Footprint Power LLC; Footprint Power Salem Harbor Operations LLC; Notice of Designation of Commission Staff as Non-Decisional, 29781 [2018-13706]
Download as PDF
Federal Register / Vol. 83, No. 123 / Tuesday, June 26, 2018 / Notices
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 10, 2018.
Dated: June 20, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–13664 Filed 6–25–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IN18–7–000]
Footprint Power LLC; Footprint Power
Salem Harbor Operations LLC; Notice
of Designation of Commission Staff as
Non-Decisional
With respect to an order issued by the
Commission in the above-captioned
docket,1 with the exceptions noted
below, the staff of the Office of
Enforcement are designated as nondecisional in deliberations by the
Commission in this docket.
Accordingly, pursuant to 18 CFR
385.2202 (2017), they will not serve as
advisors to the Commission or take part
in the Commission’s review of any offer
of settlement. Likewise, as nondecisional staff, pursuant to 18 CFR
385.2201 (2017), they are prohibited
from communicating with advisory staff
concerning any deliberations in this
docket.
Exceptions to this designation as nondecisional are:
sradovich on DSK3GMQ082PROD with NOTICES
Jeremy Medovoy
Catherine Collins
Katherine Walsh
Mark Nagle
Benjamin Jarrett
John Karp
Alfred Jasins
Dated: June 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–13706 Filed 6–25–18; 8:45 am]
BILLING CODE 6717–01–P
1 Footprint Power LLC, et al., 163 FERC ¶ 61,198
(2018).
VerDate Sep<11>2014
17:24 Jun 25, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14877–000]
Peak Hour Power, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 17, 2018, Peak Hour Power,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Silver Creek Pumped Storage Project to
be located on Silver Creek Reservoir in
Schuylkill County, Pennsylvania. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new 8,000-foot-long,
125- to 175-foot-high roller-compacted
concrete or rock-filled semi-circular
dam and/or dike forming an upper
reservoir having a surface area of 150
acres and a total storage capacity
between approximately 8,000 and
10,000 acre-feet at a normal maximum
water surface elevation between
approximately 1,650 and 1,750 feet
above mean sea level (msl); (2) a lower
reservoir encompassing the existing
Silver Creek Reservoir and neighboring
abandoned mines land and having a
surface area of 100 acres and a total
storage capacity of 10,000 acre-feet at a
normal maximum water surface
elevation between 1,200 and 1,300 feet
msl; (3) a 3,000-foot-long tunnel
connecting the upper and lower
reservoirs; (4) a powerhouse containing
two turbine units with a total rated
capacity of 250 megawatts; (5) a 2-milelong transmission line connecting to an
existing 230-kilovolt (kV) line or a 4000foot-long transmission line connecting
to an existing 69-kV line; and (6)
appurtenant facilities. Possible initial
fill water would come from local inflow,
including groundwater. The proposed
project would have an annual
generation of 784,750 megawatt-hours.
Applicant Contact: Paul DiRenzo,
Peak Hour Power, LLC, 214 Norwegian
Woods Drive, Pottsville, PA 17901;
phone: 570–617–7810.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
29781
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14877–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14877) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: June 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–13707 Filed 6–25–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16–1299–004.
Applicants: Kinetica Energy Express,
LLC.
Description: Compliance filing
Compliance Filing to be effective 4/12/
2017.
Filed Date: 6/18/18.
Accession Number: 20180618–5054.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: RP18–899–000.
Applicants: Equitrans, L.P.
E:\FR\FM\26JNN1.SGM
26JNN1
Agencies
[Federal Register Volume 83, Number 123 (Tuesday, June 26, 2018)]
[Notices]
[Page 29781]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13706]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IN18-7-000]
Footprint Power LLC; Footprint Power Salem Harbor Operations LLC;
Notice of Designation of Commission Staff as Non-Decisional
With respect to an order issued by the Commission in the above-
captioned docket,\1\ with the exceptions noted below, the staff of the
Office of Enforcement are designated as non-decisional in deliberations
by the Commission in this docket. Accordingly, pursuant to 18 CFR
385.2202 (2017), they will not serve as advisors to the Commission or
take part in the Commission's review of any offer of settlement.
Likewise, as non-decisional staff, pursuant to 18 CFR 385.2201 (2017),
they are prohibited from communicating with advisory staff concerning
any deliberations in this docket.
---------------------------------------------------------------------------
\1\ Footprint Power LLC, et al., 163 FERC ] 61,198 (2018).
---------------------------------------------------------------------------
Exceptions to this designation as non-decisional are:
Jeremy Medovoy
Catherine Collins
Katherine Walsh
Mark Nagle
Benjamin Jarrett
John Karp
Alfred Jasins
Dated: June 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-13706 Filed 6-25-18; 8:45 am]