Environmental Impact Statements; Notice of Availability, 23461 [2018-10937]
Download as PDF
Federal Register / Vol. 83, No. 98 / Monday, May 21, 2018 / Notices
with BP in a Consent Decree approved
by the United States District Court for
the Eastern District of Louisiana.
Pursuant to that Consent Decree,
restoration projects in the Louisiana
Restoration Area are now chosen and
managed by the Louisiana TIG. The
Louisiana TIG is composed of the
following Trustees: CPRA, LOSCO,
LDEQ, LDWF, LDNR, EPA, DOI, NOAA,
USDA.
sradovich on DSK3GMQ082PROD with NOTICES
Background
In the December 2017 Draft RP/EA #2,
the Louisiana TIG presented to the
public its plan for providing partial
compensation for recreational use
services lost as a result of the Deepwater
Horizon oil spill. The public comment
period for the Draft RP/EA #2 began on
December 20, 2017, and closed on
February 2, 2018. The Louisiana TIG
hosted a public meeting on January 24,
2018, in New Orleans. The Draft RP/EA
#2 proposed four restoration projects,
evaluated in accordance with OPA and
NEPA, including the Elmer’s Island
Access project. As proposed, the Elmer’s
Island Access project would enhance
recreational opportunities within the
Elmer’s Island Refuge by incorporating
a suite of features to improve upon
existing access points, enhance the
natural features of the area through
reconnected hydrology, and develop a
solution for improved access for
recreational fishing activities targeting
the eastern portion of Elmer’s Island
adjacent to Caminada Pass. In response
to the public comments received on the
Elmer’s Island Access project proposed
in the Draft RP/EA #2, the Louisiana
TIG is proposing a modification to the
original project feature. This
modification would eliminate the
proposed boardwalk and associated
small boat launch and parking area at
Elmer’s Island, and provide a beach
shuttle service that would allow
improved public access to Caminada
Pass, the most popular location for
recreational fishing on Elmer’s Island.
The Louisiana TIG has prepared the
Draft Supplemental RP/EA to inform the
public about the proposed modification
to the Elmer’s Island Access project and
to seek public comment.
Next Steps
The public is encouraged to review
and comment on the Draft
Supplemental RP/EA. A public meeting
is scheduled to also help facilitate the
public review and comment process.
Comments provided on the Draft
Supplemental RP/EA will be considered
along with comments previously
received on the Draft RP/EA #2. A
summary of comments received on the
VerDate Sep<11>2014
18:20 May 18, 2018
Jkt 244001
Draft Supplemental RP/EA and the Draft
RP/EA #2 and the Louisiana TIG’s
responses, where applicable, will be
included in the Final Restoration Plan/
Environmental Assessment #2: Provide
and Enhance Recreational Opportunities
(Final RP/EA #2). Public comments on
the Draft Supplemental RP/EA will
inform the Louisiana TIG’s decision on
whether to select the Elmer’s Island
Access project, as modified, in the Final
RP/EA #2.
Administrative Record
The documents comprising the
Administrative Record for the Draft
Supplemental RP/EA can be viewed
electronically at https://www.doi.gov/
deepwaterhorizon/administrativerecord.
Authority
The authority for this action is the Oil
Pollution Act of 1990 (33 U.S.C. 2701 et
seq.), its implementing NRDA
regulations found at 15 CFR part 990,
and NEPA (42 U.S.C. 4321 et seq.).
Dated: May 3, 2018.
Benita Best-Wong,
Acting Principal Deputy Assistant
Administrator, Office of Water.
[FR Doc. 2018–10112 Filed 5–18–18; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9039–04–OP]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7156 or https://
www2.epa.gov/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 05/07/2018 Through 05/11/2018
Pursuant to 40 CFR 1506.9
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-nepa-public/
action/eis/search.
EIS No. 20180095, Final, USFWS, CA,
Final Environmental Impact
Statement/Environmental Impact
Report for the South Sacramento
Habitat Conservation Plan, Review
Period Ends: 06/21/2018, Contact:
Nina Bicknese 916–414–6633.
EIS No. 20180096, Final Supplement,
BLM, CA, Palen Solar Project
(formerly Palen Solar Power Project),
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
23461
Final Supplemental Environmental
Impact Statement/Environmental
Impact Report/Land Use Plan
Amendment, Review Period Ends: 06/
21/2018, Contact: Mark DeMaio 760–
833–7124.
EIS No. 20180097, Final, USFS, CO,
Travel Management—Rico West
Dolores Roads and Trails Project,
Review Period Ends: 06/21/2018,
Contact: Deborah Kill 970–882–6822.
