Drawbridge Operation Regulation; Lake Champlain, North Hero Island, VT, 23220-23221 [2018-10594]
Download as PDF
23220
Federal Register / Vol. 83, No. 97 / Friday, May 18, 2018 / Rules and Regulations
sradovich on DSK3GMQ082PROD with RULES
§ 100.T08–0320 Special Local Regulation;
Monongahela River (MM 0.22), Allegheny
River (MM 0.8), and Ohio River (MM 0.8),
Pittsburgh, PA.
Dated: May 9, 2018.
L. Mcclain, Jr.,
Commander, U.S. Coast Guard, Captain of
the Port Marine Safety Unit Pittsburgh.
(a) Location. The following is a
special local regulation for all navigable
waters of the Allegheny, Monongahela,
and Ohio Rivers between the Ninth
Street Highway Bridge at mile marker
(MM) 0.8, Allegheny River, Fort Pitt
Highway Bridge at MM 0.22,
Monongahela River, and West EndNorth Side Highway Bridge at MM 0.8,
Ohio River.
(b) Applicability. This section applies
to any vessel operating within the area,
including a naval or public vessel,
except a vessel engaged in:
(1) Law enforcement;
(2) Servicing aids to navigation; or
(3) Surveying, maintaining, or
improving waters within the regulated
area.
(c) Regulations. (1) In accordance
with the general regulations in
§ 100.801, no vessel shall loiter, anchor,
stop, moor, remain, drift, or act in any
manner as to impede safe passage of
another vessel to any launching ramp,
marina, or fleeting area unless
authorized by the Captain of the Port
Marine Safety Unit Pittsburgh (COTP) or
a designated representative.
(2) No vessel shall loiter, anchor, stop,
moor, remain or drift at any time more
than 100 feet from any riverbank within
the regulated area unless authorized by
the COTP or a designated
representative.
(3) Persons and vessels seeking entry
into the regulated area must request
permission from the COTP or a
designated representative. A designated
representative is a commissioned,
warrant, or petty officer of the U.S.
Coast Guard assigned to units under the
operational control of USCG Marine
Safety Unit Pittsburgh. They may be
contacted on VHF–FM Channel 16.
(4) Persons and vessels permitted to
enter the regulated area must transit at
their slowest safe speed and comply
with all lawful directions issued by the
COTP or the designated representative.
(d) Effective period. This section is
effective from 4 p.m. on June 29, 2018
through noon on July 1, 2018.
(e) Informational broadcasts. The
COTP or a designated representative
will inform the public of the effective
period for the safety zone as well as any
changes in the dates and times of
enforcement through Local Notice to
Mariners (LNMs), Broadcast Notices to
Mariners (BNMs), and/or Marine Safety
Information Bulletins (MSIBs) as
appropriate.
[FR Doc. 2018–10626 Filed 5–17–18; 8:45 am]
VerDate Sep<11>2014
15:59 May 17, 2018
Jkt 244001
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0406]
Drawbridge Operation Regulation;
Sacramento River, Sacramento, CA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Tower
Drawbridge across the Sacramento
River, mile 59.0, at Sacramento, CA. The
deviation is necessary to allow
participants of the Weave Event to cross
the drawspan safely and without
interruption. This deviation allows the
bridge to remain in the closed-tonavigation position during the deviation
period.
DATES: This deviation is effective from
12:45 p.m. through 1:50 p.m. on May 20,
2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0406, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Carl T. Hausner,
Chief, Bridge Section, Eleventh Coast
Guard District; telephone 510–437–
3516; email Carl.T.Hausner@uscg.mil.
SUPPLEMENTARY INFORMATION: The
California Department of Transportation
has requested a temporary change to the
operation of the Tower Drawbridge over
the Sacramento River, mile 59.0, at
Sacramento, CA. The drawbridge
navigation span provides a vertical
clearance of 30 feet above Mean High
Water in the closed-to-navigation
position. The draw operates as required
by 33 CFR 117.189(a). Navigation on the
waterway is commercial and
recreational.
