k. Description of Request: The
licensee requests Commission approval
to grant the City of Walhalla permission
to use project lands and water within
the project boundary to construct and
operate a raw water intake on Lake
Keowee in order to meet demands for
public drinking water. Construction
activities within the project boundary
would include installation of an intake
line outfitted with a dual tee screen
system and air burst line, installation of
a floating dock extending over the
intake line, placement of rip rap along
the stream bank and intake line, and
installation of a stormwater outfall. The
through-slot velocity at the intake
screen will not exceed 0.5 feet per
second. The raw water line would leave
the project boundary and lead to a water
treatment plant, which is not yet
constructed. Once constructed, the
facility would withdrawal up to 6.75
million gallons per day (mgd) from Lake
Keowee.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
202–502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call 202–502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
VerDate Sep<11>2014
17:11 Jun 14, 2018
Jkt 244001
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’; ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the non-project
use application. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: June 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–12878 Filed 6–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–493–000]
Notice of Request Under Blanket
Authorization: Saltville Gas Storage
Company, LLC
Take notice that on May 31, 2018,
Saltville Gas Storage Company, L.L.C.
(Saltville), 5400 Westheimer Court,
Houston, Texas 77056–5310, filed in
Docket No. CP18–493–000 a prior notice
request pursuant to sections 157.205,
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
27979
157.208, 157.213 and 157.216 of the
Commission’s regulations under the
Natural Gas Act notifying the
Commission of Saltville’s intent to drill
two new injection and withdrawal (I/W)
wells, to replace two previously
abandon I/W wells and one existing I/
W well, to maintain the deliverability of
the Early Grove depleted reservoir
facility, as well as to abandon one
existing monitoring well at its Early
Grove natural gas storage facility in
Scott and Washington Counties,
Virginia, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Lisa A.
Connolly, Director, Rates & Certificates,
Saltville Gas Storage Company. L.L.C.,
P.O. Box 1642, Houston, Texas 77251–
1642 at (713) 627–4102 or at
lisa.connolly@enbridge.com.
Specifically, Saltville proposes to: (i)
Drill new horizontal/high angle I/W
wells; (ii) install connecting piping and
other appurtenances facilities; (iii) plug
and abandon one existing I/W well, EH–
96, and one existing monitoring well,
EH–95; and (iv) abandon by removal
related connecting piping and
appurtenance facilities. Saltville states
that, the project will have no impact on
the certificate parameters of the facility,
including total inventory, reservoir
pressure, reservoir and buffer
boundaries, or certificated capacity, and
there will be no abandonment or
reduction in service to any customer of
Saltville as a result of the project. The
project cost will be approximately $20
million.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
E:\FR\FM\15JNN1.SGM
15JNN1
27980
Federal Register / Vol. 83, No. 116 / Friday, June 15, 2018 / Notices
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: June 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–12879 Filed 6–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
sradovich on DSK3GMQ082PROD with NOTICES
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–98–000.
Applicants: Grays Harbor Energy LLC,
Hardee Power Partners Limited,
Invenergy Cannon Falls LLC, Invenergy
Nelson LLC, Lackawanna Energy Center
LLC, Spindle Hill Energy LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act and Request for
Waivers and Expedited Action of Grays
Harbor Energy LLC, et al.
Filed Date: 6/7/18.
Accession Number: 20180607–5150.
Comments Due: 5 p.m. ET 6/28/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1078–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Deficiency Response—Revisions to
Require PMUs at New Interconnections
to be effective 5/13/2018.
Filed Date: 6/7/18.
Accession Number: 20180607–5127.
Comments Due: 5 p.m. ET 6/28/18.
Docket Numbers: ER18–1762–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of ISA SA No.
3525; Queue No. V3–015 to be effective
6/26/2018.
Filed Date: 6/7/18.
Accession Number: 20180607–5131.
Comments Due: 5 p.m. ET 6/28/18.
