Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act, 24983 [2018-11701]
Download as PDF
Federal Register / Vol. 83, No. 105 / Thursday, May 31, 2018 / Notices
stewardship; risk assessment and
management; and clean-up science and
technology activities). Comments
outside of the scope may be submitted
via written statement as directed above.
Minutes: Minutes will be available by
writing or calling Jennifer Woodard at
the address and phone number listed
above. Minutes will also be available at
the following website: https://
www.energy.gov/pppo/pgdp-cab/
listings/meeting-materials.
Issued at Washington, DC, on May 24,
2018.
Latanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2018–11709 Filed 5–30–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[Certification Notice—252]
Notice of Filing of Self-Certification of
Coal Capability Under the Powerplant
and Industrial Fuel Use Act
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of Filing.
AGENCY:
On April 25, 2018, Birdsboro
Power LLC, as owner and operator of a
new baseload electric generating
powerplant, submitted a coal capability
self-certification to the Department of
Energy (DOE). The FUA and regulations
thereunder require DOE to publish a
notice of filing of self-certification in the
Federal Register.
ADDRESSES: Copies of coal capability
self-certification filings are available for
public inspection, upon request, in the
Office of Electricity Delivery and Energy
Reliability, Mail Code OE–20, Room
8G–024, Forrestal Building, 1000
Independence Avenue SW, Washington,
DC 20585.
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence at (202) 586–
5260.
SUPPLEMENTARY INFORMATION: On April
25, 2018, Birdsboro Power LLC, as
owner and operator of a new baseload
electric generating powerplant,
submitted a coal capability selfcertification to the Department of
Energy (DOE) pursuant to § 201(d) of the
Powerplant and Industrial Fuel Use Act
of 1978 (FUA), as amended, and DOE
regulations in 10 CFR 501.60, 61. The
FUA and regulations thereunder require
DOE to publish a notice of filing of selfcertification in the Federal Register. 42
U.S.C. 8311(d)(1) and 10 CFR 501.61(c).
Title II of FUA, as amended (42 U.S.C.
8301 et seq.), provides that no new
baseload powerplant may be
amozie on DSK3GDR082PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
17:46 May 30, 2018
Jkt 241001
constructed or operated without the
capability to use coal or another
alternate fuel as a primary energy
source. Pursuant to the FUA, in order to
meet the requirement of coal capability,
the owner or operator of such a facility
proposing to use natural gas or
petroleum as its primary energy source
shall certify to the Secretary of Energy
(Secretary), prior to construction or
prior to operation as a baseload
powerplant, that such powerplant has
the capability to use coal or another
alternate fuel. Such certification
establishes compliance with FUA
section 201(a) as of the date it is filed
with the Secretary. 42 U.S.C. 8311.
The following owner of a proposed
new baseload electric generating
powerplant has filed a self-certification
of coal-capability with DOE pursuant to
FUA section 201(d) and in accordance
with DOE regulations in 10 CFR 501.60,
61:
Owner: Birdsboro Power LLC
Capacity: 525 megawatts (MW)
Plant Location: Birdsboro, Berks
County, PA
In–Service Date: Expected in
approximately April 2019
Issued in Washington, DC, on May 24,
2018.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity
Delivery and Energy Reliability.
[FR Doc. 2018–11701 Filed 5–30–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–486–000]
Texas Eastern Transmission, LP,
Transcontinental Gas Pipe Line
Company, LLC, Northern Natural Gas
Company; Notice of Application
Take notice that on May 18, 2018,
Texas Eastern Transmission, LP (Texas
Eastern), on behalf of itself,
Transcontinental Gas Pipe Line
Company, LLC and Northern Natural
Gas Company (collectively, the Joint
Owners), P.O. Box 1642, Houston, Texas
77251, filed in Docket No. CP18–486–
000, a joint application pursuant to
section 7(b) of the Natural Gas Act and
Part 157 of the Commission’s
regulations, to abandon a supply lateral
and related facilities located in offshore
federal waters in the Gulf of Mexico
near Louisiana. Specifically, the Joint
Owners propose to (i) abandon in place
about 12.0 miles of a 16-inch diameter
offshore supply lateral, designated as
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
24983
Line 41–A–8; (ii) abandon receipt point
numbers 73674 and 71710; and (iii)
abandon by removal all related
appurtenant facilities. The Joint Owners
state that the facilities proposed for
abandonment are not required to meet
current firm service obligations, all as
more fully set forth in the application,
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to Lisa
A. Connolly, Director, Rates &
Certificates, Texas Eastern
Transmission, LP, P.O. Box 1642,
Houston, Texas 77251, or telephone
(713) 627–4102, or fax (713) 627–5947
or by email lisa.connolly@enbridge.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
E:\FR\FM\31MYN1.SGM
31MYN1
Agencies
[Federal Register Volume 83, Number 105 (Thursday, May 31, 2018)]
[Notices]
[Page 24983]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-11701]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Certification Notice--252]
Notice of Filing of Self-Certification of Coal Capability Under
the Powerplant and Industrial Fuel Use Act
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of Filing.
-----------------------------------------------------------------------
SUMMARY: On April 25, 2018, Birdsboro Power LLC, as owner and operator
of a new baseload electric generating powerplant, submitted a coal
capability self-certification to the Department of Energy (DOE). The
FUA and regulations thereunder require DOE to publish a notice of
filing of self-certification in the Federal Register.
ADDRESSES: Copies of coal capability self-certification filings are
available for public inspection, upon request, in the Office of
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW, Washington, DC
20585.
FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.
SUPPLEMENTARY INFORMATION: On April 25, 2018, Birdsboro Power LLC, as
owner and operator of a new baseload electric generating powerplant,
submitted a coal capability self-certification to the Department of
Energy (DOE) pursuant to Sec. 201(d) of the Powerplant and Industrial
Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR
501.60, 61. The FUA and regulations thereunder require DOE to publish a
notice of filing of self-certification in the Federal Register. 42
U.S.C. 8311(d)(1) and 10 CFR 501.61(c). Title II of FUA, as amended (42
U.S.C. 8301 et seq.), provides that no new baseload powerplant may be
constructed or operated without the capability to use coal or another
alternate fuel as a primary energy source. Pursuant to the FUA, in
order to meet the requirement of coal capability, the owner or operator
of such a facility proposing to use natural gas or petroleum as its
primary energy source shall certify to the Secretary of Energy
(Secretary), prior to construction or prior to operation as a baseload
powerplant, that such powerplant has the capability to use coal or
another alternate fuel. Such certification establishes compliance with
FUA section 201(a) as of the date it is filed with the Secretary. 42
U.S.C. 8311.
The following owner of a proposed new baseload electric generating
powerplant has filed a self-certification of coal-capability with DOE
pursuant to FUA section 201(d) and in accordance with DOE regulations
in 10 CFR 501.60, 61:
Owner: Birdsboro Power LLC
Capacity: 525 megawatts (MW)
Plant Location: Birdsboro, Berks County, PA
In-Service Date: Expected in approximately April 2019
Issued in Washington, DC, on May 24, 2018.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy
Reliability.
[FR Doc. 2018-11701 Filed 5-30-18; 8:45 am]
BILLING CODE 6450-01-P