Environmental Impact Statements; Notice of Availability, 23461 [2018-10937]

Download as PDF Federal Register / Vol. 83, No. 98 / Monday, May 21, 2018 / Notices with BP in a Consent Decree approved by the United States District Court for the Eastern District of Louisiana. Pursuant to that Consent Decree, restoration projects in the Louisiana Restoration Area are now chosen and managed by the Louisiana TIG. The Louisiana TIG is composed of the following Trustees: CPRA, LOSCO, LDEQ, LDWF, LDNR, EPA, DOI, NOAA, USDA. sradovich on DSK3GMQ082PROD with NOTICES Background In the December 2017 Draft RP/EA #2, the Louisiana TIG presented to the public its plan for providing partial compensation for recreational use services lost as a result of the Deepwater Horizon oil spill. The public comment period for the Draft RP/EA #2 began on December 20, 2017, and closed on February 2, 2018. The Louisiana TIG hosted a public meeting on January 24, 2018, in New Orleans. The Draft RP/EA #2 proposed four restoration projects, evaluated in accordance with OPA and NEPA, including the Elmer’s Island Access project. As proposed, the Elmer’s Island Access project would enhance recreational opportunities within the Elmer’s Island Refuge by incorporating a suite of features to improve upon existing access points, enhance the natural features of the area through reconnected hydrology, and develop a solution for improved access for recreational fishing activities targeting the eastern portion of Elmer’s Island adjacent to Caminada Pass. In response to the public comments received on the Elmer’s Island Access project proposed in the Draft RP/EA #2, the Louisiana TIG is proposing a modification to the original project feature. This modification would eliminate the proposed boardwalk and associated small boat launch and parking area at Elmer’s Island, and provide a beach shuttle service that would allow improved public access to Caminada Pass, the most popular location for recreational fishing on Elmer’s Island. The Louisiana TIG has prepared the Draft Supplemental RP/EA to inform the public about the proposed modification to the Elmer’s Island Access project and to seek public comment. Next Steps The public is encouraged to review and comment on the Draft Supplemental RP/EA. A public meeting is scheduled to also help facilitate the public review and comment process. Comments provided on the Draft Supplemental RP/EA will be considered along with comments previously received on the Draft RP/EA #2. A summary of comments received on the VerDate Sep<11>2014 18:20 May 18, 2018 Jkt 244001 Draft Supplemental RP/EA and the Draft RP/EA #2 and the Louisiana TIG’s responses, where applicable, will be included in the Final Restoration Plan/ Environmental Assessment #2: Provide and Enhance Recreational Opportunities (Final RP/EA #2). Public comments on the Draft Supplemental RP/EA will inform the Louisiana TIG’s decision on whether to select the Elmer’s Island Access project, as modified, in the Final RP/EA #2. Administrative Record The documents comprising the Administrative Record for the Draft Supplemental RP/EA can be viewed electronically at https://www.doi.gov/ deepwaterhorizon/administrativerecord. Authority The authority for this action is the Oil Pollution Act of 1990 (33 U.S.C. 2701 et seq.), its implementing NRDA regulations found at 15 CFR part 990, and NEPA (42 U.S.C. 4321 et seq.). Dated: May 3, 2018. Benita Best-Wong, Acting Principal Deputy Assistant Administrator, Office of Water. [FR Doc. 2018–10112 Filed 5–18–18; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9039–04–OP] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7156 or https:// www2.epa.gov/nepa/. Weekly receipt of Environmental Impact Statements Filed 05/07/2018 Through 05/11/2018 Pursuant to 40 CFR 1506.9 Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-nepa-public/ action/eis/search. EIS No. 20180095, Final, USFWS, CA, Final Environmental Impact Statement/Environmental Impact Report for the South Sacramento Habitat Conservation Plan, Review Period Ends: 06/21/2018, Contact: Nina Bicknese 916–414–6633. EIS No. 20180096, Final Supplement, BLM, CA, Palen Solar Project (formerly Palen Solar Power Project), PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 23461 Final Supplemental Environmental Impact Statement/Environmental Impact Report/Land Use Plan Amendment, Review Period Ends: 06/ 21/2018, Contact: Mark DeMaio 760– 833–7124. EIS No. 20180097, Final, USFS, CO, Travel Management—Rico West Dolores Roads and Trails Project, Review Period Ends: 06/21/2018, Contact: Deborah Kill 970–882–6822. EIS No. 20180098, Final, USFS, MT, Starry Goat, Review Period Ends: 06/ 21/2018, Contact: Lisa Osborn 406– 295–7426. EIS No. 20180099, Draft, FAA, AZ, Tucson International Airport— Airfield Safety Enhancement Project, Comment Period Ends: 07/09/2018, Contact: David B. Kessler, AICP 310– 725–3615. EIS No. 20180100, Final, USFS, CO, P District-wide Salvage Project, Review Period Ends: 07/05/2018, Contact: Mike Tooley 719–274–6321. EIS No. 20180101, Draft Supplement, Caltrans, CA, SR 710 North Study FRDEIR/SDEIS_05–09–18, Comment Period Ends: 07/05/2018, Contact: Jason Roach 213–897–0357. EIS No. 20180102, Draft, NMFS, FL, Coral Habitat Areas Considered for Habitat Areas of Particular Concern Designation in the Gulf of Mexico, Comment Period Ends: 07/05/2018, Contact: Lauren Waters 727–209– 5991. EIS No. 20180103, Final, USFWS, CA, Otay River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National Wildlife Refuge, California, Final Environmental Impact Statement, Review Period Ends: 06/21/2018, Contact: Brian Collins 619–575–2704. Dated: May 17, 2018. Brittany Bolen, Acting Assistant Administrator, Office of Policy. [FR Doc. 2018–10937 Filed 5–18–18; 8:45 am] BILLING CODE 6560–50–P DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA–2017–D–6759] Establishing Effectiveness for Drugs Intended To Treat Male Hypogonadotropic Hypogonadism Attributed to Nonstructural Disorders; Guidance for Industry; Availability AGENCY: Food and Drug Administration, HHS. E:\FR\FM\21MYN1.SGM 21MYN1

