Download as PDF daltland on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 83, No. 124 / Wednesday, June 27, 2018 / Notices (UFSAR). The proposed changes do not affect the probability of inadvertent operation or failure. Therefore, the probabilities of the accidents previously evaluated in the UFSAR are not affected. The proposed changes do not affect the ability of the PRHR HX and IRWST to perform their design functions. The designs of the PRHR HX and IRWST continue to meet the same regulatory acceptance criteria, codes, and standards as required by the UFSAR. In addition, the proposed changes maintain the capabilities of the PRHR HX and IRWST to mitigate the consequences of an accident and to meet the applicable regulatory acceptance criteria. The proposed changes do not affect the prevention and mitigation of other abnormal events (e.g., anticipated operational occurrences, earthquakes, floods and turbine missiles), or their safety or design analyses. Therefore, the consequences of the accidents evaluated in the UFSAR are not affected. Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. The proposed changes do not affect the operation of any systems or equipment that may initiate a new or different kind of accident, or alter any SSC such that a new accident initiator or initiating sequence of events is created. The proposed changes do not affect any other SSC design functions or methods of operation in a manner that results in a new failure mode, malfunction, or sequence of events that affect safety-related or nonsafety related equipment. Therefore, this activity does not allow for a new fission product release path, result in a new fission product barrier failure mode, or create a new sequence of events that result in significant fuel cladding failures. Therefore, the requested amendment does not create the possibility of a new or different type of accident from any accident previously evaluated. 3. Does the proposed amendment involve a significant reduction in a margin of safety? Response: No. The proposed changes maintain existing safety margins. The proposed changes verify and maintain the capabilities of the PRHR HX and IRWST to perform their design functions. Therefore, the proposed changes satisfy the same design functions in accordance with the same codes and standards as stated in the UFSAR. These changes do not affect any design code, function, design analysis, safety analysis input or result, or design/safety margin. No safety analysis or design basis acceptance limit/criterion is challenged or exceeded by the proposed changes, and no margin of safety is reduced. Therefore, the requested amendment does not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee’s analysis and, based on this VerDate Sep<11>2014 16:58 Jun 26, 2018 Jkt 244001 review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. Attorney for licensee: M. Stanford Blanton, Balch & Bingham LLP, 1710 Sixth Avenue North, Birmingham, AL 35203–2015. NRC Branch Chief: Jennifer L. DixonHerrity. Dated at Rockville, Maryland, this 21st day of June, 2018. For the Nuclear Regulatory Commission. Jennifer L. Dixon-Herrity, Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of New Reactors. [FR Doc. 2018–13736 Filed 6–26–18; 8:45 am] BILLING CODE 7590–01–P [Docket Nos. 052–00025 and 052–00026; NRC–2008–0252] Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Changes to Construction Fitness-for-Duty Commitments Nuclear Regulatory Commission. ACTION: License amendment application; opportunity to comment, request a hearing, and petition for leave to intervene. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Combined Licenses (NPF–91 and NPF–92), issued to Southern Nuclear Operating Company, Inc. (SNC), and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (together ‘‘the licensees’’), for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia. DATES: Submit must be filed by July 27, 2018. Requests for a hearing or petition for leave to intervene must be filed by August 27, 2018. ADDRESSES: You may submit comments by any of the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2008–0252. Address questions about NRC dockets to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the PO 00000 Frm 00105 Fmt 4703 Sfmt 4703 individual listed in the FOR FURTHER section of this document. • Mail comments to: May Ma, Office of Administration, Mail Stop: TWFN–7– A60, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. FOR FURTHER INFORMATION CONTACT: Paul B. Kallan, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555–000; telephone: 301–415–2809; email: Paul.Kallan@ nrc.gov. SUPPLEMENTARY INFORMATION: INFORMATION CONTACT I. Obtaining Information and Submitting Comments NUCLEAR REGULATORY COMMISSION SUMMARY: 30199 A. Obtaining Information Please refer to Docket ID NRC–2008– 0252 when contacting the NRC about the availability of information for this action. You may obtain publiclyavailable information related to this action by any of the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2008–0252. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The application for amendment, dated June 15, 2018, is available in ADAMS under Accession No. ML18166A347. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. B. Submitting Comments Please include Docket ID NRC–2008– 0252 in your comment submission. The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC posts all comment submissions at https:// www.regulations.gov as well as entering the comment submissions into ADAMS. E:\FR\FM\27JNN1.SGM 27JNN1 30200 Federal Register / Vol. 83, No. 124 / Wednesday, June 27, 2018 / Notices daltland on DSKBBV9HB2PROD with NOTICES The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS. II. Introduction The NRC is considering issuance of an amendment to Combined License Nos. NPF–91 and NPF–92, issued to SNC and Georgia Power Company for operation of the VEGP, Units 3 and 4, located in Burke County, Georgia. The proposed changes would revise commitments related to the construction fitness-for-duty (FFD) program described in the VEGP, Units 3 and 4 Updated Final Safety Analysis Report (UFSAR). Specifically, the change would involve the creation of a new type of FFD Authorization that would allow construction workers temporary access to the construction site pending completion of all pre-access FFD requirements. The individual will not be given assignments to work on safety or security-related structures, systems, and components prior to the completion of the FFD requirements. Before any issuance of the proposed license amendment, the NRC will need to make the findings required by the Atomic Energy Act of 1954, as amended (the Act), and NRC’s regulations. The NRC has made a proposed determination that the license amendment request involves no significant hazards consideration. Under the NRC’s regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated? VerDate Sep<11>2014 16:58 Jun 26, 2018 Jkt 244001 Response: No. The proposed changes to the Vogtle Electric Generating Plant (VEGP) 3 and 4 Updated Final Safety Analysis Report (UFSAR) commitment related to the construction worker Fitness-for-Duty (FFD) program do not affect the design of a system, structure, or component (SSC) used to meet the design bases of the nuclear plant. Nor do the changes affect the construction or operation of the nuclear plant itself, so there is no change to the probability or consequences of an accident previously evaluated. Changing the VEGP 3 and 4 FFD program commitments do not affect prevention and mitigation of abnormal events (e.g., accidents, anticipated operational occurrences, earthquakes, floods, or turbine missiles) or their safety or design analyses. No safety-related SSC or function is adversely affected. The changes neither involve nor interface with any SSC accident initiator or initiating sequence of events, so the probabilities of the accidents evaluated in the UFSAR are not affected. Because the changes do not involve any safety-related SSC or function used to mitigate an accident, the consequences of the accidents evaluated in the UFSAR are not affected. Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated? The proposed changes to the VEGP 3 and 4 UFSAR commitment related to the construction worker FFD program do not affect the operation of any systems or equipment that may initiate a new or different kind of accident or alter any SSC such that a new accident initiator or initiating sequence of events is created. The changes do not affect the design of an SSC used to meet the design bases of the nuclear plant. Nor do the changes affect the construction or operation of the nuclear plant. Consequently, there is no new or different kind of accident from any accident previously evaluated. The changes do not affect safety-related equipment, nor do they affect equipment that, if it failed, could initiate an accident or a failure of a fission product barrier. In addition, the changes do not result in a new failure mode, malfunction, or sequence of events that could affect safety or safety-related equipment. No analysis is adversely affected. No system or design function or equipment qualification is adversely affected by the changes. This activity will not allow for a new fission product release path, nor will it result in a new fission product barrier failure mode, nor create a new sequence of events that would result in significant fuel cladding failures. Therefore, the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated. 3. Does the proposed amendment involve a significant reduction in a margin of safety? Response: No. The proposed changes to the VEGP 3 and 4 UFSAR commitment related to the PO 00000 Frm 00106 Fmt 4703 Sfmt 4703 construction worker FFD program do not alter any safety-related equipment, applicable design codes, code compliance, design function, or safety analysis. Consequently, no safety analysis or design basis acceptance limit/criterion is challenged or exceeded by the proposed changes, thus the margin of safety is not reduced. Therefore, the proposed amendment does not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee’s analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the license amendment request involves no significant hazards consideration. The NRC is seeking public comments on this proposed determination that the license amendment request involves no significant hazards consideration. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination. Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60day notice period if the Commission concludes the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility. Should the Commission take action prior to the expiration of either the comment period or the notice period, the Commission will publish a notice of issuance in the Federal Register. Should the Commission make a final no significant hazards consideration determination, any hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently. III. Opportunity To Request a Hearing and Petition for Leave To Intervene Within 60 days after the date of publication of this notice, any persons (petitioner) whose interest may be affected by this action may file a request for a hearing and a petition to intervene (petition) with respect to the action. Petitions shall be filed in accordance with the Commission’s ‘‘Agency Rules of Practice and Procedure’’ in 10 CFR part 2. Interested persons should consult a current copy of 10 CFR 2.309, E:\FR\FM\27JNN1.SGM 27JNN1 daltland on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 83, No. 124 / Wednesday, June 27, 2018 / Notices which is available at the NRC’s PDR, located at One White Flint North, Room O1–F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. The NRC’s regulations are accessible electronically from the NRC Library on the NRC’s website at https:// www.nrc.gov/reading-rm/doccollections/cfr/. If a petition is filed within 60 days, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel will issue a notice of a hearing or an appropriate order. As required by 10 CFR 2.309, a petition shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements: (1) The name, address, and telephone number of the petitioner; (2) the nature of the petitioner’s right under the Act to be made a party to the proceeding; (3) the nature and extent of the petitioner’s property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the petitioner’s interest. The petition must also set forth the specific contentions which the petitioner seeks to have litigated at the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner shall provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner intends to rely to establish those facts or expert opinion to support its position on the issue. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the proceeding. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner who fails to satisfy these requirements with respect to at least one contention will VerDate Sep<11>2014 16:58 Jun 26, 2018 Jkt 244001 not be permitted to participate as a party. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that person’s admitted contentions consistent with the NRC’s regulations, policies, and procedures. Petitions for leave to intervene must be filed no later than 60 days from the date of publication of this notice. Requests for hearing, petitions for leave to intervene, and motions for leave to file new or amended contentions that are filed after the 60-day deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) through (iii). If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of any amendment unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2. A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h)(1). The petition should state the nature and extent of the petitioner’s interest in the proceeding. The petition should be submitted to the Commission by August 27, 2018. The petition must be filed in accordance with the filing instructions in the ‘‘Electronic Submissions (EFiling)’’ section of this document, and should meet the requirements for petitions set forth in this section, except that under 10 CFR 2.309(h)(2) a State, local governmental body, or Federallyrecognized Indian Tribe, or agency thereof does not need to address the standing requirements in 10 CFR PO 00000 Frm 00107 Fmt 4703 Sfmt 4703 30201 2.309(d) if the facility is located within its boundaries. A State, local governmental body, Federallyrecognized Indian Tribe, or agency thereof may also have the opportunity to participate under 10 CFR 2.315(c). If a hearing is granted, any person who does not wish, or is not qualified, to become a party to the proceeding may, in the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). A person making a limited appearance may make an oral or written statement of position on the issues, but may not otherwise participate in the proceeding. A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to the limits and conditions as may be imposed by the presiding officer. Details regarding the opportunity to make a limited appearance will be provided by the presiding officer if such sessions are scheduled. IV. Electronic Submissions (E-Filing) All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene (hereinafter ‘‘petition’’), and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC’s E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR 46562, August 3, 2012). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by email at hearing.docket@nrc.gov, or by telephone at 301–415–1677, to request (1) a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a petition (even in instances in which the participant, or its counsel or representative, already holds an NRCissued digital ID certificate). Based upon this information, the Secretary will E:\FR\FM\27JNN1.SGM 27JNN1 daltland on DSKBBV9HB2PROD with NOTICES 30202 Federal Register / Vol. 83, No. 124 / Wednesday, June 27, 2018 / Notices establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket. Information about applying for a digital ID certificate is available on the NRC’s public website at https:// www.nrc.gov/site-help/e-submittals/ getting-started.html. System requirements for accessing the ESubmittal server are available on the NRC’s public website at https:// www.nrc.gov/site-help/e-submittals/ adjudicatory-sub.html. Participants may attempt to use other software not listed on the website, but should note that the NRC’s E-Filing system does not support unlisted software, and the NRC Electronic Filing Help Desk will not be able to offer assistance in using unlisted software. Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a petition. Submissions should be in Portable Document Format (PDF). Additional guidance on PDF submissions is available on the NRC’s public website at https://www.nrc.gov/ site-help/electronic-sub-ref-mat.html. A filing is considered complete at the time the documents are submitted through the NRC’s E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the EFiling system time-stamps the document and sends the submitter an email notice confirming receipt of the document. The E-Filing system also distributes an email notice that provides access to the document to the NRC’s Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically using the NRC’s adjudicatory E-Filing system may seek assistance by contacting the NRC Electronic Filing Help Desk through the ‘‘Contact Us’’ link located on the NRC’s public website at https:// www.nrc.gov/site-help/esubmittals.html, by email to MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 7 p.m., Eastern VerDate Sep<11>2014 16:58 Jun 26, 2018 Jkt 244001 Time, Monday through Friday, excluding government holidays. Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing stating why there is good cause for not filing electronically and requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by firstclass mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists. Documents submitted in adjudicatory proceedings will appear in the NRC’s electronic hearing docket which is available to the public at https:// ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. However, in some instances, a request to intervene will require including information on local residence in order to demonstrate a proximity assertion of interest in the proceeding. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission. For further details with respect to this action, see the application for license amendment dated June 15, 2018. Attorney for licensee: Mr. M. Stanford Blanton, Balch & Bingham LLP, 1710 PO 00000 Frm 00108 Fmt 4703 Sfmt 4703 Sixth Avenue North, Birmingham, AL 35203–2015. NRC Branch Chief: Jennifer DixonHerrity. Dated at Rockville, Maryland, this 21st day of June, 2018. For the Nuclear Regulatory Commission. Jennifer L. Dixon-Herrity, Chief, Licensing Branch 4, Division of Licensing, Siting, and Environmental Analysis, Office of New Reactors. [FR Doc. 2018–13757 Filed 6–26–18; 8:45 am] BILLING CODE 7590–01–P POSTAL REGULATORY COMMISSION [Docket Nos. MC2018–184 and CP2018–258; MC2018–185 and CP2018–259] New Postal Products Postal Regulatory Commission. Notice. AGENCY: ACTION: The Commission is noticing a recent Postal Service filing for the Commission’s consideration concerning negotiated service agreements. This notice informs the public of the filing, invites public comment, and takes other administrative steps. DATES: Comments are due: June 29, 2018. SUMMARY: Submit comments electronically via the Commission’s Filing Online system at https:// www.prc.gov. Those who cannot submit comments electronically should contact the person identified in the FOR FURTHER INFORMATION CONTACT section by telephone for advice on filing alternatives. ADDRESSES: FOR FURTHER INFORMATION CONTACT: David A. Trissell, General Counsel, at 202–789–6820. SUPPLEMENTARY INFORMATION: Table of Contents I. Introduction II. Docketed Proceeding(s) I. Introduction The Commission gives notice that the Postal Service has filed request(s) for the Commission to consider matters related to negotiated service agreement(s). The requests(s) may propose the addition or removal of a negotiated service agreement from the market dominant or the competitive product list, or the modification of an existing product currently appearing on the market dominant or the competitive product list. Section II identifies the docket number(s) associated with each Postal Service request, the title of each Postal E:\FR\FM\27JNN1.SGM 27JNN1

