FreedomWorks, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 29778-29779 [2018-13708]

Download as PDF 29778 Federal Register / Vol. 83, No. 123 / Tuesday, June 26, 2018 / Notices Issued in Washington, DC, on June 15, 2018. Nanda Srinivasan Director, Office of Survey Development and Statistical Integration U.S. Energy Information Administration. [FR Doc. 2018–13678 Filed 6–25–18; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: June 20, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. sradovich on DSK3GMQ082PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1274–001. Applicants: Duke Energy Ohio, Inc., Duke Energy Kentucky, Inc., PJM Interconnection, L.L.C. Description: Compliance filing: DEOK submits compliance filing re: Commission’s 6/1/2018 order to be effective 1/1/2012. Filed Date: 6/20/18. Accession Number: 20180620–5090. Comments Due: 5 p.m. ET 7/11/18. Docket Numbers: ER18–1808–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–06–20 Termination of SA 2998 Exelon-MISO ENRIS Agreement (J371) to be effective 7/31/2018. Filed Date: 6/20/18. Accession Number: 20180620–5021. Comments Due: 5 p.m. ET 7/11/18. Docket Numbers: ER18–1809–000. Applicants: Entergy Arkansas, Inc. Description: Request of Entergy Arkansas, Inc. for Temporary and Limited Waiver of Rate Schedule. Filed Date: 6/19/18. Accession Number: 20180619–5132. Comments Due: 5 p.m. ET 7/10/18. Docket Numbers: ER18–1810–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–06–20_Termination of SA 3050 SC Interconnection-ITCM GIA (J298) to be effective 6/21/2018. Filed Date: 6/20/18. Accession Number: 20180620–5037. Comments Due: 5 p.m. ET 7/11/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern VerDate Sep<11>2014 17:24 Jun 25, 2018 Jkt 244001 time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 6, 2018. Dated: June 19, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–13595 Filed 6–25–18; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2018–13662 Filed 6–25–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14878–000] Federal Energy Regulatory Commission American Municipal Power, Inc.; Notice of Filing FreedomWorks, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications Take notice that on June 15, 2018, American Municipal Power, Inc. submitted an application for approval of revenue requirement for reactive power service in MISO. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to On June 1, 2018, FreedomWorks, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Mt. Storm Pumped Storage Hydro Project to be located near Bismarck in Grant County, West Virginia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An existing Mt. Storm Lake as an upper reservoir with a surface area of 1,200 acres and a storage capacity of 44,000 acre-feet at a surface elevation of approximately 3,200 feet above mean sea level (msl); (2) as many as two new lower reservoirs with a combined surface area of 690 acres and a combined storage capacity of 12,000 acre-feet at a surface elevation of 2,350 to 2,425 feet msl created through construction of new semi-circular dams and/or dikes; (3) as many as eight new 10,000-foot-long, 4-foot-diameter penstocks connecting the upper reservoir and lower reservoir; (4) two new 300-foot-long, 50-foot-wide, 25foot-high powerhouses containing four turbine-generator units with a total rated capacity of 1,000 megawatts; (5) a new transmission line connecting the powerhouse to a nearby electric grid [Docket No. EL18–172–000] PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\26JNN1.SGM 26JNN1 Federal Register / Vol. 83, No. 123 / Tuesday, June 26, 2018 / Notices interconnection point with options to evaluate multiple grid interconnection locations; and (6) appurtenant facilities. The proposed project would have an annual generation of 4,380,000 megawatt-hours. Applicant Contact: Tim Williamson, FreedomWorks, LLC, 525 Wren Lane, Harpers Ferry, WV 25425; phone: 267– 254–6107. FERC Contact: Woohee Choi; phone: (202) 369–6324. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14878–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14878) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 20, 2018. Kimberly D. Bose, Secretary. submitted a filing of proposed costbased revenue requirement for the provision of Reactive Supply and Voltage Control from Generation or Other Sources Service under Schedule 2 of the Midwest Independent Transmission System Operator, Inc. Open Access Transmission Tariff. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 pm Eastern Time on July 10, 2018. Dated: June 20, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–13708 Filed 6–25–18; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2018–13705 Filed 6–25–18; 8:45 am] BILLING CODE 6717–01–P sradovich on DSK3GMQ082PROD with NOTICES DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. EL18–174–000] American Municipal Power, Inc.; Notice of Filing Take notice that on June 19, 2018, American Municipal Power, Inc. VerDate Sep<11>2014 17:24 Jun 25, 2018 Jkt 244001 Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 29779 Docket Numbers: ER13–738–005; ER11–3097–009; ER10–1186–008; ER10–1329–008. Applicants: DTE Electric Company, DTE Energy Trading, Inc., DTE Energy Supply, Inc., St. Paul Cogeneration, LLC. Description: Updated Market Power Analysis for the Central Region of the DTE MBR Entities, et al. Filed Date: 6/18/18. Accession Number: 20180618–5134. Comments Due: 5 p.m. ET 8/17/18. Docket Numbers: ER14–1619–004. Applicants: Cottonwood Energy Company LP. Description: Supplement (Clarification) to May 11, 2018 Cottonwood Energy Company LP tariff filing. Filed Date: 6/18/18. Accession Number: 20180618–5142. Comments Due: 5 p.m. ET 7/9/18. Docket Numbers: ER17–219–007. Applicants: PacifiCorp. Description: Compliance filing: OATT Ancillary Erratum to Compliance Filing in ER17–219 to be effective 7/1/2018. Filed Date: 6/15/18. Accession Number: 20180615–5243. Comments Due: 5 p.m. ET 7/6/18. Docket Numbers: ER17–2088–001: ER16–2035–001; ER16–1833–003; ER14–474–008. Applicants: Apple Blossom Wind, LLC, Black Oak Wind, LLC, Sempra Gas & Power Marketing, LLC, Sempra Generation, LLC. Description: Updated Market Power Analysis for the Central Region of Apple Blossom Wind, LLC, et al. Filed Date: 6/18/18. Accession Number: 20180618–5138. Comments Due: 5 p.m. ET 8/17/18. Docket Numbers: ER18–1190–001. Applicants: Entergy Arkansas, Inc. Description: Tariff Amendment: Amended Distribution Agreement to Reflect Tax Cuts and Jobs Act of 2017 to be effective 6/1/2018. Filed Date: 6/19/18. Accession Number: 20180619–5019. Comments Due: 5 p.m. ET 7/10/18. Docket Numbers: ER18–1267–002. Applicants: South Central MCN LLC. Description: Tariff Amendment: SCMCN ER18–1267 Deficiency Filing Part 1 to be effective 3/31/2018. Filed Date: 6/18/18. Accession Number: 20180618–5089. Comments Due: 5 p.m. ET 6/28/18. Docket Numbers: ER18–1267–003. Applicants: South Central MCN LLC. Description: Tariff Amendment: SCMCN ER18–1267 Deficiency Filing Part 2 to be effective 3/31/2018. Filed Date: 6/18/18. E:\FR\FM\26JNN1.SGM 26JNN1

