Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene: Davis and Weber Counties Canal Company, 21770-21771 [2018-09964]
Download as PDF
21770
Federal Register / Vol. 83, No. 91 / Thursday, May 10, 2018 / Notices
following meetings related to the
transmission planning activities of
Tucson Electric Power Company, UNS
Electric, Inc., Public Service Company
of New Mexico, Arizona Public Service
Company, El Paso Electric Company,
Black Hills Power, Inc., Black Hills
Colorado Electric Utility Company, LP,
Cheyenne Light, Fuel, & Power
Company, NV Energy, Inc.; and Xcel
Energy Services, Inc. on behalf of Public
Service Company of Colorado:
Planning Management Committee
Meeting
May 9, 2018, 9 a.m.–3 p.m. (MDT)
Planning Management Committee
Meeting
June 13, 2018, 9 a.m.–3 p.m. (MDT)
The May 9, 2018 Planning
Management Committee Meeting will be
held at: Energy Strategies, 215 State St.
#200, Salt Lake City, UT 84111.
The June 13, 2018 Planning
Management Committee Meeting will be
held at: Xcel Energy, 1800 Larimer St.,
Denver, CO 80202.
The above-referenced meetings will
be available via web conference and
teleconference.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
https://www.westconnect.com/.
The discussions at the meetings
described above may address matters at
issue in the following proceeding:
ER13–75, Public Service Company of
Colorado, et al.
For more information contact Nicole
Cramer, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–6775 or
nicole.cramer@ferc.gov.
Dated: May 4, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–09965 Filed 5–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD18–8–000]
Notice of Preliminary Determination of
a Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene: Davis and
Weber Counties Canal Company
On April 27, 2018, Davis and Weber
Counties Canal Company filed a notice
of intent to construct a qualifying
conduit hydropower facility, pursuant
to section 30 of the Federal Power Act
(FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed West
Point Pump Station Micro-hydropower
Project would have an installed capacity
of 8 kilowatts (kW), and would be
located along Davis and Weber Counties
Canal Company’s secondary irrigation
system. The project would be located
near the Town of West Point in Davis
County, Utah.
Applicant Contact: Richard Smith,
General Manager, Davis and Weber
Counties Canal Company, 138 West
1300 North, Sunset, UT 84015; Phone
No. (801) 774–6373.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062; Email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) Two new
generating units that have a total
generating capacity of 8 kW, housed in
a pump return pipeline to a storage
reservoir; and (2) appurtenant facilities.
The proposed project would have an
estimated annual generation of 6
megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ...
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .....................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA
daltland on DSKBBV9HB2PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by
HREA.
Preliminary Determination: The
proposed hydroelectric project will
utilize an existing irrigation pipeline,
the primary purpose of which is to
deliver lawn and garden pressure
irrigation water to these same counties
to Davis and Weber Counties. The
addition of the West Point Pump Station
Micro-hydropower Project will not alter
the conduit’s primary purpose.
Therefore, based upon the above
criteria, Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
VerDate Sep<11>2014
16:29 May 09, 2018
Jkt 244001
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
Y
Y
Y
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
1 18
CFR 385.2001–2005 (2017).
E:\FR\FM\10MYN1.SGM
10MYN1
Federal Register / Vol. 83, No. 91 / Thursday, May 10, 2018 / Notices
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD18–8) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: May 4, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–09964 Filed 5–9–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD18–7–000]
Davis and Weber Counties Canal
Company; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On April 27, 2018, Davis and Weber
Counties Canal Company filed a notice
of intent to construct a qualifying
conduit hydropower facility, pursuant
to section 30 of the Federal Power Act
(FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act
21771
of 2013 (HREA). The proposed Canal
Station 603+00 Micro-hydropower
Project would have an installed capacity
up to 8 kilowatts (kW), and would be
located along the four-foot wide by sixfoot long section of the open irrigation
canal. The project would be located near
the Town of Sunset in Davis County,
Utah.
Applicant Contact: Richard Smith,
General Manager, Davis and Weber
Counties Canal Company, 138 West
1300 North, Sunset, UT 84015; Phone
No. (801) 774–6373.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062; Email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) Two new
generating units plus two future units,
approximately four-foot wide by six-foot
long, placed in an open channel of the
Davis & Weber Canal with a total
generating capacity of up to 8 kW; and
(2) appurtenant facilities. The proposed
project would have an estimated annual
generation of 17.5 megawatt-hours, and
may include two additional units in the
future.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ...
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water for
agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts .....................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA
daltland on DSKBBV9HB2PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by
HREA.
Preliminary Determination: The
proposed hydroelectric project will
utilize the Davis and Weber Canal, the
primary purpose of which is to deliver
agricultural and irrigation water to
Davis and Weber counties. The addition
of the Canal Station 603+00 Microhydropower Project will not alter the
conduit’s primary purpose. Therefore,
based upon the above criteria,
Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
VerDate Sep<11>2014
16:29 May 09, 2018
Jkt 244001
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
Y
Y
Y
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
E:\FR\FM\10MYN1.SGM
10MYN1
Agencies
[Federal Register Volume 83, Number 91 (Thursday, May 10, 2018)]
[Notices]
[Pages 21770-21771]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-09964]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD18-8-000]
Notice of Preliminary Determination of a Qualifying Conduit
Hydropower Facility and Soliciting Comments and Motions To Intervene:
Davis and Weber Counties Canal Company
On April 27, 2018, Davis and Weber Counties Canal Company filed a
notice of intent to construct a qualifying conduit hydropower facility,
pursuant to section 30 of the Federal Power Act (FPA), as amended by
section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA).
The proposed West Point Pump Station Micro-hydropower Project would
have an installed capacity of 8 kilowatts (kW), and would be located
along Davis and Weber Counties Canal Company's secondary irrigation
system. The project would be located near the Town of West Point in
Davis County, Utah.
Applicant Contact: Richard Smith, General Manager, Davis and Weber
Counties Canal Company, 138 West 1300 North, Sunset, UT 84015; Phone
No. (801) 774-6373.
FERC Contact: Robert Bell, Phone No. (202) 502-6062; Email:
[email protected].
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) Two new generating units that have a
total generating capacity of 8 kW, housed in a pump return pipeline to
a storage reservoir; and (2) appurtenant facilities. The proposed
project would have an estimated annual generation of 6 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the facility Y
HREA. uses is a tunnel,
canal, pipeline,
aqueduct, flume, ditch,
or similar manmade
water conveyance that
is operated for the
distribution of water
for agricultural,
municipal, or
industrial consumption
and not primarily for
the generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed, operated,
or maintained for the
generation of electric
power and uses for such
generation only the
hydroelectric potential
of a non-federally
owned conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity that
does not exceed 5
megawatts.
FPA 30(a)(3)(C)(iii), as amended On or before August 9, Y
by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing requirements
of Part I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed hydroelectric project will
utilize an existing irrigation pipeline, the primary purpose of which
is to deliver lawn and garden pressure irrigation water to these same
counties to Davis and Weber Counties. The addition of the West Point
Pump Station Micro-hydropower Project will not alter the conduit's
primary purpose. Therefore, based upon the above criteria, Commission
staff preliminarily determines that the proposal satisfies the
requirements for a qualifying conduit hydropower facility, which is not
required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the
[[Page 21771]]
facility meets the qualifying criteria must set forth their evidentiary
basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2017).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE, Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (i.e., CD18-8) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call
(202) 502-8659.
Dated: May 4, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-09964 Filed 5-9-18; 8:45 am]
BILLING CODE 6717-01-P