Notice of Request Under Blanket Authorization: Southern Star Central Gas Pipeline, Inc., 22666-22667 [2018-10399]
Download as PDF
22666
Federal Register / Vol. 83, No. 95 / Wednesday, May 16, 2018 / Notices
FERC–725V, MANDATORY RELIABILITY STANDARDS: COM RELIABILITY STANDARDS—Continued
Number of
respondents
Total ..............
Total number
of responses
Average burden and
cost per response 7
Total annual burden
hours & total annual
cost
Cost per
respondent
(1)
(On-going) Maintain evidence of
training and assessments
[COM–002–4
R2, R4, R5 and
R6].
(On-going) Maintain evidence of
training [COM–
002–4 R3 and
R6].
Annual
number of
responses per
respondent
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
($) (5) ÷ (1)
201 (BA, RC & TOP)
1
201
8 hrs. & $288 ............
1,608 hrs. & $57,888
288
1,880 (DP & GOP) ....
1
1,180
8 hrs. & $288 ............
15,040 hrs. &
$541,440.
288
....................................
........................
2,762
....................................
22,976 hrs. &
$827,136.
........................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: May 10, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10401 Filed 5–15–18; 8:45 am]
sradovich on DSK3GMQ082PROD with NOTICES
BILLING CODE 6717–01–P
7 The loaded hourly wage figure (includes
benefits) is based on the occupational categories for
2016 found on the Bureau of Labor Statistics
website (https://www.bls.gov/oes/current/naics2_
22.htm):
Electrical Engineer (Occupation Code: 17–2071):
$68.12 (review and documentation).
Office and Administrative Support (Occupation
Code: 43–0000): $40.89 ($68.12 + 40.89 = 109.01 ÷
3 = $36.34. This figure is rounded to $36.00 for use
in collection FERC–725V for calculating wage
figures in this renewal calculation.
VerDate Sep<11>2014
17:34 May 15, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–384–000]
Notice of Request Under Blanket
Authorization: Southern Star Central
Gas Pipeline, Inc.
Take notice that on April 30, 2018,
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 Highway 56,
Owensboro, Kentucky 42301, filed in
the above referenced docket, a prior
notice request pursuant to sections
157.205, 157.208, 157.210, 157.211, and
157.216 of the Commission’s regulations
under the Natural Gas Act (NGA) and
Southern Star’s blanket certificate
issued in Docket No. CP82–479–000, for
authorization to construct, own, and
operate a total of approximately 14.27
miles in seven non-contiguous 20- and
24-inch-diameter pipeline segments,
and subsequently to abandon the
equivalent existing segments of Line V
in Oklahoma and Logan Counties,
Oklahoma (Line V Replacement Project).
The replacement is required due to the
age and condition of the acetylenewelded pipe and to enable in-line
assessments of the Line V pipeline, all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
eLibrary link. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this prior
notice request should be directed to
Cindy Thompson, Manager, Regulatory,
Southern Star Central Gas Pipeline, Inc.,
4700 Highway 56, Owensboro,
Kentucky 42301, by phone (270) 852–
4655, or by email Cindy.C.Thompson@
sscgp.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
E:\FR\FM\16MYN1.SGM
16MYN1
Federal Register / Vol. 83, No. 95 / Wednesday, May 16, 2018 / Notices
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s website (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Dated: May 10, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10399 Filed 5–15–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–84–000.
Applicants: Antelope Expansion 2,
LLC.
Description: Self-Certification of EWG
Antelope Expansion 2, LLC.
Filed Date: 5/10/18.
Accession Number: 20180510–5119.
Comments Due: 5 p.m. ET 5/31/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–157–003.
Applicants: Moapa Southern Paiute
Solar, LLC.
Description: Compliance filing:
Supplement to Notice of Non-Material
Change in Status to be effective
5/11/2018.
Filed Date: 5/10/18.
Accession Number: 20180510–5084.
Comments Due: 5 p.m. ET 5/31/18.
Docket Numbers: ER18–995–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Amended Filing—Attachment AE
Revisions to Clarify Registration of Load
to be effective 5/11/2018.
Filed Date: 5/10/18.
Accession Number: 20180510–5116.
Comments Due: 5 p.m. ET 5/31/18.
Docket Numbers: ER18–1172–001
Applicants: Southern California
Edison Company.
VerDate Sep<11>2014
17:34 May 15, 2018
Jkt 244001
Description: Tariff Amendment:
Amended GIA Santa Ana Storage
Project SA No. 1006 to be effective
3/14/2018.
Filed Date: 5/10/18.
Accession Number: 20180510–5111.
Comments Due: 5 p.m. ET 5/31/18.
