Yuba County Water Agency; Notice of Availability of the Draft Environmental Impact Statement for the Yuba River Development Project, 26049-26050 [2018-11986]

Download as PDF Federal Register / Vol. 83, No. 108 / Tuesday, June 5, 2018 / Notices Dated: May 30, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–11992 Filed 6–4–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission amozie on DSK3GDR082PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–96–000. Applicants: ID Solar 1, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act and Request for Expedited Consideration and Confidential Treatment of ID Solar 1, LLC. Filed Date: 5/30/18. Accession Number: 20180530–5198. Comments Due: 5 p.m. ET 6/20/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1819–018; ER10–1817–016; ER10–1818–015; ER10–1820–021. Applicants: Northern States Power Company, a Minnesota corporation, Northern States Power Company, a Wisconsin corporation, Public Service Company of Colorado, Southwestern Public Service Company. Description: Notice of Change in Status of Northern States Power Company, a Minnesota corporation, et al. Filed Date: 5/29/18. Accession Number: 20180529–5235. Comments Due: 5 p.m. ET 6/19/18. Docket Numbers: ER17–1498–004. Applicants: Rockford Power II, LLC. Description: Compliance filing: Reactive Service Rate Schedule Compliance Filings to be effective 6/1/ 2017. Filed Date: 5/30/18. Accession Number: 20180530–5208. Comments Due: 5 p.m. ET 6/20/18. Docket Numbers: ER17–1499–004. Applicants: Rockford Power, LLC. Description: Compliance filing: Reactive Service Rate Schedule Compliance Filings to be effective 6/1/ 2017. Filed Date: 5/30/18. Accession Number: 20180530–5209. Comments Due: 5 p.m. ET 6/20/18. Docket Numbers: ER18–622–003. Applicants: Midcontinent Independent System Operator, Inc. VerDate Sep<11>2014 20:19 Jun 04, 2018 Jkt 241001 Description: Compliance filing: 2018– 05–29_Compliance filing regarding Order No. 831 Energy Offer Caps to be effective 12/31/9998. Filed Date: 5/29/18. Accession Number: 20180529–5228. Comments Due: 5 p.m. ET 6/19/18. Docket Numbers: ER18–1528–000. Applicants: PJM Interconnection, L.L.C. Description: Report Filing: Errata to Pending Filing in Docket No. ER18– 1528–000 RE: Attachment C to be effective N/A. Filed Date: 5/7/18. Accession Number: 20180507–5075. Comments Due: 5 p.m. ET 6/11/18. Docket Numbers: ER18–1695–000. Applicants: Puget Sound Energy, Inc. Description: Petition of Puget Sound Energy, Inc. for Limited Waiver of Tariff Provisions, et al. Filed Date: 5/29/18. Accession Number: 20180529–5249. Comments Due: 5 p.m. ET 6/19/18. Take notice that the Commission received the following electric reliability filings Docket Numbers: RD18–6–000. Applicants: North American Electric Reliability Corporation. Description: Errata Filing of the North American Electric Reliability Corporation to the Implementation Plan for the Revised Definition of ‘‘Remedial Action Scheme’’. Filed Date: 5/30/18. Accession Number: 20180530–5038. Comments Due: 5 p.m. ET 6/29/18. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR18–6–000. Applicants: North American Electric Reliability Corporation. Description: North American Electric Reliability Corporation’s Report of Comparisons of Budgeted to Actual Costs for 2017 for NERC and the Regional Entities. Filed Date: 5/30/18. Accession Number: 20180530–5196. Comments Due: 5 p.m. ET 6/20/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 26049 eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 30, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–11989 Filed 6–4–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2246–065—California] Yuba County Water Agency; Notice of Availability of the Draft Environmental Impact Statement for the Yuba River Development Project In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for license for the Yuba River Development Project (FERC No. 2246) and has prepared a draft environmental impact statement (EIS) for the project. The project is located on the Yuba River, North Yuba River, Middle Yuba River, and Oregon Creek in Yuba, Sierra, and Nevada Counties, California, and occupies 4,416.7 acres of federal lands administered by the Forest Service and 16.1 acres administered by the U.S. Army Corps of Engineers. The draft EIS contains staff’s evaluations of the applicant’s proposal and the alternatives for relicensing the Yuba River Development Project. The draft EIS documents the views of governmental agencies, nongovernmental organizations, affected Indian tribes, the public, the license applicant, and Commission staff. A copy of the draft EIS is available for review in the Commission’s Public Reference Branch, Room 2A, located at 888 First Street NE, Washington, DC 20426. The draft EIS also may be viewed on the Commission’s website at https:// www.ferc.gov under the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). E:\FR\FM\05JNN1.SGM 05JNN1 26050 Federal Register / Vol. 83, No. 108 / Tuesday, June 5, 2018 / Notices You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. All comments must be filed by July 30, 2018. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2246–065. Anyone may intervene in this proceeding based on this draft EIS (18 CFR 380.10). You must file your request to intervene as specified above.1 You do not need intervenor status to have your comments considered. Commission staff will hold two public meetings for the purpose of receiving comments on the draft EIS. The daytime meeting will focus on resource agency, Indian tribes, and non-governmental organization comments, while the evening meeting is primarily for receiving input from the public. All interested individuals and entities will be invited to attend one or both of the public meetings. A notice detailing the exact date, time, and location of the public meetings will be forthcoming. For further information, please contact Alan Mitchnick at (202) 502– 6074 or at alan.mitchnick@ferc.gov. Dated: May 30, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–11986 Filed 6–4–18; 8:45 am] amozie on DSK3GDR082PROD with NOTICES1 BILLING CODE 6717–01–P 1 Interventions may also be filed electronically via the internet in lieu of paper. See the previous discussion on filing comments electronically. VerDate Sep<11>2014 20:19 Jun 04, 2018 Jkt 241001 Dated: May 30, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2018–11990 Filed 6–4–18; 8:45 am] BILLING CODE 6717–01–P Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP18–839–000. Applicants: White River Hub, LLC. Description: Annual Report of Fuel Gas Reimbursement Percentage for 2018 of White River Hub, LLC. Filed Date: 5/23/18. Accession Number: 20180523–5230. Comments Due: 5 p.m. ET 6/4/18. Docket Numbers: RP18–840–000. Applicants: Questar Southern Trails Pipeline Company. Description: Annual Report of Fuel Gas Reimbursement Percentage for 2018 of Questar Southern Trails Pipeline Company. Filed Date: 5/23/18. Accession Number: 20180523–5231. Comments Due: 5 p.m. ET 6/4/18. Docket Numbers: RP18–841–000. Applicants: East Tennessee Natural Gas, LLC. Description: § 4(d) Rate Filing: Nonconforming Agreement Cleanup Filing to be effective 6/29/2018. Filed Date: 5/29/18. Accession Number: 20180529–5028. Comments Due: 5 p.m. ET 6/11/18. Docket Numbers: RP18–842–000. Applicants: El Paso Natural Gas Company, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate Update Filing (APS June 18) to be effective 6/1/2018. Filed Date: 5/29/18. Accession Number: 20180529–5065. Comments Due: 5 p.m. ET 6/11/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP18–791–001. Applicants: Cheniere Corpus Christi Pipeline, LP. Description: Tariff Amendment: Amendment to Negotiated Rate (physical contract) to be effective 6/1/ 2018. Filed Date: 5/24/18. Accession Number: 20180524–5186. Comments Due: 5 p.m. ET 6/1/18. Docket Numbers: RP18–836–000. Applicants: East Tennessee Natural Gas, LLC. Description: § 4(d) Rate Filing: Duke Energy Progress K410104 Neg Rate eff 11–1–2018 to be effective 11/1/2018. Filed Date: 5/25/18. Accession Number: 20180525–5039. Comments Due: 5 p.m. ET 6/6/18. Docket Numbers: RP18–837–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 052518 Negotiated Rates—Castleton Commodities Merchant Trading R– 4010–06 to be effective 5/25/2018. Filed Date: 5/25/18. Accession Number: 20180525–5044. Comments Due: 5 p.m. ET 6/6/18. Docket Numbers: RP18–838–000. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: § 4(d) Rate Filing: PCB Adjustment Period Extension through 2020 to be effective 7/1/2018. Filed Date: 5/25/18. Accession Number: 20180525–5105. Comments Due: 5 p.m. ET 6/6/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but E:\FR\FM\05JNN1.SGM 05JNN1

