Drawbridge Operation Regulation; Sacramento River, Walnut Grove, CA, 23221 [2018-10650]
Download as PDF
Federal Register / Vol. 83, No. 97 / Friday, May 18, 2018 / Rules and Regulations
The docket for this
deviation, USCG–2017–0390, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
ADDRESSES:
If
you have questions on this temporary
deviation, call or email Jeffrey Stieb;
Bridge Management Specialist, First
Coast Guard District, telephone 617–
223–8364, email Jeffrey.D.Stieb@
uscg.mil.
FOR FURTHER INFORMATION CONTACT:
sradovich on DSK3GMQ082PROD with RULES
SUPPLEMENTARY INFORMATION:
BILLING CODE 9110–04–P
VerDate Sep<11>2014
15:59 May 17, 2018
Jkt 244001
33 CFR Part 117
[Docket No. USCG–2018–0432]
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
owner, Vermont Agency of
Transportation, requested a temporary
deviation from the normal operating
schedule of the US2 Bridge, mile 91.8,
across Lake Champlain at North Hero
Island, Vermont. The drawbridge
navigation span has a vertical clearance
of 18 feet at ordinary low water in the
closed position. The existing bridge
operating regulations are found at 33
CFR 117.993(b).
Under this temporary deviation, the
US2 Bridge shall open daily on signal
only on the hour from 8 a.m. to 8 p.m.
from May 15, 2018 through October 15,
2018.
The waterway is transited by seasonal
recreational vessels of various sizes.
Several marina facilities are in the area
of the bridge. Vessels that are able to
pass under the bridge in the closed
position may do so at any time. The
bridge will be able to open for
emergencies, and for vessels unable to
pass through the bridge in the closed
position there is an alternate route to the
north under the Alburg Passage US2
fixed bridge. The Alburg Passage US2
Bridge has a vertical clearance of 25 feet
at ordinary low water. The Coast Guard
will inform the users of the waterway
through our Local and Broadcast
Notices to Mariners of the change in
operating schedule for the bridge so that
vessel operators can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
deviation. This deviation from the
operating regulations is authorized
under 33 CFR 117.35.
[FR Doc. 2018–10594 Filed 5–17–18; 8:45 am]
Coast Guard
Drawbridge Operation Regulation;
Sacramento River, Walnut Grove, CA
The bridge
Dated: May 7, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
DEPARTMENT OF HOMELAND
SECURITY
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Walnut Grove
Drawbridge across the Sacramento
River, mile 26.7, at Walnut Grove, CA.
The deviation is necessary to allow
participants in the AMGEN Tour of
California bicycle race to cross the
drawspan safely and without
interruption. This deviation allows the
bridge to remain in the closed-tonavigation position during the deviation
period.
DATES: This deviation is effective from
11 a.m. through 3 p.m. on May 17, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0432, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Carl T. Hausner,
Chief, Bridge Section, Eleventh Coast
Guard District; telephone 510–437–
3516, email Carl.T.Hausner@uscg.mil.
SUPPLEMENTARY INFORMATION:
Sacramento County has requested a
temporary change to the operation of the
Walnut Grove Drawbridge, mile 26.7,
over the Sacramento River, at Walnut
Grove, CA. The drawbridge navigation
span provides a vertical clearance of 21
feet above Mean High Water in the
closed-to-navigation position. The draw
operates as required by 33 CFR
117.189(a). Navigation on the waterway
is commercial and recreational.
The drawspan will be secured in the
closed-to-navigation position from 11
a.m. through 3 p.m. on May 17, 2018,
to allow the participants in the AMGEN
Tour of California bicycle race to cross
the drawspan safely and without
interruption. This temporary deviation
has been coordinated with the waterway
users. No objections to the proposed
temporary deviation were raised.
Vessels able to pass through the
bridge in the closed position may do so
at any time. The bridge will be able to
SUMMARY:
PO 00000
Frm 00015
Fmt 4700
Sfmt 4700
23221
open for emergencies and there is no
immediate alternate route for vessels to
pass. The Coast Guard will also inform
the users of the waterway through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: May 15, 2018.
C.T. Hausner,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2018–10650 Filed 5–17–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0431]
Drawbridge Operation Regulation;
Sacramento River, Freeport, CA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Sacramento
County highway bridge across the
Sacramento River, mile 46.0, at
Freeport, CA. The deviation is necessary
to allow participants in the AMGEN
Tour of California bicycle race to cross
the drawspan safely and without
interruption. This deviation allows the
bridge to remain in the closed-tonavigation position during the deviation
period.
DATES: This deviation is effective from
11 a.m. through 3 p.m. on May 17, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0431, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Carl T. Hausner,
Chief, Bridge Section, Eleventh Coast
Guard District; telephone 510–437–
3516, email Carl.T.Hausner@uscg.mil.
SUMMARY:
E:\FR\FM\18MYR1.SGM
18MYR1
Agencies
[Federal Register Volume 83, Number 97 (Friday, May 18, 2018)]
[Rules and Regulations]
[Page 23221]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10650]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2018-0432]
Drawbridge Operation Regulation; Sacramento River, Walnut Grove,
CA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Walnut Grove Drawbridge across the
Sacramento River, mile 26.7, at Walnut Grove, CA. The deviation is
necessary to allow participants in the AMGEN Tour of California bicycle
race to cross the drawspan safely and without interruption. This
deviation allows the bridge to remain in the closed-to-navigation
position during the deviation period.
DATES: This deviation is effective from 11 a.m. through 3 p.m. on May
17, 2018.
ADDRESSES: The docket for this deviation, USCG-2018-0432, is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Carl T. Hausner, Chief, Bridge
Section, Eleventh Coast Guard District; telephone 510-437-3516, email
[email protected].
SUPPLEMENTARY INFORMATION: Sacramento County has requested a temporary
change to the operation of the Walnut Grove Drawbridge, mile 26.7, over
the Sacramento River, at Walnut Grove, CA. The drawbridge navigation
span provides a vertical clearance of 21 feet above Mean High Water in
the closed-to-navigation position. The draw operates as required by 33
CFR 117.189(a). Navigation on the waterway is commercial and
recreational.
The drawspan will be secured in the closed-to-navigation position
from 11 a.m. through 3 p.m. on May 17, 2018, to allow the participants
in the AMGEN Tour of California bicycle race to cross the drawspan
safely and without interruption. This temporary deviation has been
coordinated with the waterway users. No objections to the proposed
temporary deviation were raised.
Vessels able to pass through the bridge in the closed position may
do so at any time. The bridge will be able to open for emergencies and
there is no immediate alternate route for vessels to pass. The Coast
Guard will also inform the users of the waterway through our Local and
Broadcast Notices to Mariners of the change in operating schedule for
the bridge so that vessel operators can arrange their transits to
minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: May 15, 2018.
C.T. Hausner,
District Bridge Chief, Eleventh Coast Guard District.
[FR Doc. 2018-10650 Filed 5-17-18; 8:45 am]
BILLING CODE 9110-04-P