Combined Notice of Filings #1, 30165-30166 [2018-13846]
Download as PDF
Federal Register / Vol. 83, No. 124 / Wednesday, June 27, 2018 / Notices
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13847 Filed 6–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–458–000]
daltland on DSKBBV9HB2PROD with NOTICES
Midship Pipeline Company, LLC;
Notice of Availability of the Final
Environmental Impact Statement for
the Proposed Midcontinent Supply
Header Interstate Pipeline Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the Midcontinent Supply Header
Interstate Pipeline Project, proposed by
Midship Pipeline Company, LLC
(Midship Pipeline) in the abovereferenced docket. Midship Pipeline
requests authorization to construct and
operate approximately 234.1 miles of
new pipeline, three compressor stations,
a booster station, and accompanying
facilities in Oklahoma. The project
would deliver an additional 1,440
million standard cubic feet per day of
year-round firm transportation capacity
from Kingfisher County, Oklahoma to
existing natural gas pipelines near
Bennington, Oklahoma for transport to
growing Gulf Coast and Southeast
Markets.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the project would result in some adverse
environmental impacts; however, these
impacts would be reduced to less-thansignificant levels with the
implementation of Midship Pipeline’s
proposed mitigation and the additional
measures recommended in the final EIS.
The U.S. Environmental Protection
Agency participated as a cooperating
agency in the preparation of the EIS.
Cooperating agencies have jurisdiction
by law or special expertise with respect
to resources potentially affected by the
proposal and participate in the NEPA
analysis. The U.S. Environmental
Protection Agency provided input to the
conclusions and recommendations
presented in the final EIS.
VerDate Sep<11>2014
18:24 Jun 26, 2018
Jkt 244001
The final EIS addresses the potential
environmental effects of the
construction and operation of the
following proposed project facilities in
Oklahoma:
• 199.7 miles of new 36-inchdiameter natural gas pipeline in
Kingfisher, Canadian, Grady, Garvin,
Stephens, Carter, Johnston, and Bryan
Counties;
• 20.5 miles of new 30-inch-diameter
pipeline lateral in Kingfisher County;
• 13.8 miles of new 16-inch-diameter
pipeline lateral in Stephens, Carter, and
Garvin Counties;
• 0.1 mile of new 24-inch-diameter
tie-in piping in Canadian County;
• three new compressor stations and
one new booster station in Canadian,
Garvin, Bryan, and Stephens Counties;
and
• eight new receipt meters, two new
receipt taps, four new delivery meters,
and appurtenant facilities.
The FERC staff mailed copies of the
EIS to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. Paper copy versions of
Volume I of the EIS were mailed to
those specifically requesting them; all
recipients received a CD version
containing both Volumes I and II of the
EIS. In addition, the EIS is available for
public viewing on the FERC’s website
(www.ferc.gov) using the eLibrary link.
A limited number of copies are available
for distribution and public inspection
at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE, Room 2A,
Washington, DC 20426, (202) 502–8371.
Questions?
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on General Search, and enter the
docket number in the Docket Number
field excluding the last three digits (i.e.,
CP17–458). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676; for TTY,
contact (202) 502–8659. The eLibrary
link also provides access to the texts of
all formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
30165
In addition, the Commission offers a
free service called eSubscription, which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13852 Filed 6–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–105–000.
Applicants: GenOn Energy
Management, LLC, GenOn Mid-Atlantic,
LLC, NRG REMA LLC.
Description: Joint Application of
GenOn Energy Management, LLC, et al.
for Approval Under Section 203 of the
Federal Power Act and Request for
Expedited Action.
Filed Date: 6/20/18.
Accession Number: 20180620–5120.
Comments Due: 5 p.m. ET 7/11/18.
Docket Numbers: EC18–106–000.
Applicants: Colorado Green Holdings
LLC.
Description: Application for Approval
Pursuant to Section 203 of the Federal
Power Act, and Requests for Waivers,
Privileged Treatment and Expedited
Consideration of Colorado Green
Holdings LLC.
Filed Date: 6/21/18.
Accession Number: 20180621–5077.
Comments Due: 5 p.m. ET 7/12/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–102–000.
Applicants: Holloman Lessee LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Holloman Lessee
LLC.
Filed Date: 6/21/18.
Accession Number: 20180621–5057.
Comments Due: 5 p.m. ET 7/12/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1667–003.
E:\FR\FM\27JNN1.SGM
27JNN1
daltland on DSKBBV9HB2PROD with NOTICES
30166
Federal Register / Vol. 83, No. 124 / Wednesday, June 27, 2018 / Notices
Applicants: Battery Utility of Ohio,
LLC.
Description: Notice of Change in
Status of Battery Utility of Ohio, LLC.
Filed Date: 6/20/18.
Accession Number: 20180620–5118.
Comments Due: 5 p.m. ET 7/11/18.
Docket Numbers: ER17–469–002.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Midwest Energy Formula Rate Revisions
Compliance Filing to be effective
1/1/2017.
Filed Date: 6/21/18.
Accession Number: 20180621–5025.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: ER18–1703–001.
Applicants: Entergy Arkansas, Inc.,
Entergy Mississippi, Inc., Entergy New
Orleans, LLC, Entergy Texas, Inc.,
Entergy Louisiana, LLC.
