Federal Register / Vol. 83, No. 93 / Monday, May 14, 2018 / Notices
and supporting merit-selected research
and education projects in all the
scientific and engineering disciplines.
NSF receives more than 50,000
proposals annually for new projects,
and makes approximately 11,000 new
awards.
Support is made primarily through
grants and cooperative agreements
awarded to approximately 2,000
colleges, universities, academic
consortia, nonprofit institutions, and
small businesses. The awards are
primarily based on merit review
evaluations of proposals submitted to
the Foundation.
The Foundation has a continuing
commitment to monitor the operations
of its information collection to identify
and address excessive reporting burdens
as well as to identify any real or
apparent inequities based on gender,
race, ethnicity, or disability of the
proposed principal investigator(s)/
project director(s) or the co-principal
investigator(s)/co-project director(s).
Burden on the Public: The Foundation
estimates that an average of 120 hours
is expended for each proposal
submitted. An estimated 50,000
proposals are expected during the
course of one year for a total of
6,000,000 public burden hours
annually.
Dated: May 9, 2018.
Suzanne H. Plimpton,
Reports Clearance Officer, National Science
Foundation.
[FR Doc. 2018–10170 Filed 5–11–18; 8:45 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2018–0001]
Sunshine Act Meeting Notice
Weeks of May 14, 21, 28, June 4,
11, 18, 2018.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and closed.
DATE:
Week of May 14, 2018
amozie on DSK3GDR082PROD with NOTICES
There are no meetings scheduled for
the week of May 14, 2018.
Week of May 21, 2018—Tentative
There are no meetings scheduled for
the week of May 21, 2018.
Week of May 28, 2018—Tentative
There are no meetings scheduled for
the week of May 28, 2018.
VerDate Sep<11>2014
18:02 May 11, 2018
Jkt 244001
Week of June 4, 2018—Tentative
Wednesday, June 6, 2018
2:00 p.m. Briefing on Human Capital
and Equal Employment Opportunity
(Public Meeting). (Contact: Sally
Wilding: 301–287–0596).
Week of June 11, 2018—Tentative
There are no meetings scheduled for
the week of June 11, 2018.
Week of June 18, 2018—Tentative
Tuesday, June, 19, 2018
9:00 a.m. Briefing on Results of the
Agency Action Review Meeting (Public
Meeting). (Contact: Joanna Bridge: 301–
415–4052).
*
*
*
*
*
The schedule for Commission
meetings is subject to change on short
notice. For more information or to verify
the status of meetings, contact Denise
McGovern at 301–415–0681 or via email
at Denise.McGovern@nrc.gov.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
braille, large print), please notify
Kimberly Meyer-Chambers, NRC
Disability Program Manager, at 301–
287–0739, by videophone at 240–428–
3217, or by email at Kimberly.MeyerChambers@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
*
*
*
*
*
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Nuclear
Regulatory Commission, Office of the
Secretary, Washington, DC 20555 (301–
415–1969), or you may email
Patricia.Jimenez@nrc.gov or
Wendy.Moore@nrc.gov.
Dated: May 9, 2018.
Denise L. McGovern,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2018–10271 Filed 5–10–18; 11:15 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 70–1151 and 70–0036; NRC–
2018–0095]
Westinghouse Electric Company LLC;
Consideration of Approval of Transfer
of License
Nuclear Regulatory
Commission.
ACTION: Application for indirect transfer
of license; opportunity to comment,
request a hearing, and petition for leave
to intervene.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) received and is
considering approval of an application
filed by Westinghouse Electric
Company, LLC (Westinghouse) on
March 21, 2017. The application seeks
NRC approval of the indirect transfer of
material licenses SNM–1107; SNM–33;
and several export licenses for the
Westinghouse Electric Company, LLC
from Toshiba Corporation, the current
parent company of the license holder, to
Brookfield WEC Holdings Inc., which is
ultimately owned and controlled by
Brookfield Asset Management Inc.
DATES: Comments must be filed by June
13, 2018. A request for a hearing on the
materials license transfers must be filed
by June 4, 2018 and a request for a
hearing on the export license transfers
must be filed by June 13, 2018. Any
potential party as defined in § 2.4 of title
10 of the Code of Federal Regulations
(10 CFR), who believes access to SUNSI
is necessary to respond to this notice
must follow the instructions in Section
VI of the SUPPLEMENTARY INFORMATION
section of this notice.
