RH energytrans, LLC; Notice of Schedule for Environmental Review of the Risberg Line Project, 20800-20801 [2018-09712]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
20800
Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices
Accession Number: 20180501–5301.
Comments Due: 5 p.m. ET 5/14/18.
Docket Numbers: RP18–775–000.
Applicants: Southeast Supply Header,
LLC.
Description: § 4(d) Rate Filing: 2018
SESH TUP/SBA Annual Filing to be
effective 6/1/2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5305.
Comments Due: 5 p.m. ET 5/14/18.
Docket Numbers: RP18–776–000.
Applicants: Sabal Trail Transmission,
LLC.
Description: § 4(d) Rate Filing: 2018
Initial TUP/SBA Filing to be effective 6/
1/2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5306.
Comments Due: 5 p.m. ET 5/14/18.
Docket Numbers: RP18–777–000.
Applicants: Great Lakes Gas
Transmission Limited Partnership.
Description: § 4(d) Rate Filing:
Implementation of TC Plus to be
effective 6/1/2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5315.
Comments Due: 5 p.m. ET 5/14/18.
Docket Numbers: RP18–779–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—June 2018 Great
Salt Plains 1010446 to be effective 6/1/
2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5347.
Comments Due: 5 p.m. ET 5/14/18.
Docket Numbers: RP18–780–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20180501 Negotiated Rate to be effective
5/1/2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5348.
Comments Due: 5 p.m. ET 5/14/18.
Docket Numbers: RP18–781–000.
Applicants: East Cheyenne Gas
Storage, LLC.
Description: Compliance filing ECGS
2018 Operational Purchase & Sales.
Filed Date: 5/1/18.
Accession Number: 20180501–5364.
Comments Due: 5 p.m. ET 5/14/18.
Docket Numbers: RP18–782–000.
Applicants: Panther Interstate
Pipeline Energy, LLC.
Description: Tariff Cancellation: PIPE
Tariff Cancellation Filing to be effective
6/1/2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5365.
Comments Due: 5 p.m. ET 5/14/18.
The filings are accessible in the
Commission’s eLibrary system by
VerDate Sep<11>2014
18:41 May 07, 2018
Jkt 244001
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 2, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–09750 Filed 5–7–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–6–000]
RH energytrans, LLC; Notice of
Schedule for Environmental Review of
the Risberg Line Project
On October 16, 2017, RH energytrans,
LLC filed an application in Docket No.
CP18–6–000 requesting a Certificate of
Public Convenience and Necessity
pursuant to section 7(c) of the Natural
Gas Act to construct and operate certain
natural gas pipeline facilities. The
proposed project is known as the
Risberg Line Project (Project), and
would deliver up to 55,000 dekatherms
per day of firm natural gas
transportation service to Dominion
Energy Ohio and other prospective
customers.
On October 26, 2017, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—June 29, 2018
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
90-Day Federal Authorization Decision
Deadline—September 27, 2018
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
RH energytrans, LLC’s Risberg Line
Project would involve modification and
recertification of existing facilities and
installation of new facilities. Activities
associated with the modification and
the recertification of existing facilities
would include:
• Modifications at the existing
County Line Compressor Station in Erie
County, Pennsylvania;
• conversion of an existing 26.6-milelong, 12-inch-diameter gathering
pipeline to natural gas transmission
service in Crawford and Erie Counties,
Pennsylvania; and
• conversion of an existing 5.0-milelong, 8-inch-diameter gathering pipeline
to natural gas transmission service in
Erie County, Pennsylvania.
New facilities that RH energytrans,
LLC proposes to construct include:
• Meadville Compressor Station in
Crawford County, Pennsylvania,
including one 728 horsepower natural
gas-fired reciprocating compressor unit;
• 650-foot-long, 12-inch-diameter
lateral pipeline within the existing 12inch-diameter gathering pipeline rightof-way;
• 28.3-mile-long, 12-inch-diameter
pipeline in Erie County, Pennsylvania
and Ashtabula County, Ohio (Risberg
Pipeline); and
• North Kingsville Meter Station in
Ashtabula County, Ohio.
Background
On November 21, 2017, the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Risberg Line Project
and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. In response to
the NOI, the Commission received
comments from the U.S. Fish and
Wildlife Service, Ohio Department of
Natural Resources, and 29 individuals.
A number of individuals submitted
more than one comment. The comments
included a variety of topics such as
water resources, wetlands, vegetation,
wildlife, land use, recreation, and
socioeconomics, air quality and noise,
reliability and safety, and alternatives.
E:\FR\FM\08MYN1.SGM
08MYN1
Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices
The U.S. Army Corps of Engineers
and Pennsylvania Fish and Boat
Commission are cooperating agencies in
the preparation of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP18–6–000), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: May 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–09712 Filed 5–7–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1163–001.
Applicants: Avista Corporation.
Description: Tariff Amendment:
Avista Corporation Amendment to
correct e-Tariff Viewer ER18–1163 to be
effective 4/1/2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5366.
Comments Due: 5 p.m. ET 5/22/18.
Docket Numbers: ER18–1494–000.
Applicants: Interstate Power and
Light Company.
Description: § 205(d) Rate Filing:
Amendment to IPL Wholesale Formula
Rate Changes to be effective 5/1/2018.
VerDate Sep<11>2014
18:41 May 07, 2018
Jkt 244001
Filed Date: 5/1/18.
Accession Number: 20180501–5322.
Comments Due: 5 p.m. ET 5/22/18.
Docket Numbers: ER18–1495–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA SA No. 2987; Queue No.
AC1–073 to be effective 4/4/2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5335.
Comments Due: 5 p.m. ET 5/22/18.
