El Paso Natural Gas Company, L.L.C.; Notice of Application, 22474-22475 [2018-10291]
Download as PDF
22474
Federal Register / Vol. 83, No. 94 / Tuesday, May 15, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2485–000]
daltland on DSKBBV9HB2PROD with NOTICES
FirstLight Hydro Generating Company;
Notice of Authorization for Continued
Project Operation
On April 29, 2016, FirstLight Hydro
Generating Company, licensee for the
Northfield Mountain Pumped Storage
Project, filed an Application for a New
License pursuant to the Federal Power
Act (FPA) and the Commission’s
regulations thereunder. The Northfield
Mountain Pumped Storage Project is
located on the Connecticut River in
Franklin County, Massachusetts;
Windham County, Vermont; and
Cheshire County, New Hampshire.
The license for Project No. 2485 was
issued for a period ending April 30,
2018. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2485
is issued to the licensee for a period
effective May 1, 2018 through April 30,
2019 or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before April 30, 2019, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
VerDate Sep<11>2014
20:27 May 14, 2018
Jkt 244001
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, FirstLight Hydro
Generating Company, is authorized to
continue operation of the Northfield
Mountain Pumped Storage Project, until
such time as the Commission acts on its
application for a subsequent license.
Dated: May 9, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10296 Filed 5–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1889–000]
FirstLight Hydro Generating Company;
Notice of Authorization for Continued
Project Operation
On April 29, 2016, FirstLight Hydro
Generating Company, licensee for the
Turners Falls Hydroelectric Project,
filed an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Turners Falls
Hydroelectric Project is located on the
Connecticut River in Franklin County,
Massachusetts; Windham County,
Vermont; and Cheshire County, New
Hampshire.
The license for Project No.1889 was
issued for a period ending April 30,
2018. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 1889
is issued to the licensee for a period
effective May 1, 2018 through April 30,
2019 or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before April 30, 2019, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, FirstLight Hydro
Generating Company, is authorized to
continue operation of the Turners Falls
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Dated: May 9, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10295 Filed 5–14–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–332–000]
El Paso Natural Gas Company, L.L.C.;
Notice of Application
Take notice that on April 26, 2018, El
Paso Natural Gas Company, L.L.C.
(EPNG), PO Box 1087, Colorado Springs,
Colorado, 80944, filed in Docket No.
CP18–332–000 an application pursuant
to section 7(c) of the Natural Gas Act
(NGA) and Part 157 of the Commission’s
regulations for authorization to
construct, own, and operate the South
Mainline Expansion Project comprising:
(i) About 17 miles of 30-inch-diameter
loop line of EPNG’s existing Line Nos.
1100 and 1103 located in Hudspeth and
El Paso Counties, Texas; (ii) a new
13,220 horsepower (hp), turbine-driven
Red Mountain Compressor Station
located in Luna County, New Mexico;
and (iii) a new 13,220 hp turbine-driven
Dragoon Compressor Station located in
Cochise County, Arizona. EPNG states
that the proposed facilities will result in
an increase of 321,000 dekatherms per
day of contracted capacity and estimates
the cost of the South Mainline
E:\FR\FM\15MYN1.SGM
15MYN1
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 94 / Tuesday, May 15, 2018 / Notices
Expansion Project to be $127,907,996,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to
Francisco Tarin, Director, Regulatory, El
Paso Natural Gas Pipeline L.L.C.; PO
Box 1087, Colorado Springs, Colorado,
80944 at (719) 667–7517 or by fax at
(719) 520–4697; or David Dewey,
Assistant General Counsel, El Paso
Natural Gas Pipeline, L.L.C.; PO Box
1087, Colorado Springs, Colorado,
80944 at (719) 520–4227 or by fax at
(719) 520–4898.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
VerDate Sep<11>2014
20:27 May 14, 2018
Jkt 244001
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on May 30, 2018.
Dated: May 9, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10291 Filed 5–14–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
22475
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–1548–000]
Seguro Energy Partners, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Seguro
Energy Partners, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 29,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
E:\FR\FM\15MYN1.SGM
15MYN1
Agencies
[Federal Register Volume 83, Number 94 (Tuesday, May 15, 2018)]
[Notices]
[Pages 22474-22475]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10291]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-332-000]
El Paso Natural Gas Company, L.L.C.; Notice of Application
Take notice that on April 26, 2018, El Paso Natural Gas Company,
L.L.C. (EPNG), PO Box 1087, Colorado Springs, Colorado, 80944, filed in
Docket No. CP18-332-000 an application pursuant to section 7(c) of the
Natural Gas Act (NGA) and Part 157 of the Commission's regulations for
authorization to construct, own, and operate the South Mainline
Expansion Project comprising: (i) About 17 miles of 30-inch-diameter
loop line of EPNG's existing Line Nos. 1100 and 1103 located in
Hudspeth and El Paso Counties, Texas; (ii) a new 13,220 horsepower
(hp), turbine-driven Red Mountain Compressor Station located in Luna
County, New Mexico; and (iii) a new 13,220 hp turbine-driven Dragoon
Compressor Station located in Cochise County, Arizona. EPNG states that
the proposed facilities will result in an increase of 321,000
dekatherms per day of contracted capacity and estimates the cost of the
South Mainline
[[Page 22475]]
Expansion Project to be $127,907,996, all as more fully set forth in
the application which is on file with the Commission and open to public
inspection. The filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's website web
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this application should be directed to
Francisco Tarin, Director, Regulatory, El Paso Natural Gas Pipeline
L.L.C.; PO Box 1087, Colorado Springs, Colorado, 80944 at (719) 667-
7517 or by fax at (719) 520-4697; or David Dewey, Assistant General
Counsel, El Paso Natural Gas Pipeline, L.L.C.; PO Box 1087, Colorado
Springs, Colorado, 80944 at (719) 520-4227 or by fax at (719) 520-4898.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice, the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made in the proceeding with the
Commission and must mail a copy to the applicant and to every other
party. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern Time on May 30, 2018.
Dated: May 9, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-10291 Filed 5-14-18; 8:45 am]
BILLING CODE 6717-01-P