Federal Register / Vol. 83, No. 96 / Thursday, May 17, 2018 / Rules and Regulations
VII. Congressional Review Act
Pursuant to the Congressional Review
Act (5 U.S.C. 801 et seq.), EPA will
submit a report containing this rule and
other required information to the U.S.
Senate, the U.S. House of
Representatives, and the Comptroller
General of the United States prior to
publication of the rule in the Federal
Register. This action is not a ‘‘major
rule’’ as defined by 5 U.S.C. 804(2).
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 300
[EPA–HQ–OLEM–2017–0604, 0606, 0607,
0609, 0611 and 0612; FRL–9978–14–OLEM]
National Priorities List
Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
The Comprehensive
Environmental Response,
Compensation, and Liability Act of 1980
(‘‘CERCLA’’ or ‘‘the Act’’), as amended,
requires that the National Oil and
Hazardous Substances Pollution
Contingency Plan (‘‘NCP’’) include a list
of national priorities among the known
releases or threatened releases of
hazardous substances, pollutants or
contaminants throughout the United
States. The National Priorities List
(‘‘NPL’’) constitutes this list. The NPL is
intended primarily to guide the
Environmental Protection Agency (‘‘the
EPA’’ or ‘‘the agency’’) in determining
which sites warrant further
investigation. These further
investigations will allow the EPA to
assess the nature and extent of public
health and environmental risks
associated with the site and to
determine what CERCLA-financed
remedial action(s), if any, may be
appropriate. This rule adds six sites to
the General Superfund section of the
NPL.
SUMMARY:
List of Subjects in 40 CFR Part 180
Environmental protection,
Administrative practice and procedure,
Agricultural commodities, Pesticides
and pests, Reporting and recordkeeping
requirements.
Dated: May 8, 2018.
Daniel Rosenblatt,
Acting Director, Registration Division, Office
of Pesticide Programs.
Therefore, 40 CFR chapter I is
amended as follows:
PART 180—[AMENDED]
1. The authority citation for part 180
continues to read as follows:
■
Authority: 21 U.S.C. 321(q), 346a and 371.
2. In § 180.659, add alphabetically
‘‘Potato, granules/flakes’’, ‘‘Vegetable,
bulb, group 3–07’’, and ‘‘Vegetable,
tuberous and corm, subgroup 1C’’ to the
table in paragraph (a)(5) to read as
follows:
■
The document is effective on
June 18, 2018.
ADDRESSES: Contact information for the
EPA Headquarters:
• Docket Coordinator, Headquarters;
U.S. Environmental Protection Agency;
CERCLA Docket Office; 1301
Constitution Avenue NW, William
Jefferson Clinton Building West, Room
3334, Washington, DC 20004, 202/566–
0276.
The contact information for the
regional dockets is as follows:
• Holly Inglis, Region 1 (CT, ME, MA,
NH, RI, VT), U.S. EPA, Superfund
Records and Information Center, 5 Post
Office Square, Suite 100, Boston, MA
02109–3912; 617/918–1413.
• Ildefonso Acosta, Region 2 (NJ, NY,
PR, VI), U.S. EPA, 290 Broadway, New
York, NY 10007–1866; 212/637–4344.
• Lorie Baker (ASRC), Region 3 (DE,
DC, MD, PA, VA, WV), U.S. EPA,
Library, 1650 Arch Street, Mailcode
3HS12, Philadelphia, PA 19103; 215/
814–3355.
• Cathy Amoroso, Region 4 (AL, FL,
GA, KY, MS, NC, SC, TN), U.S. EPA, 61
DATES:
§ 180.659 Pyroxasulfone; tolerances for
residues.
(a) * * *
(5) * * *
Parts per
million
Commodity
*
*
*
*
Potato, granules/flakes ...............
*
0.20
*
*
*
*
Vegetable, bulb, group 3–07 ......
*
0.15
*
*
*
*
Vegetable, tuberous and corm,
subgroup 1C ...........................
*
amozie on DSK3GDR082PROD with RULES
*
*
*
*
*
[FR Doc. 2018–10582 Filed 5–16–18; 8:45 am]
BILLING CODE 6560–50–P
VerDate Sep<11>2014
16:58 May 16, 2018
Jkt 244001
0.08
PO 00000
Frm 00029
Fmt 4700
Sfmt 4700
22859
Forsyth Street SW, Mailcode 9T25,
Atlanta, GA 30303; 404/562–8637.
• Todd Quesada, Region 5 (IL, IN, MI,
MN, OH, WI), U.S. EPA Superfund
Division Librarian/SFD Records
Manager SRC–7J, Metcalfe Federal
Building, 77 West Jackson Boulevard,
Chicago, IL 60604; 312/886–4465.
• Brenda Cook, Region 6 (AR, LA,
NM, OK, TX), U.S. EPA, 1445 Ross
Avenue, Suite 1200, Mailcode 6SFTS,
Dallas, TX 75202–2733; 214/665–7436.
• Kumud Pyakuryal, Region 7 (IA,
KS, MO, NE), U.S. EPA, 11201 Renner
Blvd., Mailcode SUPRSTAR, Lenexa, KS
66219; 913/551–7956.
• Victor Ketellapper, Region 8 (CO,
MT, ND, SD, UT, WY), U.S. EPA, 1595
Wynkoop Street, Mailcode 8EPR–B,
Denver, CO 80202–1129; 303/312–6578.
• Sharon Murray, Region 9 (AZ, CA,
HI, NV, AS, GU, MP), U.S. EPA, 75
Hawthorne Street, Mailcode SFD 6–1,
San Francisco, CA 94105; 415/947–
4250.
• Ken Marcy, Region 10 (AK, ID, OR,
WA), U.S. EPA, 1200 6th Avenue,
Mailcode ECL–112, Seattle, WA 98101;
206/463–1349.
FOR FURTHER INFORMATION CONTACT:
Terry Jeng, phone: (703) 603–8852,
email: jeng.terry@epa.gov Site
Assessment and Remedy Decisions
Branch, Assessment and Remediation
Division, Office of Superfund
Remediation and Technology
Innovation (Mailcode 5204P), U.S.
Environmental Protection Agency; 1200
Pennsylvania Avenue NW, Washington,
DC 20460; or the Superfund Hotline,
phone (800) 424–9346 or (703) 412–
9810 in the Washington, DC,
metropolitan area.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Background
A. What are CERCLA and SARA?
B. What is the NCP?
C. What is the National Priorities List
(NPL)?
D. How are sites listed on the NPL?
E. What happens to sites on the NPL?
F. Does the NPL define the boundaries of
sites?
G. How are sites removed from the NPL?
H. May the EPA delete portions of sites
from the NPL as they are cleaned up?
I. What is the Construction Completion List
(CCL)?
J. What is the Sitewide Ready for
Anticipated Use measure?
K. What is state/tribal correspondence
concerning NPL Listing?
II. Availability of Information to the Public
A. May I review the documents relevant to
this final rule?
B. What documents are available for review
at the EPA Headquarters docket?
C. What documents are available for review
at the EPA regional dockets?
E:\FR\FM\17MYR1.SGM
17MYR1
22860
Federal Register / Vol. 83, No. 96 / Thursday, May 17, 2018 / Rules and Regulations
D. How do I access the documents?
E. How may I obtain a current list of NPL
sites?
III. Contents of This Final Rule
A. Additions to the NPL
B. What did the EPA do with the public
comments it received?
IV. Statutory and Executive Order Reviews
A. Executive Order 12866: Regulatory
Planning and Review and Executive
Order 13563: Improving Regulation and
Regulatory Review
B. Executive Order 13771: Reducing
Regulation and Controlling Regulatory
Costs
C. Paperwork Reduction Act (PRA)
D. Regulatory Flexibility Act (RFA)
E. Unfunded Mandates Reform Act
(UMRA)
F. Executive Order 13132: Federalism
G. Executive Order 13175: Consultation
and Coordination with Indian Tribal
Governments
H. Executive Order 13045: Protection of
Children from Environmental Health and
Safety Risks
I. Executive Order 13211: Actions that
Significantly Affect Energy Supply,
Distribution, or Use
J. National Technology Transfer and
Advancement Act (NTTAA)
K. Executive Order 12898: Federal Actions
to Address Environmental Justice in
Minority Populations and Low-Income
Populations
L. Congressional Review Act
I. Background
amozie on DSK3GDR082PROD with RULES
A. What are CERCLA and SARA?
In 1980, Congress enacted the
Comprehensive Environmental
Response, Compensation, and Liability
Act, 42 U.S.C. 9601–9675 (‘‘CERCLA’’ or
‘‘the Act’’), in response to the dangers of
uncontrolled releases or threatened
releases of hazardous substances, and
releases or substantial threats of releases
into the environment of any pollutant or
contaminant that may present an
imminent or substantial danger to the
public health or welfare. CERCLA was
amended on October 17, 1986, by the
Superfund Amendments and
Reauthorization Act (‘‘SARA’’), Public
Law 99–499, 100 Stat. 1613 et seq.
B. What is the NCP?
To implement CERCLA, the EPA
promulgated the revised National Oil
and Hazardous Substances Pollution
Contingency Plan (‘‘NCP’’), 40 CFR part
300, on July 16, 1982 (47 FR 31180),
pursuant to CERCLA section 105 and
Executive Order 12316 (46 FR 42237,
August 20, 1981). The NCP sets
guidelines and procedures for
responding to releases and threatened
releases of hazardous substances, or
releases or substantial threats of releases
into the environment of any pollutant or
contaminant that may present an
imminent or substantial danger to the
VerDate Sep<11>2014
16:58 May 16, 2018
Jkt 244001
public health or welfare. The EPA has
revised the NCP on several occasions.