Agencies

[Federal Register Volume 83, Number 108 (Tuesday, June 5, 2018)]
[Notices]
[Pages 26049-26050]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-11986]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2246-065--California]


Yuba County Water Agency; Notice of Availability of the Draft 
Environmental Impact Statement for the Yuba River Development Project

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380, the Office of Energy Projects has 
reviewed the application for license for the Yuba River Development 
Project (FERC No. 2246) and has prepared a draft environmental impact 
statement (EIS) for the project. The project is located on the Yuba 
River, North Yuba River, Middle Yuba River, and Oregon Creek in Yuba, 
Sierra, and Nevada Counties, California, and occupies 4,416.7 acres of 
federal lands administered by the Forest Service and 16.1 acres 
administered by the U.S. Army Corps of Engineers.
    The draft EIS contains staff's evaluations of the applicant's 
proposal and the alternatives for relicensing the Yuba River 
Development Project. The draft EIS documents the views of governmental 
agencies, non-governmental organizations, affected Indian tribes, the 
public, the license applicant, and Commission staff.
    A copy of the draft EIS is available for review in the Commission's 
Public Reference Branch, Room 2A, located at 888 First Street NE, 
Washington, DC 20426. The draft EIS also may be viewed on the 
Commission's website at https://www.ferc.gov under the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY).

[[Page 26050]]

    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    All comments must be filed by July 30, 2018.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support. In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The 
first page of any filing should include docket number P-2246-065.
    Anyone may intervene in this proceeding based on this draft EIS (18 
CFR 380.10). You must file your request to intervene as specified 
above.\1\ You do not need intervenor status to have your comments 
considered.
---------------------------------------------------------------------------

    \1\ Interventions may also be filed electronically via the 
internet in lieu of paper. See the previous discussion on filing 
comments electronically.
---------------------------------------------------------------------------

    Commission staff will hold two public meetings for the purpose of 
receiving comments on the draft EIS. The daytime meeting will focus on 
resource agency, Indian tribes, and non-governmental organization 
comments, while the evening meeting is primarily for receiving input 
from the public. All interested individuals and entities will be 
invited to attend one or both of the public meetings. A notice 
detailing the exact date, time, and location of the public meetings 
will be forthcoming.
    For further information, please contact Alan Mitchnick at (202) 
502-6074 or at [email protected].

    Dated: May 30, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-11986 Filed 6-4-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.