Download as PDF Federal Register / Vol. 83, No. 122 / Monday, June 25, 2018 / Notices Comments Due: 5 p.m. ET 7/16/18. Docket Numbers: QM18–13–000. Applicants: Sunflower Electric Power Corporation, Mid-Kansas Electric Company, Inc. Description: Application of Sunflower Electric Power Corporation, et al. to Terminate Mandatory PURPA Purchase Obligation. Filed Date: 6/15/18. Accession Number: 20180615–5214. Comments Due: 5 p.m. ET 7/13/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 18, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–13497 Filed 6–22–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–499–000] amozie on DSK3GDR082PROD with NOTICES1 Notice of Application: Rover Pipeline LLC On June 8, 2018, Rover Pipeline LLC (Rover), 1300 Main Street, Houston, Texas 77002, filed an application pursuant to section 7(c) of the Natural Gas Act (NGA), in Docket No. CP18– 499–000, for authorization to construct and operate a new meter station on Rover’s Majorsville Lateral in Marshall County, West Virginia (Iron Bank Meter Station Project). Rover states that the project will consist of an ultrasonic meter skid and other ancillary facilities. Rover asserts that the Iron Bank Meter Station will receive up to 500,000 VerDate Sep<11>2014 17:58 Jun 22, 2018 Jkt 244001 dekatherms per day of natural gas from an interconnect with the gathering facilities of APP Midstream, LLC (APP). Rover estimates the cost of the project to be $6,781,644, all to be reimbursed by APP, all as more fully set forth in the request which is on file with the Commission and open to public inspection. The filing may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding the application should be directed to Blair Lichtenwalter, Senior Director, Regulatory Affairs, Rover Pipeline LLC, 1300 Main Street, Houston, Texas 77002, at (713) 989–2605. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 29553 by all other parties. A party must submit 5 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: July 9, 2018. Dated: June 18, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–13494 Filed 6–22–18; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\25JNN1.SGM 25JNN1

Agencies

[Federal Register Volume 83, Number 122 (Monday, June 25, 2018)]
[Notices]
[Page 29553]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13494]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-499-000]


Notice of Application: Rover Pipeline LLC

    On June 8, 2018, Rover Pipeline LLC (Rover), 1300 Main Street, 
Houston, Texas 77002, filed an application pursuant to section 7(c) of 
the Natural Gas Act (NGA), in Docket No. CP18-499-000, for 
authorization to construct and operate a new meter station on Rover's 
Majorsville Lateral in Marshall County, West Virginia (Iron Bank Meter 
Station Project). Rover states that the project will consist of an 
ultrasonic meter skid and other ancillary facilities. Rover asserts 
that the Iron Bank Meter Station will receive up to 500,000 dekatherms 
per day of natural gas from an interconnect with the gathering 
facilities of APP Midstream, LLC (APP). Rover estimates the cost of the 
project to be $6,781,644, all to be reimbursed by APP, all as more 
fully set forth in the request which is on file with the Commission and 
open to public inspection. The filing may be viewed on the web at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding the application should be directed to Blair 
Lichtenwalter, Senior Director, Regulatory Affairs, Rover Pipeline LLC, 
1300 Main Street, Houston, Texas 77002, at (713) 989-2605.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule will serve to notify federal and state agencies of the timing 
for the completion of all necessary reviews, and the subsequent need to 
complete all federal authorizations within 90 days of the date of 
issuance of the Commission staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: July 9, 2018.

    Dated: June 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-13494 Filed 6-22-18; 8:45 am]
 BILLING CODE 6717-01-P