Combined Notice of Filings #1, 29552-29553 [2018-13497]
Download as PDF
29552
Federal Register / Vol. 83, No. 122 / Monday, June 25, 2018 / Notices
amozie on DSK3GDR082PROD with NOTICES1
Dated: June 18, 2018.
Kimberly D. Bose,
Secretary.
L.L.C., Indianapolis Power & Light
Company, Mountain View Power
Partners, LLC, Mountain View Power
Partners IV, LLC, The Dayton Power and
[FR Doc. 2018–13495 Filed 6–22–18; 8:45 am]
Light Company, 65HK 8me LLC, 67RK
BILLING CODE 6717–01–P
8me LLC, 87RL 8me LLC, Antelope Big
Sky Ranch LLC, Antelope DSR 1, LLC,
Antelope DSR 2, LLC, Bayshore Solar A,
DEPARTMENT OF ENERGY
LLC, Bayshore Solar B, LLC, Bayshore
Federal Energy Regulatory
Solar C, LLC, Beacon Solar 1, LLC,
Commission
Beacon Solar 3, LLC, Beacon Solar 4,
LLC, Central Antelope Dry Ranch C
Combined Notice of Filings #1
LLC, Elevation Solar C LLC, FTS Master
Tenant 1, LLC, Land of the Sky MT,
Take notice that the Commission
received the following electric corporate LLC, Latigo Wind Park, LLC, North
Lancaster Ranch LLC, Pioneer Wind
filings:
Park I LLC, Sandstone Solar LLC, Sierra
Docket Numbers: EC18–63–000.
Solar Greenworks LLC, Solverde 1, LLC,
Applicants: Bayou Cove Peaking
Summer Solar LLC, Western Antelope
Power LLC, Big Cajun I Peaking Power
Blue Sky Ranch A LLC, Western
LLC, CottonWood Energy Company LP,
Antelope Blue Sky Ranch B LLC,
Louisiana Generating LLC, NRG
Western Antelope Dry Ranch LLC.
Sterlington Power LLC, NRG
Description: Notice of Non-Material
Cottonwood Tenant LLC, NRG Power
Change in Status of AES MBR Affiliates.
Marketing LLC, Cleco Cajun LLC, Cleco
Filed Date: 6/15/18.
Corporate Holdings LLC, Cleco Group
Accession Number: 20180615–5139.
LLC, Cleco Partners L.P.
Comments Due: 5 p.m. ET 7/6/18.
Description: Response of Bayou Cove
Docket Numbers: ER13–102–015.
Peaking Power, LLC, et al. to May 16,
Applicants: New York Independent
2018 Deficiency Letter.
System Operator, Inc.
Filed Date: 6/15/18.
Description: Compliance filing:
Accession Number: 20180615–5249.
Correction of tariff record for 4/1/16
Comments Due: 5 p.m. ET 7/6/18.
effective date—Order 1000 to be
Docket Numbers: EC18–104–000.
effective 4/1/2016.
Applicants: Vectren Corporation,
Filed Date: 6/18/18.
CenterPoint Energy.
Accession Number: 20180618–5055.
Description: Joint Application for
Comments Due: 5 p.m. ET 7/9/18.
Authorization Under Section 203 of the
Docket Numbers: ER18–1160–001.
Federal Power Act of Vectren
Applicants: NRG Cottonwood Tenant
Corporation, et al.
LLC.
Filed Date: 6/15/18.
Description: Tariff Amendment:
Accession Number: 20180615–5252.
Comments Due: 5 p.m. ET 7/6/18.
Response to Request for Additional
Information to be effective 4/1/2018.
Take notice that the Commission
Filed Date: 6/18/18.
received the following electric rate
Accession Number: 20180618–5078.
filings:
Comments Due: 5 p.m. ET 7/9/18.
Docket Numbers: ER10–3145–011;
Docket Numbers: ER18–1260–001.
ER10–3116–011; ER13–1544–008;
Applicants: Midcontinent
ER10–3120–011; ER11–2036–011;
ER16–930–005; ER10–3128–011; ER10– Independent System Operator, Inc.,
1800–012; ER10–3136–011; ER11–2701– Entergy Services, Inc.
Description: Tariff Amendment:
013; ER10–1728–011; ER15–1582–011;
2018–06–18_Entergy Deficiency
ER15–1579–010; ER15–1914–012;
Response re Att O Revisions For Tax
ER16–1255–006; ER16–2201–005;
Rate Change to be effective 6/1/2018.