The most recent comprehensive revision
was on March 8, 1990 (55 FR 8666).
As required under section
105(a)(8)(A) of CERCLA, the NCP also
includes ‘‘criteria for determining
priorities among releases or threatened
releases throughout the United States
for the purpose of taking remedial
action and, to the extent practicable,
taking into account the potential
urgency of such action, for the purpose
of taking removal action.’’ ‘‘Removal’’
actions are defined broadly and include
a wide range of actions taken to study,
clean up, prevent or otherwise address
releases and threatened releases of
hazardous substances, pollutants or
contaminants (42 U.S.C. 9601(23)).
C. What is the National Priorities List
(NPL)?
The NPL is a list of national priorities
among the known or threatened releases
of hazardous substances, pollutants or
contaminants throughout the United
States. The list, which is appendix B of
the NCP (40 CFR part 300), was required
under section 105(a)(8)(B) of CERCLA,
as amended. Section 105(a)(8)(B)
defines the NPL as a list of ‘‘releases’’
and the highest priority ‘‘facilities’’ and
requires that the NPL be revised at least
annually. The NPL is intended
primarily to guide the EPA in
determining which sites warrant further
investigation to assess the nature and
extent of public health and
environmental risks associated with a
release of hazardous substances,
pollutants or contaminants. The NPL is
of only limited significance, however, as
it does not assign liability to any party
or to the owner of any specific property.
Also, placing a site on the NPL does not
mean that any remedial or removal
action necessarily need be taken.
For purposes of listing, the NPL
includes two sections, one of sites that
are generally evaluated and cleaned up
by the EPA (the ‘‘General Superfund
section’’) and one of sites that are
owned or operated by other federal
agencies (the ‘‘Federal Facilities
section’’). With respect to sites in the
Federal Facilities section, these sites are
generally being addressed by other
federal agencies. Under Executive Order
12580 (52 FR 2923, January 29, 1987)
and CERCLA section 120, each federal
agency is responsible for carrying out
most response actions at facilities under
its own jurisdiction, custody or control,
although the EPA is responsible for
preparing a Hazard Ranking System
(‘‘HRS’’) score and determining whether
the facility is placed on the NPL.
PO 00000
Frm 00030
Fmt 4700
Sfmt 4700
D. How are sites listed on the NPL?
There are three mechanisms for
placing sites on the NPL for possible
remedial action (see 40 CFR 300.425(c)
of the NCP): (1) A site may be included
on the NPL if it scores sufficiently high
on the HRS, which the EPA
promulgated as appendix A of the NCP
(40 CFR part 300). The HRS serves as a
screening tool to evaluate the relative
potential of uncontrolled hazardous
substances, pollutants or contaminants
to pose a threat to human health or the
environment. On December 14, 1990 (55
FR 51532), the EPA promulgated
revisions to the HRS partly in response
to CERCLA section 105(c), added by
SARA. On January 9, 2017 (82 FR 2760),
a subsurface intrusion component was
added to the HRS to enable the EPA to
consider human exposure to hazardous
substances or pollutants and
contaminants that enter regularly
occupied structures through subsurface
intrusion when evaluating sites for the
NPL. The current HRS evaluates four
pathways: Ground water, surface water,
soil exposure and subsurface intrusion,
and air. As a matter of agency policy,
those sites that score 28.50 or greater on
the HRS are eligible for the NPL. (2)
Each state may designate a single site as
its top priority to be listed on the NPL,
without any HRS score. This provision
of CERCLA requires that, to the extent
practicable, the NPL include one facility
designated by each state as the greatest
danger to public health, welfare or the
environment among known facilities in
the state. This mechanism for listing is
set out in the NCP at 40 CFR
300.425(c)(2). (3) The third mechanism
for listing, included in the NCP at 40
CFR 300.425(c)(3), allows certain sites
to be listed without any HRS score, if all
of the following conditions are met:
• The Agency for Toxic Substances
and Disease Registry (ATSDR) of the
U.S. Public Health Service has issued a
health advisory that recommends
dissociation of individuals from the
release.
• The EPA determines that the release
poses a significant threat to public
health.
• The EPA anticipates that it will be
more cost-effective to use its remedial
authority than to use its removal
authority to respond to the release.
The EPA promulgated an original NPL
of 406 sites on September 8, 1983 (48 FR
40658) and generally has updated it at
least annually.
E. What happens to sites on the NPL?
A site may undergo remedial action
financed by the Trust Fund established
under CERCLA (commonly referred to
E:\FR\FM\17MYR1.SGM
17MYR1
Federal Register / Vol. 83, No. 96 / Thursday, May 17, 2018 / Rules and Regulations
amozie on DSK3GDR082PROD with RULES
as the ‘‘Superfund’’) only after it is
placed on the NPL, as provided in the
NCP at 40 CFR 300.425(b)(1).
(‘‘Remedial actions’’ are those
‘‘consistent with a permanent remedy,
taken instead of or in addition to
removal actions’’ (40 CFR 300.5).
However, under 40 CFR 300.425(b)(2),
placing a site on the NPL ‘‘does not
imply that monies will be expended.’’
The EPA may pursue other appropriate
authorities to respond to the releases,
including enforcement action under
CERCLA and other laws.
F. Does the NPL define the boundaries
of sites?
The NPL does not describe releases in
precise geographical terms; it would be
neither feasible nor consistent with the
limited purpose of the NPL (to identify
releases that are priorities for further
evaluation), for it to do so. Indeed, the
precise nature and extent of the site are
typically not known at the time of
listing.
Although a CERCLA ‘‘facility’’ is
broadly defined to include any area
where a hazardous substance has ‘‘come
to be located’’ (CERCLA section 101(9)),
the listing process itself is not intended
to define or reflect the boundaries of
such facilities or releases. Of course,
HRS data (if the HRS is used to list a
site) upon which the NPL placement
was based will, to some extent, describe
the release(s) at issue. That is, the NPL
site would include all releases evaluated
as part of that HRS analysis.
When a site is listed, the approach
generally used to describe the relevant
release(s) is to delineate a geographical
area (usually the area within an
installation or plant boundaries) and
identify the site by reference to that
area. However, the NPL site is not
necessarily coextensive with the
boundaries of the installation or plant,
and the boundaries of the installation or
plant are not necessarily the
‘‘boundaries’’ of the site. Rather, the site
consists of all contaminated areas
within the area used to identify the site,
as well as any other location where that
contamination has come to be located,
or from where that contamination came.
In other words, while geographic
terms are often used to designate the site
(e.g., the ‘‘Jones Co. Plant site’’) in terms
of the property owned by a particular
party, the site, properly understood, is
not limited to that property (e.g., it may
extend beyond the property due to
contaminant migration), and conversely
may not occupy the full extent of the
property (e.g., where there are
uncontaminated parts of the identified
property, they may not be, strictly
speaking, part of the ‘‘site’’). The ‘‘site’’
VerDate Sep<11>2014
16:58 May 16, 2018
Jkt 244001
is thus neither equal to, nor confined by,
the boundaries of any specific property
that may give the site its name, and the
name itself should not be read to imply
that this site is coextensive with the
entire area within the property
boundary of the installation or plant. In
addition, the site name is merely used
to help identify the geographic location
of the contamination, and is not meant
to constitute any determination of
liability at a site. For example, the name
‘‘Jones Co. plant site,’’ does not imply
that the Jones Company is responsible
for the contamination located on the
plant site.
EPA regulations provide that the
remedial investigation (‘‘RI’’) ‘‘is a
process undertaken . . . to determine
the nature and extent of the problem
presented by the release’’ as more
information is developed on site
contamination, and which is generally
performed in an interactive fashion with
the feasibility study (‘‘FS’’) (40 CFR
300.5). During the RI/FS process, the
release may be found to be larger or
smaller than was originally thought, as
more is learned about the source(s) and
the migration of the contamination.
However, the HRS inquiry focuses on an
evaluation of the threat posed and
therefore the boundaries of the release
need not be exactly defined. Moreover,
it generally is impossible to discover the
full extent of where the contamination
‘‘has come to be located’’ before all
necessary studies and remedial work are
completed at a site. Indeed, the known
boundaries of the contamination can be
expected to change over time. Thus, in
most cases, it may be impossible to
describe the boundaries of a release
with absolute certainty.
Further, as noted previously, NPL
listing does not assign liability to any
party or to the owner of any specific
property. Thus, if a party does not
believe it is liable for releases on
discrete parcels of property, it can
submit supporting information to the
agency at any time after it receives
notice it is a potentially responsible
party.
For these reasons, the NPL need not
be amended as further research reveals
more information about the location of
the contamination or release.
G. How are sites removed from the NPL?
The EPA may delete sites from the
NPL where no further response is
appropriate under Superfund, as
explained in the NCP at 40 CFR
300.425(e). This section also provides
that the EPA shall consult with states on
proposed deletions and shall consider
whether any of the following criteria
have been met:
PO 00000
Frm 00031
Fmt 4700
Sfmt 4700
22861
(i) Responsible parties or other
persons have implemented all
appropriate response actions required;
(ii) All appropriate Superfundfinanced response has been
implemented and no further response
action is required; or
(iii) The remedial investigation has
shown the release poses no significant
threat to public health or the
environment, and taking of remedial
measures is not appropriate.
H. May the EPA delete portions of sites
from the NPL as they are cleaned up?