Agencies

[Federal Register Volume 83, Number 123 (Tuesday, June 26, 2018)]
[Notices]
[Pages 29778-29779]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13708]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14878-000]


FreedomWorks, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On June 1, 2018, FreedomWorks, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Mt. Storm Pumped 
Storage Hydro Project to be located near Bismarck in Grant County, West 
Virginia. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land-disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) An 
existing Mt. Storm Lake as an upper reservoir with a surface area of 
1,200 acres and a storage capacity of 44,000 acre-feet at a surface 
elevation of approximately 3,200 feet above mean sea level (msl); (2) 
as many as two new lower reservoirs with a combined surface area of 690 
acres and a combined storage capacity of 12,000 acre-feet at a surface 
elevation of 2,350 to 2,425 feet msl created through construction of 
new semi-circular dams and/or dikes; (3) as many as eight new 10,000-
foot-long, 4-foot-diameter penstocks connecting the upper reservoir and 
lower reservoir; (4) two new 300-foot-long, 50-foot-wide, 25-foot-high 
powerhouses containing four turbine-generator units with a total rated 
capacity of 1,000 megawatts; (5) a new transmission line connecting the 
powerhouse to a nearby electric grid

[[Page 29779]]

interconnection point with options to evaluate multiple grid 
interconnection locations; and (6) appurtenant facilities. The proposed 
project would have an annual generation of 4,380,000 megawatt-hours.
    Applicant Contact: Tim Williamson, FreedomWorks, LLC, 525 Wren 
Lane, Harpers Ferry, WV 25425; phone: 267-254-6107.
    FERC Contact: Woohee Choi; phone: (202) 369-6324.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14878-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14878) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 20, 2018.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2018-13708 Filed 6-25-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.