Download as PDF Federal Register / Vol. 83, No. 123 / Tuesday, June 26, 2018 / Notices docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 10, 2018. Dated: June 20, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–13664 Filed 6–25–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IN18–7–000] Footprint Power LLC; Footprint Power Salem Harbor Operations LLC; Notice of Designation of Commission Staff as Non-Decisional With respect to an order issued by the Commission in the above-captioned docket,1 with the exceptions noted below, the staff of the Office of Enforcement are designated as nondecisional in deliberations by the Commission in this docket. Accordingly, pursuant to 18 CFR 385.2202 (2017), they will not serve as advisors to the Commission or take part in the Commission’s review of any offer of settlement. Likewise, as nondecisional staff, pursuant to 18 CFR 385.2201 (2017), they are prohibited from communicating with advisory staff concerning any deliberations in this docket. Exceptions to this designation as nondecisional are: sradovich on DSK3GMQ082PROD with NOTICES Jeremy Medovoy Catherine Collins Katherine Walsh Mark Nagle Benjamin Jarrett John Karp Alfred Jasins Dated: June 20, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–13706 Filed 6–25–18; 8:45 am] BILLING CODE 6717–01–P 1 Footprint Power LLC, et al., 163 FERC ¶ 61,198 (2018). VerDate Sep<11>2014 17:24 Jun 25, 2018 Jkt 244001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14877–000] Peak Hour Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 17, 2018, Peak Hour Power, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Silver Creek Pumped Storage Project to be located on Silver Creek Reservoir in Schuylkill County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new 8,000-foot-long, 125- to 175-foot-high roller-compacted concrete or rock-filled semi-circular dam and/or dike forming an upper reservoir having a surface area of 150 acres and a total storage capacity between approximately 8,000 and 10,000 acre-feet at a normal maximum water surface elevation between approximately 1,650 and 1,750 feet above mean sea level (msl); (2) a lower reservoir encompassing the existing Silver Creek Reservoir and neighboring abandoned mines land and having a surface area of 100 acres and a total storage capacity of 10,000 acre-feet at a normal maximum water surface elevation between 1,200 and 1,300 feet msl; (3) a 3,000-foot-long tunnel connecting the upper and lower reservoirs; (4) a powerhouse containing two turbine units with a total rated capacity of 250 megawatts; (5) a 2-milelong transmission line connecting to an existing 230-kilovolt (kV) line or a 4000foot-long transmission line connecting to an existing 69-kV line; and (6) appurtenant facilities. Possible initial fill water would come from local inflow, including groundwater. The proposed project would have an annual generation of 784,750 megawatt-hours. Applicant Contact: Paul DiRenzo, Peak Hour Power, LLC, 214 Norwegian Woods Drive, Pottsville, PA 17901; phone: 570–617–7810. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 29781 Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14877–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14877) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 20, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–13707 Filed 6–25–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP16–1299–004. Applicants: Kinetica Energy Express, LLC. Description: Compliance filing Compliance Filing to be effective 4/12/ 2017. Filed Date: 6/18/18. Accession Number: 20180618–5054. Comments Due: 5 p.m. ET 7/2/18. Docket Numbers: RP18–899–000. Applicants: Equitrans, L.P. E:\FR\FM\26JNN1.SGM 26JNN1

Agencies

[Federal Register Volume 83, Number 123 (Tuesday, June 26, 2018)]
[Notices]
[Page 29781]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13706]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IN18-7-000]


Footprint Power LLC; Footprint Power Salem Harbor Operations LLC; 
Notice of Designation of Commission Staff as Non-Decisional

    With respect to an order issued by the Commission in the above-
captioned docket,\1\ with the exceptions noted below, the staff of the 
Office of Enforcement are designated as non-decisional in deliberations 
by the Commission in this docket. Accordingly, pursuant to 18 CFR 
385.2202 (2017), they will not serve as advisors to the Commission or 
take part in the Commission's review of any offer of settlement. 
Likewise, as non-decisional staff, pursuant to 18 CFR 385.2201 (2017), 
they are prohibited from communicating with advisory staff concerning 
any deliberations in this docket.
---------------------------------------------------------------------------

    \1\ Footprint Power LLC, et al., 163 FERC ] 61,198 (2018).
---------------------------------------------------------------------------

    Exceptions to this designation as non-decisional are:

Jeremy Medovoy
Catherine Collins
Katherine Walsh
Mark Nagle
Benjamin Jarrett
John Karp
Alfred Jasins

    Dated: June 20, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-13706 Filed 6-25-18; 8:45 am]
 BILLING CODE 6717-01-P