EIS No. 20180098, Final, USFS, MT,
Starry Goat, Review Period Ends: 06/
21/2018, Contact: Lisa Osborn 406–
295–7426.
EIS No. 20180099, Draft, FAA, AZ,
Tucson International Airport—
Airfield Safety Enhancement Project,
Comment Period Ends: 07/09/2018,
Contact: David B. Kessler, AICP 310–
725–3615.
EIS No. 20180100, Final, USFS, CO, P
District-wide Salvage Project, Review
Period Ends: 07/05/2018, Contact:
Mike Tooley 719–274–6321.
EIS No. 20180101, Draft Supplement,
Caltrans, CA, SR 710 North Study
FRDEIR/SDEIS_05–09–18, Comment
Period Ends: 07/05/2018, Contact:
Jason Roach 213–897–0357.
EIS No. 20180102, Draft, NMFS, FL,
Coral Habitat Areas Considered for
Habitat Areas of Particular Concern
Designation in the Gulf of Mexico,
Comment Period Ends: 07/05/2018,
Contact: Lauren Waters 727–209–
5991.
EIS No. 20180103, Final, USFWS, CA,
Otay River Estuary Restoration
Project, South San Diego Bay Unit of
the San Diego Bay National Wildlife
Refuge, California, Final
Environmental Impact Statement,
Review Period Ends:
06/21/2018, Contact: Brian Collins
619–575–2704.
Dated: May 17, 2018.
Brittany Bolen,
Acting Assistant Administrator, Office of
Policy.
[FR Doc. 2018–10937 Filed 5–18–18; 8:45 am]
BILLING CODE 6560–50–P
DEPARTMENT OF HEALTH AND
HUMAN SERVICES
Food and Drug Administration
[Docket No. FDA–2017–D–6759]
Establishing Effectiveness for Drugs
Intended To Treat Male
Hypogonadotropic Hypogonadism
Attributed to Nonstructural Disorders;
Guidance for Industry; Availability
AGENCY:
Food and Drug Administration,
HHS.
E:\FR\FM\21MYN1.SGM
21MYN1
Agencies
[Federal Register Volume 83, Number 98 (Monday, May 21, 2018)]
[Notices]
[Page 23461]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10937]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9039-04-OP]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7156 or https://www2.epa.gov/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 05/07/2018 Through 05/11/2018
Pursuant to 40 CFR 1506.9
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-nepa-public/action/eis/search.
EIS No. 20180095, Final, USFWS, CA, Final Environmental Impact
Statement/Environmental Impact Report for the South Sacramento Habitat
Conservation Plan, Review Period Ends: 06/21/2018, Contact: Nina
Bicknese 916-414-6633.
EIS No. 20180096, Final Supplement, BLM, CA, Palen Solar Project
(formerly Palen Solar Power Project), Final Supplemental Environmental
Impact Statement/Environmental Impact Report/Land Use Plan Amendment,
Review Period Ends: 06/21/2018, Contact: Mark DeMaio 760-833-7124.
EIS No. 20180097, Final, USFS, CO, Travel Management--Rico West Dolores
Roads and Trails Project, Review Period Ends: 06/21/2018, Contact:
Deborah Kill 970-882-6822.
EIS No. 20180098, Final, USFS, MT, Starry Goat, Review Period Ends: 06/
21/2018, Contact: Lisa Osborn 406-295-7426.
EIS No. 20180099, Draft, FAA, AZ, Tucson International Airport--
Airfield Safety Enhancement Project, Comment Period Ends: 07/09/2018,
Contact: David B. Kessler, AICP 310-725-3615.
EIS No. 20180100, Final, USFS, CO, P District-wide Salvage Project,
Review Period Ends: 07/05/2018, Contact: Mike Tooley 719-274-6321.
EIS No. 20180101, Draft Supplement, Caltrans, CA, SR 710 North Study
FRDEIR/SDEIS_05-09-18, Comment Period Ends: 07/05/2018, Contact: Jason
Roach 213-897-0357.
EIS No. 20180102, Draft, NMFS, FL, Coral Habitat Areas Considered for
Habitat Areas of Particular Concern Designation in the Gulf of Mexico,
Comment Period Ends: 07/05/2018, Contact: Lauren Waters 727-209-5991.
EIS No. 20180103, Final, USFWS, CA, Otay River Estuary Restoration
Project, South San Diego Bay Unit of the San Diego Bay National
Wildlife Refuge, California, Final Environmental Impact Statement,
Review Period Ends: 06/21/2018, Contact: Brian Collins 619-575-2704.
Dated: May 17, 2018.
Brittany Bolen,
Acting Assistant Administrator, Office of Policy.
[FR Doc. 2018-10937 Filed 5-18-18; 8:45 am]
BILLING CODE 6560-50-P