Agencies

[Federal Register Volume 83, Number 124 (Wednesday, June 27, 2018)]
[Notices]
[Pages 30199-30202]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13757]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 052-00025 and 052-00026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc.; Vogtle Electric 
Generating Plant, Units 3 and 4; Changes to Construction Fitness-for-
Duty Commitments

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; opportunity to comment, request 
a hearing, and petition for leave to intervene.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering 
issuance of an amendment to Combined Licenses (NPF-91 and NPF-92), 
issued to Southern Nuclear Operating Company, Inc. (SNC), and Georgia 
Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG 
Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the 
City of Dalton, Georgia (together ``the licensees''), for construction 
and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 
and 4, located in Burke County, Georgia.

DATES: Submit must be filed by July 27, 2018. Requests for a hearing or 
petition for leave to intervene must be filed by August 27, 2018.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: May Ma, Office of Administration, Mail 
Stop: TWFN-7-A60, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Paul B. Kallan, Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-000; 
telephone: 301-415-2809; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2008-0252 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
application for amendment, dated June 15, 2018, is available in ADAMS 
under Accession No. ML18166A347.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2008-0252 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into 
ADAMS.

[[Page 30200]]

The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Introduction

    The NRC is considering issuance of an amendment to Combined License 
Nos. NPF-91 and NPF-92, issued to SNC and Georgia Power Company for 
operation of the VEGP, Units 3 and 4, located in Burke County, Georgia.
    The proposed changes would revise commitments related to the 
construction fitness-for-duty (FFD) program described in the VEGP, 
Units 3 and 4 Updated Final Safety Analysis Report (UFSAR). 
Specifically, the change would involve the creation of a new type of 
FFD Authorization that would allow construction workers temporary 
access to the construction site pending completion of all pre-access 
FFD requirements. The individual will not be given assignments to work 
on safety or security-related structures, systems, and components prior 
to the completion of the FFD requirements.
    Before any issuance of the proposed license amendment, the NRC will 
need to make the findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and NRC's regulations.
    The NRC has made a proposed determination that the license 
amendment request involves no significant hazards consideration. Under 
the NRC's regulations in 10 CFR 50.92, this means that operation of the 
facility in accordance with the proposed amendment would not (1) 
involve a significant increase in the probability or consequences of an 
accident previously evaluated; or (2) create the possibility of a new 
or different kind of accident from any accident previously evaluated; 
or (3) involve a significant reduction in a margin of safety. As 
required by 10 CFR 50.91(a), the licensee has provided its analysis of 
the issue of no significant hazards consideration, which is presented 
below:

    1. Does the proposed amendment involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed changes to the Vogtle Electric Generating Plant 
(VEGP) 3 and 4 Updated Final Safety Analysis Report (UFSAR) 
commitment related to the construction worker Fitness-for-Duty (FFD) 
program do not affect the design of a system, structure, or 
component (SSC) used to meet the design bases of the nuclear plant. 
Nor do the changes affect the construction or operation of the 
nuclear plant itself, so there is no change to the probability or 
consequences of an accident previously evaluated. Changing the VEGP 
3 and 4 FFD program commitments do not affect prevention and 
mitigation of abnormal events (e.g., accidents, anticipated 
operational occurrences, earthquakes, floods, or turbine missiles) 
or their safety or design analyses. No safety-related SSC or 
function is adversely affected. The changes neither involve nor 
interface with any SSC accident initiator or initiating sequence of 
events, so the probabilities of the accidents evaluated in the UFSAR 
are not affected. Because the changes do not involve any safety-
related SSC or function used to mitigate an accident, the 
consequences of the accidents evaluated in the UFSAR are not 
affected.
    Therefore, the proposed amendment does not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    2. Does the proposed amendment create the possibility of a new 
or different kind of accident from any accident previously 
evaluated?
    The proposed changes to the VEGP 3 and 4 UFSAR commitment 
related to the construction worker FFD program do not affect the 
operation of any systems or equipment that may initiate a new or 
different kind of accident or alter any SSC such that a new accident 
initiator or initiating sequence of events is created. The changes 
do not affect the design of an SSC used to meet the design bases of 
the nuclear plant. Nor do the changes affect the construction or 
operation of the nuclear plant. Consequently, there is no new or 
different kind of accident from any accident previously evaluated. 
The changes do not affect safety-related equipment, nor do they 
affect equipment that, if it failed, could initiate an accident or a 
failure of a fission product barrier. In addition, the changes do 
not result in a new failure mode, malfunction, or sequence of events 
that could affect safety or safety-related equipment.
    No analysis is adversely affected. No system or design function 
or equipment qualification is adversely affected by the changes. 
This activity will not allow for a new fission product release path, 
nor will it result in a new fission product barrier failure mode, 
nor create a new sequence of events that would result in significant 
fuel cladding failures.
    Therefore, the proposed amendment does not create the 
possibility of a new or different kind of accident from any accident 
previously evaluated.
    3. Does the proposed amendment involve a significant reduction 
in a margin of safety?
    Response: No.
    The proposed changes to the VEGP 3 and 4 UFSAR commitment 
related to the construction worker FFD program do not alter any 
safety-related equipment, applicable design codes, code compliance, 
design function, or safety analysis. Consequently, no safety 
analysis or design basis acceptance limit/criterion is challenged or 
exceeded by the proposed changes, thus the margin of safety is not 
reduced.
    Therefore, the proposed amendment does not involve a significant 
reduction in a margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
license amendment request involves no significant hazards 
consideration.
    The NRC is seeking public comments on this proposed determination 
that the license amendment request involves no significant hazards 
consideration. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no 
significant hazards consideration. In addition, the Commission may 
issue the amendment prior to the expiration of the 30-day comment 
period should circumstances change during the 30-day comment period 
such that failure to act in a timely way would result, for example, in 
derating or shutdown of the facility. Should the Commission take action 
prior to the expiration of either the comment period or the notice 
period, the Commission will publish a notice of issuance in the Federal 
Register. Should the Commission make a final no significant hazards 
consideration determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.