ER16–1955–006; ER17–1864–004;
Filed Date: 6/18/18.
ER17–1871–004; ER17–1909–004;
Accession Number: 20180618–5079.
ER17–544–005; ER17–306–005; ER16–
Comments Due: 5 p.m. ET 7/9/18.
1738–006; ER16–474–007; ER16–1901–
Docket Numbers: ER18–1769–001.
006; ER16–468–006; ER15–2668–001;
Applicants: PJM Interconnection,
ER15–2679–008; ER16–2578–006;
L.L.C.
ER16–2541–005; ER15–2680–008;
Description: Tariff Amendment:
ER15–762–012; ER16–2224–005; ER16–
Supplemental Filing for First Revised
890–007; ER15–760–011; ER16–1973–
ISA No. 4623, Queue No. AC1–152
006; ER16–1956–006.
AC1–172 to be effective 5/10/2018.
Applicants: AES Alamitos, LLC, AES
Filed Date: 6/15/18.
Energy Storage, LLC, AES ES Tait, LLC,
Accession Number: 20180615–5167.
AES Huntington Beach, L.L.C., AES
Comments Due: 5 p.m. ET 7/6/18.
Laurel Mountain, LLC, AES Ohio
Generation, LLC, AES Redondo Beach,
Docket Numbers: ER18–1790–000.
VerDate Sep<11>2014
17:58 Jun 22, 2018
Jkt 244001
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Applicants: Puget Sound Energy, Inc.
Description: § 205(d) Rate Filing:
Powerex PTP SA 880 to be effective
9/1/2018.
Filed Date: 6/15/18.
Accession Number: 20180615–5166.
Comments Due: 5 p.m. ET 7/6/18.
Docket Numbers: ER18–1791–000.
Applicants: Duke Energy Florida,
LLC.
Description: Tariff Cancellation: DEF
Notice of Termination (US EcoGen Polk,
LLC LGIA SA–180) to be effective 8/15/
2018.
Filed Date: 6/15/18.
Accession Number: 20180615–5168.
Comments Due: 5 p.m. ET 7/6/18.
Docket Numbers: ER18–1792–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: RS
560 Hurricane Filing to Comply With
Docket No. ER18–1254–000 to be
effective 8/15/2018.
Filed Date: 6/15/18.
Accession Number: 20180615–5246.
Comments Due: 5 p.m. ET 7/6/18.
Docket Numbers: ER18–1793–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA SA No. 3202;
Queue No. W3–077 to be effective 4/30/
2014.
Filed Date: 6/18/18.
Accession Number: 20180618–5053.
Comments Due: 5 p.m. ET 7/9/18.
Docket Numbers: ER18–1794–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
Bentonville PSA to be effective 5/31/
2018.
Filed Date: 6/18/18.
Accession Number: 20180618–5070.
Comments Due: 5 p.m. ET 7/9/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–40–000.
Applicants: ITC Midwest LLC.
Description: Application under
Section 204 of the Federal Power Act of
ITC Midwest LLC for authorization to
issue debt securities.
Filed Date: 6/15/18.
Accession Number: 20180615–5150.
Comments Due: 5 p.m. ET 7/6/18.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM18–10–000.
Applicants: Cooperative Energy.
Description: Response of Cooperative
Energy to May 18, 2018 Deficiency
Letter.
Filed Date: 6/18/18.
Accession Number: 20180618–5056.
E:\FR\FM\25JNN1.SGM
25JNN1
Federal Register / Vol. 83, No. 122 / Monday, June 25, 2018 / Notices
Comments Due: 5 p.m. ET 7/16/18.
Docket Numbers: QM18–13–000.
Applicants: Sunflower Electric Power
Corporation, Mid-Kansas Electric
Company, Inc.
Description: Application of Sunflower
Electric Power Corporation, et al. to
Terminate Mandatory PURPA Purchase
Obligation.
Filed Date: 6/15/18.
Accession Number: 20180615–5214.
Comments Due: 5 p.m. ET 7/13/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–13497 Filed 6–22–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–499–000]
amozie on DSK3GDR082PROD with NOTICES1
Notice of Application: Rover Pipeline
LLC
On June 8, 2018, Rover Pipeline LLC
(Rover), 1300 Main Street, Houston,
Texas 77002, filed an application
pursuant to section 7(c) of the Natural
Gas Act (NGA), in Docket No. CP18–
499–000, for authorization to construct
and operate a new meter station on
Rover’s Majorsville Lateral in Marshall
County, West Virginia (Iron Bank Meter
Station Project). Rover states that the
project will consist of an ultrasonic
meter skid and other ancillary facilities.
