Combined Notice of Filings, 19751-19752 [2018-09504]
Download as PDF
Federal Register / Vol. 83, No. 87 / Friday, May 4, 2018 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI18–4–000]
Cole Rhoten; Notice of Declaration of
Intention and Soliciting Comments,
Protests, and Motions To Intervene
amozie on DSK3GDR082PROD with NOTICES
April 30, 2018.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI18–4–000.
c. Date Filed: March 19, 2018.
d. Applicant: Cole Rhoten.
e. Name of Project: Port William Dam
Hydroelectric Project.
f. Location: The proposed Port
William Dam Hydroelectric Project
would be located on Anderson Fork
Creek, near the Village of Port William,
in Clinton County, Ohio.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b) (2012).
h. Applicant Contact: Cole Rhoten,
677 Milford Hills Drive, Milford, OH
45150, telephone: (317) 945–3936;
email: C.Rhoten@outlook.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Jennifer Polardino, (202) 502–6437, or
email: Jennifer.Polardino@ferc.gov.
j. Deadline for filing comments,
protests, and motions to intervene is: 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
protests, and motions to intervene using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number DI18–4–000.
k. Description of Project: The
proposed run-of-river Port William Dam
Hydroelectric Project would consist of:
(1) The existing Port William Dam; (2)
a new penstock; (3) a cross-flow turbine
VerDate Sep<11>2014
18:16 May 03, 2018
Jkt 244001
generating unit with a generating
capacity of 15–80 kilowatts; (4) a
transmission line connecting the
generating unit to Columbus Southern
Power Company’s electric distribution
system; and (5) appurtenant facilities.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the project would
affect the interests of interstate or
foreign commerce. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy public
lands or reservations of the United
States; (3) would utilize surplus water
or water power from a government dam;
or (4) would be located on a nonnavigable stream over which Congress
has Commerce Clause jurisdiction and
would be constructed or enlarged after
1935.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and in the Commission’s Public
Reference Room located at 888 First
Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must bear in all
capital letters the title ‘‘COMMENTS’’,
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
19751
‘‘PROTESTS’’, and ‘‘MOTIONS TO
INTERVENE’’, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–09484 Filed 5–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18–43–000.
Applicants: NorthWestern
Corporation.
Description: Tariff filing per
284.123(b),(e)/: Revised Rate Schedules
for Transportation & Storage Service
(D2016.9.68 Phase 2) to be effective 4/
1/2018.
Filed Date: 4/27/18.
Accession Number: 201804275005.
Comments/Protests Due: 5 p.m. ET 5/
27/18.
Docket Numbers: RP18–599–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: Annual Incidental
Purchases and Sales Report of
Trailblazer Pipeline Company LLC.
Filed Date: 3/27/18.
Accession Number: 20180327–5203.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: RP18–743–000.
Applicants: Discovery Gas
Transmission LLC.
Description: Imbalance Cash-out
Report for 2017 Activity for Discovery
Gas Transmission LLC.
Filed Date: 4/25/18.
Accession Number: 20180425–5261.
Comments Due: 5 p.m. ET 5/7/18.
Docket Numbers: RP18–464–001.
E:\FR\FM\04MYN1.SGM
04MYN1
amozie on DSK3GDR082PROD with NOTICES
19752
Federal Register / Vol. 83, No. 87 / Friday, May 4, 2018 / Notices
Applicants: Nautilus Pipeline
Company, L.L.C.
Description: Compliance filing
Nautilus LINK Integration Compliance
Filing to be effective 5/1/2018.
Filed Date: 4/26/18.
Accession Number: 20180426–5169.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: RP18–744–000.
Applicants: Dominion Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: DETI—
April 26, 2018 Negotiated Rate
Agreements to be effective 5/1/2018.
Filed Date: 4/26/18.
Accession Number: 20180426–5158.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: RP18–745–000.
Applicants: Garden Banks Gas
Pipeline, LLC.
Description: § 4(d) Rate Filing: PAL
Service Modifications to be effective 6/
1/2018.
Filed Date: 4/26/18.
Accession Number: 20180426–5177.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: RP18–746–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update
(APS May 2018) to be effective 5/1/
2018.
Filed Date: 4/26/18.
Accession Number: 20180426–5219.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: RP18–747–000.
Applicants: EQT Energy, LLC.
Description: Petition of EQT Energy,
LLC For Temporary Waiver under
RP18–747.
Filed Date: 4/26/18.
Accession Number: 20180426–5242.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: RP18–748–000.
Applicants: Bluewater Gas Storage,
LLC.
Description: § 4(d) Rate Filing:
Revisions to Pro Forma Service
Agreements to be effective 4/30/2018.
Filed Date: 4/27/18.
Accession Number: 20180427–5245.
Comments Due: 5 p.m. ET 5/9/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
VerDate Sep<11>2014
18:16 May 03, 2018
Jkt 244001
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 30, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–09504 Filed 5–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–534–001;
ER18–537–001; ER18–536–001; ER18–
538–001; ER18–533–001; ER18–535–
001; ER12–1436–014; ER18–280–003;
ER13–1793–011; ER10–2329–011.
Applicants: Montpelier Generating
Station, LLC, Monument Generating
Station, LLC, O.H. Hutchings CT, LLC,
Sidney, LLC, Tait Electric Generating
Station, LLC, Yankee Street, LLC, Eagle
Point Power Generation LLC, Lee
County Generating Station, LLC, Hazle
Spindle, LLC, Vineland Energy LLC.