The drawspan will be secured in the
closed-to-navigation position from 12:45
p.m. through 1:50 p.m. on May 20, 2018,
to allow the participants of the Weave
SUMMARY:
PO 00000
Frm 00014
Fmt 4700
Sfmt 4700
Event to cross the drawspan safely and
without interruption. This temporary
deviation has been coordinated with the
waterway users. No objections to the
proposed temporary deviation were
raised. Vessels able to pass through the
bridge in the closed position may do so
at any time. In the event of an
emergency, the draw can open on signal
if at least one-hour notice is given to the
bridge operator. There are no immediate
alternate routes for vessels to pass. The
Coast Guard will also inform the users
of the waterway through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: May 15, 2018.
C.T. Hausner,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2018–10640 Filed 5–17–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0390]
Drawbridge Operation Regulation;
Lake Champlain, North Hero Island, VT
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the US2 Bridge
across Lake Champlain, mile 91.8,
between South Hero Island and North
Hero Island, Vermont. This deviation is
necessary to extend the operating life of
the drawbridge until a replacement
bridge is constructed. The deviation is
necessary to allow the bridge to open
only on the hour during the day for the
2018 boating season.
DATES: This deviation is effective
without actual notice from May 18,
2018, to 8 p.m. on October 15, 2018. For
the purposes of enforcement, actual
notice will be used from 8 a.m. on May
15, 2018, to May 18, 2018.
SUMMARY:
E:\FR\FM\18MYR1.SGM
18MYR1
Federal Register / Vol. 83, No. 97 / Friday, May 18, 2018 / Rules and Regulations
The docket for this
deviation, USCG–2017–0390, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
ADDRESSES:
If
you have questions on this temporary
deviation, call or email Jeffrey Stieb;
Bridge Management Specialist, First
Coast Guard District, telephone 617–
223–8364, email Jeffrey.D.Stieb@
uscg.mil.
FOR FURTHER INFORMATION CONTACT:
sradovich on DSK3GMQ082PROD with RULES
SUPPLEMENTARY INFORMATION:
BILLING CODE 9110–04–P
VerDate Sep<11>2014
15:59 May 17, 2018
Jkt 244001
33 CFR Part 117
[Docket No. USCG–2018–0432]
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
owner, Vermont Agency of
Transportation, requested a temporary
deviation from the normal operating
schedule of the US2 Bridge, mile 91.8,
across Lake Champlain at North Hero
Island, Vermont. The drawbridge
navigation span has a vertical clearance
of 18 feet at ordinary low water in the
closed position. The existing bridge
operating regulations are found at 33
CFR 117.993(b).
Under this temporary deviation, the
US2 Bridge shall open daily on signal
only on the hour from 8 a.m. to 8 p.m.
from May 15, 2018 through October 15,
2018.
The waterway is transited by seasonal
recreational vessels of various sizes.
Several marina facilities are in the area
of the bridge. Vessels that are able to
pass under the bridge in the closed
position may do so at any time. The
bridge will be able to open for
emergencies, and for vessels unable to
pass through the bridge in the closed
position there is an alternate route to the
north under the Alburg Passage US2
fixed bridge. The Alburg Passage US2
Bridge has a vertical clearance of 25 feet
at ordinary low water. The Coast Guard
will inform the users of the waterway
through our Local and Broadcast
Notices to Mariners of the change in
operating schedule for the bridge so that
vessel operators can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
deviation. This deviation from the
operating regulations is authorized
under 33 CFR 117.35.
[FR Doc. 2018–10594 Filed 5–17–18; 8:45 am]
Coast Guard
Drawbridge Operation Regulation;
Sacramento River, Walnut Grove, CA
The bridge
Dated: May 7, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
DEPARTMENT OF HOMELAND
SECURITY
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Walnut Grove
Drawbridge across the Sacramento
River, mile 26.7, at Walnut Grove, CA.
The deviation is necessary to allow
participants in the AMGEN Tour of
California bicycle race to cross the
drawspan safely and without
interruption. This deviation allows the
bridge to remain in the closed-tonavigation position during the deviation
period.
DATES: This deviation is effective from
11 a.m. through 3 p.m. on May 17, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0432, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Carl T. Hausner,
Chief, Bridge Section, Eleventh Coast
Guard District; telephone 510–437–
3516, email Carl.T.Hausner@uscg.mil.
