Notice of Application Tendered for Filing With the Commission; PacifiCorp, 28218-28219 [2018-12945]
Download as PDF
28218
Federal Register / Vol. 83, No. 117 / Monday, June 18, 2018 / Notices
following, together with supporting
documents:
(i) A statement from any person
setting forth reasons why it would not
be in the best interest of the United
States to grant the proposed license; or
(ii) An application for a nonexclusive
license to the invention, in which
applicant states that it already has
brought the invention to practical
application or is likely to bring the
invention to practical application
expeditiously.
The proposed license would be
exclusive, subject to a license and other
rights retained by the United States, and
subject to a negotiated royalty. The
exclusive fields of use are: For use in
internal combustion engines. DOE will
review all timely written responses to
this notice, and will grant the license if,
after expiration of the 15-day notice
period, and after consideration of any
written responses to this notice, a
determination is made in accordance
with 35 U.S.C. 209(c) that the license is
in the public interest.
Dated: June 4, 2018.
Sean I. Plasynski,
Director (Acting), National Energy
Technology Laboratory.
of Information and Regulatory Affairs,
Office of Management and Budget, New
Executive Office Building, Room 10102,
735 17th Street NW, Washington DC
20503, and to Brian Lally, GC–62, U.S.
Department of Energy, 1000
Independence Ave. SW, Washington,
DC 20585, by fax at (202) 586–2805, or
by email at brian.lally@hq.doe.gov.
FOR FURTHER INFORMATION CONTACT:
Brian Lally, (202) 586–8298,
brian.lally@hq.doe.gov.
SUPPLEMENTARY INFORMATION: This
information collection request contains:
(1) OMB No. 1910–0800; (2) Information
Collection Request Title: Legal
Collections; (3) Type of Request:
Renewal and Revision; (4) Purpose: To
continue to maintain DOE control and
oversight of DOE and its contractor’s
invention reporting and related matters;
(5) Annual Estimated Number of
Respondents: 1700; (6) Annual
Estimated Number of Total Responses:
2040; (7) Annual Estimated Number of
Burden Hours: 13,260; (8) Annual
Estimated Reporting and Recordkeeping
Cost Burden: $994,500.00.
Statutory Authority: 42 U.S.C. 5908(a) (b)
and (c); 37 CFR part 404; 10 CFR part 784.
Issued in Washington, DC, on June 12,
2018.
Brian Lally,
Assistant General Counsel for Technology
Transfer, and Intellectual Property, U.S.
Department of Energy.
[FR Doc. 2018–13010 Filed 6–15–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Agency Information Collection
Extension
[FR Doc. 2018–13012 Filed 6–15–18; 8:45 am]
U.S. Department of Energy.
ACTION: Submission for Office of
Management and Budget (OMB) review;
comment request.
DEPARTMENT OF ENERGY
BILLING CODE 6450–01–P
AGENCY:
The Department of Energy
(DOE) has submitted an information
collection request to the OMB for
extension under the provisions of the
Paperwork Reduction Act of 1995. The
information collection requests a threeyear extension of its Legal Collection,
OMB Control Number 1910–0800. The
proposed collection will enable DOE to
continue to maintain DOE control and
oversight of DOE contractor’s invention
reporting and related matters.
DATES: Comments regarding this
collection must be received on or before
July 18, 2018. If you anticipate that you
will be submitting comments, but find
it difficult to do so within the period of
time allowed by this notice, please
advise the OMB Desk Officer of your
intention to make a submission as soon
as possible. The Desk Officer may be
telephoned at (202) 395–4718.
ADDRESSES: Written comments should
be sent to the: DOE Desk Officer, Office
amozie on DSK3GDR082PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
18:00 Jun 15, 2018
Jkt 244001
Federal Energy Regulatory
Commission
[Project No. 1744–041]
Notice of Application Tendered for
Filing With the Commission;
PacifiCorp
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major
Constructed Project.
b. Project No.: 1744–041.
c. Date filed: May 30, 2018.
d. Applicant: PacifiCorp.
e. Name of Project: Weber
Hydroelectric Project.
f. Location: On the Weber River, in
Weber, Davis, and Morgan Counties,
Utah. The project occupies 14.94 acres
of United States lands administered by
the U.S. Forest Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
h. Applicant Contact: Eve Davies,
PacifiCorp—Renewable Resources, 1407
West North Temple, Suite 210, Salt Lake
City, UT 84116; (801) 220–2245; email—
eve.davies@pacificorp.com.