Rover asserts that the Iron Bank Meter
Station will receive up to 500,000
VerDate Sep<11>2014
17:58 Jun 22, 2018
Jkt 244001
dekatherms per day of natural gas from
an interconnect with the gathering
facilities of APP Midstream, LLC (APP).
Rover estimates the cost of the project
to be $6,781,644, all to be reimbursed by
APP, all as more fully set forth in the
request which is on file with the
Commission and open to public
inspection. The filing may be viewed on
the web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the
application should be directed to Blair
Lichtenwalter, Senior Director,
Regulatory Affairs, Rover Pipeline LLC,
1300 Main Street, Houston, Texas
77002, at (713) 989–2605.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule will serve to notify
federal and state agencies of the timing
for the completion of all necessary
reviews, and the subsequent need to
complete all federal authorizations
within 90 days of the date of issuance
of the Commission staff’s EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
29553
by all other parties. A party must submit
5 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: July 9, 2018.
Dated: June 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–13494 Filed 6–22–18; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\25JNN1.SGM
25JNN1
Agencies
[Federal Register Volume 83, Number 122 (Monday, June 25, 2018)]
[Notices]
[Pages 29552-29553]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13497]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-63-000.
Applicants: Bayou Cove Peaking Power LLC, Big Cajun I Peaking Power
LLC, CottonWood Energy Company LP, Louisiana Generating LLC, NRG
Sterlington Power LLC, NRG Cottonwood Tenant LLC, NRG Power Marketing
LLC, Cleco Cajun LLC, Cleco Corporate Holdings LLC, Cleco Group LLC,
Cleco Partners L.P.
Description: Response of Bayou Cove Peaking Power, LLC, et al. to
May 16, 2018 Deficiency Letter.
Filed Date: 6/15/18.
Accession Number: 20180615-5249.
Comments Due: 5 p.m. ET 7/6/18.
Docket Numbers: EC18-104-000.
Applicants: Vectren Corporation, CenterPoint Energy.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Vectren Corporation, et al.
Filed Date: 6/15/18.
Accession Number: 20180615-5252.
Comments Due: 5 p.m. ET 7/6/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-3145-011; ER10-3116-011; ER13-1544-008; ER10-
3120-011; ER11-2036-011; ER16-930-005; ER10-3128-011; ER10-1800-012;
ER10-3136-011; ER11-2701-013; ER10-1728-011; ER15-1582-011; ER15-1579-
010; ER15-1914-012; ER16-1255-006; ER16-2201-005; ER16-1955-006; ER17-
1864-004; ER17-1871-004; ER17-1909-004; ER17-544-005; ER17-306-005;
ER16-1738-006; ER16-474-007; ER16-1901-006; ER16-468-006; ER15-2668-
001; ER15-2679-008; ER16-2578-006; ER16-2541-005; ER15-2680-008; ER15-
762-012; ER16-2224-005; ER16-890-007; ER15-760-011; ER16-1973-006;
ER16-1956-006.
Applicants: AES Alamitos, LLC, AES Energy Storage, LLC, AES ES
Tait, LLC, AES Huntington Beach, L.L.C., AES Laurel Mountain, LLC, AES
Ohio Generation, LLC, AES Redondo Beach, L.L.C., Indianapolis Power &
Light Company, Mountain View Power Partners, LLC, Mountain View Power
Partners IV, LLC, The Dayton Power and Light Company, 65HK 8me LLC,
67RK 8me LLC, 87RL 8me LLC, Antelope Big Sky Ranch LLC, Antelope DSR 1,
LLC, Antelope DSR 2, LLC, Bayshore Solar A, LLC, Bayshore Solar B, LLC,
Bayshore Solar C, LLC, Beacon Solar 1, LLC, Beacon Solar 3, LLC, Beacon
Solar 4, LLC, Central Antelope Dry Ranch C LLC, Elevation Solar C LLC,
FTS Master Tenant 1, LLC, Land of the Sky MT, LLC, Latigo Wind Park,
LLC, North Lancaster Ranch LLC, Pioneer Wind Park I LLC, Sandstone
Solar LLC, Sierra Solar Greenworks LLC, Solverde 1, LLC, Summer Solar
LLC, Western Antelope Blue Sky Ranch A LLC, Western Antelope Blue Sky
Ranch B LLC, Western Antelope Dry Ranch LLC.
