Combined Notice of Filings #2, 26995-26996 [2018-12464]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 112 / Monday, June 11, 2018 / Notices
Applicants: Portland General Electric
Company.
Description: § 205(d) Rate Filing:
BPA/PGE/PAC South of Allston Path
Agreement to be effective 6/4/2018.
Filed Date: 6/4/18.
Accession Number: 20180604–5178.
Comments Due: 5 p.m. ET 6/25/18.
Docket Numbers: ER18–1741–000.
Applicants: Portland General Electric
Company.
Description: Notice of Cancellation of
Rate Schedule No. 15 of Portland
General Electric Company.
Filed Date: 6/4/18.
Accession Number: 20180604–5195.
Comments Due: 5 p.m. ET 6/25/18.
Docket Numbers: ER18–1742–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1166R31 Oklahoma Municipal Power
Authority NITSA and NOA to be
effective 6/1/2018.
Filed Date: 6/5/18.
Accession Number: 20180605–5039.
Comments Due: 5 p.m. ET 6/26/18.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH18–9–000.
Applicants: LS Power Development,
LLC.
Description: LS Power Development,
LLC submits FERC 65–B Non-Material
Change in Fact of Waiver Notification.
Filed Date: 6/4/18.
Accession Number: 20180604–5185.
Comments Due: 5 p.m. ET 6/25/18.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF18–1459–000.
Applicants: Duke Energy Renewables
Commercial, LLC.
Description: Form 556 of Duke Energy
Renewables Commercial, LLC
[Montgomery County PSHQ].
Filed Date: 5/31/18.
Accession Number: 20180531–5444.
Comments Due: None-Applicable.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
VerDate Sep<11>2014
19:19 Jun 08, 2018
Jkt 244001
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–12463 Filed 6–8–18; 8:45 am]
BILLING CODE 6717–01–P
26995
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on June 25, 2018.
Dated: June 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–12465 Filed 6–8–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. EL18–6–001]
Federal Energy Regulatory
Commission
Notice of Filing: FirstEnergy Service
Company
Combined Notice of Filings #2
Take notice that on June 4, 2018,
FirstEnergy Service Company submitted
a Notice of Non-Material Change in
Circumstances pursuant to the order
issued by the Federal Energy Regulatory
Commission (Commission), in the above
captioned proceeding, on February 2,
2018.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
1 FirstEnergy Service Company, 162 FERC ¶
61,087 (2018).
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–97–000.
Applicants: NextEra Energy
Transmission Southwest, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of NextEra Energy
Transmission Southwest, LLC.
Filed Date: 6/5/18.
Accession Number: 20180605–5094.
Comments Due: 5 p.m. ET 6/26/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–95–000.
Applicants: Langdon Renewables,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Langdon
Renewables, LLC.
Filed Date: 6/5/18.
Accession Number: 20180605–5083.
Comments Due: 5 p.m. ET 6/26/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1173–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–06–05_Deficiency response for
Locational Filing to be effective 5/30/
2018.
Filed Date: 6/5/18.
Accession Number: 20180605–5129.
Comments Due: 5 p.m. ET 6/26/18.
Docket Numbers: ER18–1743–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing:
NYISO 205 filing of tariff revisions to
Alternate LCR to be effective 8/5/2018.
Filed Date: 6/5/18.
E:\FR\FM\11JNN1.SGM
11JNN1
daltland on DSKBBV9HB2PROD with NOTICES
26996
Federal Register / Vol. 83, No. 112 / Monday, June 11, 2018 / Notices
Accession Number: 20180605–5041.
Comments Due: 5 p.m. ET 6/26/18.
Docket Numbers: ER18–1744–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: TriState Trans Ownership, O&M to be
effective 8/5/2018.
Filed Date: 6/5/18.
Accession Number: 20180605–5067.
Comments Due: 5 p.m. ET 6/26/18.
Docket Numbers: ER18–1745–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Second Revised ISA SA No. 4063;
Queue No. Y2–078/AB2–014/AD1–059
to be effective 5/7/2018.
Filed Date: 6/5/18.
Accession Number: 20180605–5097.
Comments Due: 5 p.m. ET 6/26/18.
Docket Numbers: ER18–1746–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Second Revised ISA SA No. 3903;
Queue No. AC1–021 to be effective 5/7/
2018.
Filed Date: 6/5/18.
Accession Number: 20180605–5121.
Comments Due: 5 p.m. ET 6/26/18.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR18–7–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition for Approval of
Amendments to the Bylaws of the North
American Electric Reliability
Corporation.
Filed Date: 6/4/18.
Accession Number: 20180604–5136.
Comments Due: 5 p.m. ET 6/25/18.