i. FERC Contact: Evan Williams at
(202) 502–8462; or email at
evan.williams@ferc.gov.
j. The application is not ready for
environmental analysis at this time.
k. The existing Weber Project consists
of: (1) A 114-foot-long, 27-foot-high
concrete diversion dam that includes a
low-level outlet, a 35-foot-long intake
structure, and a 79-foot-long section
containing two 29-foot-long, 10-foothigh radial gates; (2) a 3-foot by 18-foot
non-operative fish passage structure that
is used to pass minimum flows through
a calibrated slide gate opening at the
dam; (3) an 8.4-acre reservoir having a
total storage of approximately 42 acrefeet at elevation 4,798 feet mean sea
level; (4) a 9,107-foot-long, 5-foot to 6.3foot-diameter steel penstock partially
encased in concrete, and buried for most
of its length; (5) a powerhouse with one
3,850-kilowatt generating unit; (6) a 36foot-long, by 20-foot-wide, by 30-footdeep concrete tailrace structure,
integrated into the powerhouse
foundation, which returns flows directly
into the Weber River on the south side
of the powerhouse; (7) a 77-foot-long,
46-kilovolt transmission line; and (8)
appurtenant facilities. The project is
estimated to generate an average of
16,932 megawatt-hours annually.
PacifiCorp proposes to build a new fish
passage structure at the edge of the
existing diversion dam in an area that
currently has graded, unvegetated soil.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
m. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance ..
Issue Notice Soliciting Final
Terms and Conditions.
E:\FR\FM\18JNN1.SGM
18JNN1
June 2018.
August 2018.
Federal Register / Vol. 83, No. 117 / Monday, June 18, 2018 / Notices
Commission issues EA .........
March 2018.
Dated: June 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–12945 Filed 6–15–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
amozie on DSK3GDR082PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–97–000.
Applicants: Origis Energy.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Origis Energy.
Filed Date: 6/11/18.
Accession Number: 20180611–5042.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: EG18–98–000.
Applicants: Palmer’s Creek Wind
Farm, LLC.
Description: Self-Certification of EWG
Status of Palmer’s Creek Wind Farm,
LLC.
Filed Date: 6/11/18.
Accession Number: 20180611–5065.
Comments Due: 5 p.m. ET 7/2/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1585–012;
ER10–1594–012; ER10–1617–012;
ER10–1628–012; ER10–1632–014;
ER12–60–014; ER16–1148–003; ER16–
733–003
Applicants: Alabama Electric
Marketing, LLC, California Electric
Marketing, LLC, LQA, LLC, New Mexico
Electric Marketing, LLC, Tenaska
´
Energıa de Mexico, S. de R. L. de C.V.,
Tenaska Power Services Co., Tenaska
Power Management, LLC, Texas Electric
Marketing, LLC.
Description: Notice of Change in
Status of the Indicated Tenaska MBR
Sellers.
Filed Date: 6/8/18.
Accession Number: 20180608–5099.
Comments Due: 5 p.m. ET 6/29/18.
Docket Numbers: ER10–1633–001.
Applicants: Deseret Generation &
Transmission Co-operative, Inc.
Description: Notice of Change in
Status of Deseret Generation and
Transmission Co-operative, Inc.
Filed Date: 6/8/18.
Accession Number: 20180608–5138.
Comments Due: 5 p.m. ET 6/29/18.
Docket Numbers: ER10–2498–005.
VerDate Sep<11>2014
18:00 Jun 15, 2018
Jkt 244001
Applicants: South Carolina Electric &
Gas Company.
Description: Notice of Non-Material
Change in Status of South Carolina
Electric & Gas Company.
Filed Date: 6/8/18.
Accession Number: 20180608–5147.
Comments Due: 5 p.m. ET 6/29/18.
Docket Numbers: ER18–1268–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Amended Filing—Revisions to
Implement a Set of Resource Adequacy
Policies to be effective 7/1/2018.
Filed Date: 6/8/18.
Accession Number: 20180608–5136.
Comments Due: 5 p.m. ET 6/29/18.
Docket Numbers: ER18–1765–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing: Notice
of Cancellation of ISA, Service
Agreement No. 2383, NQ26A to be
effective N/A.