ADDRESSES: You may submit comments
by any of the following methods (unless
this document describes a different
method for submitting comments on a
specific subject):
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0095. Address
questions about NRC dockets to Jennifer
Borges; telephone: 301–287–9127;
email: Jennifer.Borges@nrc.gov. For
technical questions contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Email comments to:
Hearingdocket@nrc.gov. If you do not
receive an automatic email reply
confirming receipt, then contact us at
301–415–1677.
• Fax comments to: Secretary,
Nuclear Regulatory Commission at 301–
415–1101.
• Mail comments to: Secretary, U.S.
Nuclear Regulatory Commission,
SUMMARY:
E:\FR\FM\14MYN1.SGM
14MYN1
Federal Register / Vol. 83, No. 93 / Monday, May 14, 2018 / Notices
Washington, DC 20555–1101, ATTN:
Rulemakings and Adjudications Staff.
• Hand deliver comments to: 11555
Rockville Pike, Rockville, Maryland
20852, between 7:30 a.m. and 4:15 p.m.
(Eastern Time) Federal workdays;
telephone: 301–415–1677.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT: Ms.
Marilyn Diaz, Office of Nuclear Material
Safety and Safeguards, telephone: 301–
415–7110, email: Marilyn.Diaz@nrc.gov,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
amozie on DSK3GDR082PROD with NOTICES
A. Obtaining Information
Please refer to Docket ID NRC–2018–
0095 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0095.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
Westinghouse Application for Consent
to Indirect Change of Control with
Respect to Material Licenses and Export
Licenses is available in ADAMS under
Accession No. ML18086B504.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2018–
0095 in your comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
VerDate Sep<11>2014
18:02 May 11, 2018
Jkt 244001
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Introduction
The NRC is considering approving the
indirect transfer of control of
Westinghouse from Toshiba
Corporation, the current parent
company of the license holder. The
application was submitted pursuant to
10 CFR 70.36, 10 CFR 110.50, and 10
CFR 110.51. Westinghouse holds
materials licenses SNM 1107; SNM–33;
and export licenses XCOM1014,
XCOM1047, XCOM1072, XCOM1082,
XCOM1093, XCOM1094, XCOM1102,
XCOM1111, XCOM1113, XCOM1116,
XCOM1170, XCOM1188, XCOM1219,
XCOM1246, XCOM1249, XCOM1252,
XCOM1255, XCOM1262, XCOM1298,
XSNM3006, XSNM3034, XSNM3163,
XSNM3264, XSNM3461, XSNM3702,
XSNM3769, XR169, XR176, and XR178.
According to the application for
approval filed by Westinghouse, the
transaction will result in a transfer of
controlling interest in Westinghouse
from its current parent company
Toshiba Corporation, to Brookfield WEC
Holdings Inc., a Delaware limited
liability company, which is ultimately
owned and controlled by Brookfield
Asset Management Inc., a Canadian
company. Westinghouse will continue
to operate the facility and hold the
licenses.
No changes to the licensed facilities,
equipment or operational changes are
being proposed in the application.
Section 184 of the Atomic Energy Act
provides ‘‘[n]o license granted
hereunder and no right to utilize or
produce special nuclear material
granted hereby shall be transferred,
assigned or in any manner disposed of,
either voluntarily or involuntarily,
directly or indirectly, through transfer of
control of any license to any person,
unless the Commission shall, after
securing full information, find that the
transfer is in accordance with the
provisions of this Act, and shall give its
consent in writing.’’ The NRC’s
regulations at 10 CFR 70.36 state that no
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
22295
license, or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission, after
securing full information, finds that the
transfer is in accordance with the
provisions of the Atomic Energy Act
and gives its consent in writing. The
Commission will approve an
application for the indirect transfer of a
license if the Commission determines
that the proposed transfer of controlling
interest will not affect the qualifications
of the licensee to hold the license, and
that the licensee has provided the
financial assurance for
decommissioning required by 10 CFR
70.25. 10 CFR 110.50(d) likewise
requires Commission approval for
transfers of a specific export or import
license.
III. Opportunity To Comment
Within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305 and 110.81. The
Commission will consider and, if
appropriate, respond to these
comments, but such comments will not
otherwise constitute part of the
decisional record. Comments should be
submitted as described in the
ADDRESSES section of this document.
