FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant, Unit No. 1, 24514 [2018-11375]
Download as PDF
24514
Federal Register / Vol. 83, No. 103 / Tuesday, May 29, 2018 / Notices
and reporting requirements are not
subject to the NRC’s backfitting and
issue finality regulations in 10 CFR
50.109, 10 CFR 70.76, 10 CFR 72.62, 10
CFR 76.76, and 10 CFR part 52 (e.g.,
‘‘Material Control and Accounting
Methods,’’ December 23, 2002 (67 FR
78130), and ‘‘Regulatory Improvements
to the Nuclear Materials Management
and Safeguards System,’’ June 9, 2008
(73 FR 32453)). Therefore, the NRC has
determined that its backfitting and issue
finality regulations would not apply to
this RG because they do not include any
provisions within the scope of matters
covered by the backfitting provisions in
10 CFR parts 50, 70, 72, or 76, or the
issue finality provisions of 10 CFR part
52.
Dated at Rockville, Maryland, this 22nd
day of May, 2018.
For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guidance and Generic
Issues Branch, Division of Engineering, Office
of Nuclear Regulatory Research.
[FR Doc. 2018–11374 Filed 5–25–18; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–440; NRC–2018–0021]
FirstEnergy Nuclear Operating
Company, Perry Nuclear Power Plant,
Unit No. 1
Nuclear Regulatory
Commission.
ACTION: License amendment application;
withdrawal by applicant.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has granted the
request of FirstEnergy Nuclear
Operating Company to withdraw its
application dated December 20, 2017,
for a proposed amendment to the Perry
Nuclear Power Plant, Unit. No. 1,
Facility Operating License No. NPF–58.
The proposed amendment would have
modified the facility technical
specifications (TSs) pertaining to direct
current electrical systems, specifically
limiting conditions for operation 3.8.4,
3.8.5, and 3.8.6. The proposed
amendment would have also added a
new Battery and Monitoring
Maintenance Program to TS Section 5.5,
‘‘Programs and Manuals.’’
DATES: May 29, 2018.
ADDRESSES: Please refer to Docket ID
NRC–2018–0021 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
daltland on DSKBBV9HB2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
16:39 May 25, 2018
Jkt 244001
information related to this document
using any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0021. Address
questions about NRC dockets to Jennifer
Borges; telephone: 301–287–9127;
email: Jennifer.Borges@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Kimberly Green, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
1627, email: Kimberly.Green@nrc.gov.
SUPPLEMENTARY INFORMATION: The NRC
has granted the request of FirstEnergy
Nuclear Operating Company (the
licensee) to withdraw its December 20,
2017, application (ADAMS Accession
No. ML17355A019) for proposed
amendment to Facility Operating
License No. NPF–58 for the Perry
Nuclear Power Plant, Unit No. 1, located
in Lake County, Ohio.
The proposed amendment would
have revised TS requirements related to
direct current electrical systems,
specifically limiting conditions for
operation 3.8.4, 3.8.5, and 3.8.6. The
amendment would have also added a
new Battery and Monitoring
Maintenance Program to TS Section 5.5,
‘‘Programs and Manuals.’’
The Commission had previously
issued a Notice of Consideration of
Issuance of Amendment published in
the Federal Register on February 13,
2018 (83 FR 6225). However, by letter
dated May 14, 2018, the licensee
withdrew the proposed change (ADAMS
Accession No. ML18135A012).
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
For further details with respect to this
action, see the application for
amendment dated December 20, 2017,
and the licensee’s letter dated May 14,
2018, which withdrew the application
for license amendment.
Dated at Rockville, Maryland, this 22nd
day of May 2018.
For the Nuclear Regulatory Commission.
Kimberly J. Green,
Senior Project Manager, Plant Licensing
Branch III, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2018–11375 Filed 5–25–18; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards; Notice of Meeting
In accordance with the purposes of
Sections 29 and 182b of the Atomic
Energy Act (42 U.S.C. 2039, 2232b), the
Advisory Committee on Reactor
Safeguards (ACRS) will hold meetings
on June 6–8, 2018, 11545 Rockville
Pike, Rockville, Maryland 20852.