Docket Numbers: ER18–1496–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5068; Queue No.
AB1–081 to be effective 4/13/2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5349.
Comments Due: 5 p.m. ET 5/22/18.
Docket Numbers: ER18–1497–000.
Applicants: Tucson Electric Power
Company.
Description: § 205(d) Rate Filing:
Service Agreement for Network
Integration Transmission Service—
TRICO to be effective 5/1/2018.
Filed Date: 5/2/18.
Accession Number: 20180502–5000.
Comments Due: 5 p.m. ET 5/23/18.
Docket Numbers: ER18–1498–000.
Applicants: Entergy Arkansas, Inc.
Description: § 205(d) Rate Filing: EAI
et al Unit Power Sales and Designated
Power Purchase Tariff Amendment to be
effective 7/1/2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5368.
Comments Due: 5 p.m. ET 5/22/18.
Docket Numbers: ER18–1499–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: SRP
Construct Agmt for Cove Fort Meter to
be effective 7/2/2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5379.
Comments Due: 5 p.m. ET 5/22/18.
Docket Numbers: ER18–1500–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2825R5 KMEA and Westar Energy Meter
Agent Agreement to be effective 6/1/
2018.
Filed Date: 5/1/18.
Accession Number: 20180501–5405.
Comments Due: 5 p.m. ET 5/22/18.
Docket Numbers: ER18–1501–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2450R2 KEPCO NITSA NOA to be
effective 6/1/2018.
Filed Date: 5/2/18.
Accession Number: 20180502–5038.
Comments Due: 5 p.m. ET 5/23/18.
PO 00000
Frm 00015
Fmt 4703
Sfmt 9990
20801
Docket Numbers: ER18–1502–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSCo–BLDR–T–2018–1–Spec Study–
486–0.0.0 to be effective 5/3/2018.
Filed Date: 5/2/18.
Accession Number: 20180502–5039.
Comments Due: 5 p.m. ET 5/23/18.
Docket Numbers: ER18–1503–000.
Applicants: International
Transmission Company.
Description: § 205(d) Rate Filing:
CIAC Agreement with DTE Electric
Company to be effective 7/2/2018.
Filed Date: 5/2/18.
Accession Number: 20180502–5043.
Comments Due: 5 p.m. ET 5/23/18.
Docket Numbers: ER18–1504–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2451R3 KEPCO NITSA NOA to be
effective 6/1/2018.
Filed Date: 5/2/18.
Accession Number: 20180502–5049.
Comments Due: 5 p.m. ET 5/23/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 2, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–09748 Filed 5–7–18; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\08MYN1.SGM
08MYN1
Agencies
[Federal Register Volume 83, Number 89 (Tuesday, May 8, 2018)]
[Notices]
[Pages 20800-20801]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-09712]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-6-000]
RH energytrans, LLC; Notice of Schedule for Environmental Review
of the Risberg Line Project
On October 16, 2017, RH energytrans, LLC filed an application in
Docket No. CP18-6-000 requesting a Certificate of Public Convenience
and Necessity pursuant to section 7(c) of the Natural Gas Act to
construct and operate certain natural gas pipeline facilities. The
proposed project is known as the Risberg Line Project (Project), and
would deliver up to 55,000 dekatherms per day of firm natural gas
transportation service to Dominion Energy Ohio and other prospective
customers.
On October 26, 2017, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--June 29, 2018
90-Day Federal Authorization Decision Deadline--September 27, 2018
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
RH energytrans, LLC's Risberg Line Project would involve
modification and recertification of existing facilities and
installation of new facilities. Activities associated with the
modification and the recertification of existing facilities would
include:
Modifications at the existing County Line Compressor
Station in Erie County, Pennsylvania;
conversion of an existing 26.6-mile-long, 12-inch-diameter
gathering pipeline to natural gas transmission service in Crawford and
Erie Counties, Pennsylvania; and
conversion of an existing 5.0-mile-long, 8-inch-diameter
gathering pipeline to natural gas transmission service in Erie County,
Pennsylvania.
New facilities that RH energytrans, LLC proposes to construct
include:
Meadville Compressor Station in Crawford County,
Pennsylvania, including one 728 horsepower natural gas-fired
reciprocating compressor unit;
650-foot-long, 12-inch-diameter lateral pipeline within
the existing 12-inch-diameter gathering pipeline right-of-way;
28.3-mile-long, 12-inch-diameter pipeline in Erie County,
Pennsylvania and Ashtabula County, Ohio (Risberg Pipeline); and
North Kingsville Meter Station in Ashtabula County, Ohio.
Background
On November 21, 2017, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Risberg Line
Project and Request for Comments on Environmental Issues (NOI). The NOI
was sent to affected landowners; federal, state, and local government
agencies; elected officials; environmental and public interest groups;
Native American tribes; other interested parties; and local libraries
and newspapers. In response to the NOI, the Commission received
comments from the U.S. Fish and Wildlife Service, Ohio Department of
Natural Resources, and 29 individuals. A number of individuals
submitted more than one comment. The comments included a variety of
topics such as water resources, wetlands, vegetation, wildlife, land
use, recreation, and socioeconomics, air quality and noise, reliability
and safety, and alternatives.
[[Page 20801]]
The U.S. Army Corps of Engineers and Pennsylvania Fish and Boat
Commission are cooperating agencies in the preparation of the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP18-6-000), and follow
the instructions. For assistance with access to eLibrary, the helpline
can be reached at (866) 208-3676, TTY (202) 502-8659, or at
[email protected]. The eLibrary link on the FERC website also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: May 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-09712 Filed 5-7-18; 8:45 am]