IV. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 20 days after the date of
publication of this notice, any persons
(petitioner) whose interest may be
affected by this action may file a request
for a hearing and petition for leave to
intervene (petition) with respect to the
action. Petitions shall be filed in
accordance with the Commission’s
‘‘Agency Rules of Practice and
Procedure’’ in 10 CFR part 2, as well as
the public participation procedures in
10 CFR part 110. Interested persons
should consult a current copy of 10 CFR
2.309 and 110.82. The NRC’s regulations
are accessible electronically from the
NRC Library on the NRC’s website at
https://www.nrc.gov/reading-rm/doccollections/cfr/. Alternatively, a copy of
the regulations is available at the NRC’s
Public Document Room, located at One
White Flint North, Room O1–F21, 11555
Rockville Pike (first floor), Rockville,
Maryland 20852. If a petition is filed,
the Commission or a presiding officer
will rule on the petition and, if
appropriate, a notice of a hearing will be
issued.
With respect to the materials licenses,
as required by 10 CFR 2.309(d), the
petition should specifically explain the
reasons why intervention should be
E:\FR\FM\14MYN1.SGM
14MYN1
amozie on DSK3GDR082PROD with NOTICES
22296
Federal Register / Vol. 83, No. 93 / Monday, May 14, 2018 / Notices
permitted with particular reference to
the following general requirements for
standing: (1) The name, address, and
telephone number of the petitioner; (2)
the nature of the petitioner’s right under
the Act to be made a party to the
proceeding; (3) the nature and extent of
the petitioner’s property, financial, or
other interest in the proceeding; and (4)
the possible effect of any decision or
order which may be entered in the
proceeding on the petitioner’s interest.
In accordance with 10 CFR 2.309(f),
the petition must also set forth the
specific contentions which the
petitioner seeks to have litigated in the
proceeding. Each contention must
consist of a specific statement of the
issue of law or fact to be raised or
controverted. In addition, the petitioner
must provide a brief explanation of the
bases for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner must also
provide references to the specific
sources and documents on which the
petitioner intends to rely to support its
position on the issue. The petition must
include sufficient information to show
that a genuine dispute exists with the
applicant or licensee on a material issue
of law or fact. Contentions must be
limited to matters within the scope of
the proceeding. The contention must be
one which, if proven, would entitle the
petitioner to relief. A petitioner who
fails to satisfy the requirements at 10
CFR 2.309(f) with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene. Parties have the opportunity
to participate fully in the conduct of the
hearing with respect to resolution of
that party’s admitted contentions,
including the opportunity to present
evidence, consistent with the NRC’s
regulations, policies, and procedures.
Petitions filed under 10 CFR 2.309
must be filed no later than 20 days from
the date of publication of this notice.
Petitions and motions for leave to file
new or amended contentions that are
filed after the deadline will not be
entertained absent a determination by
the presiding officer that the filing
demonstrates good cause by satisfying
the three factors in 10 CFR 2.309(c)(1)(i)
through (iii). The petition must be filed
in accordance with the filing
instructions in the ‘‘Electronic
Submissions (E-Filing)’’ section of this
document.
VerDate Sep<11>2014
18:02 May 11, 2018
Jkt 244001
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission no later than 20 days from
the date of publication of this notice.
The petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document, and should
meet the requirements for petitions set
forth in this section. Alternatively, a
State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof may participate as a nonparty under 10 CFR 2.315(c).
If a hearing is granted, any person
who is not a party to the proceeding and
is not affiliated with or represented by
a party may, at the discretion of the
presiding officer, be permitted to make
a limited appearance pursuant to the
provisions of 10 CFR 2.315(a). A person
making a limited appearance may make
an oral or written statement of his or her
position on the issues but may not
otherwise participate in the proceeding.
A limited appearance may be made at
any session of the hearing or at any
prehearing conference, subject to the
limits and conditions as may be
imposed by the presiding officer. Details
regarding the opportunity to make a
limited appearance will be provided by
the presiding officer if such sessions are
scheduled.
With respect to the export licenses,
hearing requests and petitions to
intervene should be filed in accordance
with 10 CFR 110.82, which requires
petitioners to explain why a hearing or
an intervention would be in the public
interest and how a hearing or
intervention would assist the
Commission in making the
determinations required by § 110.45.
Such petitions must be filed no later
than 30 days from the date of
publication of this notice.
V. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing and petition for
leave to intervene (petition), any motion
or other document filed in the
proceeding prior to the submission of a
request for hearing or petition to
intervene, and documents filed by
interested governmental entities that
request to participate under 10 CFR
2.315(c), must be filed in accordance
with the NRC’s E-Filing rule (72 FR
49139; August 28, 2007, as amended at
77 FR 46562, August 3, 2012). The E-
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
Filing process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Detailed guidance on
making electronic submissions may be
found in the Guidance for Electronic
Submissions to the NRC and on the NRC
website at https://www.nrc.gov/site-help/
e-submittals.html. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to (1) request a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
submissions and access the E-Filing
system for any proceeding in which it
is participating; and (2) advise the
Secretary that the participant will be
submitting a petition or other
adjudicatory document (even in
instances in which the participant, or its
counsel or representative, already holds
an NRC-issued digital ID certificate).
Based upon this information, the
Secretary will establish an electronic
docket for the hearing in this proceeding
if the Secretary has not already
established an electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public website at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. Once a participant
has obtained a digital ID certificate and
a docket has been created, the
participant can then submit
adjudicatory documents. Submissions
must be in Portable Document Format
(PDF). Additional guidance on PDF
submissions is available on the NRC’s
public website at https://www.nrc.gov/
site-help/electronic-sub-ref-mat.html. A
filing is considered complete at the time
the document is submitted through the
NRC’s E Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the E
Filing system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
E:\FR\FM\14MYN1.SGM
14MYN1
amozie on DSK3GDR082PROD with NOTICES
Federal Register / Vol. 83, No. 93 / Monday, May 14, 2018 / Notices
serve the document on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before adjudicatory
documents are filed so that they can
obtain access to the documents via the
E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC’s Electronic Filing Help Desk
through the ‘‘Contact Us’’ link located
on the NRC’s public website at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Electronic Filing Help Desk is available
between 9 a.m. and 6 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing stating why there is good cause for
not filing electronically and requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, 11555 Rockville Pike,
Rockville, Maryland 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing adjudicatory
documents in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
adams.nrc.gov/ehd, unless excluded
pursuant to an order of the Commission
or the presiding officer. If you do not
have an NRC-issued digital ID certificate
as described above, click cancel when
the link requests certificates and you
VerDate Sep<11>2014
18:02 May 11, 2018
Jkt 244001
will be automatically directed to the
NRC’s electronic hearing dockets where
you will be able to access any publicly
available documents in a particular
hearing docket.
Participants are requested not to
include personal privacy information,
such as social security numbers, home
addresses, or personal phone numbers
in their filings, unless an NRC
regulation or other law requires
submission of such information. For
example, in some instances, individuals
provide home addresses in order to
demonstrate proximity to a facility or
site. With respect to copyrighted works,
except for limited excerpts that serve
the purpose of the adjudicatory filings
and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their submission.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
For further details with respect to this
application, see the application dated
March 21, 2018 (ADAMS Accession No.
ML18086B504).
VI. Access to Sensitive Unclassified
Non-Safeguards Information for
Contention Preparation
Any person who desires access to
proprietary, confidential commercial
information that has been redacted from
the application should contact the
applicant by telephoning Ray P. Kuyler,
Assistant General Counsel,
Westinghouse Electric Company at 301–
230–4884 for the purpose of negotiating
a confidentiality agreement or a
proposed protective order with the
applicant. If no agreement can be
reached, persons who desire access to
this information may file a motion with
the Secretary and addressed to the
Commission that requests the issuance
of a protective order.
Dated at Rockville, Maryland, this 9th day
of May, 2018.
For the Nuclear Regulatory Commission.
Craig G. Erlanger,
Director, Division of Fuel Cycle Safety,
Safeguards, and Environmental Review,
Office of Nuclear Material Safety and
Safeguards.
[FR Doc. 2018–10177 Filed 5–11–18; 8:45 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
22297
NUCLEAR REGULATORY
COMMISSION
[NRC–2018–0092]
Standard Format and Content of
Physical Security Plans, Training and
Qualifications Plans and Safeguards
Contingency Plans for Nuclear Power
Plants
Nuclear Regulatory
Commission.
