Notice of Application Tendered for Filing With the Commission; PacifiCorp, 28218-28219 [2018-12945]

Download as PDF 28218 Federal Register / Vol. 83, No. 117 / Monday, June 18, 2018 / Notices following, together with supporting documents: (i) A statement from any person setting forth reasons why it would not be in the best interest of the United States to grant the proposed license; or (ii) An application for a nonexclusive license to the invention, in which applicant states that it already has brought the invention to practical application or is likely to bring the invention to practical application expeditiously. The proposed license would be exclusive, subject to a license and other rights retained by the United States, and subject to a negotiated royalty. The exclusive fields of use are: For use in internal combustion engines. DOE will review all timely written responses to this notice, and will grant the license if, after expiration of the 15-day notice period, and after consideration of any written responses to this notice, a determination is made in accordance with 35 U.S.C. 209(c) that the license is in the public interest. Dated: June 4, 2018. Sean I. Plasynski, Director (Acting), National Energy Technology Laboratory. of Information and Regulatory Affairs, Office of Management and Budget, New Executive Office Building, Room 10102, 735 17th Street NW, Washington DC 20503, and to Brian Lally, GC–62, U.S. Department of Energy, 1000 Independence Ave. SW, Washington, DC 20585, by fax at (202) 586–2805, or by email at brian.lally@hq.doe.gov. FOR FURTHER INFORMATION CONTACT: Brian Lally, (202) 586–8298, brian.lally@hq.doe.gov. SUPPLEMENTARY INFORMATION: This information collection request contains: (1) OMB No. 1910–0800; (2) Information Collection Request Title: Legal Collections; (3) Type of Request: Renewal and Revision; (4) Purpose: To continue to maintain DOE control and oversight of DOE and its contractor’s invention reporting and related matters; (5) Annual Estimated Number of Respondents: 1700; (6) Annual Estimated Number of Total Responses: 2040; (7) Annual Estimated Number of Burden Hours: 13,260; (8) Annual Estimated Reporting and Recordkeeping Cost Burden: $994,500.00. Statutory Authority: 42 U.S.C. 5908(a) (b) and (c); 37 CFR part 404; 10 CFR part 784. Issued in Washington, DC, on June 12, 2018. Brian Lally, Assistant General Counsel for Technology Transfer, and Intellectual Property, U.S. Department of Energy. [FR Doc. 2018–13010 Filed 6–15–18; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Agency Information Collection Extension [FR Doc. 2018–13012 Filed 6–15–18; 8:45 am] U.S. Department of Energy. ACTION: Submission for Office of Management and Budget (OMB) review; comment request. DEPARTMENT OF ENERGY BILLING CODE 6450–01–P AGENCY: The Department of Energy (DOE) has submitted an information collection request to the OMB for extension under the provisions of the Paperwork Reduction Act of 1995. The information collection requests a threeyear extension of its Legal Collection, OMB Control Number 1910–0800. The proposed collection will enable DOE to continue to maintain DOE control and oversight of DOE contractor’s invention reporting and related matters. DATES: Comments regarding this collection must be received on or before July 18, 2018. If you anticipate that you will be submitting comments, but find it difficult to do so within the period of time allowed by this notice, please advise the OMB Desk Officer of your intention to make a submission as soon as possible. The Desk Officer may be telephoned at (202) 395–4718. ADDRESSES: Written comments should be sent to the: DOE Desk Officer, Office amozie on DSK3GDR082PROD with NOTICES1 SUMMARY: VerDate Sep<11>2014 18:00 Jun 15, 2018 Jkt 244001 Federal Energy Regulatory Commission [Project No. 1744–041] Notice of Application Tendered for Filing With the Commission; PacifiCorp Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major Constructed Project. b. Project No.: 1744–041. c. Date filed: May 30, 2018. d. Applicant: PacifiCorp. e. Name of Project: Weber Hydroelectric Project. f. Location: On the Weber River, in Weber, Davis, and Morgan Counties, Utah. The project occupies 14.94 acres of United States lands administered by the U.S. Forest Service. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 h. Applicant Contact: Eve Davies, PacifiCorp—Renewable Resources, 1407 West North Temple, Suite 210, Salt Lake City, UT 84116; (801) 220–2245; email— eve.davies@pacificorp.com. i. FERC Contact: Evan Williams at (202) 502–8462; or email at evan.williams@ferc.gov. j. The application is not ready for environmental analysis at this time. k. The existing Weber Project consists of: (1) A 114-foot-long, 27-foot-high concrete diversion dam that includes a low-level outlet, a 35-foot-long intake structure, and a 79-foot-long section containing two 29-foot-long, 10-foothigh radial gates; (2) a 3-foot by 18-foot non-operative fish passage structure that is used to pass minimum flows through a calibrated slide gate opening at the dam; (3) an 8.4-acre reservoir having a total storage of approximately 42 acrefeet at elevation 4,798 feet mean sea level; (4) a 9,107-foot-long, 5-foot to 6.3foot-diameter steel penstock partially encased in concrete, and buried for most of its length; (5) a powerhouse with one 3,850-kilowatt generating unit; (6) a 36foot-long, by 20-foot-wide, by 30-footdeep concrete tailrace structure, integrated into the powerhouse foundation, which returns flows directly into the Weber River on the south side of the powerhouse; (7) a 77-foot-long, 46-kilovolt transmission line; and (8) appurtenant facilities. The project is estimated to generate an average of 16,932 megawatt-hours annually. PacifiCorp proposes to build a new fish passage structure at the edge of the existing diversion dam in an area that currently has graded, unvegetated soil. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. m. Procedural schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Notice of Acceptance .. Issue Notice Soliciting Final Terms and Conditions. E:\FR\FM\18JNN1.SGM 18JNN1 June 2018. August 2018. Federal Register / Vol. 83, No. 117 / Monday, June 18, 2018 / Notices Commission issues EA ......... March 2018. Dated: June 12, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–12945 Filed 6–15–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission amozie on DSK3GDR082PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG18–97–000. Applicants: Origis Energy. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Origis Energy. Filed Date: 6/11/18. Accession Number: 20180611–5042. Comments Due: 5 p.m. ET 7/2/18. Docket Numbers: EG18–98–000. Applicants: Palmer’s Creek Wind Farm, LLC. Description: Self-Certification of EWG Status of Palmer’s Creek Wind Farm, LLC. Filed Date: 6/11/18. Accession Number: 20180611–5065. Comments Due: 5 p.m. ET 7/2/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1585–012; ER10–1594–012; ER10–1617–012; ER10–1628–012; ER10–1632–014; ER12–60–014; ER16–1148–003; ER16– 733–003 Applicants: Alabama Electric Marketing, LLC, California Electric Marketing, LLC, LQA, LLC, New Mexico Electric Marketing, LLC, Tenaska ´ Energıa de Mexico, S. de R. L. de C.V., Tenaska Power Services Co., Tenaska Power Management, LLC, Texas Electric Marketing, LLC. Description: Notice of Change in Status of the Indicated Tenaska MBR Sellers. Filed Date: 6/8/18. Accession Number: 20180608–5099. Comments Due: 5 p.m. ET 6/29/18. Docket Numbers: ER10–1633–001. Applicants: Deseret Generation & Transmission Co-operative, Inc. Description: Notice of Change in Status of Deseret Generation and Transmission Co-operative, Inc. Filed Date: 6/8/18. Accession Number: 20180608–5138. Comments Due: 5 p.m. ET 6/29/18. Docket Numbers: ER10–2498–005. VerDate Sep<11>2014 18:00 Jun 15, 2018 Jkt 244001 Applicants: South Carolina Electric & Gas Company. Description: Notice of Non-Material Change in Status of South Carolina Electric & Gas Company. Filed Date: 6/8/18. Accession Number: 20180608–5147. Comments Due: 5 p.m. ET 6/29/18. Docket Numbers: ER18–1268–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: Amended Filing—Revisions to Implement a Set of Resource Adequacy Policies to be effective 7/1/2018. Filed Date: 6/8/18. Accession Number: 20180608–5136. Comments Due: 5 p.m. ET 6/29/18. Docket Numbers: ER18–1765–000. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Notice of Cancellation of ISA, Service Agreement No. 2383, NQ26A to be effective N/A. Filed Date: 6/11/18. Accession Number: 20180611–5026. Comments Due: 5 p.m. ET 7/2/18. Docket Numbers: ER18–1766–000. Applicants: Palmer’s Creek Wind Farm, LLC. Description: Baseline eTariff Filing: Application For Market Based Rate to be effective 8/11/2018. Filed Date: 6/11/18. Accession Number: 20180611–5061. Comments Due: 5 p.m. ET 7/2/18. Docket Numbers: ER18–1767–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA SA No. 5095; Queue No. AB2–022 to be effective 5/21/2018. Filed Date: 6/11/18. Accession Number: 20180611–5076. Comments Due: 5 p.m. ET 7/2/18. Docket Numbers: ER18–1768–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1166R32 Oklahoma Municipal Power Authority NITSA and NOA to be effective 7/1/2018. Filed Date: 6/11/18. Accession Number: 20180611–5106. Comments Due: 5 p.m. ET 7/2/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 28219 Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 11, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–12951 Filed 6–15–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–99–000. Applicants: New Harquahala Generating Company, LLC. Description: New Harquahala Generating Company, LLC, Application for Approval Under Section 203 of the Federal Power Act and Request for Expedited Approval. Filed Date: 6/11/18. Accession Number: 20180611–5152. Comments Due: 5 p.m. ET 7/2/18. Docket Numbers: EC18–100–000. Applicants: Cedar Point Wind, LLC, Silver State Solar Power North, LLC, Canada Pension Plan Investment Board. Description: Application for Authorization Under Section 203 of the Federal Power Act and Request for Expedited Consideration, Shortened Comment Period and Certain Waivers of Cedar Point Wind, LLC, et. al. Filed Date: 6/11/18. Accession Number: 20180611–5176. Comments Due: 5 p.m. ET 7/2/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1769–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised ISA No. 4623, Queue No. AC1– 152 AC1–172 to be effective 5/10/2018. Filed Date: 6/11/18. Accession Number: 20180611–5138. Comments Due: 5 p.m. ET 7/2/18. Docket Numbers: ER18–1770–000. Applicants: ISO New England Inc., New England Power Pool Participants Committee. E:\FR\FM\18JNN1.SGM 18JNN1