SUPPLEMENTARY INFORMATION:
Sacramento County has requested a
temporary change to the operation of the
Walnut Grove Drawbridge, mile 26.7,
over the Sacramento River, at Walnut
Grove, CA. The drawbridge navigation
span provides a vertical clearance of 21
feet above Mean High Water in the
closed-to-navigation position. The draw
operates as required by 33 CFR
117.189(a). Navigation on the waterway
is commercial and recreational.
The drawspan will be secured in the
closed-to-navigation position from 11
a.m. through 3 p.m. on May 17, 2018,
to allow the participants in the AMGEN
Tour of California bicycle race to cross
the drawspan safely and without
interruption. This temporary deviation
has been coordinated with the waterway
users. No objections to the proposed
temporary deviation were raised.
Vessels able to pass through the
bridge in the closed position may do so
at any time. The bridge will be able to
SUMMARY:
PO 00000
Frm 00015
Fmt 4700
Sfmt 4700
23221
open for emergencies and there is no
immediate alternate route for vessels to
pass. The Coast Guard will also inform
the users of the waterway through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: May 15, 2018.
C.T. Hausner,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2018–10650 Filed 5–17–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0431]
Drawbridge Operation Regulation;
Sacramento River, Freeport, CA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Sacramento
County highway bridge across the
Sacramento River, mile 46.0, at
Freeport, CA. The deviation is necessary
to allow participants in the AMGEN
Tour of California bicycle race to cross
the drawspan safely and without
interruption. This deviation allows the
bridge to remain in the closed-tonavigation position during the deviation
period.
DATES: This deviation is effective from
11 a.m. through 3 p.m. on May 17, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0431, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Carl T. Hausner,
Chief, Bridge Section, Eleventh Coast
Guard District; telephone 510–437–
3516, email Carl.T.Hausner@uscg.mil.
SUMMARY:
E:\FR\FM\18MYR1.SGM
18MYR1
Agencies
[Federal Register Volume 83, Number 97 (Friday, May 18, 2018)]
[Rules and Regulations]
[Pages 23220-23221]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10594]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2018-0390]
Drawbridge Operation Regulation; Lake Champlain, North Hero
Island, VT
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the US2 Bridge across Lake Champlain,
mile 91.8, between South Hero Island and North Hero Island, Vermont.
This deviation is necessary to extend the operating life of the
drawbridge until a replacement bridge is constructed. The deviation is
necessary to allow the bridge to open only on the hour during the day
for the 2018 boating season.
DATES: This deviation is effective without actual notice from May 18,
2018, to 8 p.m. on October 15, 2018. For the purposes of enforcement,
actual notice will be used from 8 a.m. on May 15, 2018, to May 18,
2018.
[[Page 23221]]
ADDRESSES: The docket for this deviation, USCG-2017-0390, is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Jeffrey Stieb; Bridge Management
Specialist, First Coast Guard District, telephone 617-223-8364, email
[email protected].
SUPPLEMENTARY INFORMATION: The bridge owner, Vermont Agency of
Transportation, requested a temporary deviation from the normal
operating schedule of the US2 Bridge, mile 91.8, across Lake Champlain
at North Hero Island, Vermont. The drawbridge navigation span has a
vertical clearance of 18 feet at ordinary low water in the closed
position. The existing bridge operating regulations are found at 33 CFR
117.993(b).
Under this temporary deviation, the US2 Bridge shall open daily on
signal only on the hour from 8 a.m. to 8 p.m. from May 15, 2018 through
October 15, 2018.
The waterway is transited by seasonal recreational vessels of
various sizes. Several marina facilities are in the area of the bridge.
Vessels that are able to pass under the bridge in the closed position
may do so at any time. The bridge will be able to open for emergencies,
and for vessels unable to pass through the bridge in the closed
position there is an alternate route to the north under the Alburg
Passage US2 fixed bridge. The Alburg Passage US2 Bridge has a vertical
clearance of 25 feet at ordinary low water. The Coast Guard will inform
the users of the waterway through our Local and Broadcast Notices to
Mariners of the change in operating schedule for the bridge so that
vessel operators can arrange their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this deviation. This deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: May 7, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2018-10594 Filed 5-17-18; 8:45 am]
BILLING CODE 9110-04-P