ACTION: Draft regulatory guide; request
for comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing for public
comment a Draft Regulatory Guide (DG),
entitled DG–5048, ‘‘Standard Format
and Content of Physical Security Plans,
Training and Qualifications Plans and
Safeguards Contingency Plans for
Nuclear Power Plants.’’ This draft
revision of Regulatory Guide (RG) 5.54
(Revision 2) renames the guide and
consolidates, enhances, and clarifies
previous staff guidance for the
development of licensee site-specific
physical security plans found in
NUREG–0908, ‘‘Acceptance Criteria for
the Evaluation of Nuclear Power Reactor
Security Plans,’’ training and
qualification plans, and safeguards
contingency plans. This revision to RG
5.54 includes editorial changes and
clarifications provided by the staff in
Security Frequently Asked Questions
after the issuance of Revision 1.
DATES: Submit comments by July 13,
2018. Comments received after this date
will be considered if it is practical to do
so, but the NRC is able to ensure
consideration only for comments
received on or before this date.
Although a time limit is given,
comments and suggestions in
connection with items for inclusion in
guides currently being developed or
improvements in all published guides
are encouraged at any time.
ADDRESSES: You may submit comments
by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0092. Address
questions about NRC dockets to Jennifer
Borges; telephone: 301–287–9127;
email: Jennifer.Borges@nrc.gov. For
technical questions, contact the
individuals listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: May Ma, Office
of Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
For additional direction on obtaining
information and submitting comments,
SUMMARY:
E:\FR\FM\14MYN1.SGM
14MYN1
Agencies
[Federal Register Volume 83, Number 93 (Monday, May 14, 2018)]
[Notices]
[Pages 22294-22297]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10177]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 70-1151 and 70-0036; NRC-2018-0095]
Westinghouse Electric Company LLC; Consideration of Approval of
Transfer of License
AGENCY: Nuclear Regulatory Commission.
ACTION: Application for indirect transfer of license; opportunity to
comment, request a hearing, and petition for leave to intervene.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) received and is
considering approval of an application filed by Westinghouse Electric
Company, LLC (Westinghouse) on March 21, 2017. The application seeks
NRC approval of the indirect transfer of material licenses SNM-1107;
SNM-33; and several export licenses for the Westinghouse Electric
Company, LLC from Toshiba Corporation, the current parent company of
the license holder, to Brookfield WEC Holdings Inc., which is
ultimately owned and controlled by Brookfield Asset Management Inc.
DATES: Comments must be filed by June 13, 2018. A request for a hearing
on the materials license transfers must be filed by June 4, 2018 and a
request for a hearing on the export license transfers must be filed by
June 13, 2018. Any potential party as defined in Sec. 2.4 of title 10
of the Code of Federal Regulations (10 CFR), who believes access to
SUNSI is necessary to respond to this notice must follow the
instructions in Section VI of the SUPPLEMENTARY INFORMATION section of
this notice.
ADDRESSES: You may submit comments by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject):
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0095. Address
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Email comments to: [email protected]. If you do not
receive an automatic email reply confirming receipt, then contact us at
301-415-1677.
Fax comments to: Secretary, Nuclear Regulatory Commission
at 301-415-1101.
Mail comments to: Secretary, U.S. Nuclear Regulatory
Commission,
[[Page 22295]]
Washington, DC 20555-1101, ATTN: Rulemakings and Adjudications Staff.
Hand deliver comments to: 11555 Rockville Pike, Rockville,
Maryland 20852, between 7:30 a.m. and 4:15 p.m. (Eastern Time) Federal
workdays; telephone: 301-415-1677.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Ms. Marilyn Diaz, Office of Nuclear
Material Safety and Safeguards, telephone: 301-415-7110, email:
[email protected], U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2018-0095 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0095.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. The
Westinghouse Application for Consent to Indirect Change of Control with
Respect to Material Licenses and Export Licenses is available in ADAMS
under Accession No. ML18086B504.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2018-0095 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Introduction
The NRC is considering approving the indirect transfer of control
of Westinghouse from Toshiba Corporation, the current parent company of
the license holder. The application was submitted pursuant to 10 CFR
70.36, 10 CFR 110.50, and 10 CFR 110.51. Westinghouse holds materials
licenses SNM 1107; SNM-33; and export licenses XCOM1014, XCOM1047,
XCOM1072, XCOM1082, XCOM1093, XCOM1094, XCOM1102, XCOM1111, XCOM1113,
XCOM1116, XCOM1170, XCOM1188, XCOM1219, XCOM1246, XCOM1249, XCOM1252,
XCOM1255, XCOM1262, XCOM1298, XSNM3006, XSNM3034, XSNM3163, XSNM3264,
XSNM3461, XSNM3702, XSNM3769, XR169, XR176, and XR178.