Wednesday, June 6, 2018, Conference
Room T–2B1, 11545 Rockville Pike,
Rockville, Maryland 20852
1:00 p.m.–1:05 p.m.: Opening
Remarks by the ACRS Chairman
(Open)—The ACRS Chairman will make
opening remarks regarding the conduct
of the meeting.
1:05 p.m.–3:00 p.m.: Digital
Instrumentation & Controls Interim Staff
Guidance-06, ‘‘Task Working Group #6:
Licensing Process’’ and Common Cause
Failure (Open)—The Committee will
have briefings by and discussion with
representatives of the NRC staff
regarding the subject topics.
3:15 p.m.–4:45 p.m.: APR1400: LongTerm Core Cooling (Open/Closed)—The
Committee will have briefings by and
discussion with representatives of the
NRC staff and KNHP regarding this
topic. [Note: A portion of this session
may be closed in order to discuss and
protect information designated as
proprietary, pursuant to 5 U.S.C
552b(c)(4)]
4:45 p.m.–5:15 p.m.: APR1400: Large
Break Loss-of-Coolant-Accident
(LBLOCA) (Closed)—The Committee
will have briefings by and discussion
with representatives of the NRC staff
and KNHP regarding the safety
evaluation associated with the subject
topical report. [Note: This session is
closed in order to discuss and protect
information designated as proprietary,
pursuant to 5 U.S.C 552b(c)(4)]
E:\FR\FM\29MYN1.SGM
29MYN1
Agencies
[Federal Register Volume 83, Number 103 (Tuesday, May 29, 2018)]
[Notices]
[Page 24514]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-11375]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-440; NRC-2018-0021]
FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant,
Unit No. 1
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; withdrawal by applicant.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has granted the
request of FirstEnergy Nuclear Operating Company to withdraw its
application dated December 20, 2017, for a proposed amendment to the
Perry Nuclear Power Plant, Unit. No. 1, Facility Operating License No.
NPF-58. The proposed amendment would have modified the facility
technical specifications (TSs) pertaining to direct current electrical
systems, specifically limiting conditions for operation 3.8.4, 3.8.5,
and 3.8.6. The proposed amendment would have also added a new Battery
and Monitoring Maintenance Program to TS Section 5.5, ``Programs and
Manuals.''
DATES: May 29, 2018.
ADDRESSES: Please refer to Docket ID NRC-2018-0021 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0021. Address
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that it is mentioned in this
document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Kimberly Green, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-1627, email: [email protected].
SUPPLEMENTARY INFORMATION: The NRC has granted the request of
FirstEnergy Nuclear Operating Company (the licensee) to withdraw its
December 20, 2017, application (ADAMS Accession No. ML17355A019) for
proposed amendment to Facility Operating License No. NPF-58 for the
Perry Nuclear Power Plant, Unit No. 1, located in Lake County, Ohio.
The proposed amendment would have revised TS requirements related
to direct current electrical systems, specifically limiting conditions
for operation 3.8.4, 3.8.5, and 3.8.6. The amendment would have also
added a new Battery and Monitoring Maintenance Program to TS Section
5.5, ``Programs and Manuals.''
The Commission had previously issued a Notice of Consideration of
Issuance of Amendment published in the Federal Register on February 13,
2018 (83 FR 6225). However, by letter dated May 14, 2018, the licensee
withdrew the proposed change (ADAMS Accession No. ML18135A012).
For further details with respect to this action, see the
application for amendment dated December 20, 2017, and the licensee's
letter dated May 14, 2018, which withdrew the application for license
amendment.
Dated at Rockville, Maryland, this 22nd day of May 2018.
For the Nuclear Regulatory Commission.
Kimberly J. Green,
Senior Project Manager, Plant Licensing Branch III, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.