III. Opportunity To Request a Hearing and Petition for Leave To 
Intervene

    Within 60 days after the date of publication of this notice, any 
persons (petitioner) whose interest may be affected by this action may 
file a request for a hearing and a petition to intervene (petition) 
with respect to the action. Petitions shall be filed in accordance with 
the Commission's ``Agency Rules of Practice and Procedure'' in 10 CFR 
part 2. Interested persons should consult a current copy of 10 CFR 
2.309,

[[Page 30201]]

which is available at the NRC's PDR, located at One White Flint North, 
Room O1-F21, 11555 Rockville Pike (first floor), Rockville, Maryland 
20852. The NRC's regulations are accessible electronically from the NRC 
Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed within 60 days, the Commission 
or a presiding officer designated by the Commission or by the Chief 
Administrative Judge of the Atomic Safety and Licensing Board Panel, 
will rule on the petition; and the Secretary or the Chief 
Administrative Judge of the Atomic Safety and Licensing Board Panel 
will issue a notice of a hearing or an appropriate order.
    As required by 10 CFR 2.309, a petition shall set forth with 
particularity the interest of the petitioner in the proceeding, and how 
that interest may be affected by the results of the proceeding. The 
petition should specifically explain the reasons why intervention 
should be permitted with particular reference to the following general 
requirements: (1) The name, address, and telephone number of the 
petitioner; (2) the nature of the petitioner's right under the Act to 
be made a party to the proceeding; (3) the nature and extent of the 
petitioner's property, financial, or other interest in the proceeding; 
and (4) the possible effect of any decision or order which may be 
entered in the proceeding on the petitioner's interest. The petition 
must also set forth the specific contentions which the petitioner seeks 
to have litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or fact to be raised or controverted. In addition, the 
petitioner shall provide a brief explanation of the bases for the 
contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on which the petitioner 
intends to rely in proving the contention at the hearing. The 
petitioner must also provide references to those specific sources and 
documents of which the petitioner is aware and on which the petitioner 
intends to rely to establish those facts or expert opinion to support 
its position on the issue. The petition must include sufficient 
information to show that a genuine dispute exists with the applicant on 
a material issue of law or fact. Contentions shall be limited to 
matters within the scope of the proceeding. The contention must be one 
which, if proven, would entitle the petitioner to relief. A petitioner 
who fails to satisfy these requirements with respect to at least one 
contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that person's admitted 
contentions consistent with the NRC's regulations, policies, and 
procedures.
    Petitions for leave to intervene must be filed no later than 60 
days from the date of publication of this notice. Requests for hearing, 
petitions for leave to intervene, and motions for leave to file new or 
amended contentions that are filed after the 60-day deadline will not 
be entertained absent a determination by the presiding officer that the 
filing demonstrates good cause by satisfying the three factors in 10 
CFR 2.309(c)(1)(i) through (iii).
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to decide when the hearing is held. If the final determination is that 
the amendment request involves no significant hazards consideration, 
the Commission may issue the amendment and make it immediately 
effective, notwithstanding the request for a hearing. Any hearing held 
would take place after issuance of the amendment. If the final 
determination is that the amendment request involves a significant 
hazards consideration, then any hearing held would take place before 
the issuance of any amendment unless the Commission finds an imminent 
danger to the health or safety of the public, in which case it will 
issue an appropriate order or rule under 10 CFR part 2.
    A State, local governmental body, Federally-recognized Indian 
Tribe, or agency thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(h)(1).
    The petition should state the nature and extent of the petitioner's 
interest in the proceeding. The petition should be submitted to the 
Commission by August 27, 2018. The petition must be filed in accordance 
with the filing instructions in the ``Electronic Submissions (E-
Filing)'' section of this document, and should meet the requirements 
for petitions set forth in this section, except that under 10 CFR 
2.309(h)(2) a State, local governmental body, or Federally-recognized 
Indian Tribe, or agency thereof does not need to address the standing 
requirements in 10 CFR 2.309(d) if the facility is located within its 
boundaries. A State, local governmental body, Federally-recognized 
Indian Tribe, or agency thereof may also have the opportunity to 
participate under 10 CFR 2.315(c).
    If a hearing is granted, any person who does not wish, or is not 
qualified, to become a party to the proceeding may, in the discretion 
of the presiding officer, be permitted to make a limited appearance 
pursuant to the provisions of 10 CFR 2.315(a). A person making a 
limited appearance may make an oral or written statement of position on 
the issues, but may not otherwise participate in the proceeding. A 
limited appearance may be made at any session of the hearing or at any 
prehearing conference, subject to the limits and conditions as may be 
imposed by the presiding officer. Details regarding the opportunity to 
make a limited appearance will be provided by the presiding officer if 
such sessions are scheduled.

