Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Cheekerton, LLC, 28638-28639 [2018-13202]
Download as PDF
28638
Federal Register / Vol. 83, No. 119 / Wednesday, June 20, 2018 / Notices
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: June 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–13204 Filed 6–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–101–000.
Applicants: Langdon Wind, LLC,
Langdon Renewables, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act and Request for
Expedited Action of Langdon Wind,
LLC, et. al.
Filed Date: 6/13/18.
Accession Number: 20180613–5026.
Comments Due: 5 p.m. ET 7/5/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–99–000.
Applicants: Meadowlark Wind I LLC.
Description: Self-Certification of
Exempt Wholesale Generator Status of
Meadowlark Wind I LLC.
Filed Date: 6/13/18.
Accession Number: 20180613–5101.
Comments Due: 5 p.m. ET 7/5/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–211–004.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Compliance filing: MAIT
submits compliance filing to the
VerDate Sep<11>2014
17:58 Jun 19, 2018
Jkt 244001
Commission’s 5/21/18 order in ER17–
211 to be effective 5/1/2018.
Filed Date: 6/13/18.
Accession Number: 20180613–5051.
Comments Due: 5 p.m. ET 7/5/18.
Docket Numbers: ER18–1244–001.
Applicants: Emera Maine.
Description: Tariff Amendment:
Deficiency Response (ER18–1213–000
and ER18–1244–000) to be effective 6/
1/2018.
Filed Date: 6/13/18.
Accession Number: 20180613–5010.
Comments Due: 5 p.m. ET 7/5/18.
Docket Numbers: ER18–1775–000.
Applicants: 64KT 8me LLC.
Description: Baseline eTariff Filing:
Application for Market Based Rate to be
effective 6/14/2018.
Filed Date: 6/13/18.
Accession Number: 20180613–5034.
Comments Due: 5 p.m. ET 7/5/18.
Docket Numbers: ER18–1776–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3126R3 WAPA NITSA and NOA to be
effective 6/1/2018.
Filed Date: 6/13/18.
Accession Number: 20180613–5046.
Comments Due: 5 p.m. ET 7/5/18.
Docket Numbers: ER18–1777–000.
Applicants: Meadowlark Wind I LLC.
Description: Baseline eTariff Filing:
MBR Tariff Filing to be effective 8/12/
2018.
Filed Date: 6/13/18.
Accession Number: 20180613–5100.
Comments Due: 5 p.m. ET 7/5/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–13199 Filed 6–19–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–1772–000]
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: Cheekerton, LLC
This is a supplemental notice in the
above-referenced proceeding of
Cheekerton, LLC‘s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 3, 2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
E:\FR\FM\20JNN1.SGM
20JNN1
Federal Register / Vol. 83, No. 119 / Wednesday, June 20, 2018 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: June 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–13202 Filed 6–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR18–9–000]
White Cliffs Pipeline, L.L.C.; Notice of
Designation of Commission Staff as
Non-Decisional
With respect to the proceedings
pending before the Commission in the
above-captioned docket, Dr. Emma
Nicholson from the Office of Energy
Policy and Innovation is designated as
non-decisional in deliberations by the
Commission in this docket.
Accordingly, pursuant to 18 CFR
385.2202 (2017), as non-decisional staff,
Dr. Nicholson will not participate in an
advisory capacity in the Commission’s
review of any future filings in the abovereferenced docket, including offers of
settlement or settlement agreements.
Likewise, pursuant to 18 CFR 385.2201
(2017), Dr. Nicholson is prohibited from
communicating with advisory staff
concerning any deliberations in these
dockets.
Dated: June 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–13207 Filed 6–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–77–002]
sradovich on DSK3GMQ082PROD with NOTICES
Notice of Application; Tennessee Gas
Pipeline Company, L.L.C.
Take notice that on May 24, 2018,
Tennessee Gas Pipeline Company,
L.L.C. (Tennessee), 1001 Louisiana
Street, Houston, Texas 77002, filed a
petition to amend the Order Issuing
Certificate and Approving
Abandonment (Order), issued in Docket
No. CP15–77–000 on September 6, 2016
for the Broad Run Expansion Project.
Specifically, Tennessee requests to
amend the portions of the Order
regarding the abandonment of certain
compressor units at Compressor Station
114 (CS 114), located in Boyd County,
VerDate Sep<11>2014
17:58 Jun 19, 2018
Jkt 244001
Kentucky. Tennessee proposes that,
rather than abandoning seven
compressor units at CS 114 by removal
as originally authorized in the Order, it
be allowed to retain the seven
compressor units as reserve
compression for use when the other
compressor units at CS 114 are not
available, such as during periods of
maintenance or repair.
The filing may be viewed on the web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Ben
Carranza, Director, Regulatory, 1001
Louisiana Street, Suite 1000, Houston,
Texas 77002 or via telephone at (713)
420–5535 or email at ben_carranza@
kindermorgan.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
28639
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
E:\FR\FM\20JNN1.SGM
20JNN1
Agencies
[Federal Register Volume 83, Number 119 (Wednesday, June 20, 2018)]
[Notices]
[Pages 28638-28639]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13202]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER18-1772-000]
Supplemental Notice That Initial Market-Based Rate Filing
Includes Request for Blanket Section 204 Authorization: Cheekerton, LLC
This is a supplemental notice in the above-referenced proceeding of
Cheekerton, LLC`s application for market-based rate authority, with an
accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is July 3, 2018.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected]. or call
[[Page 28639]]
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: June 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-13202 Filed 6-19-18; 8:45 am]
BILLING CODE 6717-01-P