Combined Notice of Filings, 30164-30165 [2018-13847]
Download as PDF
30164
Federal Register / Vol. 83, No. 124 / Wednesday, June 27, 2018 / Notices
EL18–164–000, EL18–165–000, EL18–
166–000, and EL18–167–000,
established pursuant to section 206(b) of
the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be
heard in the proceeding associated with
a particular Respondent must file a
notice of intervention or motion to
intervene, as appropriate, in the docket
number identified in the caption of this
notice, with the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426, in
accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2017),
within 21 days of the date of issuance
of the order.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13849 Filed 6–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5596–019]
daltland on DSKBBV9HB2PROD with NOTICES
Town of Bedford; Notice of Intent To
File License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 5596–019.
c. Date Filed: April 30, 2018.
d. Submitted By: Town of Bedford.
e. Name of Project: Bedford
Hydroelectric Project.
f. Location: On the James River, in
Amherst and Bedford Counties,
Virginia. The project does not occupy
federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Applicant Contact: M. Scott
Salmon, Electrical Department, Town of
Bedford, 877 Monroe Street, Bedford,
Virginia 24523, (540) 587–6022; or Jot
Splenda at (919) 866–4417; email—
jsplenda@louisberger.com.
i. FERC Contact: Allyson Conner at
(202) 502–6082; or email at
allyson.conner@ferc.gov.
j. The Town of Bedford filed its
request to use the Traditional Licensing
Process on April 30, 2018. The Town of
Bedford provided public notice of its
request on May 23, 2018. In a letter
dated June 21, 2018, the Director of the
Division of Hydropower Licensing
VerDate Sep<11>2014
16:58 Jun 26, 2018
Jkt 244001
approved the Town of Bedford’s request
to use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service under section 7 of
the Endangered Species Act and the
joint agency regulations thereunder at
50 CFR part 402. We are also initiating
consultation with the Virginia State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. The Town of Bedford filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in
paragraph h.
n. The Town of Bedford states its
unequivocal intent to submit an
application for a new license for Project
No. 5596. Pursuant to 18 CFR 16.8, 16.9,
and 16.10 each application for a new
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for this
project must be filed by April 30, 2021.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13855 Filed 6–26–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18–900–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: § 4(d) Rate Filing:
Removal of Expiring Newfield
Agreements to be effective 8/1/2018.
Filed Date: 6/20/18.
Accession Number: 20180620–5017.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: RP18–901–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update
(Pioneer July–Sept 2018) to be effective
7/1/2018.
Filed Date: 6/20/18.
Accession Number: 20180620–5091.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: RP18–902–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: Tariff
Merger Filing—June 18 to be effective
7/21/2018.
Filed Date: 6/20/18.
Accession Number: 20180620–5093.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: RP18–903–000.
Applicants: Dauphin Island Gathering
Partners.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing 6–21–2018 to be
effective 6/21/2018.
Filed Date: 6/20/18.
Accession Number: 20180620–5117.
Comments Due: 5 p.m. ET 7/2/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
E:\FR\FM\27JNN1.SGM
27JNN1
Federal Register / Vol. 83, No. 124 / Wednesday, June 27, 2018 / Notices
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13847 Filed 6–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–458–000]
daltland on DSKBBV9HB2PROD with NOTICES
Midship Pipeline Company, LLC;
Notice of Availability of the Final
Environmental Impact Statement for
the Proposed Midcontinent Supply
Header Interstate Pipeline Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the Midcontinent Supply Header
Interstate Pipeline Project, proposed by
Midship Pipeline Company, LLC
(Midship Pipeline) in the abovereferenced docket. Midship Pipeline
requests authorization to construct and
operate approximately 234.1 miles of
new pipeline, three compressor stations,
a booster station, and accompanying
facilities in Oklahoma. The project
would deliver an additional 1,440
million standard cubic feet per day of
year-round firm transportation capacity
from Kingfisher County, Oklahoma to
existing natural gas pipelines near
Bennington, Oklahoma for transport to
growing Gulf Coast and Southeast
Markets.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the project would result in some adverse
environmental impacts; however, these
impacts would be reduced to less-thansignificant levels with the
implementation of Midship Pipeline’s
proposed mitigation and the additional
measures recommended in the final EIS.
