Notice of Request Under Blanket Authorization: Southern Star Central Gas Pipeline, Inc., 22666-22667 [2018-10399]

Download as PDF 22666 Federal Register / Vol. 83, No. 95 / Wednesday, May 16, 2018 / Notices FERC–725V, MANDATORY RELIABILITY STANDARDS: COM RELIABILITY STANDARDS—Continued Number of respondents Total .............. Total number of responses Average burden and cost per response 7 Total annual burden hours & total annual cost Cost per respondent (1) (On-going) Maintain evidence of training and assessments [COM–002–4 R2, R4, R5 and R6]. (On-going) Maintain evidence of training [COM– 002–4 R3 and R6]. Annual number of responses per respondent (2) (1) * (2) = (3) (4) (3) * (4) = (5) ($) (5) ÷ (1) 201 (BA, RC & TOP) 1 201 8 hrs. & $288 ............ 1,608 hrs. & $57,888 288 1,880 (DP & GOP) .... 1 1,180 8 hrs. & $288 ............ 15,040 hrs. & $541,440. 288 .................................... ........................ 2,762 .................................... 22,976 hrs. & $827,136. ........................ Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: May 10, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–10401 Filed 5–15–18; 8:45 am] sradovich on DSK3GMQ082PROD with NOTICES BILLING CODE 6717–01–P 7 The loaded hourly wage figure (includes benefits) is based on the occupational categories for 2016 found on the Bureau of Labor Statistics website (https://www.bls.gov/oes/current/naics2_ 22.htm): Electrical Engineer (Occupation Code: 17–2071): $68.12 (review and documentation). Office and Administrative Support (Occupation Code: 43–0000): $40.89 ($68.12 + 40.89 = 109.01 ÷ 3 = $36.34. This figure is rounded to $36.00 for use in collection FERC–725V for calculating wage figures in this renewal calculation. VerDate Sep<11>2014 17:34 May 15, 2018 Jkt 244001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–384–000] Notice of Request Under Blanket Authorization: Southern Star Central Gas Pipeline, Inc. Take notice that on April 30, 2018, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky 42301, filed in the above referenced docket, a prior notice request pursuant to sections 157.205, 157.208, 157.210, 157.211, and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA) and Southern Star’s blanket certificate issued in Docket No. CP82–479–000, for authorization to construct, own, and operate a total of approximately 14.27 miles in seven non-contiguous 20- and 24-inch-diameter pipeline segments, and subsequently to abandon the equivalent existing segments of Line V in Oklahoma and Logan Counties, Oklahoma (Line V Replacement Project). The replacement is required due to the age and condition of the acetylenewelded pipe and to enable in-line assessments of the Line V pipeline, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this prior notice request should be directed to Cindy Thompson, Manager, Regulatory, Southern Star Central Gas Pipeline, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, by phone (270) 852– 4655, or by email Cindy.C.Thompson@ sscgp.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within E:\FR\FM\16MYN1.SGM 16MYN1 Federal Register / Vol. 83, No. 95 / Wednesday, May 16, 2018 / Notices the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s website (www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: May 10, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–10399 Filed 5–15–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission sradovich on DSK3GMQ082PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG18–84–000. Applicants: Antelope Expansion 2, LLC. Description: Self-Certification of EWG Antelope Expansion 2, LLC. Filed Date: 5/10/18. Accession Number: 20180510–5119. Comments Due: 5 p.m. ET 5/31/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER17–157–003. Applicants: Moapa Southern Paiute Solar, LLC. Description: Compliance filing: Supplement to Notice of Non-Material Change in Status to be effective 5/11/2018. Filed Date: 5/10/18. Accession Number: 20180510–5084. Comments Due: 5 p.m. ET 5/31/18. Docket Numbers: ER18–995–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: Amended Filing—Attachment AE Revisions to Clarify Registration of Load to be effective 5/11/2018. Filed Date: 5/10/18. Accession Number: 20180510–5116. Comments Due: 5 p.m. ET 5/31/18. Docket Numbers: ER18–1172–001 Applicants: Southern California Edison Company. VerDate Sep<11>2014 17:34 May 15, 2018 Jkt 244001 Description: Tariff Amendment: Amended GIA Santa Ana Storage Project SA No. 1006 to be effective 3/14/2018. Filed Date: 5/10/18. Accession Number: 20180510–5111. Comments Due: 5 p.m. ET 5/31/18. Docket Numbers: ER18–1219–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2018–05–08_SA 3105 EMI–EMI Substitute GIA (J477) to be effective 3/15/2018. Filed Date: 5/8/18. Accession Number: 20180508–5195. Comments Due: 5 p.m. ET 5/15/18. Docket Numbers: ER18–1292–001. Applicants: Southern California Edison Company. Description: Tariff Amendment: Amended LGIA Desert Quartzite, LLC— Quartz 3 Solar Project—Revised ITCC to be effective 4/4/2018. Filed Date: 5/10/18. Accession Number: 20180510–5095. Comments Due: 5 p.m. ET 5/31/18. Docket Numbers: ER18–1297–001. Applicants: Southern California Edison Company. Description: Tariff Amendment: Amended LGIA—Revised ITCC Palmdale Energy, LLC to be effective 6/4/2018. Filed Date: 5/10/18. Accession Number: 20180510–5097. Comments Due: 5 p.m. ET 5/31/18. Docket Numbers: ER18–1562–000. Applicants: Southwest Power Pool, Inc. Description: Compliance filing: Order No. 842 Compliance Filing to be effective 5/15/2018. Filed Date: 5/9/18. Accession Number: 20180509–5216. Comments Due: 5 p.m. ET 5/30/18. Docket Numbers: ER18–1563–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: Revisions to Attachment L— Creditworthiness Procedures to be effective 7/10/2018. Filed Date: 5/10/18. Accession Number: 20180510–5033. Comments Due: 5 p.m. ET 5/31/18. Docket Numbers: ER18–1564–000. Applicants: Niagara Mohawk Power Corporation, New York Independent System Operator, Inc. Description: Tariff Cancellation: NMPC Cancellation of CRA 2264 with Oneida Indian Nation to be effective 3/30/2017. Filed Date: 5/10/18. Accession Number: 20180510–5055. Comments Due: 5 p.m. ET 5/31/18. PO 00000 Frm 00057 Fmt 4703 Sfmt 9990 22667 Docket Numbers: ER18–1565–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of Service Agreement No. 3764; Queue No. Y3–029 to be effective 6/4/2014. Filed Date: 5/10/18. Accession Number: 20180510–5067. Comments Due: 5 p.m. ET 5/31/18. Docket Numbers: ER18–1566–000. Applicants: Essential Power Rock Springs, LLC, PJM Interconnection, L.L.C. Description: eTariff filing per 1450: Essential Power submits revisions to OATT Att H–23 re Tax Reform EL18–97 to be effective 6/1/2018. Filed Date: 5/10/18. Accession Number: 20180510–5068. Comments Due: 5 p.m. ET 5/31/18. Docket Numbers: ER18–1567–000. Applicants: South Carolina Electric & Gas Company. Description: Compliance filing: Order 842 Attch M and N to be effective 5/15/ 2018. Filed Date: 5/10/18. Accession Number: 20180510–5104. Comments Due: 5 p.m. ET 5/31/18. Docket Numbers: ER18–1568–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Market Import Service Tariff Revisions to be effective 7/10/2018. Filed Date: 5/10/18. Accession Number: 20180510–5163. Comments Due: 5 p.m. ET 5/31/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 10, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–10397 Filed 5–15–18; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\16MYN1.SGM 16MYN1

