Download as PDF sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 83, No. 116 / Friday, June 15, 2018 / Notices send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2503–167. k. Description of Request: The licensee requests Commission approval to grant the City of Walhalla permission to use project lands and water within the project boundary to construct and operate a raw water intake on Lake Keowee in order to meet demands for public drinking water. Construction activities within the project boundary would include installation of an intake line outfitted with a dual tee screen system and air burst line, installation of a floating dock extending over the intake line, placement of rip rap along the stream bank and intake line, and installation of a stormwater outfall. The through-slot velocity at the intake screen will not exceed 0.5 feet per second. The raw water line would leave the project boundary and lead to a water treatment plant, which is not yet constructed. Once constructed, the facility would withdrawal up to 6.75 million gallons per day (mgd) from Lake Keowee. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling 202–502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call 202–502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a VerDate Sep<11>2014 17:11 Jun 14, 2018 Jkt 244001 party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’; ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the non-project use application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: June 8, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–12878 Filed 6–14–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–493–000] Notice of Request Under Blanket Authorization: Saltville Gas Storage Company, LLC Take notice that on May 31, 2018, Saltville Gas Storage Company, L.L.C. (Saltville), 5400 Westheimer Court, Houston, Texas 77056–5310, filed in Docket No. CP18–493–000 a prior notice request pursuant to sections 157.205, PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 27979 157.208, 157.213 and 157.216 of the Commission’s regulations under the Natural Gas Act notifying the Commission of Saltville’s intent to drill two new injection and withdrawal (I/W) wells, to replace two previously abandon I/W wells and one existing I/ W well, to maintain the deliverability of the Early Grove depleted reservoir facility, as well as to abandon one existing monitoring well at its Early Grove natural gas storage facility in Scott and Washington Counties, Virginia, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Lisa A. Connolly, Director, Rates & Certificates, Saltville Gas Storage Company. L.L.C., P.O. Box 1642, Houston, Texas 77251– 1642 at (713) 627–4102 or at lisa.connolly@enbridge.com. Specifically, Saltville proposes to: (i) Drill new horizontal/high angle I/W wells; (ii) install connecting piping and other appurtenances facilities; (iii) plug and abandon one existing I/W well, EH– 96, and one existing monitoring well, EH–95; and (iv) abandon by removal related connecting piping and appurtenance facilities. Saltville states that, the project will have no impact on the certificate parameters of the facility, including total inventory, reservoir pressure, reservoir and buffer boundaries, or certificated capacity, and there will be no abandonment or reduction in service to any customer of Saltville as a result of the project. The project cost will be approximately $20 million. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a E:\FR\FM\15JNN1.SGM 15JNN1 27980 Federal Register / Vol. 83, No. 116 / Friday, June 15, 2018 / Notices Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenter will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Dated: June 8, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–12879 Filed 6–14–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 sradovich on DSK3GMQ082PROD with NOTICES Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–98–000. Applicants: Grays Harbor Energy LLC, Hardee Power Partners Limited, Invenergy Cannon Falls LLC, Invenergy Nelson LLC, Lackawanna Energy Center LLC, Spindle Hill Energy LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act and Request for Waivers and Expedited Action of Grays Harbor Energy LLC, et al. Filed Date: 6/7/18. Accession Number: 20180607–5150. Comments Due: 5 p.m. ET 6/28/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1078–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: Deficiency Response—Revisions to Require PMUs at New Interconnections to be effective 5/13/2018. Filed Date: 6/7/18. Accession Number: 20180607–5127. Comments Due: 5 p.m. ET 6/28/18. Docket Numbers: ER18–1762–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of ISA SA No. 3525; Queue No. V3–015 to be effective 6/26/2018. Filed Date: 6/7/18. Accession Number: 20180607–5131. Comments Due: 5 p.m. ET 6/28/18. Docket Numbers: ER18–1763–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, SA No. 5100; Queue No. AC1–212 to be effective 5/9/2018. Filed Date: 6/8/18. Accession Number: 20180608–5119. Comments Due: 5 p.m. ET 6/29/18. Docket Numbers: ER18–1764–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: PSCo-TSGT–UP-PkwySS–CO-Agmt F174–479–0.0.0 to be effective 6/9/2018. Filed Date: 6/8/18. Accession Number: 20180608–5120. Comments Due: 5 p.m. ET 6/29/18. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES18–39–000. Applicants: Consumers Energy Company. Description: Application of Consumers Energy Company for Authority to Issue Securities. Filed Date: 6/8/18. Accession Number: 20180608–5083. Comments Due: 5 p.m. ET 6/29/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 8, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–12875 Filed 6–14–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utility Company Status Midway Wind, LLC ............................................................................................................................................................................ Victoria City Power LLC .................................................................................................................................................................... Victoria Port Power LLC .................................................................................................................................................................... Meadow Lake Wind Farm VI LLC .................................................................................................................................................... Prairie Queen Wind Farm LLC .......................................................................................................................................................... Turtle Creek Wind Farm LLC ............................................................................................................................................................ Kestrel Acquisition LLC ..................................................................................................................................................................... Imperial Valley Solar 2, LLC ............................................................................................................................................................. Delta Solar Power I, LLC ................................................................................................................................................................... Delta Solar Power II, LLC .................................................................................................................................................................. Walleye Energy, LLC .......................................................................................................................................................................... VerDate Sep<11>2014 17:11 Jun 14, 2018 Jkt 244001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\15JNN1.SGM 15JNN1 EG18–49–000 EG18–50–000 EG18–51–000 EG18–53–000 EG18–54–000 EG18–55–000 EG18–56–000 EG18–57–000 EG18–58–000 EG18–59–000 EG18–60–000

Agencies

[Federal Register Volume 83, Number 116 (Friday, June 15, 2018)]
[Notices]
[Pages 27979-27980]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-12879]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-493-000]


Notice of Request Under Blanket Authorization: Saltville Gas 
Storage Company, LLC

    Take notice that on May 31, 2018, Saltville Gas Storage Company, 
L.L.C. (Saltville), 5400 Westheimer Court, Houston, Texas 77056-5310, 
filed in Docket No. CP18-493-000 a prior notice request pursuant to 
sections 157.205, 157.208, 157.213 and 157.216 of the Commission's 
regulations under the Natural Gas Act notifying the Commission of 
Saltville's intent to drill two new injection and withdrawal (I/W) 
wells, to replace two previously abandon I/W wells and one existing I/W 
well, to maintain the deliverability of the Early Grove depleted 
reservoir facility, as well as to abandon one existing monitoring well 
at its Early Grove natural gas storage facility in Scott and Washington 
Counties, Virginia, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection. The 
filing may also be viewed on the web at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to Lisa 
A. Connolly, Director, Rates & Certificates, Saltville Gas Storage 
Company. L.L.C., P.O. Box 1642, Houston, Texas 77251-1642 at (713) 627-
4102 or at [email protected].
    Specifically, Saltville proposes to: (i) Drill new horizontal/high 
angle I/W wells; (ii) install connecting piping and other appurtenances 
facilities; (iii) plug and abandon one existing I/W well, EH-96, and 
one existing monitoring well, EH-95; and (iv) abandon by removal 
related connecting piping and appurtenance facilities. Saltville states 
that, the project will have no impact on the certificate parameters of 
the facility, including total inventory, reservoir pressure, reservoir 
and buffer boundaries, or certificated capacity, and there will be no 
abandonment or reduction in service to any customer of Saltville as a 
result of the project. The project cost will be approximately $20 
million.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a

[[Page 27980]]

Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenter will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.

    Dated: June 8, 2018.
Kimberly D. Bose,
Secretary.