Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information, 20866-20872 [2018-07705]

Download as PDF 20866 Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices sradovich on DSK3GMQ082PROD with NOTICES from 1 hour to 24 hours and changed the basis for entry into the TS actions for inoperable rod position indicators from ‘‘per bank’’ to ‘‘per group.’’ The amendments also separated existing TS 3.1.3.2.1, Action a.1, into two separate actions and removed the duplicative Action b (Unit No. 1 only). Date of issuance: April 18, 2018. Effective date: As of the date of issuance and shall be implemented within 30 days from the date of issuance. Amendment Nos.: 324 (Unit No. 1) and 305 (Unit No. 2). A publiclyavailable version is in ADAMS under Accession No. ML18085B198; documents related to these amendments are listed in the Safety Evaluation enclosed with the amendments. Renewed Facility Operating License Nos. DPR–70 and DPR–75: The amendments revised the Renewed Facility Operating Licenses and TSs. Date of initial notice in Federal Register: March 1, 2018 (83 FR 8904). The Commission’s related evaluation of the amendments is contained in a Safety Evaluation dated April 18, 2018. No significant hazards consideration comments received: No. PSEG Nuclear LLC, Docket No. 50–354, Hope Creek Generating Station (HCGS), Salem County, New Jersey Date of amendment request: November 9, 2017, as supplemented by letter dated January 22, 2018. Brief description of amendment: The amendment revised the HCGS Technical Specifications. Specifically, the amendment revised the safety limit minimum critical power ratio for two recirculation loop operation and single recirculation loop operation based on the HCGS Cycle 22 specific analysis. Date of issuance: April 11, 2018. Effective date: As of the date of issuance and shall be implemented prior to startup following the spring 2018 refueling outage. Amendment No.: 211. A publiclyavailable version is in ADAMS under Accession No. ML18081A044; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment. Renewed Facility Operating License No. NPF–57: The amendment revised the renewed facility operating license and technical specifications. Date of initial notice in Federal Register: February 6, 2018 (83 FR 5281). The supplemental letter dated January 22, 2018, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staff’s VerDate Sep<11>2014 18:41 May 07, 2018 Jkt 244001 original proposed no significant hazards consideration determination as published in the Federal Register. The Commission’s related evaluation of the amendment is contained in a Safety Evaluation dated April 11, 2018. No significant hazards consideration comments received: No. Southern Nuclear Operating Company, Docket Nos. 52–025 and 52–026, Vogtle Electric Generating Plant (VEGP), Unit Nos. 3 and 4, Burke County, Georgia Date of amendment request: September 13, 2017. Description of amendment: The amendments authorized changes to the VEGP, Unit Nos. 3 and 4, Updated Final Safety Analysis Report in the form of departures from the plant-specific Design Control Document Tier 2 information and involved related changes to the VEGP, Units 3 and 4, Combined License (COL) Appendix A, Technical Specifications. The amendments authorized changes to the mass of trisodium phosphate required inside containment to provide adjustment of the pH of the water in the containment following an accident in which the containment floods. These changes are reflected in COL Appendix A. Date of issuance: February 27, 2018. Effective date: As of the date of issuance and shall be implemented within 30 days of issuance. Amendment Nos.: 110 (Unit No. 3) and 109 (Unit No. 4). A publiclyavailable version is in ADAMS under Package Accession No. ML18030A612; documents related to these amendments are listed in the Safety Evaluation enclosed with the amendments. Facility Combined Licenses Nos. NPF– 91 and NPF–92: Amendments revised the facility COL. Date of initial notice in Federal Register: November 21, 2017 (82 FR 55401). The Commission’s related evaluation of the amendments is contained in a Safety Evaluation dated February 27, 2018. No significant hazards consideration comments received: No. Dated at Rockville, Maryland, this 26th day of April 2018. For the Nuclear Regulatory Commission. Tara Inverso, Acting Deputy Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2018–09244 Filed 5–7–18; 8:45 am] BILLING CODE 7590–01–P PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 NUCLEAR REGULATORY COMMISSION [Docket Nos. 52–025 and 52–026; NRC– 2018–0071] Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information Nuclear Regulatory Commission. ACTION: License amendment request; notice of opportunity to comment, request a hearing, and petition for leave to intervene; order imposing procedures. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of one amendment request for Vogtle Electric Generating Plant, Units 3 and 4. The NRC proposes to determine that the amendment request involves no significant hazards consideration. Because the amendment request contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation. SUMMARY: Comments must be filed by June 7, 2018. A request for a hearing must be filed by July 9, 2018. Any potential party, as defined in § 2.4 of title 10 of the Code of Federal Regulations (10 CFR), who believes access to SUNSI is necessary to respond to this notice must request document access by May 18, 2018. DATES: You may submit comments by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0071. Address questions about NRC dockets to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • Mail comments to: May Ma, Office of Administration, Mail Stop: TWFN–7– A60, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the ADDRESSES: E:\FR\FM\08MYN1.SGM 08MYN1 Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices SUPPLEMENTARY INFORMATION section of this document. Kay Goldstein, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001; telephone: 301–415–1506, email: Kay.Goldstein@nrc.gov. SUPPLEMENTARY INFORMATION: FOR FURTHER INFORMATION CONTACT: I. Obtaining Information and Submitting Comments sradovich on DSK3GMQ082PROD with NOTICES A. Obtaining Information Please refer to Docket ID NRC–2018– 0071, facility name, unit number(s), plant docket number, application date, and subject when contacting the NRC about the availability of information for this action. You may obtain publiclyavailable information related to this action by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0071. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. B. Submitting Comments Please include Docket ID NRC–2018– 0071, facility name, unit number(s), plant docket number, application date, and subject in your comment submission. The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at https:// www.regulations.gov, as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should VerDate Sep<11>2014 18:41 May 07, 2018 Jkt 244001 inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Background Pursuant to Section 189.a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the NRC is publishing this notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This notice includes notices of amendments containing SUNSI. III. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses or Combined Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing The Commission has made a proposed determination that the following amendment request involves no significant hazards consideration. Under the Commission’s regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. The basis for this proposed determination for the amendment request is shown below. The Commission is seeking public comments on this proposed determination. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination. Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60day period provided that its final PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 20867 determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility. If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register. If the Commission makes a final no significant hazards consideration determination, any hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently. A. Opportunity To Request a Hearing and Petition for Leave To Intervene Within 60 days after the date of publication of this notice, any person (petitioner) whose interest may be affected by this action may file a request for a hearing and petition for leave to intervene (petition) with respect to the action. Petitions shall be filed in accordance with the Commission’s ‘‘Agency Rules of Practice and Procedure’’ in 10 CFR part 2. Interested persons should consult a current copy of 10 CFR 2.309. The NRC’s regulations are accessible electronically from the NRC Library on the NRC’s website at https://www.nrc.gov/reading-rm/doccollections/cfr/. Alternatively, a copy of the regulations is available at the NRC’s Public Document Room, located at One White Flint North, Room O1–F21, 11555 Rockville Pike (First Floor), Rockville, Maryland 20852. If a petition is filed, the Commission or a presiding officer will rule on the petition and, if appropriate, a notice of a hearing will be issued. As required by 10 CFR 2.309(d) the petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements for standing: (1) The name, address, and telephone number of the petitioner; (2) the nature of the petitioner’s right under the Act to be made a party to the proceeding; (3) the nature and extent of the petitioner’s property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the petitioner’s interest. In accordance with 10 CFR 2.309(f), the petition must also set forth the specific contentions which the petitioner seeks to have litigated in the proceeding. Each contention must E:\FR\FM\08MYN1.SGM 08MYN1 sradovich on DSK3GMQ082PROD with NOTICES 20868 Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner must provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner must also provide references to the specific sources and documents on which the petitioner intends to rely to support its position on the issue. The petition must include sufficient information to show that a genuine dispute exists with the applicant or licensee on a material issue of law or fact. Contentions must be limited to matters within the scope of the proceeding. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner who fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at least one contention will not be permitted to participate as a party. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene. Parties have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that party’s admitted contentions, including the opportunity to present evidence, consistent with the NRC’s regulations, policies, and procedures. Petitions must be filed no later than 60 days from the date of publication of this notice. Petitions and motions for leave to file new or amended contentions that are filed after the deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) through (iii). The petition must be filed in accordance with the filing instructions in the ‘‘Electronic Submissions (E-Filing)’’ section of this document. If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to establish when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing would take place after issuance of the amendment. If the final determination is that the amendment request involves a VerDate Sep<11>2014 18:41 May 07, 2018 Jkt 244001 significant hazards consideration, then any hearing held would take place before the issuance of the amendment unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2. A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h)(1). The petition should state the nature and extent of the petitioner’s interest in the proceeding. The petition should be submitted to the Commission no later than 60 days from the date of publication of this notice. The petition must be filed in accordance with the filing instructions in the ‘‘Electronic Submissions (E-Filing)’’ section of this document, and should meet the requirements for petitions set forth in this section, except that under 10 CFR 2.309(h)(2) a State, local governmental body, or Federallyrecognized Indian Tribe, or agency thereof does not need to address the standing requirements in 10 CFR 2.309(d) if the facility is located within its boundaries. Alternatively, a State, local governmental body, Federallyrecognized Indian Tribe, or agency thereof may participate as a non-party under 10 CFR 2.315(c). If a hearing is granted, any person who is not a party to the proceeding and is not affiliated with or represented by a party may, at the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). A person making a limited appearance may make an oral or written statement of his or her position on the issues but may not otherwise participate in the proceeding. A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to the limits and conditions as may be imposed by the presiding officer. Details regarding the opportunity to make a limited appearance will be provided by the presiding officer if such sessions are scheduled. B. Electronic Submissions (E-Filing) All documents filed in NRC adjudicatory proceedings, including a request for hearing and petition for leave to intervene (petition), any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities that request to participate under 10 CFR 2.315(c), must be filed in accordance with the NRC’s E-Filing rule (72 FR PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 49139; August 28, 2007, as amended at 77 FR 46562; August 3, 2012). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Detailed guidance on making electronic submissions may be found in the Guidance for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/ e-submittals.html. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by email at hearing.docket@nrc.gov, or by telephone at 301–415–1677, to (1) request a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign submissions and access the E-Filing system for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a petition or other adjudicatory document (even in instances in which the participant, or its counsel or representative, already holds an NRC-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket. Information about applying for a digital ID certificate is available on the NRC’s public website at https:// www.nrc.gov/site-help/e-submittals/ getting-started.html. Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit adjudicatory documents. Submissions must be in Portable Document Format (PDF). Additional guidance on PDF submissions is available on the NRC’s public website at https://www.nrc.gov/ site-help/electronic-sub-ref-mat.html. A filing is considered complete at the time the document is submitted through the NRC’s E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the EFiling system time-stamps the document and sends the submitter an email notice confirming receipt of the document. The E-Filing system also distributes an email notice that provides access to the document to the NRC’s Office of the General Counsel and any others who have advised the Office of the Secretary E:\FR\FM\08MYN1.SGM 08MYN1 sradovich on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices that they wish to participate in the proceeding, so that the filer need not serve the document on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before adjudicatory documents are filed so that they can obtain access to the documents via the E-Filing system. A person filing electronically using the NRC’s adjudicatory E-Filing system may seek assistance by contacting the NRC’s Electronic Filing Help Desk through the ‘‘Contact Us’’ link located on the NRC’s public website at https:// www.nrc.gov/site-help/esubmittals.html, by email to MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 6 p.m., Eastern Time, Monday through Friday, excluding government holidays. Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing stating why there is good cause for not filing electronically and requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing adjudicatory documents in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists. Documents submitted in adjudicatory proceedings will appear in the NRC’s electronic hearing docket which is available to the public at https:// adams.nrc.gov/ehd, unless excluded pursuant to an order of the Commission or the presiding officer. If you do not have an NRC-issued digital ID certificate VerDate Sep<11>2014 18:41 May 07, 2018 Jkt 244001 as described above, click cancel when the link requests certificates and you will be automatically directed to the NRC’s electronic hearing dockets where you will be able to access any publicly available documents in a particular hearing docket. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or personal phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. For example, in some instances, individuals provide home addresses in order to demonstrate proximity to a facility or site. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission. Southern Nuclear Operating Company, Inc., Docket Nos. 52–025 and 52–026, Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia Date of amendment request: December 21, 2017. A publicly-available version is in ADAMS under Accession No. ML18029A243. Description of amendment request: This amendment request contains sensitive unclassified non-safeguards information (SUNSI). The amendment request proposes changes to the Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document (DCD) Tier 2* and Tier 2 information and related changes to the Vogtle Electric Generating Plant, Units 3 and 4, Combined License (COL) Appendix A and COL Appendix C (and corresponding plant-specific DCD Tier 1) information. An exemption request relating to the proposed changes to the AP1000 DCD Tier 1 is included with the request. Specifically, the amendment request states that design changes within containment have necessitated recalculation of geometry input to the WGOTHIC evaluation model (EM) used for containment integrity analyses. Heat sinks, control volumes, and flow paths have been recalculated, and are in turn modeled in the WGOTHIC EM. Mass and energy (M&E) releases for Loss of Coolant Accident (LOCA) and Main Steam Line Break (MSLB) events are also recalculated. Various methodology changes are also made to the WGOTHIC methodology for the AP1000 design. These updates culminate in the recalculation of the containment integrity analyses. Additionally, changes are proposed to Inspections, PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 20869 Tests, Analyses, and Acceptance Criteria (ITAAC) related to flow rate testing of the passive containment cooling system (PCS) in order to capture lessons learned from preoperational testing performed at China’s AP1000 nuclear power station, Sanmen Unit 1. Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below with NRC staff edits in square brackets: 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. This change proposes updates to the plantspecific containment integrity analyses. Heat sinks, control volumes, and flow paths have been recalculated, and are in turn modeled in the WGOTHIC EM. Various methodology changes are also made to the WGOTHIC methodology for the AP1000 plant design. M&E releases for LOCA and MSLB are also recalculated. These updates culminate in the recalculation of the containment integrity calculations. Additionally, changes are proposed to ITAAC acceptance criteria related to flow rate testing of the PCS in order to capture lessons learned from testing at [China’s AP1000] Sanmen Unit 1. The proposed changes do not adversely affect the operation of any systems or equipment that initiate an analyzed accident or alter any structures, systems, and components (SSC) accident initiator or initiating sequence of events. The proposed changes do not adversely affect the physical design and operation of the PCS including asinstalled inspections, testing, and maintenance requirements, as described in the UFSAR. Therefore, the operation of the PCS is not adversely affected. A LOCA and a MSLB are considered and identified as the limiting events for the AP1000 design with respect to containment peak pressure and temperature. However, the proposed changes do not adversely affect the probability of either a LOCA or MSLB from occurring. Therefore, the probabilities of the accidents previously evaluated in the UFSAR are not affected. The proposed changes do not adversely affect the ability of the PCS to perform its design functions. The design of the PCS continues to meet the same regulatory acceptance criteria, codes, and standards as required by the UFSAR. In addition, the proposed changes maintain the capabilities of the PCS to mitigate the consequences of an accident and to meet the applicable regulatory acceptance criteria. The proposed changes do not adversely affect the prevention and mitigation of other abnormal events, e.g., anticipated operational occurrences, earthquakes, floods and turbine missiles, or their safety or design analyses. Therefore, the consequences of accidents evaluated in the UFSAR are not affected. Therefore, the proposed amendment does not involve a significant increase in the E:\FR\FM\08MYN1.SGM 08MYN1 sradovich on DSK3GMQ082PROD with NOTICES 20870 Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices consequences of an accident previously evaluated. 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. This change proposes updates to the plantspecific containment integrity analyses. Heat sinks, control volumes, and flow paths have been recalculated, and are in turn modeled in the WGOTHIC EM. Various methodology changes are also made to the WGOTHIC methodology for the AP1000 plant design. M&E releases for LOCA and MSLB are also recalculated. These updates culminate in the recalculation of the containment integrity calculations. Additionally, changes are proposed to ITAAC acceptance criteria related to flow rate testing of the passive containment cooling system PCS in order to capture lessons learned from testing at [China’s AP1000] Sanmen Unit 1. The proposed changes would not introduce a new failure mode, fault, or sequence of events that could result in a radioactive material release. The proposed changes do not alter the design, configuration, or method of operation of the plant beyond standard functional capabilities of the equipment. Therefore, this activity does not allow for a new fission product release path, result in a new fission product barrier failure mode, or create a new sequence of events which results in significant fuel cladding failures. Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated. 3. Does the proposed amendment involve a significant reduction in a margin of safety? Response: No. This change proposes updates to the plantspecific containment integrity analyses. Heat sinks, control volumes, and flow paths have been recalculated, and are in turn modeled in the WGOTHIC EM. Various methodology changes are also made to the WGOTHIC methodology for the AP1000 plant design. M&E releases for LOCA and MSLB are also recalculated. These updates culminate in the recalculation of the containment integrity calculations. Additionally, changes are proposed to ITAAC acceptance criteria related to flow rate testing of the passive containment cooling system (PCS) in order to capture lessons learned from testing at [China’s AP1000] Sanmen Unit 1. Safety margins are applied at many levels to the design and licensing basis functions and to the controlling values of parameters to account for various uncertainties and to avoid exceeding regulatory or licensing limits. The proposed changes maintain existing safety margins, and in some cases, provide additional margin. The proposed changes maintain the capabilities of the PCS to perform its design functions. Therefore, the proposed changes satisfy the same design functions in accordance with the same codes and standards as stated in the UFSAR. These changes do not adversely affect any design code, function, safety analysis, safety analysis input or results, or design/safety margin. No safety analysis or design basis acceptance limit/criterion is challenged or VerDate Sep<11>2014 18:41 May 07, 2018 Jkt 244001 exceeded by the proposed changes, and no margin of safety is reduced. Therefore, the proposed amendment does not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee’s analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration. Attorney for licensee: Kathryn M. Sutton, Morgan, Lewis & Bockius LLC, 1111 Pennsylvania Avenue NW, Washington, DC 20004–2514. NRC Branch Chief: Jennifer DixonHerrity. Order Imposing Procedures for Access to Sensitive Unclassified NonSafeguards Information for Contention Preparation Southern Nuclear Operating Company, Inc., Docket Nos. 52–025 and 52–026, Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia A. This Order contains instructions regarding how potential parties to this proceeding may request access to documents containing Sensitive Unclassified Non-Safeguards Information (SUNSI). B. Within 10 days after publication of this notice of hearing and opportunity to petition for leave to intervene, any potential party who believes access to SUNSI is necessary to respond to this notice may request access to SUNSI. A ‘‘potential party’’ is any person who intends to participate as a party by demonstrating standing and filing an admissible contention under 10 CFR 2.309. Requests for access to SUNSI submitted later than 10 days after publication of this notice will not be considered absent a showing of good cause for the late filing, addressing why the request could not have been filed earlier. C. The requester shall submit a letter requesting permission to access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemakings and Adjudications Staff, and provide a copy to the Associate General Counsel for Hearings, Enforcement and Administration, Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. The expedited delivery or courier mail address for both offices is: U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The email addresses for the Office of the Secretary and the PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 Office of the General Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov, respectively.1 The request must include the following information: (1) A description of the licensing action with a citation to this Federal Register notice; (2) The name and address of the potential party and a description of the potential party’s particularized interest that could be harmed by the action identified in C.(1); and (3) The identity of the individual or entity requesting access to SUNSI and the requester’s basis for the need for the information in order to meaningfully participate in this adjudicatory proceeding. In particular, the request must explain why publicly available versions of the information requested would not be sufficient to provide the basis and specificity for a proffered contention. D. Based on an evaluation of the information submitted under paragraph C.(3), the NRC staff will determine within 10 days of receipt of the request whether: (1) There is a reasonable basis to believe the petitioner is likely to establish standing to participate in this NRC proceeding; and (2) The requestor has established a legitimate need for access to SUNSI. E. If the NRC staff determines that the requestor satisfies both D.(1) and D.(2) above, the NRC staff will notify the requestor in writing that access to SUNSI has been granted. The written notification will contain instructions on how the requestor may obtain copies of the requested documents, and any other conditions that may apply to access to those documents. These conditions may include, but are not limited to, the signing of a Non-Disclosure Agreement or Affidavit, or Protective Order 2 setting forth terms and conditions to prevent the unauthorized or inadvertent disclosure of SUNSI by each individual who will be granted access to SUNSI. F. Filing of Contentions. Any contentions in these proceedings that are based upon the information received as a result of the request made for SUNSI must be filed by the requestor no later than 25 days after receipt of (or 1 While a request for hearing or petition to intervene in this proceeding must comply with the filing requirements of the NRC’s ‘‘E-Filing Rule,’’ the initial request to access SUNSI under these procedures should be submitted as described in this paragraph. 2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must be filed with the presiding officer or the Chief Administrative Judge if the presiding officer has not yet been designated, within 30 days of the deadline for the receipt of the written access request. E:\FR\FM\08MYN1.SGM 08MYN1 Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices access to) that information. However, if more than 25 days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline. G. Review of Denials of Access. (1) If the request for access to SUNSI is denied by the NRC staff after a determination on standing and requisite need, the NRC staff shall immediately notify the requestor in writing, briefly stating the reason or reasons for the denial. (2) The requester may challenge the NRC staff’s adverse determination by filing a challenge within 5 days of receipt of that determination with: (a) The presiding officer designated in this proceeding; (b) if no presiding officer has been appointed, the Chief Administrative Judge, or if he or she is unavailable, another administrative judge, or an Administrative Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another officer has been designated to rule on information access issues, with that officer. (3) Further appeals of decisions under this paragraph must be made pursuant to 10 CFR 2.311. H. Review of Grants of Access. A party other than the requester may challenge an NRC staff determination granting access to SUNSI whose release would harm that party’s interest independent of the proceeding. Such a challenge must be filed within 5 days of the notification by the NRC staff of its grant of access and must be filed with: (a) The presiding officer designated in this proceeding; (b) if no presiding officer has been appointed, the Chief Administrative Judge, or if he or she is unavailable, another administrative judge, or an Administrative Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another officer has been designated to rule on information access issues, with that officer. If challenges to the NRC staff determinations are filed, these procedures give way to the normal process for litigating disputes concerning access to information. The 20871 availability of interlocutory review by the Commission of orders ruling on such NRC staff determinations (whether granting or denying access) is governed by 10 CFR 2.311.3 I. The Commission expects that the NRC staff and presiding officers (and any other reviewing officers) will consider and resolve requests for access to SUNSI, and motions for protective orders, in a timely fashion in order to minimize any unnecessary delays in identifying those petitioners who have standing and who have propounded contentions meeting the specificity and basis requirements in 10 CFR part 2. The attachment to this Order summarizes the general target schedule for processing and resolving requests under these procedures. It is so ordered. Dated at Rockville, Maryland, this 9th of April 2018. For the Nuclear Regulatory Commission. Annette L. Vietti-Cook, Secretary of the Commission. ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING Day Event/activity 0 ........................ Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests. Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information: Supporting the standing of a potential party identified by name and address; describing the need for the information in order for the potential party to participate meaningfully in an adjudicatory proceeding. Deadline for submitting petition for intervention containing: (i) Demonstration of standing; and (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 petitioner/requestor reply). U.S. Nuclear Regulatory Commission (NRC) staff informs the requester of the staff’s determination whether the request for access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents). If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for petitioner/requester to file a motion seeking a ruling to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to file a motion seeking a ruling to reverse the NRC staff’s grant of access. Deadline for NRC staff reply to motions to reverse NRC staff determination(s). (Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure Agreement for SUNSI. If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse determination by the NRC staff. Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order. Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of opportunity to request a hearing and petition for leave to intervene), the petitioner may file its SUNSI contentions by that later deadline. (Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI. (Answer receipt +7) Petitioner/Intervenor reply to answers. Decision on contention admission. 10 ...................... 60 ...................... 20 ...................... 25 ...................... 30 ...................... 40 ...................... A ....................... A + 3 ................. sradovich on DSK3GMQ082PROD with NOTICES A + 28 ............... A + 53 ............... A + 60 ............... >A + 60 ............. 3 Requesters should note that the filing requirements of the NRC’s E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77 FR VerDate Sep<11>2014 18:41 May 07, 2018 Jkt 244001 46562; August 3, 2012) apply to appeals of NRC staff determinations (because they must be served on a presiding officer or the Commission, as PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 applicable), but not to the initial SUNSI request submitted to the NRC staff under these procedures. E:\FR\FM\08MYN1.SGM 08MYN1 20872 Federal Register / Vol. 83, No. 89 / Tuesday, May 8, 2018 / Notices [FR Doc. 2018–07705 Filed 5–7–18; 8:45 am] BILLING CODE 7590–01–P POSTAL SERVICE Temporary Emergency Committee of the Board of Governors; Sunshine Act Meeting Wednesday, May 9, 2018, at 10:30 a.m. PLACE: Washington, DC, and via Teleconference. STATUS: Closed. MATTERS TO BE CONSIDERED: TIME AND DATE: Wednesday, May 9, 2018, at 10:30 a.m. 1. Strategic Items. 2. Financial Matters. 3. Executive Session—Discussion of prior agenda items and Temporary Emergency Committee governance. General Counsel Certification: The General Counsel of the United States Postal Service has certified that the meeting may be closed under the Government in the Sunshine Act. CONTACT PERSON FOR MORE INFORMATION: Julie S. Moore, Secretary of the Board, U.S. Postal Service, 475 L’Enfant Plaza SW, Washington, DC 20260–1000. Telephone: (202) 268–4800. Julie S. Moore, Secretary. [FR Doc. 2018–09905 Filed 5–4–18; 4:15 pm] BILLING CODE 7710–12–P RAILROAD RETIREMENT BOARD Agency Forms Submitted for OMB Review, Request for Comments In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the Railroad Retirement Board (RRB) is forwarding SUMMARY: an Information Collection Request (ICR) to the Office of Information and Regulatory Affairs (OIRA), Office of Management and Budget (OMB). Our ICR describes the information we seek to collect from the public. Review and approval by OIRA ensures that we impose appropriate paperwork burdens. The RRB invites comments on the proposed collections of information to determine (1) the practical utility of the collections; (2) the accuracy of the estimated burden of the collections; (3) ways to enhance the quality, utility, and clarity of the information that is the subject of collection; and (4) ways to minimize the burden of collections on respondents, including the use of automated collection techniques or other forms of information technology. Comments to the RRB or OIRA must contain the OMB control number of the ICR. For proper consideration of your comments, it is best if the RRB and OIRA receive them within 30 days of the publication date. 1. Title and purpose of information collection: Appeal Under the Railroad Retirement and Railroad Unemployment Insurance Act; OMB 3220–0007. Under Section 7(b)(3) of the Railroad Retirement Act (RRA), and Section 5(c) of the Railroad Unemployment Insurance Act (RUIA) any person aggrieved by a decision made by an office of the RRB on his or her application for an annuity or benefit under those Acts has the right to appeal to the RRB. This right is prescribed in 20 CFR 260 and 20 CFR 320. The notification letter, which is provided at the time of filing the original application, informs the applicant of such right. When an applicant protests a decision, the concerned RRB office reviews the entire file and any additional evidence submitted and sends the applicant a letter explaining the basis of the determination. The applicant is then notified that to protest further, they can appeal to the RRB’s Bureau of Hearings and Appeals. The appeal process is prescribed in 20 CFR 260.5 and 260.9 and 20 CFR 320.12 and 320.38. To file a request for an appeal the applicant must complete Form HA–1, Appeal Under the Railroad Retirement Act or Railroad Unemployment Insurance Act. The form asks the applicant to explain the basis for their request for an appeal and, if necessary, to describe any additional evidence they wish to submit in support of the appeal. Completion is voluntary, however, if the information is not provided the RRB cannot process the appeal. Previous Requests for Comments: The RRB has already published the initial 60-day notice (83 FR 7511 on February 21, 2018) required by 44 U.S.C. 3506(c)(2). That request elicited no comments. Information Collection Request (ICR) Title: Appeal Under the Railroad Retirement and Railroad Unemployment Insurance Act. OMB Control Number: 3220–0007. Form(s) submitted: HA–1. Type of request: Extension without change of a currently approved collection. Affected public: Individuals or Households. Abstract: Under Section 7(b)(3) of the Railroad Retirement Act and Section 5(c) of the Railroad Unemployment Insurance Act, a person aggrieved by a decision on his or her application for an annuity or other benefit has the right to appeal to the RRB. The collection provides the means for the appeal action. Changes proposed: The RRB proposes no changes to Form HA–1. The burden estimate for the ICR is as follows: Annual responses Form No. sradovich on DSK3GMQ082PROD with NOTICES HA–1 ........................................................................................................................................................ 2. Title and Purpose of information collection: Annual Earnings Questionnaire; OMB 3220–0179. Under section 2(e)(3) of the Railroad Retirement Act (RRA), an annuity is not payable for any month in which a beneficiary works for a railroad. In addition, an annuity is reduced for any month in which the beneficiary works for an employer other than a railroad employer and earns more than a prescribed amount. Under the 1988 VerDate Sep<11>2014 18:41 May 07, 2018 Jkt 244001 amendments to the RRA, the Tier II portion of the regular annuity and any supplemental annuity must be reduced by one dollar for each two dollars of Last Pre-Retirement Non-Railroad Employment (LPE) earnings for each month of such service. However, the reduction cannot exceed 50 percent of the Tier II and supplemental annuity amount for the month to which such deductions apply. The LPE generally refers to an annuitant’s last employment PO 00000 Frm 00086 Fmt 4703 Sfmt 4703 550 Time (minutes) 20 Burden (hours) 185 with a non-railroad person, company, or institution prior to retirement, which was performed at the same time as railroad employment or after the annuitant stopped railroad employment. The collection obtains earnings information needed by the RRB to determine if possible reductions in annuities are in order due to LPE. The RRB utilizes Form G–19L, Annual Earnings Questionnaire, to obtain LPE earnings information from E:\FR\FM\08MYN1.SGM 08MYN1