Docket Numbers: RR18–8–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of
Amendments to the Midwest Reliability
Organization Bylaws.
Filed Date: 6/4/18.
Accession Number: 20180604–5137.
Comments Due: 5 p.m. ET 6/25/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
VerDate Sep<11>2014
19:19 Jun 08, 2018
Jkt 244001
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=
bic&directory=2018-06-20.
Dated: June 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=
oc&directory=2018-06-21.
[FR Doc. 2018–12464 Filed 6–8–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
NYISO Operating Committee Meeting
June 21, 2018, 10:00 a.m.–4:00 p.m.
(EST)
Federal Energy Regulatory
Commission
NYISO Electric System Planning
Working Group and Transmission
Planning Advisory Meeting
Notice of Commission Staff
Attendance
June 22, 2018, 11:00 a.m.–2:00 p.m.
(EST)
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meetings related to the
transmission planning activities of the
New York Independent System
Operator, Inc. (NYISO):
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic_
espwg&directory=2018-06-22.
NYISO Management Committee
Meeting
NYISO Special Management Committee
Meeting
June 12, 2018, 10:00 a.m.–2:00 p.m.
(EST)
June 26, 2018, 10:00 a.m.–12:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=
mc&directory=2018-06-12.
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=
mc&directory=2018-06-26.
NYISO Electric System Planning
Working Group and Transmission
Planning Advisory Meeting
NYISO Electric System Planning
Working Group Meeting
June 14, 2018, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic_
espwg&directory=2018-06-14.
NYISO Business Issues Committee
Meeting
June 20, 2018, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
June 28, 2018, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/
committees/documents.jsp?com=bic_
espwg&directory=2018-06-28.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
New York Independent System
Operator, Inc., Docket No. ER13–102.
New York Independent System
Operator, Inc., Docket No. ER15–2059.
New York Independent System
Operator, Inc., Docket No. ER17–2327.
For more information, contact James
Eason, Office of Energy Market
E:\FR\FM\11JNN1.SGM
11JNN1
Agencies
[Federal Register Volume 83, Number 112 (Monday, June 11, 2018)]
[Notices]
[Pages 26995-26996]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-12464]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-97-000.
Applicants: NextEra Energy Transmission Southwest, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of NextEra Energy Transmission Southwest, LLC.
Filed Date: 6/5/18.
Accession Number: 20180605-5094.
Comments Due: 5 p.m. ET 6/26/18.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG18-95-000.
Applicants: Langdon Renewables, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Langdon Renewables, LLC.
Filed Date: 6/5/18.
Accession Number: 20180605-5083.
Comments Due: 5 p.m. ET 6/26/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-1173-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2018-06-05_Deficiency response for
Locational Filing to be effective 5/30/2018.
Filed Date: 6/5/18.
Accession Number: 20180605-5129.
Comments Due: 5 p.m. ET 6/26/18.
Docket Numbers: ER18-1743-000.
Applicants: New York Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: NYISO 205 filing of tariff
revisions to Alternate LCR to be effective 8/5/2018.
Filed Date: 6/5/18.
[[Page 26996]]
Accession Number: 20180605-5041.
Comments Due: 5 p.m. ET 6/26/18.
Docket Numbers: ER18-1744-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: Tri-State Trans Ownership,
O&M to be effective 8/5/2018.
Filed Date: 6/5/18.
Accession Number: 20180605-5067.
Comments Due: 5 p.m. ET 6/26/18.
Docket Numbers: ER18-1745-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Second Revised ISA SA No.
4063; Queue No. Y2-078/AB2-014/AD1-059 to be effective 5/7/2018.
Filed Date: 6/5/18.
Accession Number: 20180605-5097.
Comments Due: 5 p.m. ET 6/26/18.
Docket Numbers: ER18-1746-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Second Revised ISA SA No.
3903; Queue No. AC1-021 to be effective 5/7/2018.
Filed Date: 6/5/18.
Accession Number: 20180605-5121.
Comments Due: 5 p.m. ET 6/26/18.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR18-7-000.
Applicants: North American Electric Reliability Corporation.
Description: Petition for Approval of Amendments to the Bylaws of
the North American Electric Reliability Corporation.
Filed Date: 6/4/18.
Accession Number: 20180604-5136.
Comments Due: 5 p.m. ET 6/25/18.
Docket Numbers: RR18-8-000.
Applicants: North American Electric Reliability Corporation.
Description: Petition of the North American Electric Reliability
Corporation for Approval of Amendments to the Midwest Reliability
Organization Bylaws.
Filed Date: 6/4/18.
Accession Number: 20180604-5137.
Comments Due: 5 p.m. ET 6/25/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-12464 Filed 6-8-18; 8:45 am]
BILLING CODE 6717-01-P