Description: Notice of Change in
Status for the Rockland PJM MBR
Sellers.
Filed Date: 4/25/18.
Accession Number: 20180425–5348.
Comments Due: 5 p.m. ET 5/16/18.
Docket Numbers: ER18–1449–000.
Applicants: GASNA 6P, LLC.
Description: § 205(d) Rate Filing:
GASNA 6P, LLC MBR Tariff
Supplement to be effective 3/15/2018.
Filed Date: 4/27/18.
Accession Number: 20180427–5001.
Comments Due: 5 p.m. ET 5/18/18.
Docket Numbers: ER18–1450–000.
Applicants: GASNA 36P, LLC
Description: § 205(d) Rate Filing:
GASNA 36P, LLC MBR Tariff
Supplement to be effective 3/15/2018.
Filed Date: 4/27/18.
Accession Number: 20180427–5003.
Comments Due: 5 p.m. ET 5/18/18.
Docket Numbers: ER18–1451–000.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing:
Interconnection Agreement: NMPC and
Village of Ilion SA 2416 to be effective
3/28/2018.
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
Filed Date: 4/27/18.
Accession Number: 20180427–5049.
Comments Due: 5 p.m. ET 5/18/18.
Docket Numbers: ER18–1452–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1637R3 Kansas Electric Power
Cooperative, Inc. NITSA and NOA to be
effective 4/1/2018.
Filed Date: 4/27/18.
Accession Number: 20180427–5055.
Comments Due: 5 p.m. ET 5/18/18.
Docket Numbers: ER18–1453–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to 7 ISAs & 1 WMPA RE:
AES Ohio Assignment to be effective
10/5/2007.
Filed Date: 4/27/18.
Accession Number: 20180427–5064.
Comments Due: 5 p.m. ET 5/18/18.
Docket Numbers: ER18–1454–000.
Applicants: Golden Spread Electric
Cooperative, Inc.
Description: Compliance filing: OATT
Order No. 842 Compliance to be
effective 5/15/2018.
Filed Date: 4/27/18.
Accession Number: 20180427–5075.
Comments Due: 5 p.m. ET 5/18/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–30–000.
Applicants: Mississippi Power
Company.
Description: Application of
Mississippi Power Company for
Authorization to Issue Securities under
Section 204 of the Federal Power Act.
Filed Date: 4/26/18.
Accession Number: 20180426–5243.
Comments Due: 5 p.m. ET 5/17/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 83, Number 87 (Friday, May 4, 2018)]
[Notices]
[Pages 19751-19752]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-09504]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18-43-000.
Applicants: NorthWestern Corporation.
Description: Tariff filing per 284.123(b),(e)/: Revised Rate
Schedules for Transportation & Storage Service (D2016.9.68 Phase 2) to
be effective 4/1/2018.
Filed Date: 4/27/18.
Accession Number: 201804275005.
Comments/Protests Due: 5 p.m. ET 5/27/18.
Docket Numbers: RP18-599-000.
Applicants: Trailblazer Pipeline Company LLC.
Description: Annual Incidental Purchases and Sales Report of
Trailblazer Pipeline Company LLC.
Filed Date: 3/27/18.
Accession Number: 20180327-5203.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: RP18-743-000.
Applicants: Discovery Gas Transmission LLC.
Description: Imbalance Cash-out Report for 2017 Activity for
Discovery Gas Transmission LLC.
Filed Date: 4/25/18.
Accession Number: 20180425-5261.
Comments Due: 5 p.m. ET 5/7/18.
Docket Numbers: RP18-464-001.
[[Page 19752]]
Applicants: Nautilus Pipeline Company, L.L.C.
Description: Compliance filing Nautilus LINK Integration Compliance
Filing to be effective 5/1/2018.
Filed Date: 4/26/18.
Accession Number: 20180426-5169.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: RP18-744-000.
Applicants: Dominion Energy Transmission, Inc.
Description: Sec. 4(d) Rate Filing: DETI--April 26, 2018
Negotiated Rate Agreements to be effective 5/1/2018.
Filed Date: 4/26/18.
Accession Number: 20180426-5158.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: RP18-745-000.
Applicants: Garden Banks Gas Pipeline, LLC.
Description: Sec. 4(d) Rate Filing: PAL Service Modifications to
be effective 6/1/2018.
Filed Date: 4/26/18.
Accession Number: 20180426-5177.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: RP18-746-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agreement
Update (APS May 2018) to be effective 5/1/2018.
Filed Date: 4/26/18.
Accession Number: 20180426-5219.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: RP18-747-000.
Applicants: EQT Energy, LLC.
Description: Petition of EQT Energy, LLC For Temporary Waiver under
RP18-747.
Filed Date: 4/26/18.
Accession Number: 20180426-5242.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: RP18-748-000.
Applicants: Bluewater Gas Storage, LLC.
Description: Sec. 4(d) Rate Filing: Revisions to Pro Forma Service
Agreements to be effective 4/30/2018.
Filed Date: 4/27/18.
Accession Number: 20180427-5245.
Comments Due: 5 p.m. ET 5/9/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified date(s). Protests may be considered,
but intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 30, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-09504 Filed 5-3-18; 8:45 am]
BILLING CODE 6717-01-P