Download as PDF 24514 Federal Register / Vol. 83, No. 103 / Tuesday, May 29, 2018 / Notices and reporting requirements are not subject to the NRC’s backfitting and issue finality regulations in 10 CFR 50.109, 10 CFR 70.76, 10 CFR 72.62, 10 CFR 76.76, and 10 CFR part 52 (e.g., ‘‘Material Control and Accounting Methods,’’ December 23, 2002 (67 FR 78130), and ‘‘Regulatory Improvements to the Nuclear Materials Management and Safeguards System,’’ June 9, 2008 (73 FR 32453)). Therefore, the NRC has determined that its backfitting and issue finality regulations would not apply to this RG because they do not include any provisions within the scope of matters covered by the backfitting provisions in 10 CFR parts 50, 70, 72, or 76, or the issue finality provisions of 10 CFR part 52. Dated at Rockville, Maryland, this 22nd day of May, 2018. For the Nuclear Regulatory Commission. Thomas H. Boyce, Chief, Regulatory Guidance and Generic Issues Branch, Division of Engineering, Office of Nuclear Regulatory Research. [FR Doc. 2018–11374 Filed 5–25–18; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 50–440; NRC–2018–0021] FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant, Unit No. 1 Nuclear Regulatory Commission. ACTION: License amendment application; withdrawal by applicant. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) has granted the request of FirstEnergy Nuclear Operating Company to withdraw its application dated December 20, 2017, for a proposed amendment to the Perry Nuclear Power Plant, Unit. No. 1, Facility Operating License No. NPF–58. The proposed amendment would have modified the facility technical specifications (TSs) pertaining to direct current electrical systems, specifically limiting conditions for operation 3.8.4, 3.8.5, and 3.8.6. The proposed amendment would have also added a new Battery and Monitoring Maintenance Program to TS Section 5.5, ‘‘Programs and Manuals.’’ DATES: May 29, 2018. ADDRESSES: Please refer to Docket ID NRC–2018–0021 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available daltland on DSKBBV9HB2PROD with NOTICES SUMMARY: VerDate Sep<11>2014 16:39 May 25, 2018 Jkt 244001 information related to this document using any of the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0021. Address questions about NRC dockets to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Kimberly Green, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 1627, email: Kimberly.Green@nrc.gov. SUPPLEMENTARY INFORMATION: The NRC has granted the request of FirstEnergy Nuclear Operating Company (the licensee) to withdraw its December 20, 2017, application (ADAMS Accession No. ML17355A019) for proposed amendment to Facility Operating License No. NPF–58 for the Perry Nuclear Power Plant, Unit No. 1, located in Lake County, Ohio. The proposed amendment would have revised TS requirements related to direct current electrical systems, specifically limiting conditions for operation 3.8.4, 3.8.5, and 3.8.6. The amendment would have also added a new Battery and Monitoring Maintenance Program to TS Section 5.5, ‘‘Programs and Manuals.’’ The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on February 13, 2018 (83 FR 6225). However, by letter dated May 14, 2018, the licensee withdrew the proposed change (ADAMS Accession No. ML18135A012). PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 For further details with respect to this action, see the application for amendment dated December 20, 2017, and the licensee’s letter dated May 14, 2018, which withdrew the application for license amendment. Dated at Rockville, Maryland, this 22nd day of May 2018. For the Nuclear Regulatory Commission. Kimberly J. Green, Senior Project Manager, Plant Licensing Branch III, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2018–11375 Filed 5–25–18; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards; Notice of Meeting In accordance with the purposes of Sections 29 and 182b of the Atomic Energy Act (42 U.S.C. 2039, 2232b), the Advisory Committee on Reactor Safeguards (ACRS) will hold meetings on June 6–8, 2018, 11545 Rockville Pike, Rockville, Maryland 20852. Wednesday, June 6, 2018, Conference Room T–2B1, 11545 Rockville Pike, Rockville, Maryland 20852 1:00 p.m.–1:05 p.m.: Opening Remarks by the ACRS Chairman (Open)—The ACRS Chairman will make opening remarks regarding the conduct of the meeting. 1:05 p.m.–3:00 p.m.: Digital Instrumentation & Controls Interim Staff Guidance-06, ‘‘Task Working Group #6: Licensing Process’’ and Common Cause Failure (Open)—The Committee will have briefings by and discussion with representatives of the NRC staff regarding the subject topics. 3:15 p.m.–4:45 p.m.: APR1400: LongTerm Core Cooling (Open/Closed)—The Committee will have briefings by and discussion with representatives of the NRC staff and KNHP regarding this topic. [Note: A portion of this session may be closed in order to discuss and protect information designated as proprietary, pursuant to 5 U.S.C 552b(c)(4)] 4:45 p.m.–5:15 p.m.: APR1400: Large Break Loss-of-Coolant-Accident (LBLOCA) (Closed)—The Committee will have briefings by and discussion with representatives of the NRC staff and KNHP regarding the safety evaluation associated with the subject topical report. [Note: This session is closed in order to discuss and protect information designated as proprietary, pursuant to 5 U.S.C 552b(c)(4)] E:\FR\FM\29MYN1.SGM 29MYN1

Agencies

[Federal Register Volume 83, Number 103 (Tuesday, May 29, 2018)]
[Notices]
[Page 24514]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-11375]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-440; NRC-2018-0021]


FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant, 
Unit No. 1

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; withdrawal by applicant.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has granted the 
request of FirstEnergy Nuclear Operating Company to withdraw its 
application dated December 20, 2017, for a proposed amendment to the 
Perry Nuclear Power Plant, Unit. No. 1, Facility Operating License No. 
NPF-58. The proposed amendment would have modified the facility 
technical specifications (TSs) pertaining to direct current electrical 
systems, specifically limiting conditions for operation 3.8.4, 3.8.5, 
and 3.8.6. The proposed amendment would have also added a new Battery 
and Monitoring Maintenance Program to TS Section 5.5, ``Programs and 
Manuals.''

DATES: May 29, 2018.

ADDRESSES: Please refer to Docket ID NRC-2018-0021 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0021. Address 
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Kimberly Green, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-1627, email: [email protected].

SUPPLEMENTARY INFORMATION: The NRC has granted the request of 
FirstEnergy Nuclear Operating Company (the licensee) to withdraw its 
December 20, 2017, application (ADAMS Accession No. ML17355A019) for 
proposed amendment to Facility Operating License No. NPF-58 for the 
Perry Nuclear Power Plant, Unit No. 1, located in Lake County, Ohio.
    The proposed amendment would have revised TS requirements related 
to direct current electrical systems, specifically limiting conditions 
for operation 3.8.4, 3.8.5, and 3.8.6. The amendment would have also 
added a new Battery and Monitoring Maintenance Program to TS Section 
5.5, ``Programs and Manuals.''
    The Commission had previously issued a Notice of Consideration of 
Issuance of Amendment published in the Federal Register on February 13, 
2018 (83 FR 6225). However, by letter dated May 14, 2018, the licensee 
withdrew the proposed change (ADAMS Accession No. ML18135A012).
    For further details with respect to this action, see the 
application for amendment dated December 20, 2017, and the licensee's 
letter dated May 14, 2018, which withdrew the application for license 
amendment.

    Dated at Rockville, Maryland, this 22nd day of May 2018.

    For the Nuclear Regulatory Commission.
Kimberly J. Green,
Senior Project Manager, Plant Licensing Branch III, Division of 
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.