Agencies

[Federal Register Volume 83, Number 89 (Tuesday, May 8, 2018)]
[Notices]
[Pages 20866-20872]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-07705]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2018-0071]


Applications and Amendments to Facility Operating Licenses and 
Combined Licenses Involving Proposed No Significant Hazards 
Considerations and Containing Sensitive Unclassified Non-Safeguards 
Information and Order Imposing Procedures for Access to Sensitive 
Unclassified Non-Safeguards Information

AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment request; notice of opportunity to comment, 
request a hearing, and petition for leave to intervene; order imposing 
procedures.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) received and is 
considering approval of one amendment request for Vogtle Electric 
Generating Plant, Units 3 and 4. The NRC proposes to determine that the 
amendment request involves no significant hazards consideration. 
Because the amendment request contains sensitive unclassified non-
safeguards information (SUNSI), an order imposes procedures to obtain 
access to SUNSI for contention preparation.

DATES: Comments must be filed by June 7, 2018. A request for a hearing 
must be filed by July 9, 2018. Any potential party, as defined in Sec.  
2.4 of title 10 of the Code of Federal Regulations (10 CFR), who 
believes access to SUNSI is necessary to respond to this notice must 
request document access by May 18, 2018.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0071. Address 
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: May Ma, Office of Administration, Mail 
Stop: TWFN-7-A60, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the

[[Page 20867]]

SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Kay Goldstein, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-1506, email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2018-0071, facility name, unit 
number(s), plant docket number, application date, and subject when 
contacting the NRC about the availability of information for this 
action. You may obtain publicly-available information related to this 
action by any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0071.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2018-0071, facility name, unit 
number(s), plant docket number, application date, and subject in your 
comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at https://www.regulations.gov, as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Background

    Pursuant to Section 189.a.(2) of the Atomic Energy Act of 1954, as 
amended (the Act), the NRC is publishing this notice. The Act requires 
the Commission to publish notice of any amendments issued, or proposed 
to be issued and grants the Commission the authority to issue and make 
immediately effective any amendment to an operating license or combined 
license, as applicable, upon a determination by the Commission that 
such amendment involves no significant hazards consideration, 
notwithstanding the pendency before the Commission of a request for a 
hearing from any person.
    This notice includes notices of amendments containing SUNSI.

III. Notice of Consideration of Issuance of Amendments to Facility 
Operating Licenses or Combined Licenses, Proposed No Significant 
Hazards Consideration Determination, and Opportunity for a Hearing

    The Commission has made a proposed determination that the following 
amendment request involves no significant hazards consideration. Under 
the Commission's regulations in 10 CFR 50.92, this means that operation 
of the facility in accordance with the proposed amendment would not (1) 
involve a significant increase in the probability or consequences of an 
accident previously evaluated, or (2) create the possibility of a new 
or different kind of accident from any accident previously evaluated, 
or (3) involve a significant reduction in a margin of safety. The basis 
for this proposed determination for the amendment request is shown 
below.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period if circumstances change during the 30-day comment 
period such that failure to act in a timely way would result, for 
example, in derating or shutdown of the facility. If the Commission 
takes action prior to the expiration of either the comment period or 
the notice period, it will publish a notice of issuance in the Federal 
Register. If the Commission makes a final no significant hazards 
consideration determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.