Filed Date: 6/11/18.
Accession Number: 20180611–5026.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: ER18–1766–000.
Applicants: Palmer’s Creek Wind
Farm, LLC.
Description: Baseline eTariff Filing:
Application For Market Based Rate to be
effective 8/11/2018.
Filed Date: 6/11/18.
Accession Number: 20180611–5061.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: ER18–1767–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 5095; Queue
No. AB2–022 to be effective 5/21/2018.
Filed Date: 6/11/18.
Accession Number: 20180611–5076.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: ER18–1768–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1166R32 Oklahoma Municipal Power
Authority NITSA and NOA to be
effective 7/1/2018.
Filed Date: 6/11/18.
Accession Number: 20180611–5106.
Comments Due: 5 p.m. ET 7/2/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
28219
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–12951 Filed 6–15–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–99–000.
Applicants: New Harquahala
Generating Company, LLC.
Description: New Harquahala
Generating Company, LLC, Application
for Approval Under Section 203 of the
Federal Power Act and Request for
Expedited Approval.
Filed Date: 6/11/18.
Accession Number: 20180611–5152.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: EC18–100–000.
Applicants: Cedar Point Wind, LLC,
Silver State Solar Power North, LLC,
Canada Pension Plan Investment Board.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act and Request for
Expedited Consideration, Shortened
Comment Period and Certain Waivers of
Cedar Point Wind, LLC, et. al.
Filed Date: 6/11/18.
Accession Number: 20180611–5176.
Comments Due: 5 p.m. ET 7/2/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1769–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA No. 4623, Queue No. AC1–
152 AC1–172 to be effective 5/10/2018.
Filed Date: 6/11/18.
Accession Number: 20180611–5138.
Comments Due: 5 p.m. ET 7/2/18.
Docket Numbers: ER18–1770–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
E:\FR\FM\18JNN1.SGM
18JNN1
Agencies
[Federal Register Volume 83, Number 117 (Monday, June 18, 2018)]
[Notices]
[Pages 28218-28219]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-12945]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1744-041]
Notice of Application Tendered for Filing With the Commission;
PacifiCorp
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major Constructed Project.
b. Project No.: 1744-041.
c. Date filed: May 30, 2018.
d. Applicant: PacifiCorp.
e. Name of Project: Weber Hydroelectric Project.
f. Location: On the Weber River, in Weber, Davis, and Morgan
Counties, Utah. The project occupies 14.94 acres of United States lands
administered by the U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Eve Davies, PacifiCorp--Renewable Resources,
1407 West North Temple, Suite 210, Salt Lake City, UT 84116; (801) 220-
2245; [email protected]
i. FERC Contact: Evan Williams at (202) 502-8462; or email at
[email protected].
j. The application is not ready for environmental analysis at this
time.
k. The existing Weber Project consists of: (1) A 114-foot-long, 27-
foot-high concrete diversion dam that includes a low-level outlet, a
35-foot-long intake structure, and a 79-foot-long section containing
two 29-foot-long, 10-foot-high radial gates; (2) a 3-foot by 18-foot
non-operative fish passage structure that is used to pass minimum flows
through a calibrated slide gate opening at the dam; (3) an 8.4-acre
reservoir having a total storage of approximately 42 acre-feet at
elevation 4,798 feet mean sea level; (4) a 9,107-foot-long, 5-foot to
6.3-foot-diameter steel penstock partially encased in concrete, and
buried for most of its length; (5) a powerhouse with one 3,850-kilowatt
generating unit; (6) a 36-foot-long, by 20-foot-wide, by 30-foot-deep
concrete tailrace structure, integrated into the powerhouse foundation,
which returns flows directly into the Weber River on the south side of
the powerhouse; (7) a 77-foot-long, 46-kilovolt transmission line; and
(8) appurtenant facilities. The project is estimated to generate an
average of 16,932 megawatt-hours annually. PacifiCorp proposes to build
a new fish passage structure at the edge of the existing diversion dam
in an area that currently has graded, unvegetated soil.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC
Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
m. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance............... June 2018.
Issue Notice Soliciting Final Terms and August 2018.
Conditions.
[[Page 28219]]
Commission issues EA..................... March 2018.
Dated: June 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-12945 Filed 6-15-18; 8:45 am]
BILLING CODE 6717-01-P