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene (hereinafter 
``petition''), and documents filed by interested governmental entities 
participating under 10 CFR 2.315(c), must be filed in accordance with 
the NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 
FR 46562, August 3, 2012). The E-Filing process requires participants 
to submit and serve all adjudicatory documents over the internet, or in 
some cases to mail copies on electronic storage media. Participants may 
not submit paper copies of their filings unless they seek an exemption 
in accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to request (1) a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition (even 
in instances in which the participant, or its counsel or 
representative, already holds an NRC-issued digital ID certificate). 
Based upon this information, the Secretary will

[[Page 30202]]

establish an electronic docket for the hearing in this proceeding if 
the Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing 
the E-Submittal server are available on the NRC's public website at 
https://www.nrc.gov/site-help/e-submittals/adjudicatory-sub.html. 
Participants may attempt to use other software not listed on the 
website, but should note that the NRC's E-Filing system does not 
support unlisted software, and the NRC Electronic Filing Help Desk will 
not be able to offer assistance in using unlisted software.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a petition. 
Submissions should be in Portable Document Format (PDF). Additional 
guidance on PDF submissions is available on the NRC's public website at 
https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is 
considered complete at the time the documents are submitted through the 
NRC's E-Filing system. To be timely, an electronic filing must be 
submitted to the E-Filing system no later than 11:59 p.m. Eastern Time 
on the due date. Upon receipt of a transmission, the E-Filing system 
time-stamps the document and sends the submitter an email notice 
confirming receipt of the document. The E-Filing system also 
distributes an email notice that provides access to the document to the 
NRC's Office of the General Counsel and any others who have advised the 
Office of the Secretary that they wish to participate in the 
proceeding, so that the filer need not serve the documents on those 
participants separately. Therefore, applicants and other participants 
(or their counsel or representative) must apply for and receive a 
digital ID certificate before a hearing petition to intervene is filed 
so that they can obtain access to the document via the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website at https://www.nrc.gov/site-help/e-submittals.html, by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 7 p.m., Eastern Time, Monday through Friday, excluding government 
holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, 11555 
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and 
Adjudications Staff. Participants filing a document in this manner are 
responsible for serving the document on all other participants. Filing 
is considered complete by first-class mail as of the time of deposit in 
the mail, or by courier, express mail, or expedited delivery service 
upon depositing the document with the provider of the service. A 
presiding officer, having granted an exemption request from using E-
Filing, may require a participant or party to use E-Filing if the 
presiding officer subsequently determines that the reason for granting 
the exemption from use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. 
However, in some instances, a request to intervene will require 
including information on local residence in order to demonstrate a 
proximity assertion of interest in the proceeding. With respect to 
copyrighted works, except for limited excerpts that serve the purpose 
of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    For further details with respect to this action, see the 
application for license amendment dated June 15, 2018.
    Attorney for licensee: Mr. M. Stanford Blanton, Balch & Bingham 
LLP, 1710 Sixth Avenue North, Birmingham, AL 35203-2015.
    NRC Branch Chief: Jennifer Dixon-Herrity.

    Dated at Rockville, Maryland, this 21st day of June, 2018.

    For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of Licensing, Siting, and 
Environmental Analysis, Office of New Reactors.