Docket Numbers: ER18–1219–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–05–08_SA 3105 EMI–EMI
Substitute GIA (J477) to be effective
3/15/2018.
Filed Date: 5/8/18.
Accession Number: 20180508–5195.
Comments Due: 5 p.m. ET 5/15/18.
Docket Numbers: ER18–1292–001.
Applicants: Southern California
Edison Company.
Description: Tariff Amendment:
Amended LGIA Desert Quartzite, LLC—
Quartz 3 Solar Project—Revised ITCC to
be effective 4/4/2018.
Filed Date: 5/10/18.
Accession Number: 20180510–5095.
Comments Due: 5 p.m. ET 5/31/18.
Docket Numbers: ER18–1297–001.
Applicants: Southern California
Edison Company.
Description: Tariff Amendment:
Amended LGIA—Revised ITCC
Palmdale Energy, LLC to be effective
6/4/2018.
Filed Date: 5/10/18.
Accession Number: 20180510–5097.
Comments Due: 5 p.m. ET 5/31/18.
Docket Numbers: ER18–1562–000.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing: Order
No. 842 Compliance Filing to be
effective 5/15/2018.
Filed Date: 5/9/18.
Accession Number: 20180509–5216.
Comments Due: 5 p.m. ET 5/30/18.
Docket Numbers: ER18–1563–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing:
Revisions to Attachment L—
Creditworthiness Procedures to be
effective 7/10/2018.
Filed Date: 5/10/18.
Accession Number: 20180510–5033.
Comments Due: 5 p.m. ET 5/31/18.
Docket Numbers: ER18–1564–000.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: Tariff Cancellation:
NMPC Cancellation of CRA 2264 with
Oneida Indian Nation to be effective
3/30/2017.
Filed Date: 5/10/18.
Accession Number: 20180510–5055.
Comments Due: 5 p.m. ET 5/31/18.
PO 00000
Frm 00057
Fmt 4703
Sfmt 9990
22667
Docket Numbers: ER18–1565–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of Service
Agreement No. 3764; Queue No. Y3–029
to be effective 6/4/2014.
Filed Date: 5/10/18.
Accession Number: 20180510–5067.
Comments Due: 5 p.m. ET 5/31/18.
Docket Numbers: ER18–1566–000.
Applicants: Essential Power Rock
Springs, LLC, PJM Interconnection,
L.L.C.
Description: eTariff filing per 1450:
Essential Power submits revisions to
OATT Att H–23 re Tax Reform EL18–97
to be effective 6/1/2018.
Filed Date: 5/10/18.
Accession Number: 20180510–5068.
Comments Due: 5 p.m. ET 5/31/18.
Docket Numbers: ER18–1567–000.
Applicants: South Carolina Electric &
Gas Company.
Description: Compliance filing: Order
842 Attch M and N to be effective 5/15/
2018.
Filed Date: 5/10/18.
Accession Number: 20180510–5104.
Comments Due: 5 p.m. ET 5/31/18.
Docket Numbers: ER18–1568–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Market Import Service Tariff Revisions
to be effective 7/10/2018.
Filed Date: 5/10/18.
Accession Number: 20180510–5163.
Comments Due: 5 p.m. ET 5/31/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 10, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10397 Filed 5–15–18; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 83, Number 95 (Wednesday, May 16, 2018)]
[Notices]
[Pages 22666-22667]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10399]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-384-000]
Notice of Request Under Blanket Authorization: Southern Star
Central Gas Pipeline, Inc.
Take notice that on April 30, 2018, Southern Star Central Gas
Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky
42301, filed in the above referenced docket, a prior notice request
pursuant to sections 157.205, 157.208, 157.210, 157.211, and 157.216 of
the Commission's regulations under the Natural Gas Act (NGA) and
Southern Star's blanket certificate issued in Docket No. CP82-479-000,
for authorization to construct, own, and operate a total of
approximately 14.27 miles in seven non-contiguous 20- and 24-inch-
diameter pipeline segments, and subsequently to abandon the equivalent
existing segments of Line V in Oklahoma and Logan Counties, Oklahoma
(Line V Replacement Project). The replacement is required due to the
age and condition of the acetylene-welded pipe and to enable in-line
assessments of the Line V pipeline, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection.
The filing may also be viewed on the web at https://www.ferc.gov
using the eLibrary link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this prior notice request should be
directed to Cindy Thompson, Manager, Regulatory, Southern Star Central
Gas Pipeline, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, by
phone (270) 852-4655, or by email [email protected].
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the NGA (18 CFR 157.205) file a protest to the request. If no protest
is filed within
[[Page 22667]]
the time allowed therefore, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
website (www.ferc.gov) under the ``e-Filing'' link.
Dated: May 10, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-10399 Filed 5-15-18; 8:45 am]