In November 1995, the EPA initiated
a policy to delete portions of NPL sites
where cleanup is complete (60 FR
55465, November 1, 1995). Total site
cleanup may take many years, while
portions of the site may have been
cleaned up and made available for
productive use.
I. What is the Construction Completion
List (CCL)?
The EPA also has developed an NPL
construction completion list (‘‘CCL’’) to
simplify its system of categorizing sites
and to better communicate the
successful completion of cleanup
activities (58 FR 12142, March 2, 1993).
Inclusion of a site on the CCL has no
legal significance.
Sites qualify for the CCL when: (1)
Any necessary physical construction is
complete, whether or not final cleanup
levels or other requirements have been
achieved; (2) the EPA has determined
that the response action should be
limited to measures that do not involve
construction (e.g., institutional
controls); or (3) the site qualifies for
deletion from the NPL. For more
information on the CCL, see the EPA’s
internet site at https://www.epa.gov/
superfund/construction-completionsnational-priorities-list-npl-sites-number.
J. What is the Sitewide Ready for
Anticipated Use measure?
The Sitewide Ready for Anticipated
Use measure represents important
Superfund accomplishments and the
measure reflects the high priority the
EPA places on considering anticipated
future land use as part of the remedy
selection process. See Guidance for
Implementing the Sitewide Ready-forReuse Measure, May 24, 2006, OSWER
9365.0–36. This measure applies to final
and deleted sites where construction is
complete, all cleanup goals have been
achieved, and all institutional or other
controls are in place. The EPA has been
successful on many occasions in
carrying out remedial actions that
ensure protectiveness of human health
and the environment for current and
E:\FR\FM\17MYR1.SGM
17MYR1
22862
Federal Register / Vol. 83, No. 96 / Thursday, May 17, 2018 / Rules and Regulations
future land uses, in a manner that
allows contaminated properties to be
restored to environmental and economic
vitality. For further information, please
go to https://www.epa.gov/superfund/
about-superfund-cleanup-process#tab-9.
K. What is state/tribal correspondence
concerning NPL listing?
In order to maintain close
coordination with states and tribes in
the NPL listing decision process, the
EPA’s policy is to determine the
position of the states and tribes
regarding sites that the EPA is
considering for listing. This
consultation process is outlined in two
memoranda that can be found at the
following website: https://www.epa.gov/
superfund/statetribal-correspondenceconcerning-npl-site-listing.
The EPA has improved the
transparency of the process by which
state and tribal input is solicited. The
EPA is using the Web and where
appropriate more structured state and
tribal correspondence that (1) explains
the concerns at the site and the EPA’s
rationale for proceeding; (2) requests an
explanation of how the state intends to
address the site if placement on the NPL
is not favored; and (3) emphasizes the
transparent nature of the process by
informing states that information on
their responses will be publicly
available.
A model letter and correspondence
between the EPA and states and tribes
where applicable, is available on the
EPA’s website at https://
semspub.epa.gov/src/document/HQ/
174024.
II. Availability of Information to the
Public
A. May I review the documents relevant
to this final rule?
Yes, documents relating to the
evaluation and scoring of the sites in
this final rule are contained in dockets
located both at the EPA headquarters
and in the EPA regional offices.
An electronic version of the public
docket is available through https://
www.regulations.gov (see table below
for docket identification numbers).
Although not all docket materials may
be available electronically, you may still
access any of the publicly available
docket materials through the docket
facilities identified in section II.D.
DOCKET IDENTIFICATION NUMBERS BY SITE
Site name
City/County, State
Docket ID No.
Hockessin Groundwater ...........................
Franklin Street Groundwater Contamination.
Spring Park Municipal Well Field .............
Burlington Industries Cheraw ...................
Lane Plating Works, Inc ...........................
River City Metal Finishing ........................
Hockessin, DE .......................................................................
Spencer, IN ...........................................................................
EPA–HQ–OLEM–2017–0604.
EPA–HQ–OLEM–2017–0606.
Spring Park, MN ....................................................................
Cheraw, SC ...........................................................................
Dallas, TX ..............................................................................
San Antonio, TX ....................................................................
EPA–HQ–OLEM–2017–0607.
EPA–HQ–OLEM–2017–0609.
EPA–HQ–OLEM–2017–0611.
EPA–HQ–OLEM–2017–0612.
B. What documents are available for
review at the EPA Headquarters docket?
These reference documents are available
only in the regional dockets.
E. How may I obtain a current list of
NPL sites?
The headquarters docket for this rule
contains the HRS score sheets, the
documentation record describing the
information used to compute the score
and a list of documents referenced in
the documentation record for each site.
D. How do I access the documents?
You may obtain a current list of NPL
sites via the internet at https://
www.epa.gov/superfund/nationalpriorities-list-npl-sites-site-name or by
contacting the Superfund docket (see
contact information in the beginning
portion of this document).
C. What documents are available for
review at the EPA regional dockets?
The EPA regional dockets contain all
the information in the headquarters
docket, plus the actual reference
documents containing the data
principally relied upon by the EPA in
calculating or evaluating the HRS score.
You may view the documents, by
appointment only, after the publication
of this rule. The hours of operation for
the headquarters docket are from 8:30
a.m. to 4:30 p.m., Monday through
Friday, excluding federal holidays.
Please contact the regional dockets for
hours. For addresses for the
headquarters and regional dockets, see
ADDRESSES section in the beginning
portion of this preamble.
III. Contents of This Final Rule
A. Additions to the NPL
This final rule adds the following six
sites to the General Superfund section of
the NPL. These sites are being added to
the NPL based on HRS score.
General Superfund section:
Site name
DE ...........................
IN ............................
MN ..........................
SC ...........................
TX ...........................
TX ...........................
amozie on DSK3GDR082PROD with RULES
State
Hockessin Groundwater .........................................................................................
Franklin Street Groundwater Contamination .........................................................
Spring Park Municipal Well Field ...........................................................................
Burlington Industries Cheraw .................................................................................
Lane Plating Works, Inc .........................................................................................
River City Metal Finishing ......................................................................................
B. What did the EPA do with the public
comments it received?
The EPA reviewed all comments
received on the sites in this rule and
responded to all relevant comments.
VerDate Sep<11>2014
16:58 May 16, 2018
Jkt 244001
City/County
The EPA is adding six sites to the NPL
in this final rule. All six sites were
proposed for NPL addition on January
18, 2018 (83 FR 2576). The sites are:
Hockessin Groundwater in Hockessin,
DE; Franklin Street Groundwater
PO 00000
Frm 00032
Fmt 4700
Sfmt 4700
Hockessin.
Spencer.
Spring Park.
Cheraw.
Dallas.
San Antonio.
Contamination in Spencer, IN; Spring
Park Municipal Well Field in Spring
Park, MN; Burlington Industries Cheraw
in Cheraw, SC; Lane Plating Works, Inc.
in Dallas, TX; and, River City Metal
Finishing in San Antonio, TX.
E:\FR\FM\17MYR1.SGM
17MYR1
amozie on DSK3GDR082PROD with RULES
Federal Register / Vol. 83, No. 96 / Thursday, May 17, 2018 / Rules and Regulations
Comments on the Franklin Street
Groundwater Contamination site are
being addressed in a response to
comment support document available in
the public docket concurrently with this
rule.
For the Hockessin Groundwater site,
the EPA received several comments
supporting NPL listing, several
comments unrelated to NPL listing and
two anonymous comments questioning
site investigation and interim mitigation
measures, timing of cleanup actions and
potential remedies. In response, EPA is
adding the site to the NPL as the best
way to ensure that cleanup proceeds in
a timely manner. NPL listing makes a
site eligible for remedial action funding
under CERCLA. The site will be further
investigated during the remedial
investigation/feasibility study (RI/FS)
phase of the Superfund process to
determine what response, if any, is
appropriate to ensure protection of
public health and the environment.
The EPA received no comments on
the Spring Park Muncipal Well Field
site.
The EPA received one comment from
a community member regarding the
Burlington Industries Cheraw site. The
commenter expressed their opposition
to NPL listing based on concerns that
listing may negatively affect their
property value. Economic factors such
as those raised by the commenter are
generally not considered in the
assessment of whether a site belongs on
the NPL. The EPA notes that there are
both costs and benefits that can be
associated with listing a site. Among the
benefits are increased health and
environmental protection as a result of
increased public awareness of potential
hazards. In addition to the potential for
federally financed remedial actions, the
addition of a site to the NPL could
accelerate privately financed, voluntary
cleanup efforts. Listing sites as national
priority targets also may give states
increased support for funding responses
at particular sites. As a result of the
additional CERCLA remedies, there will
be lower human exposure to high-risk
chemicals, and higher quality surface
water, ground water, soil, and air.
Therefore, it is possible that any
perceived or actual negative fluctuations
in property values or development
opportunities that may result from
contamination may also be countered by
positive fluctuations when a CERCLA
investigation and any necessary cleanup
are completed.
For the Lane Plating Works, Inc. site,
the EPA received only one comment
related to NPL listing. The comment,
submitted by the city of Dallas’ Office of
Environmental Quality, supports NPL
VerDate Sep<11>2014
16:58 May 16, 2018
Jkt 244001
listing in order to facilitate federal
funding for full and complete
remediation.
The EPA received two comments
supporting the NPL listing of the River
City Metal Finishing site, one from a
community member and one from a
student.
IV. Statutory and Executive Order
Reviews
Additional information about these
statutes and Executive Orders can be
found at https://www.epa.gov/lawsregulations/laws-and-executive-orders.
