American Municipal Power, Inc.; Notice of Filing, 29778 [2018-13595]
Download as PDF
29778
Federal Register / Vol. 83, No. 123 / Tuesday, June 26, 2018 / Notices
Issued in Washington, DC, on June 15,
2018.
Nanda Srinivasan
Director, Office of Survey Development and
Statistical Integration U.S. Energy
Information Administration.
[FR Doc. 2018–13678 Filed 6–25–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: June 20, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1274–001.
Applicants: Duke Energy Ohio, Inc.,
Duke Energy Kentucky, Inc., PJM
Interconnection, L.L.C.
Description: Compliance filing: DEOK
submits compliance filing re:
Commission’s 6/1/2018 order to be
effective 1/1/2012.
Filed Date: 6/20/18.
Accession Number: 20180620–5090.
Comments Due: 5 p.m. ET 7/11/18.
Docket Numbers: ER18–1808–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–06–20 Termination of SA 2998
Exelon-MISO ENRIS Agreement (J371)
to be effective 7/31/2018.
Filed Date: 6/20/18.
Accession Number: 20180620–5021.
Comments Due: 5 p.m. ET 7/11/18.
Docket Numbers: ER18–1809–000.
Applicants: Entergy Arkansas, Inc.
Description: Request of Entergy
Arkansas, Inc. for Temporary and
Limited Waiver of Rate Schedule.
Filed Date: 6/19/18.
Accession Number: 20180619–5132.
Comments Due: 5 p.m. ET 7/10/18.
Docket Numbers: ER18–1810–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–06–20_Termination of SA 3050 SC
Interconnection-ITCM GIA (J298) to be
effective 6/21/2018.
Filed Date: 6/20/18.
Accession Number: 20180620–5037.
Comments Due: 5 p.m. ET 7/11/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
VerDate Sep<11>2014
17:24 Jun 25, 2018
Jkt 244001
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 6, 2018.
Dated: June 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–13595 Filed 6–25–18; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2018–13662 Filed 6–25–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14878–000]
Federal Energy Regulatory
Commission
American Municipal Power, Inc.; Notice
of Filing
FreedomWorks, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
Take notice that on June 15, 2018,
American Municipal Power, Inc.
submitted an application for approval of
revenue requirement for reactive power
service in MISO.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
On June 1, 2018, FreedomWorks, LLC,
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Mt. Storm
Pumped Storage Hydro Project to be
located near Bismarck in Grant County,
West Virginia. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An existing Mt. Storm
Lake as an upper reservoir with a
surface area of 1,200 acres and a storage
capacity of 44,000 acre-feet at a surface
elevation of approximately 3,200 feet
above mean sea level (msl); (2) as many
as two new lower reservoirs with a
combined surface area of 690 acres and
a combined storage capacity of 12,000
acre-feet at a surface elevation of 2,350
to 2,425 feet msl created through
construction of new semi-circular dams
and/or dikes; (3) as many as eight new
10,000-foot-long, 4-foot-diameter
penstocks connecting the upper
reservoir and lower reservoir; (4) two
new 300-foot-long, 50-foot-wide, 25foot-high powerhouses containing four
turbine-generator units with a total rated
capacity of 1,000 megawatts; (5) a new
transmission line connecting the
powerhouse to a nearby electric grid
[Docket No. EL18–172–000]
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
E:\FR\FM\26JNN1.SGM
26JNN1
Agencies
[Federal Register Volume 83, Number 123 (Tuesday, June 26, 2018)]
[Notices]
[Page 29778]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13595]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL18-172-000]
American Municipal Power, Inc.; Notice of Filing
Take notice that on June 15, 2018, American Municipal Power, Inc.
submitted an application for approval of revenue requirement for
reactive power service in MISO.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the website that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on July 6, 2018.
Dated: June 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-13595 Filed 6-25-18; 8:45 am]
BILLING CODE 6717-01-P