Agencies

[Federal Register Volume 83, Number 117 (Monday, June 18, 2018)]
[Notices]
[Pages 28218-28219]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-12945]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1744-041]


Notice of Application Tendered for Filing With the Commission; 
PacifiCorp

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major Constructed Project.
    b. Project No.: 1744-041.
    c. Date filed: May 30, 2018.
    d. Applicant: PacifiCorp.
    e. Name of Project: Weber Hydroelectric Project.
    f. Location: On the Weber River, in Weber, Davis, and Morgan 
Counties, Utah. The project occupies 14.94 acres of United States lands 
administered by the U.S. Forest Service.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Eve Davies, PacifiCorp--Renewable Resources, 
1407 West North Temple, Suite 210, Salt Lake City, UT 84116; (801) 220-
2245; [email protected]
    i. FERC Contact: Evan Williams at (202) 502-8462; or email at 
[email protected].
    j. The application is not ready for environmental analysis at this 
time.
    k. The existing Weber Project consists of: (1) A 114-foot-long, 27-
foot-high concrete diversion dam that includes a low-level outlet, a 
35-foot-long intake structure, and a 79-foot-long section containing 
two 29-foot-long, 10-foot-high radial gates; (2) a 3-foot by 18-foot 
non-operative fish passage structure that is used to pass minimum flows 
through a calibrated slide gate opening at the dam; (3) an 8.4-acre 
reservoir having a total storage of approximately 42 acre-feet at 
elevation 4,798 feet mean sea level; (4) a 9,107-foot-long, 5-foot to 
6.3-foot-diameter steel penstock partially encased in concrete, and 
buried for most of its length; (5) a powerhouse with one 3,850-kilowatt 
generating unit; (6) a 36-foot-long, by 20-foot-wide, by 30-foot-deep 
concrete tailrace structure, integrated into the powerhouse foundation, 
which returns flows directly into the Weber River on the south side of 
the powerhouse; (7) a 77-foot-long, 46-kilovolt transmission line; and 
(8) appurtenant facilities. The project is estimated to generate an 
average of 16,932 megawatt-hours annually. PacifiCorp proposes to build 
a new fish passage structure at the edge of the existing diversion dam 
in an area that currently has graded, unvegetated soil.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at https://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    m. Procedural schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.

Issue Notice of Acceptance...............  June 2018.
Issue Notice Soliciting Final Terms and    August 2018.
 Conditions.

[[Page 28219]]

 
Commission issues EA.....................  March 2018.
 


    Dated: June 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-12945 Filed 6-15-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.