A. Executive Order 12866: Regulatory
Planning and Review and Executive
Order 13563: Improving Regulation and
Regulatory Review
This action is not a significant
regulatory action and was therefore not
submitted to the Office of Management
and Budget (OMB) for review.
B. Executive Order 13771: Reducing
Regulation and Controlling Regulatory
Costs
This action is not an Executive Order
13771 regulatory action because this
action is not significant under Executive
Order 12866.
C. Paperwork Reduction Act (PRA)
This action does not impose an
information collection burden under the
PRA. This rule does not contain any
information collection requirements that
require approval of the OMB.
D. Regulatory Flexibility Act (RFA)
I certify that this action will not have
a significant economic impact on a
substantial number of small entities
under the RFA. This action will not
impose any requirements on small
entities. This rule listing sites on the
NPL does not impose any obligations on
any group, including small entities. This
rule also does not establish standards or
requirements that any small entity must
meet, and imposes no direct costs on
any small entity. Whether an entity,
small or otherwise, is liable for response
costs for a release of hazardous
substances depends on whether that
entity is liable under CERCLA 107(a).
Any such liability exists regardless of
whether the site is listed on the NPL
through this rulemaking.
E. Unfunded Mandates Reform Act
(UMRA)
This action does not contain any
unfunded mandate as described in
UMRA, 2 U.S.C. 1531–1538, and does
not significantly or uniquely affect small
governments. This action imposes no
enforceable duty on any state, local or
PO 00000
Frm 00033
Fmt 4700
Sfmt 4700
22863
tribal governments or the private sector.
Listing a site on the NPL does not itself
impose any costs. Listing does not mean
that the EPA necessarily will undertake
remedial action. Nor does listing require
any action by a private party, state, local
or tribal governments or determine
liability for response costs. Costs that
arise out of site responses result from
future site-specific decisions regarding
what actions to take, not directly from
the act of placing a site on the NPL.
F. Executive Order 13132: Federalism
This final rule does not have
federalism implications. It will not have
substantial direct effects on the states,
on the relationship between the national
government and the states, or on the
distribution of power and
responsibilities among the various
levels of government.
G. Executive Order 13175: Consultation
and Coordination With Indian Tribal
Governments
This action does not have tribal
implications as specified in Executive
Order 13175. Listing a site on the NPL
does not impose any costs on a tribe or
require a tribe to take remedial action.
Thus, Executive Order 13175 does not
apply to this action.
H. Executive Order 13045: Protection of
Children From Environmental Health
and Safety Risks
The EPA interprets Executive Order
13045 as applying only to those
regulatory actions that concern
environmental health or safety risks that
the EPA has reason to believe may
disproportionately affect children, per
the definition of ‘‘covered regulatory
action’’ in section 2–202 of the
Executive Order. This action is not
subject to Executive Order 13045
because this action itself is procedural
in nature (adds sites to a list) and does
not, in and of itself, provide protection
from environmental health and safety
risks. Separate future regulatory actions
are required for mitigation of
environmental health and safety risks.
I. Executive Order 13211: Actions That
Significantly Affect Energy Supply,
Distribution, or Use
This action is not subject to Executive
Order 13211, because it is not a
significant regulatory action under
Executive Order 12866.
J. National Technology Transfer and
Advancement Act (NTTAA)
This rulemaking does not involve
technical standards.
E:\FR\FM\17MYR1.SGM
17MYR1
22864
Federal Register / Vol. 83, No. 96 / Thursday, May 17, 2018 / Rules and Regulations
K. Executive Order 12898: Federal
Actions To Address Environmental
Justice in Minority Populations and
Low-Income Populations
The EPA believes the human health or
environmental risk addressed by this
action will not have potential
disproportionately high and adverse
human health or environmental effects
on minority, low-income or indigenous
populations because it does not affect
the level of protection provided to
human health or the environment. As
discussed in Section I.C. of the
preamble to this action, the NPL is a list
of national priorities. The NPL is
intended primarily to guide the EPA in
determining which sites warrant further
investigation to assess the nature and
extent of public health and
environmental risks associated with a
release of hazardous substances,
pollutants or contaminants. The NPL is
of only limited significance as it does
not assign liability to any party. Also,
placing a site on the NPL does not mean
that any remedial or removal action
necessarily need be taken.
L. Congressional Review Act
This action is subject to the CRA, and
the EPA will submit a rule report to
each House of the Congress and to the
Comptroller General of the United
States. This action is not a ‘‘major rule’’
as defined by 5 U.S.C. 804(2).
Provisions of the Congressional
Review Act (CRA) or section 305 of
CERCLA may alter the effective date of
this regulation. Under 5 U.S.C.
801(b)(1), a rule shall not take effect, or
continue in effect, if Congress enacts
(and the President signs) a joint
resolution of disapproval, described
under section 802. Another statutory
provision that may affect this rule is
CERCLA section 305, which provides
for a legislative veto of regulations
promulgated under CERCLA. Although
INS v. Chadha, 462 U.S. 919,103 S. Ct.
2764 (1983), and Bd. of Regents of the
University of Washington v. EPA, 86
F.3d 1214,1222 (D.C. Cir. 1996), cast the
validity of the legislative veto into
question, the EPA has transmitted a
copy of this regulation to the Secretary
of the Senate and the Clerk of the House
of Representatives.
If action by Congress under either the
CRA or CERCLA section 305 calls the
effective date of this regulation into
question, the EPA will publish a
document of clarification in the Federal
Register.
List of Subjects in 40 CFR Part 300
Environmental protection, Air
pollution control, Chemicals, Hazardous
substances, Hazardous waste,
Intergovernmental relations, Natural
resources, Oil pollution, Penalties,
Reporting and recordkeeping
requirements, Superfund, Water
pollution control, Water supply.
Dated: May 9, 2018.
Barry N. Breen,
Acting Assistant Administrator, Office of
Land and Emergency Management.
40 CFR part 300 is amended as
follows:
PART 300—NATIONAL OIL AND
HAZARDOUS SUBSTANCES
POLLUTION CONTINGENCY PLAN
1. The authority citation for part 300
continues to read as follows:
■
Authority: 33 U.S.C. 1321(d); 42 U.S.C.
9601–9657; E.O. 13626, 77 FR 56749, 3CFR,
2013 Comp., p. 306; E.O. 12777, 56 FR 54757,
3 CFR, 1991 Comp., p.351; E.O. 12580, 52 FR
2923, 3 CFR, 1987 Comp., p.193.
2. Table 1 of appendix B to part 300
is amended by adding entries for
‘‘Hockessin Groundwater’’, ‘‘Franklin
Street Groundwater Contamination’’,
‘‘Spring Park Municipal Well Field’’,
‘‘Burlington Industries Cheraw’’, ‘‘Lane
Plating Works, Inc.’’, and ‘‘River City
Metal Finishing’’ in alphabetical order
by state to read as follows:
■
Appendix B to Part 300—National
Priorities List
TABLE 1—GENERAL SUPERFUND SECTION
State
Site name
*
DE .............................
*
*
Hockessin Groundwater .............................
*
*
*
*
Hockessin ................................................... ..................................................
*
IN ..............................
*
*
Franklin Street Groundwater Contamination.
*
*
*
*
Spencer ...................................................... ..................................................
*
MN ............................
*
*
Spring Park Municipal Well Field ...............
*
*
*
*
Spring Park ................................................ ..................................................
*
SC .............................
*
*
Burlington Industries Cheraw .....................
*
*
*
*
Cheraw ....................................................... ..................................................
*
TX .............................
*
*
Lane Plating Works, Inc .............................
*
*
*
*
Dallas ......................................................... ..................................................
*
TX .............................
*
*
River City Metal Finishing ..........................
*
*
*
*
San Antonio ............................................... ..................................................
amozie on DSK3GDR082PROD with RULES
*
*
City/County
*
*
Notes (a)
*
*
*
(a)A = Based on issuance of health advisory by Agency for Toxic Substances and Disease Registry (if scored, HRS score need not be greater
than or equal to 28.50).
VerDate Sep<11>2014
16:58 May 16, 2018
Jkt 244001
PO 00000
Frm 00034
Fmt 4700
Sfmt 4700
E:\FR\FM\17MYR1.SGM
17MYR1
Federal Register / Vol. 83, No. 96 / Thursday, May 17, 2018 / Rules and Regulations
*
*
*
*
*
[FR Doc. 2018–10464 Filed 5–16–18; 8:45 am]
BILLING CODE 6560–50–P
DEPARTMENT OF TRANSPORTATION
Federal Motor Carrier Safety
Administration
49 CFR Parts 350, 360, 365, 373, 380,
382, 383, 384, 385, 387, 390, 393, 395,
396, 397, and 398
RIN 2126–AC06
General Technical, Organizational,
Conforming, and Correcting
Amendments to the Federal Motor
Carrier Safety Regulations
Federal Motor Carrier Safety
Administration (FMCSA), DOT.
ACTION: Final rule.
AGENCY:
FMCSA amends its
regulations by making technical
corrections throughout the Federal
Motor Carrier Safety Regulations. The
Agency makes minor changes to correct
inadvertent errors and omissions,
remove or update obsolete references,
ensure conformity with Office of the
Federal Register style guidelines, and
improve the clarity and consistency of
certain regulatory provisions.
DATES: This rule is effective June 18,
2018.
SUMMARY:
Mr.
David Miller, Federal Motor Carrier
Safety Administration, Regulatory
Development Division, 1200 New Jersey
Avenue SE, Washington, DC 20590–
0001, by telephone at (202) 366–5370 or
via email at david.miller@dot.gov. Office
hours are from 9:00 a.m. to 5:00 p.m.
e.t., Monday through Friday, except
Federal holidays.