A. Opportunity To Request a Hearing and Petition for Leave To Intervene

    Within 60 days after the date of publication of this notice, any 
person (petitioner) whose interest may be affected by this action may 
file a request for a hearing and petition for leave to intervene 
(petition) with respect to the action. Petitions shall be filed in 
accordance with the Commission's ``Agency Rules of Practice and 
Procedure'' in 10 CFR part 2. Interested persons should consult a 
current copy of 10 CFR 2.309. The NRC's regulations are accessible 
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. Alternatively, a copy of 
the regulations is available at the NRC's Public Document Room, located 
at One White Flint North, Room O1-F21, 11555 Rockville Pike (First 
Floor), Rockville, Maryland 20852. If a petition is filed, the 
Commission or a presiding officer will rule on the petition and, if 
appropriate, a notice of a hearing will be issued.
    As required by 10 CFR 2.309(d) the petition should specifically 
explain the reasons why intervention should be permitted with 
particular reference to the following general requirements for 
standing: (1) The name, address, and telephone number of the 
petitioner; (2) the nature of the petitioner's right under the Act to 
be made a party to the proceeding; (3) the nature and extent of the 
petitioner's property, financial, or other interest in the proceeding; 
and (4) the possible effect of any decision or order which may be 
entered in the proceeding on the petitioner's interest.
    In accordance with 10 CFR 2.309(f), the petition must also set 
forth the specific contentions which the petitioner seeks to have 
litigated in the proceeding. Each contention must

[[Page 20868]]

consist of a specific statement of the issue of law or fact to be 
raised or controverted. In addition, the petitioner must provide a 
brief explanation of the bases for the contention and a concise 
statement of the alleged facts or expert opinion which support the 
contention and on which the petitioner intends to rely in proving the 
contention at the hearing. The petitioner must also provide references 
to the specific sources and documents on which the petitioner intends 
to rely to support its position on the issue. The petition must include 
sufficient information to show that a genuine dispute exists with the 
applicant or licensee on a material issue of law or fact. Contentions 
must be limited to matters within the scope of the proceeding. The 
contention must be one which, if proven, would entitle the petitioner 
to relief. A petitioner who fails to satisfy the requirements at 10 CFR 
2.309(f) with respect to at least one contention will not be permitted 
to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene. 
Parties have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that party's admitted 
contentions, including the opportunity to present evidence, consistent 
with the NRC's regulations, policies, and procedures.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice. Petitions and motions for leave to file new 
or amended contentions that are filed after the deadline will not be 
entertained absent a determination by the presiding officer that the 
filing demonstrates good cause by satisfying the three factors in 10 
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in 
accordance with the filing instructions in the ``Electronic Submissions 
(E-Filing)'' section of this document.
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to establish when the hearing is held. If the final determination is 
that the amendment request involves no significant hazards 
consideration, the Commission may issue the amendment and make it 
immediately effective, notwithstanding the request for a hearing. Any 
hearing would take place after issuance of the amendment. If the final 
determination is that the amendment request involves a significant 
hazards consideration, then any hearing held would take place before 
the issuance of the amendment unless the Commission finds an imminent 
danger to the health or safety of the public, in which case it will 
issue an appropriate order or rule under 10 CFR part 2.
    A State, local governmental body, Federally-recognized Indian 
Tribe, or agency thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(h)(1). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission no later 
than 60 days from the date of publication of this notice. The petition 
must be filed in accordance with the filing instructions in the 
``Electronic Submissions (E-Filing)'' section of this document, and 
should meet the requirements for petitions set forth in this section, 
except that under 10 CFR 2.309(h)(2) a State, local governmental body, 
or Federally-recognized Indian Tribe, or agency thereof does not need 
to address the standing requirements in 10 CFR 2.309(d) if the facility 
is located within its boundaries. Alternatively, a State, local 
governmental body, Federally-recognized Indian Tribe, or agency thereof 
may participate as a non-party under 10 CFR 2.315(c).
    If a hearing is granted, any person who is not a party to the 
proceeding and is not affiliated with or represented by a party may, at 
the discretion of the presiding officer, be permitted to make a limited 
appearance pursuant to the provisions of 10 CFR 2.315(a). A person 
making a limited appearance may make an oral or written statement of 
his or her position on the issues but may not otherwise participate in 
the proceeding. A limited appearance may be made at any session of the 
hearing or at any prehearing conference, subject to the limits and 
conditions as may be imposed by the presiding officer. Details 
regarding the opportunity to make a limited appearance will be provided 
by the presiding officer if such sessions are scheduled.

B. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing and petition for leave to intervene (petition), any 
motion or other document filed in the proceeding prior to the 
submission of a request for hearing or petition to intervene, and 
documents filed by interested governmental entities that request to 
participate under 10 CFR 2.315(c), must be filed in accordance with the 
NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 FR 
46562; August 3, 2012). The E-Filing process requires participants to 
submit and serve all adjudicatory documents over the internet, or in 
some cases to mail copies on electronic storage media. Detailed 
guidance on making electronic submissions may be found in the Guidance 
for Electronic Submissions to the NRC and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html. Participants may not submit 
paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to (1) request a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a 
digital ID certificate and a docket has been created, the participant 
can then submit adjudicatory documents. Submissions must be in Portable 
Document Format (PDF). Additional guidance on PDF submissions is 
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the 
time the document is submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an email notice confirming receipt of the document. The 
E-Filing system also distributes an email notice that provides access 
to the document to the NRC's Office of the General Counsel and any 
others who have advised the Office of the Secretary

[[Page 20869]]

that they wish to participate in the proceeding, so that the filer need 
not serve the document on those participants separately. Therefore, 
applicants and other participants (or their counsel or representative) 
must apply for and receive a digital ID certificate before adjudicatory 
documents are filed so that they can obtain access to the documents via 
the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website at https://www.nrc.gov/site-help/e-submittals.html, by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., Eastern Time, Monday through Friday, excluding government 
holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, 11555 
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and 
Adjudications Staff. Participants filing adjudicatory documents in this 
manner are responsible for serving the document on all other 
participants. Filing is considered complete by first-class mail as of 
the time of deposit in the mail, or by courier, express mail, or 
expedited delivery service upon depositing the document with the 
provider of the service. A presiding officer, having granted an 
exemption request from using E-Filing, may require a participant or 
party to use E-Filing if the presiding officer subsequently determines 
that the reason for granting the exemption from use of E-Filing no 
longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the 
Commission or the presiding officer. If you do not have an NRC-issued 
digital ID certificate as described above, click cancel when the link 
requests certificates and you will be automatically directed to the 
NRC's electronic hearing dockets where you will be able to access any 
publicly available documents in a particular hearing docket. 
Participants are requested not to include personal privacy information, 
such as social security numbers, home addresses, or personal phone 
numbers in their filings, unless an NRC regulation or other law 
requires submission of such information. For example, in some 
instances, individuals provide home addresses in order to demonstrate 
proximity to a facility or site. With respect to copyrighted works, 
except for limited excerpts that serve the purpose of the adjudicatory 
filings and would constitute a Fair Use application, participants are 
requested not to include copyrighted materials in their submission.

