Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests: TCAI Incorporated; Waneta Holdings (US) Inc., 24104 [2018-11176]

Download as PDF 24104 Federal Register / Vol. 83, No. 101 / Thursday, May 24, 2018 / Notices submitted a response to the March 15, 2018 Show Cause Order.1 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on June 4, 2018. Dated: May 18, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–11163 Filed 5–23–18; 8:45 am] sradovich on DSK3GMQ082PROD with NOTICES BILLING CODE 6717–01–P 1 Alcoa Power Generation, Inc.—Long Sault Division, et al., 162 FERC ¶ 61,224 (2018) (Show Cause Order). VerDate Sep<11>2014 18:10 May 23, 2018 Jkt 244001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2103–006] Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests: TCAI Incorporated; Waneta Holdings (US) Inc. On May 2, 2018, TCAI Incorporated (transferor) and Waneta Holdings (US) Inc. (transferee) filed an application for the transfer of license of the Cedar Creek Project No. 2103. The project is located on Cedar Creek in Stevens County, Washington, and partially occupies Federal lands managed by the U.S. Department of Interior’s Bureau of Land Management. The applicants seek Commission approval to transfer the license for the Cedar Creek Project from the transferor to the transferee. Applicants Contact: For transferor: Mr. Phil Pesek, Vice president General Counsel & Secretary, TCAI Incorporated, 501 North Riverpoint Blvd., Suite 300, Spokane, WA 99202, Phone: 509–623– 4544, Email: Phil.Pesek@teck.com and Ms. Pamela J. Anderson, Perkins Coie LLP, 10885 NE 4th Street, Suite 700, Bellevue, WA 98004–5579, Phone: 425– 635–1417, Email: PJAnderson@ perkinsscoie.com. For transferee: Ms. Amy McCallion, Corporate Secretary, British Columbia Hydro and Power Authority, 13th Floor, 333 Dunsmuir St., Vancouver, B.C. V6B 5R3, Canada, Phone: 604–623–4234, Email: amy.mccallion@bchydro.com, Mr. David R. Poe, Bracewell LLP, 2001 M Street NW, Suite 900, Washington, DC 20006, Phone: 202–828–5800, Email: dave.poe@bracewell.com, and Ms. Jessica W. Miller, Bracewell LLP, 2300 Congress Ave., Suite 2300, Austin, TX 78701, Phone: 512–494–3606, Email: Jessica.miller@bracewell.com. FERC Contact: Patricia W. Gillis, (202) 502–8735, patricia.gillis@ferc.gov. Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2103–006. Dated: May 18, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–11176 Filed 5–23–18; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPPT–2018–0174; FRL–9978–21] Advance Notice of Public Meeting; Technical Issues—Formaldehyde Emission Standards for Composite Wood Products Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: This notice announces EPA’s plan for a public meeting regarding technical issues in the Formaldehyde Emission Standards for Composite Wood Products Final Rule published on December 12, 2016. The meeting will inform EPA’s potential development of a proposed rule to address these technical issues and to further align the rule requirements with the California Air Resources Board (CARB) Airborne Toxic Control Measures (ATCM) Phase II program. The primary audience for this public meeting is Third Party Certifiers (TPCs) and panel producers who contract with TPCs to certify composite wood products under the December 12, 2016 final rule; however, this meeting is open to the public. DATES: The meeting will be held on June 28, 2018 from 1:00 p.m. EDT to 4:00 p.m. EDT. EPA will accept questions from the public in advance of the meeting, and will address these questions during the meeting as time allows, if such questions are received by June 22, 2018. Members of the public who register to speak at the meeting may make comments and may ask additional questions. Online requests to participate in the meeting must be received on or before June 8, 2018. On-site registration will be permitted, but seating and speaking priority will be given to those who pre-register by the deadline. See Unit III.B. for information on public participation in the meeting. SUMMARY: E:\FR\FM\24MYN1.SGM 24MYN1

Agencies

[Federal Register Volume 83, Number 101 (Thursday, May 24, 2018)]
[Notices]
[Page 24104]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-11176]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2103-006]


Notice of Application for Transfer of License and Soliciting 
Comments, Motions To Intervene, and Protests: TCAI Incorporated; Waneta 
Holdings (US) Inc.

    On May 2, 2018, TCAI Incorporated (transferor) and Waneta Holdings 
(US) Inc. (transferee) filed an application for the transfer of license 
of the Cedar Creek Project No. 2103. The project is located on Cedar 
Creek in Stevens County, Washington, and partially occupies Federal 
lands managed by the U.S. Department of Interior's Bureau of Land 
Management.
    The applicants seek Commission approval to transfer the license for 
the Cedar Creek Project from the transferor to the transferee.
    Applicants Contact: For transferor: Mr. Phil Pesek, Vice president 
General Counsel & Secretary, TCAI Incorporated, 501 North Riverpoint 
Blvd., Suite 300, Spokane, WA 99202, Phone: 509-623-4544, Email: 
[email protected] and Ms. Pamela J. Anderson, Perkins Coie LLP, 10885 
NE 4th Street, Suite 700, Bellevue, WA 98004-5579, Phone: 425-635-1417, 
Email: [email protected].
    For transferee: Ms. Amy McCallion, Corporate Secretary, British 
Columbia Hydro and Power Authority, 13th Floor, 333 Dunsmuir St., 
Vancouver, B.C. V6B 5R3, Canada, Phone: 604-623-4234, Email: 
[email protected], Mr. David R. Poe, Bracewell LLP, 2001 M 
Street NW, Suite 900, Washington, DC 20006, Phone: 202-828-5800, Email: 
[email protected], and Ms. Jessica W. Miller, Bracewell LLP, 2300 
Congress Ave., Suite 2300, Austin, TX 78701, Phone: 512-494-3606, 
Email: [email protected].
    FERC Contact: Patricia W. Gillis, (202) 502-8735, 
[email protected].
    Deadline for filing comments, motions to intervene, and protests: 
30 days from the date that the Commission issues this notice. The 
Commission strongly encourages electronic filing. Please file comments, 
motions to intervene, and protests using the Commission's eFiling 
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE, Washington, DC 20426. The first page of any filing should 
include docket number P-2103-006.

    Dated: May 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-11176 Filed 5-23-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.