Longview Power, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 22054-22055 [2018-10004]
Download as PDF
22054
Federal Register / Vol. 83, No. 92 / Friday, May 11, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–491–001]
sradovich on DSK3GMQ082PROD with NOTICES
Perryville Gas Storage LLC; Notice of
Application
Take notice that on April 27, 2018,
Perryville Gas Storage LLC (Perryville),
having its principal place of business at
Three Riverway, Suite 1350, Houston,
Texas 77056, filed in the above
referenced docket an application
pursuant to section 7(c) of the Natural
Gas Act (NGA), and Part 157 of the
Commission’s regulations for an order
amending the certificate of public
convenience and necessity issued in
Docket No. CP09–418–000, and
amended in Docket Nos. CP11–159–000,
CP12–460–000, CP13–23–000 and
CP17–491–000, to authorize Perryville
to make certain changes to its
certificated project. Perryville proposes
to amend its certificate for natural gas
storage caverns, located in Franklin and
Richland Parishes, Louisiana, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection.
Specifically, the applicant proposes to
amend two requirements of the
Certificate issued in Docket No. CP17–
491–000 on December 20, 2017: (i)
Sonar survey requirement and (ii)
wellbore integrity requirements. The
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to J. Gordon
Pennington, Attorney at Law, 1101 30th
Street NW, Suite 500, Washington, DC
20007, at (202) 625–4330, or by email at
pennington5@verzion.net.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
VerDate Sep<11>2014
19:21 May 10, 2018
Jkt 244001
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on May 29, 2018.
Dated: May 7, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–10073 Filed 5–10–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–134–000]
Longview Power, LLC; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On May 3, 2018, the Commission
issued an order in Docket No. EL18–
134–000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether Longview Power, LLC’s
reactive supply and voltage control
service rates may be unjust and
unreasonable. Longview Power, LLC, 163
FERC ¶61,088 (2018).
The refund effective date in Docket
No. EL18–134–000, established
pursuant to section 206(b) of the FPA,
will be the date of publication of this
notice in the Federal Register.
Any interested person desiring to be
heard in Docket No. EL18–134–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, in accordance
with Rule 214 of the Commission’s
Rules of Practice and Procedure, 18 CFR
385.214, within 21 days of the date of
issuance of the order.
E:\FR\FM\11MYN1.SGM
11MYN1
Federal Register / Vol. 83, No. 92 / Friday, May 11, 2018 / Notices
Dated: May 4, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10004 Filed 5–10–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–71–000.
Applicants: NorthWestern
Corporation, NJR Clean Energy Ventures
II Corporation.
Description: Supplement to March 6,
2018 Application of NorthWestern
Corporation, et al. for FPA Section 203
Authorization.
Filed Date: 5/3/18.
Accession Number: 20180503–5066.
Comments Due: 5 p.m. ET 5/14/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2437–010.
Applicants: Arizona Public Service
Company.
Description: Notice of Non-Material
Change in Status of Arizona Public
Service Company.
Filed Date: 5/3/18.
Accession Number: 20180503–5136.
Comments Due: 5 p.m. ET 5/24/18.
Docket Numbers: ER10–3199–004.
Applicants: MDU Resources Group,
Inc.
Description: Second Supplement to
December 29, 2017 Updated Market
Analysis in the Central Region of MDU
Resources Group, Inc.
Filed Date: 5/3/18.
Accession Number: 20180503–5137.
Comments Due: 5 p.m. ET 5/24/18.
Docket Numbers: ER18–614–002.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Response to Deficiency Letter issued
April 3, 2018 in Docket No. ER18–614
to be effective 4/5/2018.
Filed Date: 5/3/18.
Accession Number: 20180503–5112.
Comments Due: 5 p.m. ET 5/24/18.
Docket Numbers: ER18–1515–000.
Applicants: MATL LLP.
Description: Compliance filing: Order
No. 842 Compliance to be effective
5/15/2018.
Filed Date: 5/3/18.
Accession Number: 20180503–5114.
Comments Due: 5 p.m. ET 5/24/18.
VerDate Sep<11>2014
19:21 May 10, 2018
Jkt 244001
Docket Numbers: ER18–1516–000.
Applicants: El Paso Electric Company.
Description: § 205(d) Rate Filing:
Concurrence of EPE to APS Rate
Schedule No. 152 to be effective
7/2/2018.
Filed Date: 5/3/18.
Accession Number: 20180503–5125.
Comments Due: 5 p.m. ET 5/24/18.
Docket Numbers: ER18–1517–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 3466, NQ77 re: Units 4 and 6 to be
effective 11/28/2012.
Filed Date: 5/4/18.
Accession Number: 20180504–5124.
Comments Due: 5 p.m. ET 5/25/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 4, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–10000 Filed 5–10–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–260–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Application
Take notice that on April 23, 2018,
Transcontinental Gas Pipe Line
Company, LLC (Transco), having its
principal place of business at P.O. Box
1396, Houston, Texas 77251 filed in the
above referenced docket an application
pursuant to section 7(b) of the Natural
Gas Act (NGA), and Part 157 of the
Commission’s regulations requesting
authorization to abandon its North
Padre Island Block ‘‘B’’ Platform and
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
22055
offshore lateral facilities extending from
North High Island Block 956 to
approximately 3.5 miles from shore,
Offshore Texas, referred to as NPI
Lateral and NPI 956 Platform
Abandonment Project (Project), all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Marg
Camardello, Regulatory Analyst, P.O.
Box 1396, Houston, Texas 77251, or
telephone (713) 215–3380, or fax (713)
215–3483 or by emailing
Marg.r.camardello@williams.com.
Specifically, Transco is requesting
approval to abandon: (i) Approximately
21.6 miles of a 24-inch pipeline lateral
extending from the North Padre Island
Block 956 ‘‘B’’ Platform, to
approximately 3.5 miles from shore,
offshore Texas (NPI Lateral) and (ii) the
North Padre Island Block 956 ‘‘B’’
Platform and appurtenant facilities
located on the platform (NPI 956
Platform) in Offshore, Texas. Transco
states that the Project will allow Transco
to eliminate the need for future
maintenance expenditures on facilities
that are not needed to satisfy its current
firm service obligations. The cost of the
Project will be approximately $3.3
million.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
E:\FR\FM\11MYN1.SGM
11MYN1
Agencies
[Federal Register Volume 83, Number 92 (Friday, May 11, 2018)]
[Notices]
[Pages 22054-22055]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-10004]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL18-134-000]
Longview Power, LLC; Notice of Institution of Section 206
Proceeding and Refund Effective Date
On May 3, 2018, the Commission issued an order in Docket No. EL18-
134-000, pursuant to section 206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an investigation into whether Longview
Power, LLC's reactive supply and voltage control service rates may be
unjust and unreasonable. Longview Power, LLC, 163 FERC ]61,088 (2018).
The refund effective date in Docket No. EL18-134-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL18-134-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426, in accordance with Rule 214 of the
Commission's Rules of Practice and Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
[[Page 22055]]
Dated: May 4, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-10004 Filed 5-10-18; 8:45 am]