Description: Tariff Amendment:
Entergy OpCos Reactive Power Update
Errata (ER18–1703) to be effective
6/1/2018.
Filed Date: 6/21/18.
Accession Number: 20180621–5075.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: ER18–1811–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1276R17 KCPL NITSA NOA to be
effective 9/1/2018.
Filed Date: 6/21/18.
Accession Number: 20180621–5033.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: ER18–1812–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–06–21 SA 3126/3127 ATC–
WEPCo Project Commitment Agrmts
Juneautown to be effective 8/21/2018.
Filed Date: 6/21/18.
Accession Number: 20180621–5054.
Comments Due: 5 p.m. ET 7/12/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–41–000.
Applicants: Northern Pass
Transmission LLC.
Description: Application for
Authority to Issue Debt Securities of
Northern Pass Transmission LLC.
Filed Date: 6/20/18.
Accession Number: 20180620–5131.
Comments Due: 5 p.m. ET 7/11/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
VerDate Sep<11>2014
16:58 Jun 26, 2018
Jkt 244001
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13846 Filed 6–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–502–000]
Panhandle Eastern Pipe Line
Company, LP; Notice of Request Under
Blanket Authorization
Take notice that on June 11, 2018,
Panhandle Eastern Pipe Line, LP
(Panhandle), P.O. Box 4967, Houston,
Texas 77210–4967, filed a prior notice
application pursuant to sections
157.205, and 157.208(f)(2) of the Federal
Energy Regulatory Commission’s
(Commission) regulations under the
Natural Gas Act (NGA), and Panhandle’s
blanket certificate issued in Docket No.
CP83–83–000. Panhandle requests
authorization to decrease the maximum
allowable operating pressure (MAOP) of
a segment of its State Line Lateral
located in Johnson County, Kansas and
Jackson County, Missouri, due to the
recent compliance testing results in
accordance with U.S. Department of
Transportation regulations, all as more
fully set forth in the application, which
is open to the public for inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Blair
Lichtenwalter, Senior Director of
Certificates, Panhandle Eastern Pipe
Line Company, LP, 1300 Main Street,
Houston, Texas 77002 or phone (713)
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
989–1205, or by email at
blair.lichtenwalter@energytransfer.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
E:\FR\FM\27JNN1.SGM
27JNN1
Agencies
[Federal Register Volume 83, Number 124 (Wednesday, June 27, 2018)]
[Notices]
[Pages 30165-30166]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13846]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-105-000.
Applicants: GenOn Energy Management, LLC, GenOn Mid-Atlantic, LLC,
NRG REMA LLC.
Description: Joint Application of GenOn Energy Management, LLC, et
al. for Approval Under Section 203 of the Federal Power Act and Request
for Expedited Action.
Filed Date: 6/20/18.
Accession Number: 20180620-5120.
Comments Due: 5 p.m. ET 7/11/18.
Docket Numbers: EC18-106-000.
Applicants: Colorado Green Holdings LLC.
Description: Application for Approval Pursuant to Section 203 of
the Federal Power Act, and Requests for Waivers, Privileged Treatment
and Expedited Consideration of Colorado Green Holdings LLC.
Filed Date: 6/21/18.
Accession Number: 20180621-5077.
Comments Due: 5 p.m. ET 7/12/18.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG18-102-000.
Applicants: Holloman Lessee LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Holloman Lessee LLC.
Filed Date: 6/21/18.
Accession Number: 20180621-5057.
Comments Due: 5 p.m. ET 7/12/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-1667-003.
[[Page 30166]]
Applicants: Battery Utility of Ohio, LLC.
Description: Notice of Change in Status of Battery Utility of Ohio,
LLC.
Filed Date: 6/20/18.
Accession Number: 20180620-5118.
Comments Due: 5 p.m. ET 7/11/18.
Docket Numbers: ER17-469-002.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Midwest Energy Formula Rate
Revisions Compliance Filing to be effective 1/1/2017.
Filed Date: 6/21/18.
Accession Number: 20180621-5025.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: ER18-1703-001.
Applicants: Entergy Arkansas, Inc., Entergy Mississippi, Inc.,
Entergy New Orleans, LLC, Entergy Texas, Inc., Entergy Louisiana, LLC.
Description: Tariff Amendment: Entergy OpCos Reactive Power Update
Errata (ER18-1703) to be effective 6/1/2018.
Filed Date: 6/21/18.
Accession Number: 20180621-5075.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: ER18-1811-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1276R17 KCPL NITSA NOA to be
effective 9/1/2018.
Filed Date: 6/21/18.
Accession Number: 20180621-5033.
Comments Due: 5 p.m. ET 7/12/18.
Docket Numbers: ER18-1812-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2018-06-21 SA 3126/3127 ATC-
WEPCo Project Commitment Agrmts Juneautown to be effective 8/21/2018.
Filed Date: 6/21/18.
Accession Number: 20180621-5054.
Comments Due: 5 p.m. ET 7/12/18.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES18-41-000.
Applicants: Northern Pass Transmission LLC.
Description: Application for Authority to Issue Debt Securities of
Northern Pass Transmission LLC.
Filed Date: 6/20/18.
Accession Number: 20180620-5131.
Comments Due: 5 p.m. ET 7/11/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-13846 Filed 6-26-18; 8:45 am]
BILLING CODE 6717-01-P