Description: Notice of Non-Material Change in Status of AES MBR
Affiliates.
Filed Date: 6/15/18.
Accession Number: 20180615-5139.
Comments Due: 5 p.m. ET 7/6/18.
Docket Numbers: ER13-102-015.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: Correction of tariff record for 4/
1/16 effective date--Order 1000 to be effective 4/1/2016.
Filed Date: 6/18/18.
Accession Number: 20180618-5055.
Comments Due: 5 p.m. ET 7/9/18.
Docket Numbers: ER18-1160-001.
Applicants: NRG Cottonwood Tenant LLC.
Description: Tariff Amendment: Response to Request for Additional
Information to be effective 4/1/2018.
Filed Date: 6/18/18.
Accession Number: 20180618-5078.
Comments Due: 5 p.m. ET 7/9/18.
Docket Numbers: ER18-1260-001.
Applicants: Midcontinent Independent System Operator, Inc., Entergy
Services, Inc.
Description: Tariff Amendment: 2018-06-18_Entergy Deficiency
Response re Att O Revisions For Tax Rate Change to be effective 6/1/
2018.
Filed Date: 6/18/18.
Accession Number: 20180618-5079.
Comments Due: 5 p.m. ET 7/9/18.
Docket Numbers: ER18-1769-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Supplemental Filing for First
Revised ISA No. 4623, Queue No. AC1-152 AC1-172 to be effective 5/10/
2018.
Filed Date: 6/15/18.
Accession Number: 20180615-5167.
Comments Due: 5 p.m. ET 7/6/18.
Docket Numbers: ER18-1790-000.
Applicants: Puget Sound Energy, Inc.
Description: Sec. 205(d) Rate Filing: Powerex PTP SA 880 to be
effective 9/1/2018.
Filed Date: 6/15/18.
Accession Number: 20180615-5166.
Comments Due: 5 p.m. ET 7/6/18.
Docket Numbers: ER18-1791-000.
Applicants: Duke Energy Florida, LLC.
Description: Tariff Cancellation: DEF Notice of Termination (US
EcoGen Polk, LLC LGIA SA-180) to be effective 8/15/2018.
Filed Date: 6/15/18.
Accession Number: 20180615-5168.
Comments Due: 5 p.m. ET 7/6/18.
Docket Numbers: ER18-1792-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: RS 560 Hurricane Filing to
Comply With Docket No. ER18-1254-000 to be effective 8/15/2018.
Filed Date: 6/15/18.
Accession Number: 20180615-5246.
Comments Due: 5 p.m. ET 7/6/18.
Docket Numbers: ER18-1793-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to WMPA SA No.
3202; Queue No. W3-077 to be effective 4/30/2014.
Filed Date: 6/18/18.
Accession Number: 20180618-5053.
Comments Due: 5 p.m. ET 7/9/18.
Docket Numbers: ER18-1794-000.
Applicants: Southwestern Electric Power Company.
Description: Sec. 205(d) Rate Filing: Bentonville PSA to be
effective 5/31/2018.
Filed Date: 6/18/18.
Accession Number: 20180618-5070.
Comments Due: 5 p.m. ET 7/9/18.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES18-40-000.
Applicants: ITC Midwest LLC.
Description: Application under Section 204 of the Federal Power Act
of ITC Midwest LLC for authorization to issue debt securities.
Filed Date: 6/15/18.
Accession Number: 20180615-5150.
Comments Due: 5 p.m. ET 7/6/18.
Take notice that the Commission received the following PURPA
210(m)(3) filings:
Docket Numbers: QM18-10-000.
Applicants: Cooperative Energy.
Description: Response of Cooperative Energy to May 18, 2018
Deficiency Letter.
Filed Date: 6/18/18.
Accession Number: 20180618-5056.
[[Page 29553]]
Comments Due: 5 p.m. ET 7/16/18.
Docket Numbers: QM18-13-000.
Applicants: Sunflower Electric Power Corporation, Mid-Kansas
Electric Company, Inc.
Description: Application of Sunflower Electric Power Corporation,
et al. to Terminate Mandatory PURPA Purchase Obligation.
Filed Date: 6/15/18.
Accession Number: 20180615-5214.
Comments Due: 5 p.m. ET 7/13/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-13497 Filed 6-22-18; 8:45 am]
BILLING CODE 6717-01-P