Agencies

[Federal Register Volume 83, Number 98 (Monday, May 21, 2018)]
[Notices]
[Page 23461]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10937]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9039-04-OP]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7156 or https://www2.epa.gov/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 05/07/2018 Through 05/11/2018
Pursuant to 40 CFR 1506.9

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-nepa-public/action/eis/search.
EIS No. 20180095, Final, USFWS, CA, Final Environmental Impact 
Statement/Environmental Impact Report for the South Sacramento Habitat 
Conservation Plan, Review Period Ends: 06/21/2018, Contact: Nina 
Bicknese 916-414-6633.
EIS No. 20180096, Final Supplement, BLM, CA, Palen Solar Project 
(formerly Palen Solar Power Project), Final Supplemental Environmental 
Impact Statement/Environmental Impact Report/Land Use Plan Amendment, 
Review Period Ends: 06/21/2018, Contact: Mark DeMaio 760-833-7124.
EIS No. 20180097, Final, USFS, CO, Travel Management--Rico West Dolores 
Roads and Trails Project, Review Period Ends: 06/21/2018, Contact: 
Deborah Kill 970-882-6822.
EIS No. 20180098, Final, USFS, MT, Starry Goat, Review Period Ends: 06/
21/2018, Contact: Lisa Osborn 406-295-7426.
EIS No. 20180099, Draft, FAA, AZ, Tucson International Airport--
Airfield Safety Enhancement Project, Comment Period Ends: 07/09/2018, 
Contact: David B. Kessler, AICP 310-725-3615.
EIS No. 20180100, Final, USFS, CO, P District-wide Salvage Project, 
Review Period Ends: 07/05/2018, Contact: Mike Tooley 719-274-6321.
EIS No. 20180101, Draft Supplement, Caltrans, CA, SR 710 North Study 
FRDEIR/SDEIS_05-09-18, Comment Period Ends: 07/05/2018, Contact: Jason 
Roach 213-897-0357.
EIS No. 20180102, Draft, NMFS, FL, Coral Habitat Areas Considered for 
Habitat Areas of Particular Concern Designation in the Gulf of Mexico, 
Comment Period Ends: 07/05/2018, Contact: Lauren Waters 727-209-5991.
EIS No. 20180103, Final, USFWS, CA, Otay River Estuary Restoration 
Project, South San Diego Bay Unit of the San Diego Bay National 
Wildlife Refuge, California, Final Environmental Impact Statement, 
Review Period Ends: 06/21/2018, Contact: Brian Collins 619-575-2704.

    Dated: May 17, 2018.
Brittany Bolen,
Acting Assistant Administrator, Office of Policy.
[FR Doc. 2018-10937 Filed 5-18-18; 8:45 am]
 BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.