SUPPLEMENTARY INFORMATION:
FOR FURTHER INFORMATION CONTACT:
amozie on DSK3GDR082PROD with RULES
I. Legal Basis for the Rulemaking
Congress delegated certain powers to
regulate interstate commerce to the
United States Department of
Transportation (DOT or Department) in
numerous pieces of legislation, most
notably in section 6 of the Department
of Transportation Act (DOT Act) (Pub.
L. 89–670, 80 Stat. 931, Oct. 15, 1966).
Section 6 of the DOT Act transferred to
the Department the authority of the
former Interstate Commerce
Commission (ICC) to regulate the
qualifications and maximum hours-ofservice of employees, the safety of
operations, and the equipment of motor
carriers in interstate commerce. This
authority, first granted to the ICC in the
Motor Carrier Act of 1935 (Pub. L. 74–
VerDate Sep<11>2014
16:58 May 16, 2018
Jkt 244001
255, 49 Stat. 543, Aug. 9, 1935), now
appears in 49 U.S.C. chapter 315. The
regulations issued under this (and
subsequently enacted) authority became
known as the Federal Motor Carrier
Safety Regulations (FMCSRs), codified
at 49 CFR parts 350–399. The
administrative powers to enforce
chapter 315 (codified in 49 U.S.C.
chapter 5) were also transferred from the
ICC to the DOT in 1966 and assigned,
first to the Federal Highway
Administration (FHWA), and then to
FMCSA. The FMCSA Administrator has
been delegated authority under 49 CFR
1.87 to carry out the motor carrier
functions vested in the Secretary of
Transportation.
Between 1984 and 1999, a number of
statutes added to FHWA’s authority.
Various statutes authorize the
enforcement of the FMCSRs, the
Hazardous Materials Regulations
(HMRs), and the Commercial
Regulations, and provide both civil and
criminal penalties for violations of these
requirements. These statutes include the
Motor Carrier Safety Act of 1984
(MCSA) (Pub. L. 98–554, 98 Stat. 2832,
Oct. 30, 1984), codified at 49 U.S.C.
chapter 311, subchapter III; the
Commercial Motor Vehicle Safety Act of
1986 (Pub. L. 99–570, 100 Stat. 3207–
170, Oct. 27, 1986), codified at 49 U.S.C.
chapter 313; the Hazardous Materials
Transportation Uniform Safety Act of
1990, as amended (Pub. L. 101–615, 104
Stat. 3244, Nov. 16, 1990), codified at 49
U.S.C. chapter 51; and the ICC
Termination Act of 1995 (ICCTA) (Pub.
L. 104–88, 109 Stat. 803, Dec. 29, 1995),
codified at 49 U.S.C. chapters 131–149.
The Motor Carrier Safety
Improvement Act of 1999 (MCSIA) (Pub.
L. 106–159, 113 Stat. 1748, Dec. 9, 1999)
established FMCSA as a new operating
administration within DOT, effective
January 1, 2000. The motor carrier safety
responsibilities previously assigned to
both the ICC and FHWA are now
assigned to FMCSA.
Congress expanded, modified, and
amended FMCSA’s authority in the
Uniting and Strengthening America by
Providing Appropriate Tools Required
to Intercept and Obstruct Terrorism
(USA PATRIOT) Act of 2001 (Pub. L.
107–56, 115 Stat. 272, Oct. 26, 2001);
the Safe, Accountable, Flexible,
Efficient Transportation Equity Act: A
Legacy for Users (SAFETEA–LU) (Pub.
L. 109–59, 119 Stat. 1144, Aug. 10,
2005); the SAFETEA–LU Technical
Corrections Act of 2008 (Pub. L. 110–
244, 122 Stat. 1572, June 6, 2008); the
Moving Ahead for Progress in the 21st
Century Act (MAP–21) (Pub. L. 112–
141, 126 Stat. 405, July 6, 2012); and the
Fixing America’s Surface Transportation
PO 00000
Frm 00035
Fmt 4700
Sfmt 4700
22865
Act (FAST Act) (Pub. L. 114–94, 129
Stat. 1312, Dec. 4, 2015).
The specific regulations amended by
this rule are based on the statutes
detailed above. Generally, the legal
authority for each of those provisions
was explained when the requirement
was originally adopted and is noted at
the beginning of each part in title 49 of
the CFR.
The Administrative Procedure Act
(APA) (5 U.S.C. 551–706) specifically
provides exceptions to its notice and
comment rulemaking procedures when
the Agency finds there is good cause to
dispense with them, and incorporates
the finding and a brief statement of
reasons therefore in the rules issued.
Generally, good cause exists when the
Agency determines that notice and
public procedures are impractical,
unnecessary, or contrary to the public
interest (5 U.S.C. 553(b)(3)(B)). The
amendments made in this final rule
merely correct inadvertent errors and
omissions, remove or update obsolete
references, ensure conformity with
Office of the Federal Register style
guidelines, and make minor changes to
improve clarity and consistency. The
technical amendments do not impose
any material new requirements or
increase compliance obligations. For
these reasons, FMCSA finds good cause
that notice and public comment on this
final rule are unnecessary.
The APA also allows agencies to make
rules effective immediately with good
cause (5 U.S.C. 553(d)(3)), instead of
requiring publication 30 days prior to
the effective date. For the reasons
already stated, FMCSA finds there is
good cause for this rule to be effective
immediately.
FMCSA is aware of the regulatory
requirements concerning public
participation in FMCSA rulemaking (49
U.S.C. 31136(g)). These requirements
pertain to certain major rules,1 but,
because this final rule is not a major
rule, they are not applicable. In any
event, the Agency finds that publication
of an advance notice of proposed
rulemaking under 49 U.S.C.
1 A ‘‘major rule’’ means any rule that the
Administrator of the Office of Information and
Regulatory Affairs of the Office of Management and
Budget finds has resulted in or is likely to result
in (a) an annual effect on the economy of $100
million or more; (b) a major increase in costs or
prices for consumers, individual industries,
Federal, State, or local government agencies, or
geographic regions; or (c) significant adverse effects
on competition, employment, investment,
productivity, innovation, or on the ability of United
States-based enterprises to compete with foreignbased enterprises in domestic and export markets
5 U.S.C. 804(2)). Exception: The term ‘‘major rule’’
does not include any rule promulgated under the
Telecommunications Act of 1996 and the
amendments made by that Act.
E:\FR\FM\17MYR1.SGM
17MYR1
Agencies
[Federal Register Volume 83, Number 96 (Thursday, May 17, 2018)]
[Rules and Regulations]
[Pages 22859-22865]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10464]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 300
[EPA-HQ-OLEM-2017-0604, 0606, 0607, 0609, 0611 and 0612; FRL-9978-14-
OLEM]
National Priorities List
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The Comprehensive Environmental Response, Compensation, and
Liability Act of 1980 (``CERCLA'' or ``the Act''), as amended, requires
that the National Oil and Hazardous Substances Pollution Contingency
Plan (``NCP'') include a list of national priorities among the known
releases or threatened releases of hazardous substances, pollutants or
contaminants throughout the United States. The National Priorities List
(``NPL'') constitutes this list. The NPL is intended primarily to guide
the Environmental Protection Agency (``the EPA'' or ``the agency'') in
determining which sites warrant further investigation. These further
investigations will allow the EPA to assess the nature and extent of
public health and environmental risks associated with the site and to
determine what CERCLA-financed remedial action(s), if any, may be
appropriate. This rule adds six sites to the General Superfund section
of the NPL.
DATES: The document is effective on June 18, 2018.
ADDRESSES: Contact information for the EPA Headquarters:
Docket Coordinator, Headquarters; U.S. Environmental
Protection Agency; CERCLA Docket Office; 1301 Constitution Avenue NW,
William Jefferson Clinton Building West, Room 3334, Washington, DC
20004, 202/566-0276.
The contact information for the regional dockets is as follows:
Holly Inglis, Region 1 (CT, ME, MA, NH, RI, VT), U.S. EPA,
Superfund Records and Information Center, 5 Post Office Square, Suite
100, Boston, MA 02109-3912; 617/918-1413.
Ildefonso Acosta, Region 2 (NJ, NY, PR, VI), U.S. EPA, 290
Broadway, New York, NY 10007-1866; 212/637-4344.
Lorie Baker (ASRC), Region 3 (DE, DC, MD, PA, VA, WV),
U.S. EPA, Library, 1650 Arch Street, Mailcode 3HS12, Philadelphia, PA
19103; 215/814-3355.
Cathy Amoroso, Region 4 (AL, FL, GA, KY, MS, NC, SC, TN),
U.S. EPA, 61 Forsyth Street SW, Mailcode 9T25, Atlanta, GA 30303; 404/
562-8637.
Todd Quesada, Region 5 (IL, IN, MI, MN, OH, WI), U.S. EPA
Superfund Division Librarian/SFD Records Manager SRC-7J, Metcalfe
Federal Building, 77 West Jackson Boulevard, Chicago, IL 60604; 312/
886-4465.
Brenda Cook, Region 6 (AR, LA, NM, OK, TX), U.S. EPA, 1445
Ross Avenue, Suite 1200, Mailcode 6SFTS, Dallas, TX 75202-2733; 214/
665-7436.
