–166–000.
Docket Nos. EL18–167–000 (not consolidated).
Public Service Company, and Virginia
Electric and Power Company
(collectively, Respondents) may be
unjust, unreasonable, or unduly
discriminatory or preferential. Ameren
Illinois Company, et al., 163 FERC
61,200 (2018).
The refund effective date in Docket
Nos. EL18–155–000, EL18–156–000,
EL18–157–000, EL18–158–000, EL18–
159–000, EL18–160–000, EL18–161–
000, EL18–162–000, EL18–163–000,
E:\FR\FM\27JNN1.SGM
27JNN1
30164
Federal Register / Vol. 83, No. 124 / Wednesday, June 27, 2018 / Notices
EL18–164–000, EL18–165–000, EL18–
166–000, and EL18–167–000,
established pursuant to section 206(b) of
the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be
heard in the proceeding associated with
a particular Respondent must file a
notice of intervention or motion to
intervene, as appropriate, in the docket
number identified in the caption of this
notice, with the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426, in
accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2017),
within 21 days of the date of issuance
of the order.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13849 Filed 6–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5596–019]
daltland on DSKBBV9HB2PROD with NOTICES
Town of Bedford; Notice of Intent To
File License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 5596–019.
c. Date Filed: April 30, 2018.
d. Submitted By: Town of Bedford.
e. Name of Project: Bedford
Hydroelectric Project.
f. Location: On the James River, in
Amherst and Bedford Counties,
Virginia. The project does not occupy
federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Applicant Contact: M. Scott
Salmon, Electrical Department, Town of
Bedford, 877 Monroe Street, Bedford,
Virginia 24523, (540) 587–6022; or Jot
Splenda at (919) 866–4417; email—
jsplenda@louisberger.com.
i. FERC Contact: Allyson Conner at
(202) 502–6082; or email at
allyson.conner@ferc.gov.
j. The Town of Bedford filed its
request to use the Traditional Licensing
Process on April 30, 2018. The Town of
Bedford provided public notice of its
request on May 23, 2018. In a letter
dated June 21, 2018, the Director of the
Division of Hydropower Licensing
VerDate Sep<11>2014
16:58 Jun 26, 2018
Jkt 244001
approved the Town of Bedford’s request
to use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service under section 7 of
the Endangered Species Act and the
joint agency regulations thereunder at
50 CFR part 402. We are also initiating
consultation with the Virginia State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. The Town of Bedford filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in
paragraph h.
n. The Town of Bedford states its
unequivocal intent to submit an
application for a new license for Project
No. 5596. Pursuant to 18 CFR 16.8, 16.9,
and 16.10 each application for a new
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by April 30, 2021.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13855 Filed 6–26–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18–900–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: § 4(d) Rate Filing:
Removal of Expiring Newfield
Agreements to be effective 8/1/2018.
Filed Date: 6/20/18.
Accession Number: 20180620–5017.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: RP18–901–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update
(Pioneer July–Sept 2018) to be effective
7/1/2018.
Filed Date: 6/20/18.
Accession Number: 20180620–5091.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: RP18–902–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: Tariff
Merger Filing—June 18 to be effective
7/21/2018.
Filed Date: 6/20/18.
Accession Number: 20180620–5093.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: RP18–903–000.
Applicants: Dauphin Island Gathering
Partners.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing 6–21–2018 to be
effective 6/21/2018.
Filed Date: 6/20/18.
Accession Number: 20180620–5117.
Comments Due: 5 p.m. ET 7/2/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
E:\FR\FM\27JNN1.SGM
27JNN1
Agencies
[Federal Register Volume 83, Number 124 (Wednesday, June 27, 2018)]
[Notices]
[Pages 30163-30164]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13849]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Institution of Section 206 Proceedings and Refund
Effective Date
Ameren Illinois Company.................. Docket Nos. EL18-155-000.
Ameren Transmission Company of Illinois.. Docket Nos. EL18-156-000.
American Transmission Company, LLC....... Docket Nos. EL18-157-000.
GridLiance West Transco LLC.............. Docket Nos. EL18-158-000.
International Transmission Company....... Docket Nos. EL18-159-000.
ITC Midwest, LLC......................... Docket Nos. EL18-160-000.
Northern States Power Company, a Docket Nos. EL18-161-000.
Minnesota corporation.
Northern States Power Company, a Docket Nos. EL18-162-000.
Wisconsin corporation.
Public Service Company of Colorado....... Docket Nos. EL18-163-000.
Southern California Edison Company....... Docket Nos. EL18-164-000.
TransCanyon DCR, LLC..................... Docket Nos. EL18-165-000.
Southwestern Public Service Company...... Docket Nos. EL18-166-000.
Virginia Electric and Power Company...... Docket Nos. EL18-167-000 (not consolidated).
On June 21, 2018, the Commission issued an order in Docket Nos.
EL18-155-000, EL18-156-000, EL18-157-000, EL18-158-000, EL18-159-000,
EL18-160-000, EL18-161-000, EL18-162-000, EL18-163-000, EL18-164-000,
EL18-165-000, EL18-166-000, and EL18-167-000, pursuant to section 206
of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting
investigations into whether the transmission formula rates of Ameren
Illinois Company, Ameren Transmission Company of Illinois, American
Transmission Company, LLC, GridLiance West Transco LLC, International
Transmission Company, ITC Midwest, LLC, Northern States Power Company,
a Minnesota corporation, Northern States Power Company, a Wisconsin
corporation, Public Service Company of Colorado, Southern California
Edison Company, TransCanyon DCR, LLC, Southwestern Public Service
Company, and Virginia Electric and Power Company (collectively,
Respondents) may be unjust, unreasonable, or unduly discriminatory or
preferential. Ameren Illinois Company, et al., 163 FERC 61,200 (2018).
The refund effective date in Docket Nos. EL18-155-000, EL18-156-
000, EL18-157-000, EL18-158-000, EL18-159-000, EL18-160-000, EL18-161-
000, EL18-162-000, EL18-163-000,
[[Page 30164]]
EL18-164-000, EL18-165-000, EL18-166-000, and EL18-167-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in the proceeding
associated with a particular Respondent must file a notice of
intervention or motion to intervene, as appropriate, in the docket
number identified in the caption of this notice, with the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426, in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure, 18 CFR 385.214 (2017), within 21 days of the
date of issuance of the order.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-13849 Filed 6-26-18; 8:45 am]