Docket Numbers: ER18–1763–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 5100; Queue
No. AC1–212 to be effective 5/9/2018.
Filed Date: 6/8/18.
Accession Number: 20180608–5119.
Comments Due: 5 p.m. ET 6/29/18.
Docket Numbers: ER18–1764–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSCo-TSGT–UP-PkwySS–CO-Agmt
F174–479–0.0.0 to be effective 6/9/2018.
Filed Date: 6/8/18.
Accession Number: 20180608–5120.
Comments Due: 5 p.m. ET 6/29/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–39–000.
Applicants: Consumers Energy
Company.
Description: Application of
Consumers Energy Company for
Authority to Issue Securities.
Filed Date: 6/8/18.
Accession Number: 20180608–5083.
Comments Due: 5 p.m. ET 6/29/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–12875 Filed 6–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator and Foreign
Utility Company Status
Midway Wind, LLC ............................................................................................................................................................................
Victoria City Power LLC ....................................................................................................................................................................
Victoria Port Power LLC ....................................................................................................................................................................
Meadow Lake Wind Farm VI LLC ....................................................................................................................................................
Prairie Queen Wind Farm LLC ..........................................................................................................................................................
Turtle Creek Wind Farm LLC ............................................................................................................................................................
Kestrel Acquisition LLC .....................................................................................................................................................................
Imperial Valley Solar 2, LLC .............................................................................................................................................................
Delta Solar Power I, LLC ...................................................................................................................................................................
Delta Solar Power II, LLC ..................................................................................................................................................................
Walleye Energy, LLC ..........................................................................................................................................................................
VerDate Sep<11>2014
17:11 Jun 14, 2018
Jkt 244001
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
E:\FR\FM\15JNN1.SGM
15JNN1
EG18–49–000
EG18–50–000
EG18–51–000
EG18–53–000
EG18–54–000
EG18–55–000
EG18–56–000
EG18–57–000
EG18–58–000
EG18–59–000
EG18–60–000
Agencies
[Federal Register Volume 83, Number 116 (Friday, June 15, 2018)]
[Notices]
[Pages 27979-27980]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-12879]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-493-000]
Notice of Request Under Blanket Authorization: Saltville Gas
Storage Company, LLC
Take notice that on May 31, 2018, Saltville Gas Storage Company,
L.L.C. (Saltville), 5400 Westheimer Court, Houston, Texas 77056-5310,
filed in Docket No. CP18-493-000 a prior notice request pursuant to
sections 157.205, 157.208, 157.213 and 157.216 of the Commission's
regulations under the Natural Gas Act notifying the Commission of
Saltville's intent to drill two new injection and withdrawal (I/W)
wells, to replace two previously abandon I/W wells and one existing I/W
well, to maintain the deliverability of the Early Grove depleted
reservoir facility, as well as to abandon one existing monitoring well
at its Early Grove natural gas storage facility in Scott and Washington
Counties, Virginia, all as more fully set forth in the application
which is on file with the Commission and open to public inspection. The
filing may also be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to Lisa
A. Connolly, Director, Rates & Certificates, Saltville Gas Storage
Company. L.L.C., P.O. Box 1642, Houston, Texas 77251-1642 at (713) 627-
4102 or at [email protected].
Specifically, Saltville proposes to: (i) Drill new horizontal/high
angle I/W wells; (ii) install connecting piping and other appurtenances
facilities; (iii) plug and abandon one existing I/W well, EH-96, and
one existing monitoring well, EH-95; and (iv) abandon by removal
related connecting piping and appurtenance facilities. Saltville states
that, the project will have no impact on the certificate parameters of
the facility, including total inventory, reservoir pressure, reservoir
and buffer boundaries, or certificated capacity, and there will be no
abandonment or reduction in service to any customer of Saltville as a
result of the project. The project cost will be approximately $20
million.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a
[[Page 27980]]
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenter will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: June 8, 2018.
Kimberly D. Bose,
Secretary.