Southern Nuclear Operating Company, Inc., Docket Nos. 52-025 and 52-
026, Vogtle Electric Generating Plant, Units 3 and 4, Burke County, 
Georgia

    Date of amendment request: December 21, 2017. A publicly-available 
version is in ADAMS under Accession No. ML18029A243.
    Description of amendment request: This amendment request contains 
sensitive unclassified non-safeguards information (SUNSI). The 
amendment request proposes changes to the Updated Final Safety Analysis 
Report (UFSAR) in the form of departures from the incorporated plant-
specific Design Control Document (DCD) Tier 2* and Tier 2 information 
and related changes to the Vogtle Electric Generating Plant, Units 3 
and 4, Combined License (COL) Appendix A and COL Appendix C (and 
corresponding plant-specific DCD Tier 1) information. An exemption 
request relating to the proposed changes to the AP1000 DCD Tier 1 is 
included with the request. Specifically, the amendment request states 
that design changes within containment have necessitated recalculation 
of geometry input to the WGOTHIC evaluation model (EM) used for 
containment integrity analyses. Heat sinks, control volumes, and flow 
paths have been recalculated, and are in turn modeled in the WGOTHIC 
EM. Mass and energy (M&E) releases for Loss of Coolant Accident (LOCA) 
and Main Steam Line Break (MSLB) events are also recalculated. Various 
methodology changes are also made to the WGOTHIC methodology for the 
AP1000 design. These updates culminate in the recalculation of the 
containment integrity analyses. Additionally, changes are proposed to 
Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) related 
to flow rate testing of the passive containment cooling system (PCS) in 
order to capture lessons learned from preoperational testing performed 
at China's AP1000 nuclear power station, Sanmen Unit 1.
    Basis for proposed no significant hazards consideration 
determination: As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented below with NRC staff edits in square 
brackets:

    1. Does the proposed amendment involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    This change proposes updates to the plant-specific containment 
integrity analyses. Heat sinks, control volumes, and flow paths have 
been recalculated, and are in turn modeled in the WGOTHIC EM. 
Various methodology changes are also made to the WGOTHIC methodology 
for the AP1000 plant design. M&E releases for LOCA and MSLB are also 
recalculated. These updates culminate in the recalculation of the 
containment integrity calculations. Additionally, changes are 
proposed to ITAAC acceptance criteria related to flow rate testing 
of the PCS in order to capture lessons learned from testing at 
[China's AP1000] Sanmen Unit 1.
    The proposed changes do not adversely affect the operation of 
any systems or equipment that initiate an analyzed accident or alter 
any structures, systems, and components (SSC) accident initiator or 
initiating sequence of events. The proposed changes do not adversely 
affect the physical design and operation of the PCS including as-
installed inspections, testing, and maintenance requirements, as 
described in the UFSAR. Therefore, the operation of the PCS is not 
adversely affected. A LOCA and a MSLB are considered and identified 
as the limiting events for the AP1000 design with respect to 
containment peak pressure and temperature. However, the proposed 
changes do not adversely affect the probability of either a LOCA or 
MSLB from occurring. Therefore, the probabilities of the accidents 
previously evaluated in the UFSAR are not affected.
    The proposed changes do not adversely affect the ability of the 
PCS to perform its design functions. The design of the PCS continues 
to meet the same regulatory acceptance criteria, codes, and 
standards as required by the UFSAR. In addition, the proposed 
changes maintain the capabilities of the PCS to mitigate the 
consequences of an accident and to meet the applicable regulatory 
acceptance criteria. The proposed changes do not adversely affect 
the prevention and mitigation of other abnormal events, e.g., 
anticipated operational occurrences, earthquakes, floods and turbine 
missiles, or their safety or design analyses. Therefore, the 
consequences of accidents evaluated in the UFSAR are not affected.
    Therefore, the proposed amendment does not involve a significant 
increase in the

[[Page 20870]]

consequences of an accident previously evaluated.
    2. Does the proposed amendment create the possibility of a new 
or different kind of accident from any accident previously 
evaluated?
    Response: No.
    This change proposes updates to the plant-specific containment 
integrity analyses. Heat sinks, control volumes, and flow paths have 
been recalculated, and are in turn modeled in the WGOTHIC EM. 
Various methodology changes are also made to the WGOTHIC methodology 
for the AP1000 plant design. M&E releases for LOCA and MSLB are also 
recalculated. These updates culminate in the recalculation of the 
containment integrity calculations. Additionally, changes are 
proposed to ITAAC acceptance criteria related to flow rate testing 
of the passive containment cooling system PCS in order to capture 
lessons learned from testing at [China's AP1000] Sanmen Unit 1.
    The proposed changes would not introduce a new failure mode, 
fault, or sequence of events that could result in a radioactive 
material release. The proposed changes do not alter the design, 
configuration, or method of operation of the plant beyond standard 
functional capabilities of the equipment. Therefore, this activity 
does not allow for a new fission product release path, result in a 
new fission product barrier failure mode, or create a new sequence 
of events which results in significant fuel cladding failures.
    Therefore, the proposed changes do not create the possibility of 
a new or different kind of accident from any accident previously 
evaluated.
    3. Does the proposed amendment involve a significant reduction 
in a margin of safety?
    Response: No.
    This change proposes updates to the plant-specific containment 
integrity analyses. Heat sinks, control volumes, and flow paths have 
been recalculated, and are in turn modeled in the WGOTHIC EM. 
Various methodology changes are also made to the WGOTHIC methodology 
for the AP1000 plant design. M&E releases for LOCA and MSLB are also 
recalculated. These updates culminate in the recalculation of the 
containment integrity calculations. Additionally, changes are 
proposed to ITAAC acceptance criteria related to flow rate testing 
of the passive containment cooling system (PCS) in order to capture 
lessons learned from testing at [China's AP1000] Sanmen Unit 1.
    Safety margins are applied at many levels to the design and 
licensing basis functions and to the controlling values of 
parameters to account for various uncertainties and to avoid 
exceeding regulatory or licensing limits. The proposed changes 
maintain existing safety margins, and in some cases, provide 
additional margin. The proposed changes maintain the capabilities of 
the PCS to perform its design functions. Therefore, the proposed 
changes satisfy the same design functions in accordance with the 
same codes and standards as stated in the UFSAR. These changes do 
not adversely affect any design code, function, safety analysis, 
safety analysis input or results, or design/safety margin. No safety 
analysis or design basis acceptance limit/criterion is challenged or 
exceeded by the proposed changes, and no margin of safety is 
reduced.
    Therefore, the proposed amendment does not involve a significant 
reduction in a margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    Attorney for licensee: Kathryn M. Sutton, Morgan, Lewis & Bockius 
LLC, 1111 Pennsylvania Avenue NW, Washington, DC 20004-2514.
    NRC Branch Chief: Jennifer Dixon-Herrity.