Kumud Pyakuryal, Region 7 (IA, KS, MO, NE), U.S. EPA,
11201 Renner Blvd., Mailcode SUPRSTAR, Lenexa, KS 66219; 913/551-7956.
Victor Ketellapper, Region 8 (CO, MT, ND, SD, UT, WY),
U.S. EPA, 1595 Wynkoop Street, Mailcode 8EPR-B, Denver, CO 80202-1129;
303/312-6578.
Sharon Murray, Region 9 (AZ, CA, HI, NV, AS, GU, MP), U.S.
EPA, 75 Hawthorne Street, Mailcode SFD 6-1, San Francisco, CA 94105;
415/947-4250.
Ken Marcy, Region 10 (AK, ID, OR, WA), U.S. EPA, 1200 6th
Avenue, Mailcode ECL-112, Seattle, WA 98101; 206/463-1349.
FOR FURTHER INFORMATION CONTACT: Terry Jeng, phone: (703) 603-8852,
email: [email protected] Site Assessment and Remedy Decisions Branch,
Assessment and Remediation Division, Office of Superfund Remediation
and Technology Innovation (Mailcode 5204P), U.S. Environmental
Protection Agency; 1200 Pennsylvania Avenue NW, Washington, DC 20460;
or the Superfund Hotline, phone (800) 424-9346 or (703) 412-9810 in the
Washington, DC, metropolitan area.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Background
A. What are CERCLA and SARA?
B. What is the NCP?
C. What is the National Priorities List (NPL)?
D. How are sites listed on the NPL?
E. What happens to sites on the NPL?
F. Does the NPL define the boundaries of sites?
G. How are sites removed from the NPL?
H. May the EPA delete portions of sites from the NPL as they are
cleaned up?
I. What is the Construction Completion List (CCL)?
J. What is the Sitewide Ready for Anticipated Use measure?
K. What is state/tribal correspondence concerning NPL Listing?
II. Availability of Information to the Public
A. May I review the documents relevant to this final rule?
B. What documents are available for review at the EPA
Headquarters docket?
C. What documents are available for review at the EPA regional
dockets?
[[Page 22860]]
D. How do I access the documents?
E. How may I obtain a current list of NPL sites?
III. Contents of This Final Rule
A. Additions to the NPL
B. What did the EPA do with the public comments it received?
IV. Statutory and Executive Order Reviews
A. Executive Order 12866: Regulatory Planning and Review and
Executive Order 13563: Improving Regulation and Regulatory Review
B. Executive Order 13771: Reducing Regulation and Controlling
Regulatory Costs
C. Paperwork Reduction Act (PRA)
D. Regulatory Flexibility Act (RFA)
E. Unfunded Mandates Reform Act (UMRA)
F. Executive Order 13132: Federalism
G. Executive Order 13175: Consultation and Coordination with
Indian Tribal Governments
H. Executive Order 13045: Protection of Children from
Environmental Health and Safety Risks
I. Executive Order 13211: Actions that Significantly Affect
Energy Supply, Distribution, or Use
J. National Technology Transfer and Advancement Act (NTTAA)
K. Executive Order 12898: Federal Actions to Address
Environmental Justice in Minority Populations and Low-Income
Populations
L. Congressional Review Act
I. Background
A. What are CERCLA and SARA?
In 1980, Congress enacted the Comprehensive Environmental Response,
Compensation, and Liability Act, 42 U.S.C. 9601-9675 (``CERCLA'' or
``the Act''), in response to the dangers of uncontrolled releases or
threatened releases of hazardous substances, and releases or
substantial threats of releases into the environment of any pollutant
or contaminant that may present an imminent or substantial danger to
the public health or welfare. CERCLA was amended on October 17, 1986,
by the Superfund Amendments and Reauthorization Act (``SARA''), Public
Law 99-499, 100 Stat. 1613 et seq.
B. What is the NCP?
To implement CERCLA, the EPA promulgated the revised National Oil
and Hazardous Substances Pollution Contingency Plan (``NCP''), 40 CFR
part 300, on July 16, 1982 (47 FR 31180), pursuant to CERCLA section
105 and Executive Order 12316 (46 FR 42237, August 20, 1981). The NCP
sets guidelines and procedures for responding to releases and
threatened releases of hazardous substances, or releases or substantial
threats of releases into the environment of any pollutant or
contaminant that may present an imminent or substantial danger to the
public health or welfare. The EPA has revised the NCP on several
occasions. The most recent comprehensive revision was on March 8, 1990
(55 FR 8666).
As required under section 105(a)(8)(A) of CERCLA, the NCP also
includes ``criteria for determining priorities among releases or
threatened releases throughout the United States for the purpose of
taking remedial action and, to the extent practicable, taking into
account the potential urgency of such action, for the purpose of taking
removal action.'' ``Removal'' actions are defined broadly and include a
wide range of actions taken to study, clean up, prevent or otherwise
address releases and threatened releases of hazardous substances,
pollutants or contaminants (42 U.S.C. 9601(23)).
C. What is the National Priorities List (NPL)?
The NPL is a list of national priorities among the known or
threatened releases of hazardous substances, pollutants or contaminants
throughout the United States. The list, which is appendix B of the NCP
(40 CFR part 300), was required under section 105(a)(8)(B) of CERCLA,
as amended. Section 105(a)(8)(B) defines the NPL as a list of
``releases'' and the highest priority ``facilities'' and requires that
the NPL be revised at least annually. The NPL is intended primarily to
guide the EPA in determining which sites warrant further investigation
to assess the nature and extent of public health and environmental
risks associated with a release of hazardous substances, pollutants or
contaminants. The NPL is of only limited significance, however, as it
does not assign liability to any party or to the owner of any specific
property. Also, placing a site on the NPL does not mean that any
remedial or removal action necessarily need be taken.
For purposes of listing, the NPL includes two sections, one of
sites that are generally evaluated and cleaned up by the EPA (the
``General Superfund section'') and one of sites that are owned or
operated by other federal agencies (the ``Federal Facilities
section''). With respect to sites in the Federal Facilities section,
these sites are generally being addressed by other federal agencies.
Under Executive Order 12580 (52 FR 2923, January 29, 1987) and CERCLA
section 120, each federal agency is responsible for carrying out most
response actions at facilities under its own jurisdiction, custody or
control, although the EPA is responsible for preparing a Hazard Ranking
System (``HRS'') score and determining whether the facility is placed
on the NPL.
D. How are sites listed on the NPL?
There are three mechanisms for placing sites on the NPL for
possible remedial action (see 40 CFR 300.425(c) of the NCP): (1) A site
may be included on the NPL if it scores sufficiently high on the HRS,
which the EPA promulgated as appendix A of the NCP (40 CFR part 300).
The HRS serves as a screening tool to evaluate the relative potential
of uncontrolled hazardous substances, pollutants or contaminants to
pose a threat to human health or the environment. On December 14, 1990
(55 FR 51532), the EPA promulgated revisions to the HRS partly in
response to CERCLA section 105(c), added by SARA. On January 9, 2017
(82 FR 2760), a subsurface intrusion component was added to the HRS to
enable the EPA to consider human exposure to hazardous substances or
pollutants and contaminants that enter regularly occupied structures
through subsurface intrusion when evaluating sites for the NPL. The
current HRS evaluates four pathways: Ground water, surface water, soil
exposure and subsurface intrusion, and air. As a matter of agency
policy, those sites that score 28.50 or greater on the HRS are eligible
for the NPL. (2) Each state may designate a single site as its top
priority to be listed on the NPL, without any HRS score. This provision
of CERCLA requires that, to the extent practicable, the NPL include one
facility designated by each state as the greatest danger to public
health, welfare or the environment among known facilities in the state.
This mechanism for listing is set out in the NCP at 40 CFR
300.425(c)(2). (3) The third mechanism for listing, included in the NCP
at 40 CFR 300.425(c)(3), allows certain sites to be listed without any
HRS score, if all of the following conditions are met:
The Agency for Toxic Substances and Disease Registry
(ATSDR) of the U.S. Public Health Service has issued a health advisory
that recommends dissociation of individuals from the release.
The EPA determines that the release poses a significant
threat to public health.
The EPA anticipates that it will be more cost-effective to
use its remedial authority than to use its removal authority to respond
to the release.
The EPA promulgated an original NPL of 406 sites on September 8,
1983 (48 FR 40658) and generally has updated it at least annually.
E. What happens to sites on the NPL?
A site may undergo remedial action financed by the Trust Fund
established under CERCLA (commonly referred to
[[Page 22861]]
as the ``Superfund'') only after it is placed on the NPL, as provided
in the NCP at 40 CFR 300.425(b)(1). (``Remedial actions'' are those
``consistent with a permanent remedy, taken instead of or in addition
to removal actions'' (40 CFR 300.5). However, under 40 CFR
300.425(b)(2), placing a site on the NPL ``does not imply that monies
will be expended.'' The EPA may pursue other appropriate authorities to
respond to the releases, including enforcement action under CERCLA and
other laws.
F. Does the NPL define the boundaries of sites?
The NPL does not describe releases in precise geographical terms;
it would be neither feasible nor consistent with the limited purpose of
the NPL (to identify releases that are priorities for further
evaluation), for it to do so. Indeed, the precise nature and extent of
the site are typically not known at the time of listing.
Although a CERCLA ``facility'' is broadly defined to include any
area where a hazardous substance has ``come to be located'' (CERCLA
section 101(9)), the listing process itself is not intended to define
or reflect the boundaries of such facilities or releases. Of course,
HRS data (if the HRS is used to list a site) upon which the NPL
placement was based will, to some extent, describe the release(s) at
issue. That is, the NPL site would include all releases evaluated as
part of that HRS analysis.
