Download as PDF 28638 Federal Register / Vol. 83, No. 119 / Wednesday, June 20, 2018 / Notices of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 14, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–13204 Filed 6–19–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission sradovich on DSK3GMQ082PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–101–000. Applicants: Langdon Wind, LLC, Langdon Renewables, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act and Request for Expedited Action of Langdon Wind, LLC, et. al. Filed Date: 6/13/18. Accession Number: 20180613–5026. Comments Due: 5 p.m. ET 7/5/18. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG18–99–000. Applicants: Meadowlark Wind I LLC. Description: Self-Certification of Exempt Wholesale Generator Status of Meadowlark Wind I LLC. Filed Date: 6/13/18. Accession Number: 20180613–5101. Comments Due: 5 p.m. ET 7/5/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–211–004. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: Compliance filing: MAIT submits compliance filing to the VerDate Sep<11>2014 17:58 Jun 19, 2018 Jkt 244001 Commission’s 5/21/18 order in ER17– 211 to be effective 5/1/2018. Filed Date: 6/13/18. Accession Number: 20180613–5051. Comments Due: 5 p.m. ET 7/5/18. Docket Numbers: ER18–1244–001. Applicants: Emera Maine. Description: Tariff Amendment: Deficiency Response (ER18–1213–000 and ER18–1244–000) to be effective 6/ 1/2018. Filed Date: 6/13/18. Accession Number: 20180613–5010. Comments Due: 5 p.m. ET 7/5/18. Docket Numbers: ER18–1775–000. Applicants: 64KT 8me LLC. Description: Baseline eTariff Filing: Application for Market Based Rate to be effective 6/14/2018. Filed Date: 6/13/18. Accession Number: 20180613–5034. Comments Due: 5 p.m. ET 7/5/18. Docket Numbers: ER18–1776–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3126R3 WAPA NITSA and NOA to be effective 6/1/2018. Filed Date: 6/13/18. Accession Number: 20180613–5046. Comments Due: 5 p.m. ET 7/5/18. Docket Numbers: ER18–1777–000. Applicants: Meadowlark Wind I LLC. Description: Baseline eTariff Filing: MBR Tariff Filing to be effective 8/12/ 2018. Filed Date: 6/13/18. Accession Number: 20180613–5100. Comments Due: 5 p.m. ET 7/5/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 13, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–13199 Filed 6–19–18; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–1772–000] Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Cheekerton, LLC This is a supplemental notice in the above-referenced proceeding of Cheekerton, LLC‘s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is July 3, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call E:\FR\FM\20JNN1.SGM 20JNN1 Federal Register / Vol. 83, No. 119 / Wednesday, June 20, 2018 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 13, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–13202 Filed 6–19–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR18–9–000] White Cliffs Pipeline, L.L.C.; Notice of Designation of Commission Staff as Non-Decisional With respect to the proceedings pending before the Commission in the above-captioned docket, Dr. Emma Nicholson from the Office of Energy Policy and Innovation is designated as non-decisional in deliberations by the Commission in this docket. Accordingly, pursuant to 18 CFR 385.2202 (2017), as non-decisional staff, Dr. Nicholson will not participate in an advisory capacity in the Commission’s review of any future filings in the abovereferenced docket, including offers of settlement or settlement agreements. Likewise, pursuant to 18 CFR 385.2201 (2017), Dr. Nicholson is prohibited from communicating with advisory staff concerning any deliberations in these dockets. Dated: June 14, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–13207 Filed 6–19–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–77–002] sradovich on DSK3GMQ082PROD with NOTICES Notice of Application; Tennessee Gas Pipeline Company, L.L.C. Take notice that on May 24, 2018, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed a petition to amend the Order Issuing Certificate and Approving Abandonment (Order), issued in Docket No. CP15–77–000 on September 6, 2016 for the Broad Run Expansion Project. Specifically, Tennessee requests to amend the portions of the Order regarding the abandonment of certain compressor units at Compressor Station 114 (CS 114), located in Boyd County, VerDate Sep<11>2014 17:58 Jun 19, 2018 Jkt 244001 Kentucky. Tennessee proposes that, rather than abandoning seven compressor units at CS 114 by removal as originally authorized in the Order, it be allowed to retain the seven compressor units as reserve compression for use when the other compressor units at CS 114 are not available, such as during periods of maintenance or repair. The filing may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Ben Carranza, Director, Regulatory, 1001 Louisiana Street, Suite 1000, Houston, Texas 77002 or via telephone at (713) 420–5535 or email at ben_carranza@ kindermorgan.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 28639 all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please E:\FR\FM\20JNN1.SGM 20JNN1

Agencies

[Federal Register Volume 83, Number 119 (Wednesday, June 20, 2018)]
[Notices]
[Pages 28638-28639]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-13202]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER18-1772-000]


Supplemental Notice That Initial Market-Based Rate Filing 
Includes Request for Blanket Section 204 Authorization: Cheekerton, LLC

    This is a supplemental notice in the above-referenced proceeding of 
Cheekerton, LLC`s application for market-based rate authority, with an 
accompanying rate tariff, noting that such application includes a 
request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is July 3, 2018.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected]. or call

[[Page 28639]]

(866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: June 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-13202 Filed 6-19-18; 8:45 am]
BILLING CODE 6717-01-P