Agencies

[Federal Register Volume 83, Number 95 (Wednesday, May 16, 2018)]
[Notices]
[Pages 22666-22667]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10399]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-384-000]


Notice of Request Under Blanket Authorization: Southern Star 
Central Gas Pipeline, Inc.

    Take notice that on April 30, 2018, Southern Star Central Gas 
Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky 
42301, filed in the above referenced docket, a prior notice request 
pursuant to sections 157.205, 157.208, 157.210, 157.211, and 157.216 of 
the Commission's regulations under the Natural Gas Act (NGA) and 
Southern Star's blanket certificate issued in Docket No. CP82-479-000, 
for authorization to construct, own, and operate a total of 
approximately 14.27 miles in seven non-contiguous 20- and 24-inch-
diameter pipeline segments, and subsequently to abandon the equivalent 
existing segments of Line V in Oklahoma and Logan Counties, Oklahoma 
(Line V Replacement Project). The replacement is required due to the 
age and condition of the acetylene-welded pipe and to enable in-line 
assessments of the Line V pipeline, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection.
    The filing may also be viewed on the web at https://www.ferc.gov 
using the eLibrary link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this prior notice request should be 
directed to Cindy Thompson, Manager, Regulatory, Southern Star Central 
Gas Pipeline, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, by 
phone (270) 852-4655, or by email [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within

[[Page 22667]]

the time allowed therefore, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request shall be treated as 
an application for authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
website (www.ferc.gov) under the ``e-Filing'' link.

    Dated: May 10, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-10399 Filed 5-15-18; 8:45 am]
 BILLING CODE 6717-01-P