When a site is listed, the approach generally used to describe the
relevant release(s) is to delineate a geographical area (usually the
area within an installation or plant boundaries) and identify the site
by reference to that area. However, the NPL site is not necessarily
coextensive with the boundaries of the installation or plant, and the
boundaries of the installation or plant are not necessarily the
``boundaries'' of the site. Rather, the site consists of all
contaminated areas within the area used to identify the site, as well
as any other location where that contamination has come to be located,
or from where that contamination came.
In other words, while geographic terms are often used to designate
the site (e.g., the ``Jones Co. Plant site'') in terms of the property
owned by a particular party, the site, properly understood, is not
limited to that property (e.g., it may extend beyond the property due
to contaminant migration), and conversely may not occupy the full
extent of the property (e.g., where there are uncontaminated parts of
the identified property, they may not be, strictly speaking, part of
the ``site''). The ``site'' is thus neither equal to, nor confined by,
the boundaries of any specific property that may give the site its
name, and the name itself should not be read to imply that this site is
coextensive with the entire area within the property boundary of the
installation or plant. In addition, the site name is merely used to
help identify the geographic location of the contamination, and is not
meant to constitute any determination of liability at a site. For
example, the name ``Jones Co. plant site,'' does not imply that the
Jones Company is responsible for the contamination located on the plant
site.
EPA regulations provide that the remedial investigation (``RI'')
``is a process undertaken . . . to determine the nature and extent of
the problem presented by the release'' as more information is developed
on site contamination, and which is generally performed in an
interactive fashion with the feasibility study (``FS'') (40 CFR 300.5).
During the RI/FS process, the release may be found to be larger or
smaller than was originally thought, as more is learned about the
source(s) and the migration of the contamination. However, the HRS
inquiry focuses on an evaluation of the threat posed and therefore the
boundaries of the release need not be exactly defined. Moreover, it
generally is impossible to discover the full extent of where the
contamination ``has come to be located'' before all necessary studies
and remedial work are completed at a site. Indeed, the known boundaries
of the contamination can be expected to change over time. Thus, in most
cases, it may be impossible to describe the boundaries of a release
with absolute certainty.
Further, as noted previously, NPL listing does not assign liability
to any party or to the owner of any specific property. Thus, if a party
does not believe it is liable for releases on discrete parcels of
property, it can submit supporting information to the agency at any
time after it receives notice it is a potentially responsible party.
For these reasons, the NPL need not be amended as further research
reveals more information about the location of the contamination or
release.
G. How are sites removed from the NPL?
The EPA may delete sites from the NPL where no further response is
appropriate under Superfund, as explained in the NCP at 40 CFR
300.425(e). This section also provides that the EPA shall consult with
states on proposed deletions and shall consider whether any of the
following criteria have been met:
(i) Responsible parties or other persons have implemented all
appropriate response actions required;
(ii) All appropriate Superfund-financed response has been
implemented and no further response action is required; or
(iii) The remedial investigation has shown the release poses no
significant threat to public health or the environment, and taking of
remedial measures is not appropriate.
H. May the EPA delete portions of sites from the NPL as they are
cleaned up?
In November 1995, the EPA initiated a policy to delete portions of
NPL sites where cleanup is complete (60 FR 55465, November 1, 1995).
Total site cleanup may take many years, while portions of the site may
have been cleaned up and made available for productive use.
I. What is the Construction Completion List (CCL)?
The EPA also has developed an NPL construction completion list
(``CCL'') to simplify its system of categorizing sites and to better
communicate the successful completion of cleanup activities (58 FR
12142, March 2, 1993). Inclusion of a site on the CCL has no legal
significance.
Sites qualify for the CCL when: (1) Any necessary physical
construction is complete, whether or not final cleanup levels or other
requirements have been achieved; (2) the EPA has determined that the
response action should be limited to measures that do not involve
construction (e.g., institutional controls); or (3) the site qualifies
for deletion from the NPL. For more information on the CCL, see the
EPA's internet site at https://www.epa.gov/superfund/construction-completions-national-priorities-list-npl-sites-number.
J. What is the Sitewide Ready for Anticipated Use measure?
The Sitewide Ready for Anticipated Use measure represents important
Superfund accomplishments and the measure reflects the high priority
the EPA places on considering anticipated future land use as part of
the remedy selection process. See Guidance for Implementing the
Sitewide Ready-for-Reuse Measure, May 24, 2006, OSWER 9365.0-36. This
measure applies to final and deleted sites where construction is
complete, all cleanup goals have been achieved, and all institutional
or other controls are in place. The EPA has been successful on many
occasions in carrying out remedial actions that ensure protectiveness
of human health and the environment for current and
[[Page 22862]]
future land uses, in a manner that allows contaminated properties to be
restored to environmental and economic vitality. For further
information, please go to https://www.epa.gov/superfund/about-superfund-cleanup-process#tab-9.
K. What is state/tribal correspondence concerning NPL listing?
In order to maintain close coordination with states and tribes in
the NPL listing decision process, the EPA's policy is to determine the
position of the states and tribes regarding sites that the EPA is
considering for listing. This consultation process is outlined in two
memoranda that can be found at the following website: https://www.epa.gov/superfund/statetribal-correspondence-concerning-npl-site-listing.
The EPA has improved the transparency of the process by which state
and tribal input is solicited. The EPA is using the Web and where
appropriate more structured state and tribal correspondence that (1)
explains the concerns at the site and the EPA's rationale for
proceeding; (2) requests an explanation of how the state intends to
address the site if placement on the NPL is not favored; and (3)
emphasizes the transparent nature of the process by informing states
that information on their responses will be publicly available.
A model letter and correspondence between the EPA and states and
tribes where applicable, is available on the EPA's website at https://semspub.epa.gov/src/document/HQ/174024.
II. Availability of Information to the Public
A. May I review the documents relevant to this final rule?
Yes, documents relating to the evaluation and scoring of the sites
in this final rule are contained in dockets located both at the EPA
headquarters and in the EPA regional offices.
An electronic version of the public docket is available through
https://www.regulations.gov (see table below for docket identification
numbers). Although not all docket materials may be available
electronically, you may still access any of the publicly available
docket materials through the docket facilities identified in section
II.D.
Docket Identification Numbers by Site
----------------------------------------------------------------------------------------------------------------
Site name City/County, State Docket ID No.
----------------------------------------------------------------------------------------------------------------
Hockessin Groundwater................. Hockessin, DE........................... EPA-HQ-OLEM-2017-0604.
Franklin Street Groundwater Spencer, IN............................. EPA-HQ-OLEM-2017-0606.
Contamination.
Spring Park Municipal Well Field...... Spring Park, MN......................... EPA-HQ-OLEM-2017-0607.
Burlington Industries Cheraw.......... Cheraw, SC.............................. EPA-HQ-OLEM-2017-0609.
Lane Plating Works, Inc............... Dallas, TX.............................. EPA-HQ-OLEM-2017-0611.
River City Metal Finishing............ San Antonio, TX......................... EPA-HQ-OLEM-2017-0612.
----------------------------------------------------------------------------------------------------------------
B. What documents are available for review at the EPA Headquarters
docket?
The headquarters docket for this rule contains the HRS score
sheets, the documentation record describing the information used to
compute the score and a list of documents referenced in the
documentation record for each site.
C. What documents are available for review at the EPA regional dockets?
The EPA regional dockets contain all the information in the
headquarters docket, plus the actual reference documents containing the
data principally relied upon by the EPA in calculating or evaluating
the HRS score. These reference documents are available only in the
regional dockets.
D. How do I access the documents?
You may view the documents, by appointment only, after the
publication of this rule. The hours of operation for the headquarters
docket are from 8:30 a.m. to 4:30 p.m., Monday through Friday,
excluding federal holidays. Please contact the regional dockets for
hours. For addresses for the headquarters and regional dockets, see
Addresses section in the beginning portion of this preamble.
E. How may I obtain a current list of NPL sites?
You may obtain a current list of NPL sites via the internet at
https://www.epa.gov/superfund/national-priorities-list-npl-sites-site-name or by contacting the Superfund docket (see contact information in
the beginning portion of this document).
III. Contents of This Final Rule
A. Additions to the NPL
This final rule adds the following six sites to the General
Superfund section of the NPL. These sites are being added to the NPL
based on HRS score.
General Superfund section:
------------------------------------------------------------------------
State Site name City/County
------------------------------------------------------------------------
DE............................ Hockessin Groundwater. Hockessin.
IN............................ Franklin Street Spencer.
Groundwater
Contamination.
MN............................ Spring Park Municipal Spring Park.
Well Field.
SC............................ Burlington Industries Cheraw.
Cheraw.
TX............................ Lane Plating Works, Dallas.
Inc.
TX............................ River City Metal San Antonio.
Finishing.
------------------------------------------------------------------------
B. What did the EPA do with the public comments it received?
The EPA reviewed all comments received on the sites in this rule
and responded to all relevant comments. The EPA is adding six sites to
the NPL in this final rule. All six sites were proposed for NPL
addition on January 18, 2018 (83 FR 2576). The sites are: Hockessin
Groundwater in Hockessin, DE; Franklin Street Groundwater Contamination
in Spencer, IN; Spring Park Municipal Well Field in Spring Park, MN;
Burlington Industries Cheraw in Cheraw, SC; Lane Plating Works, Inc. in
Dallas, TX; and, River City Metal Finishing in San Antonio, TX.
[[Page 22863]]
Comments on the Franklin Street Groundwater Contamination site are
being addressed in a response to comment support document available in
the public docket concurrently with this rule.