According to the application for approval filed by Westinghouse,
the transaction will result in a transfer of controlling interest in
Westinghouse from its current parent company Toshiba Corporation, to
Brookfield WEC Holdings Inc., a Delaware limited liability company,
which is ultimately owned and controlled by Brookfield Asset Management
Inc., a Canadian company. Westinghouse will continue to operate the
facility and hold the licenses.
No changes to the licensed facilities, equipment or operational
changes are being proposed in the application.
Section 184 of the Atomic Energy Act provides ``[n]o license
granted hereunder and no right to utilize or produce special nuclear
material granted hereby shall be transferred, assigned or in any manner
disposed of, either voluntarily or involuntarily, directly or
indirectly, through transfer of control of any license to any person,
unless the Commission shall, after securing full information, find that
the transfer is in accordance with the provisions of this Act, and
shall give its consent in writing.'' The NRC's regulations at 10 CFR
70.36 state that no license, or any right thereunder, shall be
transferred, directly or indirectly, through transfer of control of the
license, unless the Commission, after securing full information, finds
that the transfer is in accordance with the provisions of the Atomic
Energy Act and gives its consent in writing. The Commission will
approve an application for the indirect transfer of a license if the
Commission determines that the proposed transfer of controlling
interest will not affect the qualifications of the licensee to hold the
license, and that the licensee has provided the financial assurance for
decommissioning required by 10 CFR 70.25. 10 CFR 110.50(d) likewise
requires Commission approval for transfers of a specific export or
import license.
III. Opportunity To Comment
Within 30 days from the date of publication of this notice, persons
may submit written comments regarding the license transfer application,
as provided for in 10 CFR 2.1305 and 110.81. The Commission will
consider and, if appropriate, respond to these comments, but such
comments will not otherwise constitute part of the decisional record.
Comments should be submitted as described in the ADDRESSES section of
this document.
IV. Opportunity To Request a Hearing and Petition for Leave To
Intervene
Within 20 days after the date of publication of this notice, any
persons (petitioner) whose interest may be affected by this action may
file a request for a hearing and petition for leave to intervene
(petition) with respect to the action. Petitions shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2, as well as the public participation
procedures in 10 CFR part 110. Interested persons should consult a
current copy of 10 CFR 2.309 and 110.82. The NRC's regulations are
accessible electronically from the NRC Library on the NRC's website at
https://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a
copy of the regulations is available at the NRC's Public Document Room,
located at One White Flint North, Room O1-F21, 11555 Rockville Pike
(first floor), Rockville, Maryland 20852. If a petition is filed, the
Commission or a presiding officer will rule on the petition and, if
appropriate, a notice of a hearing will be issued.
With respect to the materials licenses, as required by 10 CFR
2.309(d), the petition should specifically explain the reasons why
intervention should be
[[Page 22296]]
permitted with particular reference to the following general
requirements for standing: (1) The name, address, and telephone number
of the petitioner; (2) the nature of the petitioner's right under the
Act to be made a party to the proceeding; (3) the nature and extent of
the petitioner's property, financial, or other interest in the
proceeding; and (4) the possible effect of any decision or order which
may be entered in the proceeding on the petitioner's interest.
In accordance with 10 CFR 2.309(f), the petition must also set
forth the specific contentions which the petitioner seeks to have
litigated in the proceeding. Each contention must consist of a specific
statement of the issue of law or fact to be raised or controverted. In
addition, the petitioner must provide a brief explanation of the bases
for the contention and a concise statement of the alleged facts or
expert opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to the specific sources and
documents on which the petitioner intends to rely to support its
position on the issue. The petition must include sufficient information
to show that a genuine dispute exists with the applicant or licensee on
a material issue of law or fact. Contentions must be limited to matters
within the scope of the proceeding. The contention must be one which,
if proven, would entitle the petitioner to relief. A petitioner who
fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene.
Parties have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that party's admitted
contentions, including the opportunity to present evidence, consistent
with the NRC's regulations, policies, and procedures.
Petitions filed under 10 CFR 2.309 must be filed no later than 20
days from the date of publication of this notice. Petitions and motions
for leave to file new or amended contentions that are filed after the
deadline will not be entertained absent a determination by the
presiding officer that the filing demonstrates good cause by satisfying
the three factors in 10 CFR 2.309(c)(1)(i) through (iii). The petition
must be filed in accordance with the filing instructions in the
``Electronic Submissions (E-Filing)'' section of this document.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission no later
than 20 days from the date of publication of this notice. The petition
must be filed in accordance with the filing instructions in the
``Electronic Submissions (E-Filing)'' section of this document, and
should meet the requirements for petitions set forth in this section.