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation

Southern Nuclear Operating Company, Inc., Docket Nos. 52-025 and 52-
026, Vogtle Electric Generating Plant, Units 3 and 4, Burke County, 
Georgia

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing Sensitive 
Unclassified Non-Safeguards Information (SUNSI).
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party who 
believes access to SUNSI is necessary to respond to this notice may 
request access to SUNSI. A ``potential party'' is any person who 
intends to participate as a party by demonstrating standing and filing 
an admissible contention under 10 CFR 2.309. Requests for access to 
SUNSI submitted later than 10 days after publication of this notice 
will not be considered absent a showing of good cause for the late 
filing, addressing why the request could not have been filed earlier.
    C. The requester shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Associate General 
Counsel for Hearings, Enforcement and Administration, Office of the 
General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001. The expedited delivery or courier mail address for both 
offices is: U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, 
Rockville, Maryland 20852. The email addresses for the Office of the 
Secretary and the Office of the General Counsel are 
[email protected] and [email protected], respectively.\1\ The 
request must include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1); and
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requester's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention.
    D. Based on an evaluation of the information submitted under 
paragraph C.(3), the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2) above, the NRC staff will notify the requestor in 
writing that access to SUNSI has been granted. The written notification 
will contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may include, but are not limited 
to, the signing of a Non-Disclosure Agreement or Affidavit, or 
Protective Order \2\ setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI by each individual who 
will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
receipt of (or

[[Page 20871]]

access to) that information. However, if more than 25 days remain 
between the petitioner's receipt of (or access to) the information and 
the deadline for filing all other contentions (as established in the 
notice of hearing or opportunity for hearing), the petitioner may file 
its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
after a determination on standing and requisite need, the NRC staff 
shall immediately notify the requestor in writing, briefly stating the 
reason or reasons for the denial.
    (2) The requester may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) The presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an Administrative Law Judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.
    (3) Further appeals of decisions under this paragraph must be made 
pursuant to 10 CFR 2.311.
    H. Review of Grants of Access. A party other than the requester may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed within 5 days of the notification by the 
NRC staff of its grant of access and must be filed with: (a) The 
presiding officer designated in this proceeding; (b) if no presiding 
officer has been appointed, the Chief Administrative Judge, or if he or 
she is unavailable, another administrative judge, or an Administrative 
Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if 
another officer has been designated to rule on information access 
issues, with that officer.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requesters should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77 
FR 46562; August 3, 2012) apply to appeals of NRC staff 
determinations (because they must be served on a presiding officer 
or the Commission, as applicable), but not to the initial SUNSI 
request submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR part 2. The 
attachment to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is so ordered.

    Dated at Rockville, Maryland, this 9th of April 2018.

    For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.

   Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
                           in This Proceeding
------------------------------------------------------------------------
           Day                             Event/activity
------------------------------------------------------------------------
0........................  Publication of Federal Register notice of
                            hearing and opportunity to petition for
                            leave to intervene, including order with
                            instructions for access requests.
10.......................  Deadline for submitting requests for access
                            to Sensitive Unclassified Non-Safeguards
                            Information (SUNSI) with information:
                            Supporting the standing of a potential party
                            identified by name and address; describing
                            the need for the information in order for
                            the potential party to participate
                            meaningfully in an adjudicatory proceeding.
60.......................  Deadline for submitting petition for
                            intervention containing: (i) Demonstration
                            of standing; and (ii) all contentions whose
                            formulation does not require access to SUNSI
                            (+25 Answers to petition for intervention;
                            +7 petitioner/requestor reply).
20.......................  U.S. Nuclear Regulatory Commission (NRC)
                            staff informs the requester of the staff's
                            determination whether the request for access
                            provides a reasonable basis to believe
                            standing can be established and shows need
                            for SUNSI. (NRC staff also informs any party
                            to the proceeding whose interest independent
                            of the proceeding would be harmed by the
                            release of the information.) If NRC staff
                            makes the finding of need for SUNSI and
                            likelihood of standing, NRC staff begins
                            document processing (preparation of
                            redactions or review of redacted documents).
25.......................  If NRC staff finds no ``need'' or no
                            likelihood of standing, the deadline for
                            petitioner/requester to file a motion
                            seeking a ruling to reverse the NRC staff's
                            denial of access; NRC staff files copy of
                            access determination with the presiding
                            officer (or Chief Administrative Judge or
                            other designated officer, as appropriate).
                            If NRC staff finds ``need'' for SUNSI, the
                            deadline for any party to the proceeding
                            whose interest independent of the proceeding
                            would be harmed by the release of the
                            information to file a motion seeking a
                            ruling to reverse the NRC staff's grant of
                            access.
30.......................  Deadline for NRC staff reply to motions to
                            reverse NRC staff determination(s).
40.......................  (Receipt +30) If NRC staff finds standing and
                            need for SUNSI, deadline for NRC staff to
                            complete information processing and file
                            motion for Protective Order and draft Non-
                            Disclosure Affidavit. Deadline for applicant/
                            licensee to file Non-Disclosure Agreement
                            for SUNSI.
A........................  If access granted: Issuance of presiding
                            officer or other designated officer decision
                            on motion for protective order for access to
                            sensitive information (including schedule
                            for providing access and submission of
                            contentions) or decision reversing a final
                            adverse determination by the NRC staff.
A + 3....................  Deadline for filing executed Non-Disclosure
                            Affidavits. Access provided to SUNSI
                            consistent with decision issuing the
                            protective order.
A + 28...................  Deadline for submission of contentions whose
                            development depends upon access to SUNSI.
                            However, if more than 25 days remain between
                            the petitioner's receipt of (or access to)
                            the information and the deadline for filing
                            all other contentions (as established in the
                            notice of opportunity to request a hearing
                            and petition for leave to intervene), the
                            petitioner may file its SUNSI contentions by
                            that later deadline.
A + 53...................  (Contention receipt +25) Answers to
                            contentions whose development depends upon
                            access to SUNSI.
A + 60...................  (Answer receipt +7) Petitioner/Intervenor
                            reply to answers.
>A + 60..................  Decision on contention admission.
------------------------------------------------------------------------


[[Page 20872]]

[FR Doc. 2018-07705 Filed 5-7-18; 8:45 am]
 BILLING CODE 7590-01-P