For the Hockessin Groundwater site, the EPA received several
comments supporting NPL listing, several comments unrelated to NPL
listing and two anonymous comments questioning site investigation and
interim mitigation measures, timing of cleanup actions and potential
remedies. In response, EPA is adding the site to the NPL as the best
way to ensure that cleanup proceeds in a timely manner. NPL listing
makes a site eligible for remedial action funding under CERCLA. The
site will be further investigated during the remedial investigation/
feasibility study (RI/FS) phase of the Superfund process to determine
what response, if any, is appropriate to ensure protection of public
health and the environment.
The EPA received no comments on the Spring Park Muncipal Well Field
site.
The EPA received one comment from a community member regarding the
Burlington Industries Cheraw site. The commenter expressed their
opposition to NPL listing based on concerns that listing may negatively
affect their property value. Economic factors such as those raised by
the commenter are generally not considered in the assessment of whether
a site belongs on the NPL. The EPA notes that there are both costs and
benefits that can be associated with listing a site. Among the benefits
are increased health and environmental protection as a result of
increased public awareness of potential hazards. In addition to the
potential for federally financed remedial actions, the addition of a
site to the NPL could accelerate privately financed, voluntary cleanup
efforts. Listing sites as national priority targets also may give
states increased support for funding responses at particular sites. As
a result of the additional CERCLA remedies, there will be lower human
exposure to high-risk chemicals, and higher quality surface water,
ground water, soil, and air. Therefore, it is possible that any
perceived or actual negative fluctuations in property values or
development opportunities that may result from contamination may also
be countered by positive fluctuations when a CERCLA investigation and
any necessary cleanup are completed.
For the Lane Plating Works, Inc. site, the EPA received only one
comment related to NPL listing. The comment, submitted by the city of
Dallas' Office of Environmental Quality, supports NPL listing in order
to facilitate federal funding for full and complete remediation.
The EPA received two comments supporting the NPL listing of the
River City Metal Finishing site, one from a community member and one
from a student.
IV. Statutory and Executive Order Reviews
Additional information about these statutes and Executive Orders
can be found at https://www.epa.gov/laws-regulations/laws-and-executive-orders.
A. Executive Order 12866: Regulatory Planning and Review and Executive
Order 13563: Improving Regulation and Regulatory Review
This action is not a significant regulatory action and was
therefore not submitted to the Office of Management and Budget (OMB)
for review.
B. Executive Order 13771: Reducing Regulation and Controlling
Regulatory Costs
This action is not an Executive Order 13771 regulatory action
because this action is not significant under Executive Order 12866.
C. Paperwork Reduction Act (PRA)
This action does not impose an information collection burden under
the PRA. This rule does not contain any information collection
requirements that require approval of the OMB.
D. Regulatory Flexibility Act (RFA)
I certify that this action will not have a significant economic
impact on a substantial number of small entities under the RFA. This
action will not impose any requirements on small entities. This rule
listing sites on the NPL does not impose any obligations on any group,
including small entities. This rule also does not establish standards
or requirements that any small entity must meet, and imposes no direct
costs on any small entity. Whether an entity, small or otherwise, is
liable for response costs for a release of hazardous substances depends
on whether that entity is liable under CERCLA 107(a). Any such
liability exists regardless of whether the site is listed on the NPL
through this rulemaking.
E. Unfunded Mandates Reform Act (UMRA)
This action does not contain any unfunded mandate as described in
UMRA, 2 U.S.C. 1531-1538, and does not significantly or uniquely affect
small governments. This action imposes no enforceable duty on any
state, local or tribal governments or the private sector. Listing a
site on the NPL does not itself impose any costs. Listing does not mean
that the EPA necessarily will undertake remedial action. Nor does
listing require any action by a private party, state, local or tribal
governments or determine liability for response costs. Costs that arise
out of site responses result from future site-specific decisions
regarding what actions to take, not directly from the act of placing a
site on the NPL.
F. Executive Order 13132: Federalism
This final rule does not have federalism implications. It will not
have substantial direct effects on the states, on the relationship
between the national government and the states, or on the distribution
of power and responsibilities among the various levels of government.
G. Executive Order 13175: Consultation and Coordination With Indian
Tribal Governments
This action does not have tribal implications as specified in
Executive Order 13175. Listing a site on the NPL does not impose any
costs on a tribe or require a tribe to take remedial action. Thus,
Executive Order 13175 does not apply to this action.
H. Executive Order 13045: Protection of Children From Environmental
Health and Safety Risks
The EPA interprets Executive Order 13045 as applying only to those
regulatory actions that concern environmental health or safety risks
that the EPA has reason to believe may disproportionately affect
children, per the definition of ``covered regulatory action'' in
section 2-202 of the Executive Order. This action is not subject to
Executive Order 13045 because this action itself is procedural in
nature (adds sites to a list) and does not, in and of itself, provide
protection from environmental health and safety risks. Separate future
regulatory actions are required for mitigation of environmental health
and safety risks.
I. Executive Order 13211: Actions That Significantly Affect Energy
Supply, Distribution, or Use
This action is not subject to Executive Order 13211, because it is
not a significant regulatory action under Executive Order 12866.
J. National Technology Transfer and Advancement Act (NTTAA)
This rulemaking does not involve technical standards.
[[Page 22864]]
K. Executive Order 12898: Federal Actions To Address Environmental
Justice in Minority Populations and Low-Income Populations
The EPA believes the human health or environmental risk addressed
by this action will not have potential disproportionately high and
adverse human health or environmental effects on minority, low-income
or indigenous populations because it does not affect the level of
protection provided to human health or the environment. As discussed in
Section I.C. of the preamble to this action, the NPL is a list of
national priorities. The NPL is intended primarily to guide the EPA in
determining which sites warrant further investigation to assess the
nature and extent of public health and environmental risks associated
with a release of hazardous substances, pollutants or contaminants. The
NPL is of only limited significance as it does not assign liability to
any party. Also, placing a site on the NPL does not mean that any
remedial or removal action necessarily need be taken.
L. Congressional Review Act
This action is subject to the CRA, and the EPA will submit a rule
report to each House of the Congress and to the Comptroller General of
the United States. This action is not a ``major rule'' as defined by 5
U.S.C. 804(2).
Provisions of the Congressional Review Act (CRA) or section 305 of
CERCLA may alter the effective date of this regulation. Under 5 U.S.C.
801(b)(1), a rule shall not take effect, or continue in effect, if
Congress enacts (and the President signs) a joint resolution of
disapproval, described under section 802. Another statutory provision
that may affect this rule is CERCLA section 305, which provides for a
legislative veto of regulations promulgated under CERCLA. Although INS
v. Chadha, 462 U.S. 919,103 S. Ct. 2764 (1983), and Bd. of Regents of
the University of Washington v. EPA, 86 F.3d 1214,1222 (D.C. Cir.
1996), cast the validity of the legislative veto into question, the EPA
has transmitted a copy of this regulation to the Secretary of the
Senate and the Clerk of the House of Representatives.
If action by Congress under either the CRA or CERCLA section 305
calls the effective date of this regulation into question, the EPA will
publish a document of clarification in the Federal Register.
List of Subjects in 40 CFR Part 300
Environmental protection, Air pollution control, Chemicals,
Hazardous substances, Hazardous waste, Intergovernmental relations,
Natural resources, Oil pollution, Penalties, Reporting and
recordkeeping requirements, Superfund, Water pollution control, Water
supply.
Dated: May 9, 2018.
Barry N. Breen,
Acting Assistant Administrator, Office of Land and Emergency
Management.
40 CFR part 300 is amended as follows:
PART 300--NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION
CONTINGENCY PLAN
0
1. The authority citation for part 300 continues to read as follows:
Authority: 33 U.S.C. 1321(d); 42 U.S.C. 9601-9657; E.O. 13626,
77 FR 56749, 3CFR, 2013 Comp., p. 306; E.O. 12777, 56 FR 54757, 3
CFR, 1991 Comp., p.351; E.O. 12580, 52 FR 2923, 3 CFR, 1987 Comp.,
p.193.
0
2. Table 1 of appendix B to part 300 is amended by adding entries for
``Hockessin Groundwater'', ``Franklin Street Groundwater
Contamination'', ``Spring Park Municipal Well Field'', ``Burlington
Industries Cheraw'', ``Lane Plating Works, Inc.'', and ``River City
Metal Finishing'' in alphabetical order by state to read as follows:
Appendix B to Part 300--National Priorities List
Table 1--General Superfund Section
----------------------------------------------------------------------------------------------------------------
State Site name City/County Notes (a)
----------------------------------------------------------------------------------------------------------------
* * * * * * *
DE................................. Hockessin Groundwater. Hockessin............ ............................
* * * * * * *
IN................................. Franklin Street Spencer.............. ............................
Groundwater
Contamination.
* * * * * * *
MN................................. Spring Park Municipal Spring Park.......... ............................
Well Field.
* * * * * * *
SC................................. Burlington Industries Cheraw............... ............................
Cheraw.
* * * * * * *
TX................................. Lane Plating Works, Dallas............... ............................
Inc.
* * * * * * *
TX................................. River City Metal San Antonio.......... ............................
Finishing.
* * * * * * *
----------------------------------------------------------------------------------------------------------------
\(a)\A = Based on issuance of health advisory by Agency for Toxic Substances and Disease Registry (if scored,
HRS score need not be greater than or equal to 28.50).
[[Page 22865]]
* * * * *
[FR Doc. 2018-10464 Filed 5-16-18; 8:45 am]