Alternatively, a State, local governmental body, Federally-recognized
Indian Tribe, or agency thereof may participate as a non-party under 10
CFR 2.315(c).
If a hearing is granted, any person who is not a party to the
proceeding and is not affiliated with or represented by a party may, at
the discretion of the presiding officer, be permitted to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
his or her position on the issues but may not otherwise participate in
the proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to the limits and
conditions as may be imposed by the presiding officer. Details
regarding the opportunity to make a limited appearance will be provided
by the presiding officer if such sessions are scheduled.
With respect to the export licenses, hearing requests and petitions
to intervene should be filed in accordance with 10 CFR 110.82, which
requires petitioners to explain why a hearing or an intervention would
be in the public interest and how a hearing or intervention would
assist the Commission in making the determinations required by Sec.
110.45. Such petitions must be filed no later than 30 days from the
date of publication of this notice.
V. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing and petition for leave to intervene (petition), any
motion or other document filed in the proceeding prior to the
submission of a request for hearing or petition to intervene, and
documents filed by interested governmental entities that request to
participate under 10 CFR 2.315(c), must be filed in accordance with the
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR
46562, August 3, 2012). The E-Filing process requires participants to
submit and serve all adjudicatory documents over the internet, or in
some cases to mail copies on electronic storage media. Detailed
guidance on making electronic submissions may be found in the Guidance
for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit
paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at [email protected], or by
telephone at 301-415-1677, to (1) request a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign submissions and access the E-Filing
system for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a petition or
other adjudicatory document (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a
digital ID certificate and a docket has been created, the participant
can then submit adjudicatory documents. Submissions must be in Portable
Document Format (PDF). Additional guidance on PDF submissions is
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the
time the document is submitted through the NRC's E Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not
[[Page 22297]]
serve the document on those participants separately. Therefore,
applicants and other participants (or their counsel or representative)
must apply for and receive a digital ID certificate before adjudicatory
documents are filed so that they can obtain access to the documents via
the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic
Filing Help Desk through the ``Contact Us'' link located on the NRC's
public website at https://www.nrc.gov/site-help/e-submittals.html, by
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m.
and 6 p.m., Eastern Time, Monday through Friday, excluding government
holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
stating why there is good cause for not filing electronically and
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, 11555
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and
Adjudications Staff. Participants filing adjudicatory documents in this
manner are responsible for serving the document on all other
participants. Filing is considered complete by first-class mail as of
the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the
Commission or the presiding officer. If you do not have an NRC-issued
digital ID certificate as described above, click cancel when the link
requests certificates and you will be automatically directed to the
NRC's electronic hearing dockets where you will be able to access any
publicly available documents in a particular hearing docket.
Participants are requested not to include personal privacy
information, such as social security numbers, home addresses, or
personal phone numbers in their filings, unless an NRC regulation or
other law requires submission of such information. For example, in some
instances, individuals provide home addresses in order to demonstrate
proximity to a facility or site. With respect to copyrighted works,
except for limited excerpts that serve the purpose of the adjudicatory
filings and would constitute a Fair Use application, participants are
requested not to include copyrighted materials in their submission.
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held and designating the Presiding Officer. A
notice granting a hearing will be published in the Federal Register and
served on the parties to the hearing.
For further details with respect to this application, see the
application dated March 21, 2018 (ADAMS Accession No. ML18086B504).
VI. Access to Sensitive Unclassified Non-Safeguards Information for
Contention Preparation
Any person who desires access to proprietary, confidential
commercial information that has been redacted from the application
should contact the applicant by telephoning Ray P. Kuyler, Assistant
General Counsel, Westinghouse Electric Company at 301-230-4884 for the
purpose of negotiating a confidentiality agreement or a proposed
protective order with the applicant. If no agreement can be reached,
persons who desire access to this information may file a motion with
the Secretary and addressed to the Commission that requests the
issuance of a protective order.
Dated at Rockville, Maryland, this 9th day of May, 2018.
For the Nuclear Regulatory Commission.
Craig G. Erlanger,
Director, Division of Fuel Cycle Safety, Safeguards, and Environmental
Review, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 2018-10177 Filed 5-11-18; 8:45 am]