Drawbridge Operation Regulation; Lake Champlain, North Hero Island, VT, 23220-23221 [2018-10594]

Download as PDF 23220 Federal Register / Vol. 83, No. 97 / Friday, May 18, 2018 / Rules and Regulations sradovich on DSK3GMQ082PROD with RULES § 100.T08–0320 Special Local Regulation; Monongahela River (MM 0.22), Allegheny River (MM 0.8), and Ohio River (MM 0.8), Pittsburgh, PA. Dated: May 9, 2018. L. Mcclain, Jr., Commander, U.S. Coast Guard, Captain of the Port Marine Safety Unit Pittsburgh. (a) Location. The following is a special local regulation for all navigable waters of the Allegheny, Monongahela, and Ohio Rivers between the Ninth Street Highway Bridge at mile marker (MM) 0.8, Allegheny River, Fort Pitt Highway Bridge at MM 0.22, Monongahela River, and West EndNorth Side Highway Bridge at MM 0.8, Ohio River. (b) Applicability. This section applies to any vessel operating within the area, including a naval or public vessel, except a vessel engaged in: (1) Law enforcement; (2) Servicing aids to navigation; or (3) Surveying, maintaining, or improving waters within the regulated area. (c) Regulations. (1) In accordance with the general regulations in § 100.801, no vessel shall loiter, anchor, stop, moor, remain, drift, or act in any manner as to impede safe passage of another vessel to any launching ramp, marina, or fleeting area unless authorized by the Captain of the Port Marine Safety Unit Pittsburgh (COTP) or a designated representative. (2) No vessel shall loiter, anchor, stop, moor, remain or drift at any time more than 100 feet from any riverbank within the regulated area unless authorized by the COTP or a designated representative. (3) Persons and vessels seeking entry into the regulated area must request permission from the COTP or a designated representative. A designated representative is a commissioned, warrant, or petty officer of the U.S. Coast Guard assigned to units under the operational control of USCG Marine Safety Unit Pittsburgh. They may be contacted on VHF–FM Channel 16. (4) Persons and vessels permitted to enter the regulated area must transit at their slowest safe speed and comply with all lawful directions issued by the COTP or the designated representative. (d) Effective period. This section is effective from 4 p.m. on June 29, 2018 through noon on July 1, 2018. (e) Informational broadcasts. The COTP or a designated representative will inform the public of the effective period for the safety zone as well as any changes in the dates and times of enforcement through Local Notice to Mariners (LNMs), Broadcast Notices to Mariners (BNMs), and/or Marine Safety Information Bulletins (MSIBs) as appropriate. [FR Doc. 2018–10626 Filed 5–17–18; 8:45 am] VerDate Sep<11>2014 15:59 May 17, 2018 Jkt 244001 BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2018–0406] Drawbridge Operation Regulation; Sacramento River, Sacramento, CA Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Tower Drawbridge across the Sacramento River, mile 59.0, at Sacramento, CA. The deviation is necessary to allow participants of the Weave Event to cross the drawspan safely and without interruption. This deviation allows the bridge to remain in the closed-tonavigation position during the deviation period. DATES: This deviation is effective from 12:45 p.m. through 1:50 p.m. on May 20, 2018. ADDRESSES: The docket for this deviation, USCG–2018–0406, is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Carl T. Hausner, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510–437– 3516; email Carl.T.Hausner@uscg.mil. SUPPLEMENTARY INFORMATION: The California Department of Transportation has requested a temporary change to the operation of the Tower Drawbridge over the Sacramento River, mile 59.0, at Sacramento, CA. The drawbridge navigation span provides a vertical clearance of 30 feet above Mean High Water in the closed-to-navigation position. The draw operates as required by 33 CFR 117.189(a). Navigation on the waterway is commercial and recreational. The drawspan will be secured in the closed-to-navigation position from 12:45 p.m. through 1:50 p.m. on May 20, 2018, to allow the participants of the Weave SUMMARY: PO 00000 Frm 00014 Fmt 4700 Sfmt 4700 Event to cross the drawspan safely and without interruption. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were raised. Vessels able to pass through the bridge in the closed position may do so at any time. In the event of an emergency, the draw can open on signal if at least one-hour notice is given to the bridge operator. There are no immediate alternate routes for vessels to pass. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: May 15, 2018. C.T. Hausner, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2018–10640 Filed 5–17–18; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2018–0390] Drawbridge Operation Regulation; Lake Champlain, North Hero Island, VT Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the US2 Bridge across Lake Champlain, mile 91.8, between South Hero Island and North Hero Island, Vermont. This deviation is necessary to extend the operating life of the drawbridge until a replacement bridge is constructed. The deviation is necessary to allow the bridge to open only on the hour during the day for the 2018 boating season. DATES: This deviation is effective without actual notice from May 18, 2018, to 8 p.m. on October 15, 2018. For the purposes of enforcement, actual notice will be used from 8 a.m. on May 15, 2018, to May 18, 2018. SUMMARY: E:\FR\FM\18MYR1.SGM 18MYR1 Federal Register / Vol. 83, No. 97 / Friday, May 18, 2018 / Rules and Regulations The docket for this deviation, USCG–2017–0390, is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH’’. Click on Open Docket Folder on the line associated with this deviation. ADDRESSES: If you have questions on this temporary deviation, call or email Jeffrey Stieb; Bridge Management Specialist, First Coast Guard District, telephone 617– 223–8364, email Jeffrey.D.Stieb@ uscg.mil. FOR FURTHER INFORMATION CONTACT: sradovich on DSK3GMQ082PROD with RULES SUPPLEMENTARY INFORMATION: BILLING CODE 9110–04–P VerDate Sep<11>2014 15:59 May 17, 2018 Jkt 244001 33 CFR Part 117 [Docket No. USCG–2018–0432] Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: owner, Vermont Agency of Transportation, requested a temporary deviation from the normal operating schedule of the US2 Bridge, mile 91.8, across Lake Champlain at North Hero Island, Vermont. The drawbridge navigation span has a vertical clearance of 18 feet at ordinary low water in the closed position. The existing bridge operating regulations are found at 33 CFR 117.993(b). Under this temporary deviation, the US2 Bridge shall open daily on signal only on the hour from 8 a.m. to 8 p.m. from May 15, 2018 through October 15, 2018. The waterway is transited by seasonal recreational vessels of various sizes. Several marina facilities are in the area of the bridge. Vessels that are able to pass under the bridge in the closed position may do so at any time. The bridge will be able to open for emergencies, and for vessels unable to pass through the bridge in the closed position there is an alternate route to the north under the Alburg Passage US2 fixed bridge. The Alburg Passage US2 Bridge has a vertical clearance of 25 feet at ordinary low water. The Coast Guard will inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. [FR Doc. 2018–10594 Filed 5–17–18; 8:45 am] Coast Guard Drawbridge Operation Regulation; Sacramento River, Walnut Grove, CA The bridge Dated: May 7, 2018. Christopher J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. DEPARTMENT OF HOMELAND SECURITY The Coast Guard has issued a temporary deviation from the operating schedule that governs the Walnut Grove Drawbridge across the Sacramento River, mile 26.7, at Walnut Grove, CA. The deviation is necessary to allow participants in the AMGEN Tour of California bicycle race to cross the drawspan safely and without interruption. This deviation allows the bridge to remain in the closed-tonavigation position during the deviation period. DATES: This deviation is effective from 11 a.m. through 3 p.m. on May 17, 2018. ADDRESSES: The docket for this deviation, USCG–2018–0432, is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Carl T. Hausner, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510–437– 3516, email Carl.T.Hausner@uscg.mil. SUPPLEMENTARY INFORMATION: Sacramento County has requested a temporary change to the operation of the Walnut Grove Drawbridge, mile 26.7, over the Sacramento River, at Walnut Grove, CA. The drawbridge navigation span provides a vertical clearance of 21 feet above Mean High Water in the closed-to-navigation position. The draw operates as required by 33 CFR 117.189(a). Navigation on the waterway is commercial and recreational. The drawspan will be secured in the closed-to-navigation position from 11 a.m. through 3 p.m. on May 17, 2018, to allow the participants in the AMGEN Tour of California bicycle race to cross the drawspan safely and without interruption. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were raised. Vessels able to pass through the bridge in the closed position may do so at any time. The bridge will be able to SUMMARY: PO 00000 Frm 00015 Fmt 4700 Sfmt 4700 23221 open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: May 15, 2018. C.T. Hausner, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2018–10650 Filed 5–17–18; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2018–0431] Drawbridge Operation Regulation; Sacramento River, Freeport, CA Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Sacramento County highway bridge across the Sacramento River, mile 46.0, at Freeport, CA. The deviation is necessary to allow participants in the AMGEN Tour of California bicycle race to cross the drawspan safely and without interruption. This deviation allows the bridge to remain in the closed-tonavigation position during the deviation period. DATES: This deviation is effective from 11 a.m. through 3 p.m. on May 17, 2018. ADDRESSES: The docket for this deviation, USCG–2018–0431, is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Carl T. Hausner, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510–437– 3516, email Carl.T.Hausner@uscg.mil. SUMMARY: E:\FR\FM\18MYR1.SGM 18MYR1

