Seguro Energy Partners, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 22475-22476 [2018-10292]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 94 / Tuesday, May 15, 2018 / Notices
Expansion Project to be $127,907,996,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to
Francisco Tarin, Director, Regulatory, El
Paso Natural Gas Pipeline L.L.C.; PO
Box 1087, Colorado Springs, Colorado,
80944 at (719) 667–7517 or by fax at
(719) 520–4697; or David Dewey,
Assistant General Counsel, El Paso
Natural Gas Pipeline, L.L.C.; PO Box
1087, Colorado Springs, Colorado,
80944 at (719) 520–4227 or by fax at
(719) 520–4898.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
VerDate Sep<11>2014
20:27 May 14, 2018
Jkt 244001
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on May 30, 2018.
Dated: May 9, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10291 Filed 5–14–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
22475
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–1548–000]
Seguro Energy Partners, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Seguro
Energy Partners, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 29,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
E:\FR\FM\15MYN1.SGM
15MYN1
22476
Federal Register / Vol. 83, No. 94 / Tuesday, May 15, 2018 / Notices
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Docket Numbers: ER18–1552–000.
Applicants: MidAmerican Energy
Company.
Description: Notice of Termination of
Interchange Agreement between
MidAmerican Energy Company.
Filed Date: 5/8/18.
Accession Number: 20180508–5173.
Comments Due: 5 p.m. ET 5/29/18.
Dated: May 9, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10292 Filed 5–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–80–000.
Applicants: Bayonne Plant Holding,
L.L.C.
Description: Supplement to April 3,
2018 Application of Bayonne Plant
Holding, L.L.C. for Approval Under
Section 203 of the Federal Power Act
and Request for Expedited Action.
Filed Date: 5/8/18.
Accession Number: 20180508–5176.
Comments Due: 5 p.m. ET 5/18/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1293–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2018–05–08_SA 3106 Dodge County
Wind-SMMPA Substitute GIA (J441) to
be effective 3/21/2018.
Filed Date: 5/8/18.
Accession Number: 20180508–5128.
Comments Due: 5 p.m. ET 5/29/18.
Docket Numbers: ER18–1549–000.
Applicants: Manifold Energy Inc.
Description: Baseline eTariff Filing:
Application_C008940 to be effective 6/
11/2018.
Filed Date: 5/8/18.
Accession Number: 20180508–5171.
Comments Due: 5 p.m. ET 5/29/18.
Docket Numbers: ER18–1550–000.
Applicants: Puget Sound Energy, Inc.
Description: Compliance filing: Order
842 Compliance Filing to be effective 5/
10/2018.
Filed Date: 5/9/18.
Accession Number: 20180509–5000.
Comments Due: 5 p.m. ET 5/30/18.
Docket Numbers: ER18–1551–000.
Applicants: Duke Energy Florida,
LLC.
Description: Notice of Termination of
Standard Large Generator
Interconnection Agreement (No. TF–
183) of Duke Energy Florida, LLC.
VerDate Sep<11>2014
20:27 May 14, 2018
Jkt 244001
Filed Date: 5/7/18.
Accession Number: 20180507–5235.
Comments Due: 5 p.m. ET 5/29/18.
Docket Numbers: ER18–1553–000.
Applicants: Southwest Power Pool,
Inc.
Description: Notice of Cancellation of
Amendatory Agreement No. 4 to the
Municipal Participation Agreement of
Southwest Power Pool, Inc.
Filed Date: 5/8/18.
Accession Number: 20180508–5177.
Comments Due: 5 p.m. ET 5/29/18.
Docket Numbers: ER18–1554–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5067; Queue No.
AA2–133 to be effective 4/11/2018.
Filed Date: 5/9/18.
Accession Number: 20180509–5051.
Comments Due: 5 p.m. ET 5/30/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 9, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10288 Filed 5–14–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR18–23–000]
Targa Crude Pipeline LLC; Notice of
Request for Temporary Waiver
Take notice that on May 4, 2018,
pursuant to Rule 204 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.204, Targa Crude
Pipeline LLC filed a petition seeking
waiver of the Interstate Commerce Acts
sections 6 and 20 and the Commission’s
implementing regulations at 18 CFR
parts 341 and 357 with respect to
certain crude petroleum gathering and
pipeline facilities (the Waiver Facilities)
being constructed and leased in Loving
County, Texas, all as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and 385.214.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on May 23, 2018.
E:\FR\FM\15MYN1.SGM
15MYN1
Agencies
[Federal Register Volume 83, Number 94 (Tuesday, May 15, 2018)]
[Notices]
[Pages 22475-22476]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10292]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER18-1548-000]
Seguro Energy Partners, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Seguro Energy Partners, LLC's application for market-based rate
authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is May 29, 2018.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC
[[Page 22476]]
Online service, please email [email protected]. or call (866)
208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: May 9, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-10292 Filed 5-14-18; 8:45 am]
BILLING CODE 6717-01-P