Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utility Company Status, 23273 [2018-10614]

Download as PDF 23273 Federal Register / Vol. 83, No. 97 / Friday, May 18, 2018 / Notices Description: § 205(d) Rate Filing: Original ISA, SA No. 5072; Queue No. AB2–129 to be effective 4/16/2018. Filed Date: 5/14/18. Accession Number: 20180514–6094. Comments Due: 5 p.m. ET 6/4/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 14, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–10612 Filed 5–17–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utility Company Status Upstream Wind Energy LLC ............................................................................................................................................................. New Mexico Wind, LLC .................................................................................................................................................................... Wy’East Solar, LLC .......................................................................................................................................................................... Carlsbad Energy Center LLC ........................................................................................................................................................... ColGreen North Shore, LLC ............................................................................................................................................................. Panoche Valley Solar, LLC .............................................................................................................................................................. Elk City Renewables II, LLC ............................................................................................................................................................. Techren Solar II LLC ........................................................................................................................................................................ Parry Energy Storage, LP ................................................................................................................................................................ Elmira Energy Storage, LP ............................................................................................................................................................... Take notice that during the month of April 2018, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a) (2017). Dated: May 14, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–10614 Filed 5–17–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL18–145–000] daltland on DSKBBV9HB2PROD with NOTICES Notice of Complaint: Tilton Energy LLC v. PJM Interconnection, LLC Take notice that on May 11, 2018, pursuant to sections 206, 306, and 309 of the Federal Power Act, 16 U.S.C. 824e, 825e, and 825h (2012) and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206 (2017), Tilton Energy LLC (Complainant) filed a formal complaint against PJM Interconnection, L.L.C. (Respondent) requesting that the Commission direct Respondent to reverse its determination to terminate the Tilton Pseudo-Tie into the PJM balancing authority, as more fully explained in the complaint. VerDate Sep<11>2014 16:38 May 17, 2018 Jkt 244001 Tilton Energy LLC certifies that a copy of the Complaint was served on PJM. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondents’ answer and all interventions, or protests must be filed on or before the comment date. The Respondents’ answer, motions to intervene, and protests must be served on the Complainant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 EG18–40–000 EG18–41–000 EG18–43–000 EG18–44–000 EG18–45–000 EG18–46–000 EG18–47–000 EG18–48–000 FC18–1–000 FC18–2–000 email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on May 31, 2018. Dated: May 14, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–10617 Filed 5–17–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–1577–000] Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Thunder Spirit Wind, LLC This is a supplemental notice in the above-referenced proceeding of Thunder Spirit Wind, LLC‘s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to E:\FR\FM\18MYN1.SGM 18MYN1

Agencies

[Federal Register Volume 83, Number 97 (Friday, May 18, 2018)]
[Notices]
[Page 23273]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10614]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator and Foreign 
Utility Company Status

------------------------------------------------------------------------
 
------------------------------------------------------------------------
Upstream Wind Energy LLC.....................  EG18-40-000
New Mexico Wind, LLC.........................  EG18-41-000
Wy'East Solar, LLC...........................  EG18-43-000
Carlsbad Energy Center LLC...................  EG18-44-000
ColGreen North Shore, LLC....................  EG18-45-000
Panoche Valley Solar, LLC....................  EG18-46-000
Elk City Renewables II, LLC..................  EG18-47-000
Techren Solar II LLC.........................  EG18-48-000
Parry Energy Storage, LP.....................  FC18-1-000
Elmira Energy Storage, LP....................  FC18-2-000
------------------------------------------------------------------------

    Take notice that during the month of April 2018, the status of the 
above-captioned entities as Exempt Wholesale Generators or Foreign 
Utility Companies became effective by operation of the Commission's 
regulations. 18 CFR 366.7(a) (2017).

    Dated: May 14, 2018.
 Nathaniel J. Davis, Sr.,
 Deputy Secretary.
[FR Doc. 2018-10614 Filed 5-17-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.