Notice of Revocation of Market-Based Rate Authority and Termination of Electric Market-Based Rate Tariff, 19276 [2018-09250]
Download as PDF
19276
Federal Register / Vol. 83, No. 85 / Wednesday, May 2, 2018 / Notices
issued. SD2 may include a revised
process plan and schedule, as well as a
list of issues, identified through the
scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review of the
project on Wednesday, May 16, 2018,
starting at 10:00 a.m. All participants
should meet at Brainerd Industrial
Center, 1801 Mill Ave., Brainerd, MN
56401. Participants will be met at the
entrance gate prior to entering the
property. Participants must wear closed
toe shoes and be 16 years or older.
Please notify Adele Braun at (952) 842–
3703, or ABraun@barr.com, by May 9,
2018, if you plan to attend the
environmental site review.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: April 26, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–09248 Filed 5–1–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP18–738–000.
Applicants: WBI Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: 2018
Housekeeping Filing to be effective 5/
25/2018.
Filed Date: 4/24/18.
Accession Number: 20180424–5065.
Comments Due: 5 p.m. ET 5/7/18.
Docket Numbers: RP18–739–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate NRG Power Marketing
910616 to be effective 5/1/2018.
Filed Date: 4/24/18.
Accession Number: 20180424–5223.
Comments Due: 5 p.m. ET 5/7/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 25, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–09245 Filed 5–1–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Revocation of Market-Based
Rate Authority and Termination of
Electric Market-Based Rate Tariff
Docket No.
daltland on DSKBBV9HB2PROD with NOTICES
Electric Quarterly Reports ..........................................................................................................................................................
Fibrominn LLC ...........................................................................................................................................................................
BluCo Energy LLC .....................................................................................................................................................................
Alternate Power Source Inc., .....................................................................................................................................................
Atlantic Coast Energy Corporation ............................................................................................................................................
On March 19, 2018, the Commission
issued an order announcing its intent to
revoke the market-based rate authority
of the public utilities listed in the
caption of that order, which included
the companies listed in the caption
above, which had failed to file their
required Electric Quarterly Reports.1
The Commission directed those public
utilities to file the required Electric
Quarterly Reports within 15 days of the
date of issuance of the order or face
revocation of their authority to sell
1 Electric Quarterly Reports, 162 FERC 61,249
(2018) (March 19 Order).
VerDate Sep<11>2014
22:14 May 01, 2018
Jkt 244001
power at market-based rates and
termination of their electric marketbased rate tariffs.2
The time period for compliance with
the March 19 Order has elapsed. The
above-captioned companies failed to file
their delinquent Electric Quarterly
Reports. The Commission hereby
revokes, effective as of the date of
issuance of this notice, the market-based
rate authority and terminates the
electric market-based rate tariff of each
2 Id.
PO 00000
of the companies who are named in the
caption of this order.
Dated: April 25, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–09250 Filed 5–1–18; 8:45 am]
BILLING CODE 6717–01–P
at Ordering Paragraph A.
Frm 00066
Fmt 4703
Sfmt 9990
ER02–2001–020
ER12–1161–002
ER12–1279–000
ER11–4550–000
ER13–734–000
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 83, Number 85 (Wednesday, May 2, 2018)]
[Notices]
[Page 19276]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-09250]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Revocation of Market-Based Rate Authority and
Termination of Electric Market-Based Rate Tariff
------------------------------------------------------------------------
Docket No.
------------------------------------------------------------------------
Electric Quarterly Reports................. ER02-2001-020
Fibrominn LLC.............................. ER12-1161-002
BluCo Energy LLC........................... ER12-1279-000
Alternate Power Source Inc.,............... ER11-4550-000
Atlantic Coast Energy Corporation.......... ER13-734-000
------------------------------------------------------------------------
On March 19, 2018, the Commission issued an order announcing its
intent to revoke the market-based rate authority of the public
utilities listed in the caption of that order, which included the
companies listed in the caption above, which had failed to file their
required Electric Quarterly Reports.\1\ The Commission directed those
public utilities to file the required Electric Quarterly Reports within
15 days of the date of issuance of the order or face revocation of
their authority to sell power at market-based rates and termination of
their electric market-based rate tariffs.\2\
---------------------------------------------------------------------------
\1\ Electric Quarterly Reports, 162 FERC 61,249 (2018) (March 19
Order).
\2\ Id. at Ordering Paragraph A.
---------------------------------------------------------------------------
The time period for compliance with the March 19 Order has elapsed.
The above-captioned companies failed to file their delinquent Electric
Quarterly Reports. The Commission hereby revokes, effective as of the
date of issuance of this notice, the market-based rate authority and
terminates the electric market-based rate tariff of each of the
companies who are named in the caption of this order.
Dated: April 25, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-09250 Filed 5-1-18; 8:45 am]
BILLING CODE 6717-01-P