Agencies

[Federal Register Volume 83, Number 97 (Friday, May 18, 2018)]
[Rules and Regulations]
[Pages 23220-23221]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10594]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2018-0390]


Drawbridge Operation Regulation; Lake Champlain, North Hero 
Island, VT

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the US2 Bridge across Lake Champlain, 
mile 91.8, between South Hero Island and North Hero Island, Vermont. 
This deviation is necessary to extend the operating life of the 
drawbridge until a replacement bridge is constructed. The deviation is 
necessary to allow the bridge to open only on the hour during the day 
for the 2018 boating season.

DATES: This deviation is effective without actual notice from May 18, 
2018, to 8 p.m. on October 15, 2018. For the purposes of enforcement, 
actual notice will be used from 8 a.m. on May 15, 2018, to May 18, 
2018.

[[Page 23221]]


ADDRESSES: The docket for this deviation, USCG-2017-0390, is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Jeffrey Stieb; Bridge Management 
Specialist, First Coast Guard District, telephone 617-223-8364, email 
[email protected].

SUPPLEMENTARY INFORMATION: The bridge owner, Vermont Agency of 
Transportation, requested a temporary deviation from the normal 
operating schedule of the US2 Bridge, mile 91.8, across Lake Champlain 
at North Hero Island, Vermont. The drawbridge navigation span has a 
vertical clearance of 18 feet at ordinary low water in the closed 
position. The existing bridge operating regulations are found at 33 CFR 
117.993(b).
    Under this temporary deviation, the US2 Bridge shall open daily on 
signal only on the hour from 8 a.m. to 8 p.m. from May 15, 2018 through 
October 15, 2018.
    The waterway is transited by seasonal recreational vessels of 
various sizes. Several marina facilities are in the area of the bridge. 
Vessels that are able to pass under the bridge in the closed position 
may do so at any time. The bridge will be able to open for emergencies, 
and for vessels unable to pass through the bridge in the closed 
position there is an alternate route to the north under the Alburg 
Passage US2 fixed bridge. The Alburg Passage US2 Bridge has a vertical 
clearance of 25 feet at ordinary low water. The Coast Guard will inform 
the users of the waterway through our Local and Broadcast Notices to 
Mariners of the change in operating schedule for the bridge so that 
vessel operators can arrange their transits to minimize any impact 
caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this deviation. This deviation from the operating regulations 
is authorized under 33 CFR 117.35.

    Dated: May 7, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2018-10594 Filed 5-17-18; 8:45 am]
 BILLING CODE 9110-04-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.