The U.S. Environmental Protection
Agency participated as a cooperating
agency in the preparation of the EIS.
Cooperating agencies have jurisdiction
by law or special expertise with respect
to resources potentially affected by the
proposal and participate in the NEPA
analysis. The U.S. Environmental
Protection Agency provided input to the
conclusions and recommendations
presented in the final EIS.
VerDate Sep<11>2014
18:24 Jun 26, 2018
Jkt 244001
The final EIS addresses the potential
environmental effects of the
construction and operation of the
following proposed project facilities in
Oklahoma:
• 199.7 miles of new 36-inchdiameter natural gas pipeline in
Kingfisher, Canadian, Grady, Garvin,
Stephens, Carter, Johnston, and Bryan
Counties;
• 20.5 miles of new 30-inch-diameter
pipeline lateral in Kingfisher County;
• 13.8 miles of new 16-inch-diameter
pipeline lateral in Stephens, Carter, and
Garvin Counties;
• 0.1 mile of new 24-inch-diameter
tie-in piping in Canadian County;
• three new compressor stations and
one new booster station in Canadian,
Garvin, Bryan, and Stephens Counties;
and
• eight new receipt meters, two new
receipt taps, four new delivery meters,
and appurtenant facilities.
The FERC staff mailed copies of the
EIS to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. Paper copy versions of
Volume I of the EIS were mailed to
those specifically requesting them; all
recipients received a CD version
containing both Volumes I and II of the
EIS. In addition, the EIS is available for
public viewing on the FERC’s website
(www.ferc.gov) using the eLibrary link.
A limited number of copies are available
for distribution and public inspection
at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE, Room 2A,
Washington, DC 20426, (202) 502–8371.
Questions?
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on General Search, and enter the
docket number in the Docket Number
field excluding the last three digits (i.e.,
CP17–458). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676; for TTY,
contact (202) 502–8659. The eLibrary
link also provides access to the texts of
all formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
30165
In addition, the Commission offers a
free service called eSubscription, which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13852 Filed 6–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–105–000.
Applicants: GenOn Energy
Management, LLC, GenOn Mid-Atlantic,
LLC, NRG REMA LLC.
Description: Joint Application of
GenOn Energy Management, LLC, et al.
for Approval Under Section 203 of the
Federal Power Act and Request for
Expedited Action.
Filed Date: 6/20/18.
Accession Number: 20180620–5120.
Comments Due: 5 p.m. ET 7/11/18.
Docket Numbers: EC18–106–000.
Applicants: Colorado Green Holdings
LLC.
Description: Application for Approval
Pursuant to Section 203 of the Federal
Power Act, and Requests for Waivers,
Privileged Treatment and Expedited
Consideration of Colorado Green
Holdings LLC.
Filed Date: 6/21/18.
Accession Number: 20180621–5077.
Comments Due: 5 p.m. ET 7/12/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–102–000.
Applicants: Holloman Lessee LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Holloman Lessee
LLC.
Filed Date: 6/21/18.
Accession Number: 20180621–5057.
Comments Due: 5 p.m. ET 7/12/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1667–003.
E:\FR\FM\27JNN1.SGM
27JNN1
Agencies
[Federal Register Volume 83, Number 124 (Wednesday, June 27, 2018)]
[Notices]
[Pages 30164-30165]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13847]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18-900-000.
Applicants: Midcontinent Express Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Removal of Expiring Newfield
Agreements to be effective 8/1/2018.
Filed Date: 6/20/18.
Accession Number: 20180620-5017.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: RP18-901-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agreement
Update (Pioneer July-Sept 2018) to be effective 7/1/2018.
Filed Date: 6/20/18.
Accession Number: 20180620-5091.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: RP18-902-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Tariff Merger Filing--June 18
to be effective 7/21/2018.
Filed Date: 6/20/18.
Accession Number: 20180620-5093.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: RP18-903-000.
Applicants: Dauphin Island Gathering Partners.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Filing 6-21-
2018 to be effective 6/21/2018.
Filed Date: 6/20/18.
Accession Number: 20180620-5117.
Comments Due: 5 p.m. ET 7/2/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For
[[Page 30165]]
other information, call (866) 208-3676 (toll free). For TTY, call (202)
502-8659.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-13847 Filed 6-26-18; 8:45 am]